Republic of Maldives Ministry of Housing, Transport and Environment (MHTE) Maldives Energy Authority (MEA) State Electric Company Limited (STELCO) FEASIBILITY STUDY FOR APPLICATION OF PHOTOVOLTAIC POWER ON MALE’ AND HULHUMALE’ ISLANDS IN THE REPUBLIC OF MALDIVES FINAL REPORT NOVEMBER 2009 JAPAN INTERNATIONAL COOPERATION AGENCY YACHIYO ENGINEERING CO., LTD SHIKOKU ELECTRIC POWER CO., INC.

Upload: others

Post on 09-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Republic of Maldives Ministry of Housing, Transport and Environment (MHTE) Maldives Energy Authority (MEA) State Electric Company Limited (STELCO)

    FEASIBILITY STUDY

    FOR APPLICATION OF PHOTOVOLTAIC POWER

    ON MALE’ AND HULHUMALE’ ISLANDS

    IN

    THE REPUBLIC OF MALDIVES

    FINAL REPORT

    NOVEMBER 2009

    JAPAN INTERNATIONAL COOPERATION AGENCY

    YACHIYO ENGINEERING CO., LTD

    SHIKOKU ELECTRIC POWER CO., INC.

  • PREFACE

    In response to a request from the Republic of Maldives, the Government of Japan decided to conduct the Feasibility Study for Application of Photovoltaic Power on Male’ and Hulhumale’ Islands and entrusted to the study to the Japan International Cooperation Agency (JICA).

    JICA selected and dispatched a study team headed by Mr.

    Tadayuki Ogawa of Yachiyo Engineering Co., LTD. (yec) and consists of yec and Shikoku Electric Power Co., INC. four times between February and November, 2009.

    The team held discussions with the officials concerned of the

    Government of Maldives and conducted field surveys at the study area. Upon returning to Japan, the team conducted further studies and prepared this final report.

    I hope that this report will contribute to the promotion of this

    project and to the enhancement of friendly relationship between our two countries.

    Finally, I wish to express my sincere appreciation to the

    officials concerned of the Government of Maldives for their close cooperation extended to the study. November 2009

    Atsuo Kuroda Vice President Japan International Cooperation Agency

  • Mr. Atsuo Kuroda Vice President Japan International Cooperation Agency

    LETTER OF TRANSMITTAL

    November 2009 Dear Sir, It is my great pleasure to submit herewith the Final Report of “The Feasibility Study for Application of Photovoltaic Power on Male’ and Hulhumale’ Islands in the Republic of Maldives”. The Study Team conducted field surveys in Maldives over the period between February and November, 2009 according to the contract with the Japan International Cooperation Agency (JICA). The Study Team compiled this report, which consists of the Technical, Economic and Financial Feasibility Study to introduce Grid-connected Photovoltaic (PV) System, Detail Design for Pilot Project, examination on Value-added Measures, and Long-term Action Plan, etc. through close consultations with officials concerned of the Government of the Republic of Maldives and other authorities concerned. In addition to compiling this report, technical transfer and human resource development have been conducted through collaboration work with counterpart engineers in Maldives, and counterpart training at concerned organizations in Japan for the capacity development in planning and designing of Grid-connected PV system. On behalf of the Study Team, I would like to express my sincere appreciation to officials concerned of the Government of Maldives and other authorities concerned for their cooperation, assistance, and heartfelt hospitality extended to the Study Team. We are also deeply grateful to the Japan International Cooperation Agency, the Ministry of Foreign Affairs, the Ministry of Economy, Trade and Industry, and the Embassy of Japan in Sri Lanka for their valuable suggestions and assistance during the course of the Study.

    Yours faithfully,

    Tadayuki Ogawa Team Leader The Feasibility Study for Application of Photovoltaic Power on Male’ and Hulhumale’ Islands in the Republic of Maldives

  • Location Map of the Project Sites

    MALDIVES

    MALE

    MALE

  • Pos

    sibl

    e Lo

    cati

    ons

    for

    PV

    In

    stal

    lati

    ons

    Mal

    eP

    V

  • Pos

    sibl

    e Lo

    cati

    ons

    for

    PV

    In

    stal

    lati

    ons

    Hu

    lhu

    mal

    eP

    V

  • Eva

    luat

    ion

    of th

    e po

    tent

    ial s

    ites

    in M

    ale'

    and

    Hul

    hum

    ale'

    Isla

    nds

    Isla

    ndN

    o.1

    35

    67

    89

    Site

    nam

    eS

    TELC

    OB

    uild

    ing

    Dha

    ruba

    arug

    e(P

    ublic

    Wor

    ks B

    uild

    ing)

    Giy

    aasu

    dhee

    nS

    choo

    lK

    alaa

    faan

    uS

    choo

    lM

    aldi

    ves

    Cen

    ter

    for S

    ocia

    l Edu

    catio

    nTh

    aaju

    ddee

    nS

    choo

    lN

    ew S

    econ

    dary

    Sch

    ool f

    or G

    irls

    Inst

    alla

    tion

    loca

    tion

    Roo

    ftop

    Bui

    ldin

    g ro

    ofB

    uild

    ing

    roof

    ,R

    oofto

    pB

    uild

    ing

    roof

    Bui

    ldin

    g ro

    ofB

    uild

    ing

    roof

    Bui

    ldin

    g ro

    of

    Ava

    ilabl

    e ar

    ea [m

    2 ]62

    02,

    420

    520

    950

    1,18

    01,

    460

    1,44

    0

    PV

    cap

    acity

    [kW

    p]45

    8540

    8510

    013

    010

    0A

    nnua

    lpo

    wer

    gen

    erat

    ion

    [kW

    h]45

    ,739

    100,

    382

    48,3

    7811

    7,06

    912

    0,94

    515

    7,22

    890

    ,778

    Sha

    de c

    ondi

    tion

    OK

    OK

    OK

    OK

    OK

    OK

    OK

    Rei

    nfor

    cem

    ent o

    fex

    istin

    g st

    ruct

    ure

    Unn

    eces

    sary

    Nee

    d ex

    amin

    atio

    nU

    nnec

    essa

    ryU

    nnec

    essa

    ryU

    nnec

    essa

    ryU

    nnec

    essa

    ryU

    nnec

    essa

    ryS

    pace

    for

    Pow

    er C

    ondi

    tione

    rE

    noug

    hN

    eed

    to fi

    nd a

    nad

    ditio

    nal e

    lect

    ric ro

    omE

    noug

    hN

    eed

    to fi

    nd a

    nad

    ditio

    nal e

    lect

    ric ro

    omE

    noug

    hE

    noug

    hE

    noug

    h

    Cab

    le ro

    ute

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    Inte

    rcon

    nect

    ion

    feed

    erFD

    9FD

    3FD

    6FD

    3FD

    6FD

    6FD

    6Tr

    ansf

    orm

    er N

    o.20

    B60

    7061

    6223

    23C

    apac

    ity [k

    VA

    ]50

    063

    015

    010

    020

    010

    0010

    00

    Site

    ow

    ner

    STE

    LCO

    MH

    TEM

    inis

    try o

    f Edu

    catio

    nM

    inis

    try o

    f Edu

    catio

    nM

    inis

    try o

    f You

    thM

    inis

    try o

    f Edu

    catio

    nM

    inis

    try o

    f Edu

    catio

    n

    App

    rova

    l fro

    m o

    wne

    r

    O &

    ME

    asy

    Gen

    eral

    Gen

    eral

    Gen

    eral

    Gen

    eral

    Gen

    eral

    Gen

    eral

    Saf

    ety

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    Pub

    lic R

    elat

    ions

    Impa

    ctM

    iddl

    eM

    iddl

    eM

    iddl

    eM

    iddl

    eH

    igh

    Mid

    dle

    Mid

    dle

    Cos

    t

    Pho

    to

    Ove

    rall

    Com

    men

    ts

    /The

    pan

    el s

    uppo

    rtst

    ruct

    ural

    is n

    eces

    sary

    /Con

    stru

    ctio

    n of

    foo

    ting

    and

    wat

    er p

    roof

    ing

    isne

    cess

    ary

    /O &

    M is

    eas

    y be

    caus

    eth

    ere

    are

    man

    yst

    aff

    /Exi

    stin

    g bu

    ildin

    g is

    not

    perm

    anen

    t stru

    ctur

    e./L

    arge

    are

    a of

    roof

    /As-

    build

    DW

    G n

    ot fo

    und

    /Det

    ail i

    nves

    tigat

    ion

    isne

    cess

    ary

    /The

    exc

    hang

    e of

    the

    roof

    mat

    eria

    l is

    nece

    ssar

    y/T

    he s

    pace

    of t

    he e

    lect

    ricro

    om is

    eno

    ugh

    /The

    exc

    hang

    e of

    the

    roof

    mat

    eria

    l is

    nece

    ssar

    y/T

    he e

    xcha

    nge

    of th

    e ro

    ofm

    ater

    ial i

    s ne

    cess

    ary

    /The

    re is

    eno

    ugh

    spac

    efo

    r equ

    ipm

    ents

    abo

    ve th

    eel

    ectri

    c ro

    om

    /Lar

    ge a

    rea

    of ro

    of/C

    oatin

    g im

    prov

    emen

    t of

    the

    roof

    is n

    eces

    sary

    /Lar

    ge a

    rea

    of ro

    of

    Ran

    king

    67

    94

    31

    2To

    tal o

    f =

    1605

    kWTo

    tal o

    f top

    6 =

    480

    kW

    Mal

    e'

    P-1/2

  • Eva

    luat

    ion

    of th

    e po

    tent

    ial s

    ites

    in M

    ale'

    and

    Hul

    hum

    ale'

    Isla

    nds

    Isla

    ndN

    o.

    Site

    nam

    e

    Inst

    alla

    tion

    loca

    tion

    Ava

    ilabl

    e ar

    ea [m

    2 ]

    PV

    cap

    acity

    [kW

    p]A

    nnua

    lpo

    wer

    gen

    erat

    ion

    [kW

    h]

    Sha

    de c

    ondi

    tion

    Rei

    nfor

    cem

    ent o

    fex

    istin

    g st

    ruct

    ure

    Spa

    ce fo

    rP

    ower

    Con

    ditio

    ner

    Cab

    le ro

    ute

    Inte

    rcon

    nect

    ion

    feed

    erTr

    ansf

    orm

    er N

    o.C

    apac

    ity [k

    VA

    ]

    Site

    ow

    ner

    App

    rova

    l fro

    m o

    wne

    r

    O &

    MS

    afet

    y

    Pub

    lic R

    elat

    ions

    Impa

    ct

    Cos

    t

    Pho

    to

    Ove

    rall

    Com

    men

    ts

    Ran

    king

    1112

    1720

    2122

    2Fa

    culty

    of

    Eng

    inee

    ring

    Nat

    iona

    l Sta

    dium

    Facu

    lty o

    fE

    duca

    tion

    Gra

    nd F

    riday

    Mos

    que

    Jum

    hoor

    ee M

    aidh

    aan

    Pre

    side

    nt's

    Offi

    ceH

    ospi

    tal

    Bui

    ldin

    g ro

    of,

    Roo

    ftop

    Roo

    fR

    oofto

    pR

    oofto

    pG

    roun

    dR

    oofto

    pB

    uild

    ing

    roof

    1,13

    02,

    970

    982,

    000

    2,86

    01,

    158

    1,13

    0

    8040

    010

    3060

    ~160

    (dep

    end

    on th

    ear

    rang

    emen

    t of p

    anel

    s)20

    60

    96,7

    5648

    3,78

    012

    ,094

    36,2

    8319

    6,98

    624

    ,189

    72,5

    67

    OK

    Sha

    de fr

    om s

    urro

    undi

    ngbu

    ildin

    gs a

    nd s

    tand

    ligh

    tsm

    ust b

    e co

    nsid

    ered

    .

    Nee

    d co

    nfirm

    atio

    n of

    the

    cons

    truct

    ion

    plan

    for t

    hene

    w b

    uild

    ing

    Sha

    de fr

    om to

    wer

    and

    the

    mos

    que

    top

    OK

    Sha

    de o

    n th

    e w

    est a

    ndea

    st s

    ide

    roof

    sO

    K

    Nee

    d ex

    amin

    atio

    nN

    eces

    sary

    Nee

    d ex

    amin

    atio

    nN

    eed

    exam

    inat

    ion

    Unn

    eces

    sary

    Nee

    d ex

    amin

    atio

    n

    Eno

    ugh

    Eno

    ugh

    Eno

    ugh

    Eno

    ugh

    Nee

    d to

    find

    a lo

    catio

    nN

    eed

    to fi

    nd a

    loca

    tion

    Eno

    ugh

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    FD4

    FD9

    FD7

    FD2

    FD2

    FD8

    FD2

    2541

    B30

    1414

    7311

    800

    1000

    630

    630

    630

    1250

    315

    Min

    istry

    of E

    duca

    tion

    Min

    istry

    of Y

    outh

    Min

    istry

    of E

    duca

    tion

    Min

    istry

    of I

    slam

    ic A

    ffairs

    Mal

    e' M

    unic

    ipal

    ity o

    rM

    inis

    try o

    f Hom

    eP

    resi

    dent

    Offi

    ceM

    inis

    try o

    f Hea

    lthA

    ppro

    val f

    rom

    man

    yst

    akeh

    olde

    rs in

    clud

    ing

    publ

    ic a

    re re

    quire

    d.E

    asy

    Gen

    eral

    Gen

    eral

    Gen

    eral

    Gen

    eral

    Gen

    eral

    Gen

    eral

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    No

    prob

    lem

    Mid

    dle

    Hig

    hM

    iddl

    eH

    igh

    Hig

    h bu

    t pub

    licco

    nsul

    tatio

    n m

    ay b

    ene

    cess

    ary

    Hig

    hM

    iddl

    e

    Stru

    ctur

    al re

    info

    rcem

    ent

    cost

    is e

    xpen

    sive

    /Sha

    pe o

    f roo

    f is

    com

    plic

    ated

    ther

    efor

    e it

    mig

    ht n

    eed

    spec

    ial

    mou

    ntin

    g st

    ruct

    ure

    /Lar

    gest

    pot

    entia

    l but

    stru

    ctur

    al re

    info

    rcem

    ent

    cost

    is e

    xpen

    sive

    /Ava

    ilabl

    e ar

    ea is

    onl

    y R

    Cro

    ofto

    p/L

    arge

    are

    a bu

    t mos

    t of

    loca

    tions

    are

    affe

    cted

    by

    the

    shad

    ow fr

    omsu

    rrou

    ndin

    g st

    ruct

    ures

    /Pub

    licity

    is q

    uite

    hig

    h/D

    iffic

    ulty

    in g

    ettin

    gap

    prov

    al fr

    om a

    llst

    akeh

    olde

    rs

    /Pub

    licity

    is h

    igh

    /Det

    ail p

    lan

    ofco

    nstru

    ctio

    n sc

    hedu

    le is

    nece

    ssar

    y /C

    oatin

    gim

    prov

    emen

    t of t

    he ro

    of is

    nece

    ssar

    y

    /Prio

    rity

    is lo

    wer

    than

    Mal

    e' Is

    land

    bec

    ause

    the

    pow

    er s

    uppl

    y is

    eno

    ugh

    atpr

    esen

    t

    812

    1110

    513

    Hul

    hum

    ale'

    Mal

    e'

    P-2/2

  • MA

    LE

    ’M

    ED

    IUM

    VO

    LTA

    GE

    DIS

    TR

    IBU

    TIO

    NN

    ET

    WO

    RK

    50

    15

    05

    10

    00

    kV

    A

    50

    3

    50A

    1040m

    Cu

    185

    sqm

    m

    42

    14

    25

    50

    0kV

    A

    42

    3

    42

    180m

    Cu

    185

    sqm

    m

    34

    13

    45

    10

    00

    kV

    A

    34

    3

    34

    154m

    Al

    240

    sqm

    m173m

    Cu

    70

    sqm

    m

    14

    71

    41

    63

    0k

    VA

    14

    5

    14

    14

    3

    50

    15

    05

    10

    00

    kV

    A

    50

    3

    50B

    5m

    Cu

    185

    sqm

    m

    54

    15

    45

    10

    00

    kV

    A

    54

    3

    54B

    5.1

    mC

    u70

    sqm

    m

    21

    52

    11

    63

    0kV

    A

    21

    3

    21

    145m

    Cu

    185

    sqm

    m

    17

    51

    71

    10

    00

    kV

    A

    17

    3

    17B

    138m

    Cu

    185

    sqm

    m

    68

    56

    81

    30

    0kV

    A

    68

    3

    68

    87m

    Cu

    70

    sqm

    m

    11

    5111

    50

    0kV

    A

    11

    3

    11

    290m

    Cu

    70

    sqm

    m

    73

    17

    35

    12

    50

    kV

    A

    73

    3

    73

    98m

    Cu

    70

    sqm

    m

    490m

    Cu

    185

    sqm

    m

    54

    15

    47

    63

    0k

    VA

    54

    5

    54A

    54

    3

    FD

    2

    60

    16

    05

    63

    0kV

    A

    60

    3

    60

    290m

    Cu

    185

    sqm

    m144m

    Cu

    185

    sqm

    m

    13

    11

    35

    10

    00

    kV

    A

    13

    3

    13B

    275m

    Cu

    185

    sqm

    m

    57

    15

    75

    50

    0kV

    A

    57

    3

    57A

    10

    mC

    u70

    sqm

    m

    511

    51

    5

    10

    00

    kV

    A

    51

    3

    51

    401

    mC

    u70

    sqm

    m

    57

    15

    75

    10

    00

    kV

    A

    57

    3

    57B

    10m

    Cu

    185

    sqm

    m

    411

    41

    5

    10

    00

    kV

    A

    41

    3

    41A

    188

    mC

    u70

    sqm

    m

    FD

    35.1

    mC

    u185

    sqm

    m

    13

    11

    35

    63

    0k

    VA

    13

    7

    13A

    13

    3

    222m

    Cu

    25

    sqm

    m 65m

    Cu

    185

    sqm

    m

    33

    13

    35

    63

    0kV

    A

    33

    3

    33

    418m

    Cu

    185

    sqm

    m

    25

    52

    51

    80

    0kV

    A

    25

    3

    25

    200m

    Cu

    70

    sqm

    m

    31

    53

    11

    50

    0kV

    A

    31

    3

    31B

    173m

    Cu

    70

    sqm

    m

    36

    13

    65

    10

    00

    kV

    A

    36

    3

    36

    177m

    Cu

    185

    sqm

    m

    35

    13

    55

    63

    0k

    VA

    35

    3

    35

    607m

    Cu

    70

    sqm

    m

    64

    16

    45

    75

    0kV

    A

    64

    3

    64

    83m

    Cu

    185

    sqm

    m

    230m

    Cu

    70

    sqm

    m

    311

    31

    7

    31

    5kV

    A

    31

    5

    31A

    31

    3

    FD

    4

    27

    12

    75

    10

    00

    kV

    A

    27

    3

    27A

    364m

    Cu

    180

    sqm

    m

    63

    16

    35

    10

    00

    kV

    A

    63

    3

    63

    402m

    Cu

    180

    sqm

    m

    273m

    Cu

    70

    sqm

    m

    39

    53

    91

    30

    0kV

    A

    39

    3

    39

    90

    59

    01

    75

    0kV

    A

    90

    3

    90

    375m

    Cu

    70

    sqm

    m

    47

    54

    71

    63

    0k

    VA

    47

    3

    47

    217m

    Cu

    70

    sqm

    m

    FD

    55m

    Cu

    180

    sqm

    m

    20

    12

    05

    63

    0kV

    A

    20

    3

    20A

    191m

    Cu

    185

    sqm

    m

    40

    14

    05

    63

    0k

    VA

    40

    3

    40

    21m

    Cu

    70

    sqm

    m

    70

    17

    05

    15

    0kV

    A

    70

    3

    70

    286m

    Cu

    70

    sqm

    m

    28

    12

    85

    10

    00

    kV

    A

    28

    3

    28

    631

    mC

    u185

    sqm

    m

    72

    17

    25

    63

    0k

    VA

    72

    3

    72

    690

    mC

    u70

    sqm

    m

    26

    12

    65

    31

    5kV

    A

    26

    3

    26

    108m

    Cu

    70

    sqm

    m

    FD

    6256m

    Cu

    185

    sqm

    m425m

    Cu

    185

    sqm

    m29

    12

    97

    63

    0k

    VA

    29

    5

    29

    29

    3

    30

    13

    05

    63

    0k

    VA

    30

    3

    30

    682m

    Cu

    185

    sqm

    m

    77

    17

    75

    63

    0k

    VA

    77

    3

    77

    182m

    Cu

    185

    sqm

    m

    66

    16

    65

    63

    0k

    VA

    66

    3

    66

    303m

    Cu

    185

    sqm

    m

    76

    17

    65

    63

    0k

    VA

    76

    3

    76

    133m

    Cu

    185

    sqm

    m

    299m

    Cu

    185

    sqm

    m

    59

    15

    95

    10

    00

    kV

    A

    59

    3

    59B

    59

    15

    95

    63

    0kV

    A

    59

    3

    59A

    6m

    Cu

    185

    sqm

    m

    FD

    7266m

    Cu

    185

    sqm

    m56

    75

    65

    10

    00

    kV

    A

    56

    3

    56A

    56

    1

    79

    17

    95

    10

    00

    kV

    A

    79

    3

    79

    404

    mC

    u185

    sqm

    m

    16

    11

    65

    63

    0k

    VA

    16

    3

    16

    158

    mC

    u70

    sqm

    m

    84

    18

    45

    63

    0kV

    A

    84

    3

    84

    181

    mC

    u185

    sqm

    m

    22

    12

    25

    63

    0k

    VA

    22

    3

    22

    321

    mC

    u185

    sqm

    m

    10

    11

    05

    10

    00

    kV

    A

    10

    3

    10

    310

    mC

    u70

    sqm

    m130

    mC

    u185

    sqm

    m

    74

    17

    45

    63

    0k

    VA

    74

    7

    74

    74

    3

    5.1

    mC

    u185

    sqm

    m58

    75

    81

    63

    0kV

    A

    58

    5

    58A

    58

    3

    67

    16

    75

    63

    0kV

    A

    67

    3

    67

    160m

    Cu

    185

    sqm

    m

    FD

    8682m

    Cu

    185

    sqm

    m

    48

    14

    85

    63

    0kV

    A

    48

    3

    48

    53

    15

    35

    10

    00

    kV

    A

    53

    3

    53

    110m

    Cu

    70

    sqm

    m195m

    Cu

    185

    sqm

    m

    52

    75

    25

    10

    00

    kV

    A

    52

    1

    52

    52

    3

    240m

    Cu

    185

    sqm

    m

    85

    12

    35

    25

    0kV

    A

    85

    3

    85

    85

    3

    25

    0kV

    A

    315m

    Cu

    185

    sqm

    m38

    73

    85

    10

    00

    kV

    A

    38

    1

    38

    38

    3

    304

    mC

    u185

    sqm

    m

    15

    11

    55

    63

    0k

    VA

    15

    7

    15

    15

    3

    20

    12

    05

    50

    0kV

    A

    20

    3

    20B

    192m

    Cu

    185

    sqm

    m

    FD

    91

    21

    12

    5

    63

    0kV

    A

    12

    3

    12A

    220m

    Cu

    185

    sqm

    m

    65

    16

    55

    50

    0kV

    A

    65

    3

    65

    205m

    Cu

    70

    sqm

    m

    711

    71

    5

    25

    0kV

    A

    71

    3

    71

    65m

    Cu

    70

    sqm

    m

    78

    17

    85

    63

    0k

    VA

    78

    3

    78

    437m

    Cu

    185

    sqm

    m

    19

    11

    95

    63

    0kV

    A

    19

    3

    19

    341m

    Cu

    70

    sqm

    m

    37

    13

    75

    10

    00

    kV

    A

    37

    3

    37

    188m

    Cu

    185

    sqm

    m

    12

    11

    25

    63

    0k

    VA

    12

    3

    12B

    290m

    Cu

    185

    sqm

    m

    69

    16

    95

    35

    0kV

    A

    69

    3

    69

    43m

    Cu

    185

    sqm

    m

    82

    18

    25

    63

    0kV

    A

    82

    3

    82A

    180m

    Cu

    185

    sqm

    m334m

    Cu

    185

    sqm

    m41

    74

    15

    10

    00

    kV

    A

    411

    41B

    41

    3

    736m

    Cu

    70

    sqm

    m

    49

    54

    91

    80

    0kV

    A

    49

    3

    49

    158m

    Cu

    185

    sqm

    m

    58

    55

    81

    10

    00

    kV

    A

    58

    3

    58B

    108

    mC

    u70

    sqm

    m

    127m

    Cu

    185

    sqm

    m

    1136m

    Cu

    185

    sqm

    m

    56

    15

    65

    63

    0k

    VA

    56

    7

    56B

    56

    3

    151m

    Cu

    70

    sqm

    m

    225m

    Cu

    185

    sqm

    m

    10

    mC

    u70

    sqm

    m

    Update

    d:

    24th

    May

    2009

    17

    51

    71

    10

    00

    kV

    A

    17

    3

    17A

    10m

    Cu

    185

    sqm

    m

    10

    0kV

    A

    61

    24

    12

    45

    24

    324

    24

    12

    45

    10

    00

    kV

    A

    24

    3

    24B

    24

    5

    24

    3

    24A

    10

    00

    kV

    A

    24

    18

    75

    63

    0kV

    A

    87

    3

    87

    87

    1

    259m

    Cu

    185

    sqm

    m

    88

    5

    63

    0kV

    A

    44

    3

    88

    88

    1

    86

    18

    65

    10

    00

    kV

    A

    86

    3

    86

    137m

    Cu

    185

    sqm

    m

    43

    54

    31

    63

    0k

    VA

    43

    3

    43

    120m

    Cu

    185

    sqm

    m

    264m

    Cu

    25

    sqm

    m

    50

    0kV

    A

    18

    5m

    Cu

    185

    sqm

    m

    83

    18

    35

    10

    00

    kV

    A

    83

    3

    83

    424

    mC

    u185

    sqm

    m

    478m

    Cu

    70

    sqm

    m

    89

    18

    95

    63

    0k

    VA

    89

    3

    89

    96

    mC

    u185

    sqm

    m

    205m

    Cu

    70

    sqm

    m

    10.1

    mC

    u70

    sqm

    m

    6.1

    mC

    u70

    sqm

    m

    209m

    Cu

    70

    sqm

    m

    45

    14

    55

    63

    0k

    VA

    45

    7

    45

    45

    3

    55

    15

    55

    63

    0k

    VA

    55

    3

    55B

    5m

    Cu

    185

    sqm

    m

    55

    75

    51

    10

    00

    kV

    A

    55

    5

    55A 55

    95

    53

    46

    54

    61

    10

    00

    kV

    A

    46

    3

    46

    215m

    Cu

    70

    sqm

    m

    44

    54

    41

    10

    00

    kV

    A

    44

    3

    44B

    529m

    Cu

    70

    sqm

    m

    44

    54

    41

    63

    0k

    VA

    44

    3

    44A

    6m

    Cu

    185

    sqm

    m409m

    Cu

    70

    sqm

    m23

    52

    37

    10

    00

    kV

    A

    23

    1

    23

    23

    3

    154m

    Cu

    70

    sqm

    m

    20

    0kV

    A

    62

    55

    15

    55

    10

    00

    kV

    A

    55

    3

    55C

    10m

    Cu

    185

    sqm

    m

    188m

    Cu

    70

    sqm

    m

    911

    91

    5

    10

    00

    kV

    A

    91

    3

    91

    127

    mC

    u185

    sqm

    m

    32

    13

    25

    10

    00

    kV

    A

    32

    3

    32

    27

    12

    75

    10

    00

    kV

    A

    27

    3

    27B

    378m

    Cu

    180

    sqm

    m

    811

    81

    5

    10

    00

    kV

    A

    81

    3

    81

    422m

    Cu

    185

    sqm

    m

    75

    17

    55

    10

    00

    kV

    A

    75

    3

    75

    Po

    we

    rD

    istr

    ibu

    tio

    nD

    ep

    art

    me

    nt

    /S

    tate

    Ele

    ctr

    icC

    om

    pa

    ny

    Ltd

    230

    mC

    u185

    sqm

    m

    184m

    Cu

    185

    sqm

    m

    マレ島中圧(11kV)配電系統図

  • フル

    マレ

    島 中

    圧(

    11

    kV

    )配

    電系

    統図

    1200

    KW

    10

    00K

    W

    Pow

    er

    Dis

    trib

    ution s

    yste

    m (

    Hulh

    um

    ale')

  • i

    CONTENTS

    Location Map of the Project Sites Possible Locations for PV Installations Evaluation of the potential sites in Male’ and Hulhumale’ Islands Medium Voltage Ringmain Distribution System (Male’) Medium Voltage Distribution Network Diagram (Male’ and Hulhumale’) List of Figures and Tables Abbreviations Chapter 1 Background and Basic Concept of the Study 1.1 Background and Objectives of the Study................................................................................ 1-1 1.2 Basic Concept of the Study..................................................................................................... 1-2 Chapter 2 Socioeconomic Conditions and Development Plans 2.1 Socioeconomic Conditions ..................................................................................................... 2-1 2.2 Development Plans ................................................................................................................. 2-4

    2.2.1 National Development Plan..................................................................................... 2-4 2.2.2 Hulhumale’ Island Development Plans ................................................................... 2-6

    2.3 Aid by Other Donors............................................................................................................... 2-7 Chapter 3 Current Energy and Electric Power Demand and Supply 3.1 Energy and Electric Power Policies and Legal Systems ......................................................... 3-1

    3.1.1 Related Policy on the Energy and Electric Power Sector ........................................ 3-1 3.1.2 Legal Systems.......................................................................................................... 3-3

    3.2 Organizations in the Energy and Electric Power Utility ......................................................... 3-6 3.2.1 Ministry of Housing, Transport and Environment (MHTE).................................... 3-6 3.2.2 Maldives Energy Authority (MEA)......................................................................... 3-7 3.2.3 State Electric Company Limited (STELCO) ........................................................ 3-8

    3.2.4 Business Condition of the State Electric Company Limited (STELCO)................. 3-9 3.2.5 Restructuring of the Electric Power Sector ............................................................. 3-13

    3.3 Energy and Electricity Demand and Supply Situation............................................................ 3-14 3.3.1 Energy Demand and Supply .................................................................................... 3-14 3.3.2 Power Supply and Demand ..................................................................................... 3-16 3.3.3 Electricity Tariffs and Fuel Prices ........................................................................... 3-21 3.3.4 Current Situation and Reinforcement Plan in Male’ Metropolitan Area

    (Male’ Island and Huluhumale’ Island)................................................................... 3-24 3.3.5 Current Condition and Reinforcement Plans of Distribution Facilities

    in Male’ Metropolitan Area (Male’ Island and Hulhumale’ Island)........................ 3-26

  • 3.4 Dissemination of PV Generating Facilities............................................................................. 3-27 3.4.1 Introduction by the Government of the Maldives and Other Donors ...................... 3-27 3.4.2 Facilities Introduced under Japanese Support ......................................................... 3-30

    Chapter 4 Technical Feasibility Study 4.1 Power Demand Projection.............................................................................................................4-1

    4.1.1 Male’ Island ...................................................................................................................4-1 4.1.2 Hulhumale’ Island .........................................................................................................4-2

    4.2 Collection and Analysis of Solar Radiation Data, etc. .................................................................4-4 4.3 Examination and Measurement concerning Solar Radiation Obstruction ...................................4-6 4.4 Selection of Potential Sites for Introducing the Grid-Connected PV System..............................4-13 4.5 Assessment of Load Responsiveness in the Diesel Generator .....................................................4-15 4.6 Examination and Measurement of Existing Distribution Transformer Capacity and

    Distribution System .......................................................................................................................4-15 4.7 Grid-Connected PV System Stability Assessment Technique.....................................................4-24 4.8 Technique for Determining the Introduced Capacity of Grid-Connected PV Systems ..............4-29 4.9 Standard Design Specifications of the Grid-Connected PV System............................................4-33 4.10 Potential Sites for Grid-Connected PV System Installation, and PV Installation Capacity........4-35 4.11 Beneficial Effects of Grid-Connected PV System Introduction ..................................................4-39

    4.11.1 Estimated Power Generation.........................................................................................4-39 4.11.2 Diesel Fuel Consumption Saving..................................................................................4-46 4.11.3 CO2 Emission Reductions.............................................................................................4-46

    4.12 Examination of Solar Cells and Assessment of Output................................................................4-47 4.13 Expected Model of Grid-Connected PV System Introduction.....................................................4-49 4.14 Legal Systems (Building Law, etc.) concerning Existing Buildings ...........................................4-53 4.15 Structural Analysis of Buildings and Conceptual Design of Building Reinforcements..............4-53 4.16 Cost Estimation of Grid-Connected PV System Introduction......................................................4-55

    4.16.1 Estimation Conditions ...................................................................................................4-55 4.16.2 Project Cost....................................................................................................................4-56

    4.17 Examination of Environmental and Social Consideration ...........................................................4-56 4.17.1 Environmental and Social Consideration Systems in the Maldives.............................4-56 4.17.2 Agencies concerned with Environmental and Social Consideration ...........................4-58 4.17.3 Environmental and Social Consideration for Pilot Project Implementation................4-59

    Chapter 5 Economic and Financial Feasibility Study 5.1 Methodology of Economic and Financial Analysis on Introduction

    of the Grid-Connected PV System.......................................................................................... 5-1 5.2 Setting of Preconditions .......................................................................................................... 5-2

    ii

  • 5.2.1 Conditions on PV System, Operation and Maintenance.......................................... 5-2 5.2.2 Price Forecast of the Grid-Connected PV System................................................... 5-7

    5.3 Financial Analysis................................................................................................................... 5-10 5.3.1 Preconditions ........................................................................................................... 5-10 5.3.2 Results of Financial Analysis .................................................................................. 5-11 5.3.3 Sensitivity Analysis ................................................................................................. 5-19

    5.4 Economic Analysis ................................................................................................................. 5-22 5.4.1 Preconditions ........................................................................................................... 5-22 5.4.2 Results of Economic Analysis ................................................................................. 5-24 5.4.3 Sensitivity Analysis ................................................................................................. 5-25 5.4.4 Examination of Profitability on Private Investment in the PV System ................. 5-27

    5.5 Assessment of Impact on Investment Profitability of CDM Project Implementation ............ 5-29 5.5.1 Movements in the CER Trading Price..................................................................... 5-29 5.5.2 Project Formulation Cost......................................................................................... 5-31 5.5.3 Profit from CDM Project Formulation .................................................................... 5-33

    5.6 Investment Financing Plan...................................................................................................... 5-35 5.7 Budget to be prepared for Execution of Each Measure .......................................................... 5-37 Chapter 6 Detailed Design of the Pilot Project 6.1 Examination and Selection of Pilot Project sites .................................................................... 6-1 6.2 Detailed Design Procedure for the Pilot Project Sites............................................................. 6-2 6.3 Detailed Design of Structure reinforcement ........................................................................... 6-3 6.4 Technical Transfer of the Detailed Design Technique............................................................ 6-6

    6.4.1 Concept of the Technical Transfer for Detailed Design .......................................... 6-6 6.4.2 Contents of the Technical Transfer for Detailed Design ......................................... 6-6 6.4.3 Report of the Technical Transfer for Detailed Design ............................................ 6-6

    6.5 Beneficial Effects of Grid-Connected PV System Introduction ............................................. 6-8 6.5.1 Estimated PV Power Generation ............................................................................. 6-8 6.5.2 Saving on Diesel Fuel Consumption ....................................................................... 6-11 6.5.3 CO2 Emission Reductions ....................................................................................... 6-11

    Chapter 7 Examination of Value Added Measures 7.1 Examination and Recommendation of Measures for Education and Promotion of DSM

    (Peak Power Limitation and Energy Saving, etc.) .................................................................. 7-1 7.1.1 Current Conditions of DSM in the Maldives........................................................... 7-1 7.1.2 DSM Techniques Appropriate to the Maldives ....................................................... 7-3 7.1.3 Legal systems .......................................................................................................... 7-15 7.1.4 Staging of Seminars................................................................................................. 7-17

    iii

  • 7.1.5 DSM Recommendations.......................................................................................... 7-17 7.2 Examination and Recommendation of CDM Project Implementation ................................... 7-19

    7.2.1 CDM Activities in the Maldives.............................................................................. 7-19 7.2.2 Organizations and Institutional Preparations for Implementing CDM Projects ...... 7-22 7.2.3 Program CDM Application ..................................................................................... 7-26

    7.3 Introduction of PV Power Generation to Resort Islands......................................................... 7-28 Chapter 8 Recommendations For Dissemination of the Grid-Connected PV System 8.1 Legal Systems concerning Dissemination of New Energies in the Maldives......................... 8-1 8.2 Dissemination Promotion Policies and Systems (Incentives) ................................................. 8-2

    8.2.1 Outline of Dissemination Promotion Measures....................................................... 8-2 8.2.2 Examples of Policy Introduction in Advanced Countries ....................................... 8-5 8.2.3 Dissemination Promotion Policies (Draft) in the Maldives..................................... 8-8 8.2.4 Future issues for Examination regarding the Grid-connected PV system Dissemination

    Promotion Policies and Systems.............................................................................. 8-15 8.3 Technical Criteria and Guidelines, etc. for Introduction of Grid-Connected PV Systems ..... 8-17 8.4 Medium to Long-Term Plans for Introducing Grid-Connected PV Systems.......................... 8-19 8.5 Action Plan for Introduction of Grid-Connected PV Systems................................................ 8-23 8.6 Human Resources Development Plan..................................................................................... 8-26

    8.6.1 Capacity Assessment of Counterpart Agencies, etc. ............................................... 8-26 8.6.2 Direction of Human Resources Development ......................................................... 8-29 8.6.3 Human Resource Development Plan ....................................................................... 8-30 8.6.4 Collaboration with Faculty of Engineering Technology (FET)............................... 8-32

    Attachments 1. Member List of the Study Team 2. List of Parties Concerned in the Recipient Country 3. Study Implementation Work Flow 4. Agenda for the 1st Seminar 5. Agenda for the 2nd Seminar 6. Design Manual for Grid-connected Photovoltaic System 7. Shade Map for each Project Site 8. Meteorological Data 9. Report on Field Survey of PV-Diesel Hybrid System in Mandhoo Island 10. Report on Field Survey of PV System in Gan and Fonadhoo Island in Laamu Atoll 11. Structure Examination Document

    iv

  • LIST OF FIGURES AND TABLES

    Chapter 2 Figure 2.2.2-1 Hulhumale’ Island Development Plan and Current Condition ........................ 2-7 Figure 2.3-1 Support Framework for Photovoltaic Power by ADB ..................................... 2-9 Table 2.1-1 Transitions in GDP .......................................................................................... 2-1 Table 2.1-2 Fiscal Balance of the Government of Maldives............................................... 2-2 Table 2.1-3 Population in the Study Target Area................................................................ 2-3 Table 2.1-4 Population Forecast in the Maldives and Urban Areas.................................... 2-3 Table 2.3-1 State of Progress in the Outer Islands Electrification Project (June 2009) ...... 2-8

    Chapter 3 Figure 3.1.1-1 Main Points of National Energy Policy (revised version draft) ....................... 3-1 Figure 3.1.1-2 Breakdown of Primary Energy Supply in Maldives (Actual and Forecast)..... 3-2 Figure 3.1.1-3 Energy Resources Investment Plan up to 2015................................................ 3-3 Figure 3.1.2-1 Legal Systems related to Energy...................................................................... 3-3 Figure 3.1.2-2 Necessary Procedures and Times for Each Legal System ............................... 3-5 Figure 3.2.1-1 Organization Chart of the Ministry of Housing, Transport

    and Environment (MHTE)............................................................................... 3-7 Figure 3.2.1-2 Organization Chart of the MHTE Energy & Sustainable Development Section

    ......................................................................................................................... 3-7 Figure 3.2.2-1 Organization Chart of Maldives Energy Authority (MEA) ............................. 3-8 Figure 3.2.3-1 Organization Chart of the State Electric Company Limited (STELCO) ......... 3-9 Figure 3.2.4-1 Unit Cost and Average Electricity Tariff ......................................................... 3-12 Figure 3.3.1-1 Breakdown of Primary Energy Supply in the Maldives (2002)....................... 3-14 Figure 3.3.1-2 Breakdown of Final Energy Consumption in Maldives (2002) ....................... 3-15 Figure 3.3.1-3 Breakdown of Final Energy Consumption

    (Industrial and Commercial Sectors) in the Maldives (2002).......................... 3-15 Figure 3.3.1-4 Breakdown of Final Energy Consumption (Housing Sector)

    in the Maldives (2002) ..................................................................................... 3-16 Figure 3.3.2-1 Breakdown of Generated Electric Energy ....................................................... 3-16 Figure 3.3.2-2 Generated Electric Energy in the STELCO Supply Area ................................ 3-17 Figure 3.3.2-3 Peak load in the STELCO Supply Area........................................................... 3-17 Figure 3.3.2-4 Daily Load Curve in Male’ .............................................................................. 3-18 Figure 3.3.2-5 Generated Electrical Energy on Male’ Island .................................................. 3-19 Figure 3.3.2-6 Peak Load on Male’ Island .............................................................................. 3-19 Figure 3.3.2-7 Power Consumption by Sector on Male’ Island (2008)................................... 3-19

    v

  • Figure 3.3.2-8 Generated Electric Energy on Hulhumale’ Island ........................................... 3-20 Figure 3.3.2-9 Peak load on Hulhumale’ Island ...................................................................... 3-20 Figure 3.3.2-10 Power Consumption by Sector on Hulhumale’ Island..................................... 3-20 Figure 3.3.3-1 Movements in Diesel Prices............................................................................. 3-23 Figure 3.3.3-2 Projected Diesel Fuel Prices (2009~2030)..................................................... 3-23

    Figure 3.3.4-1 Diesel generating facilities installed on the public road adjoining the STELCO power plant................................................................. 3-25

    Figure 3.3.4-2 Site for installation of emergency power generating facilities......................... 3-26 Figure 3.4.1-1 PV System Introduced to Mandau Island ........................................................ 3-29 Figure 3.4.2-1 Schematic Diagram of Grid-Connected PV System Introduced

    under Japan’s Non-Project Grant Aid.............................................................. 3-31 Figure 3.4.2-2 Operating Condition of the Grid-Connected PV System

    Introduced under Non-Project Grant Aid......................................................... 3-32 Table 3.1.2-1 Outline of the Regulations on Public Supply of Electricity

    in Male’ and Outer Atolls ................................................................................ 3-4 Table 3.2.4-1 Profit and Loss Statement of STELCO............................................................ 3-9 Table 3.2.4-2 Breakdown of Subsidies from the Government ............................................... 3-11 Table 3.2.4-3 STELCO Financial Performance Indicators .................................................... 3-11 Table 3.2.4-4 Power Sales Income and Costs and Mean Electricity Tariffs .......................... 3-12 Table 3.3.3-1 STELCO Electricity Tariffs (from July 2005 to October 2009) ................... 3-21 Table 3.3.3-2 Tariff Structure for Greater Male’ Region (from November 2009) .............. 3-21

    Table 3.3.3-3 Number of Consumers by Category................................................................. 3-21 Table 3.3.3-4 Electricity Consumption and Average Tariffs on Male’ Island

    and Hulhumale’ Island..................................................................................... 3-22 Table 3.3.4-1 Generating Facilities at Male’ Power Station (June 2009) .............................. 3-25 Table 3.3.4-2 Facilities at Hulhumale’ Power Station (as of June 2009)............................... 3-26 Table 3.3.5-1 Distribution Facility Reinforcement Plans....................................................... 3-27 Table 3.4.1-1 Hybrid Systems Introduced by the Government of the Maldives

    and Other Donors............................................................................................. 3-28

    Chapter 4 Figure 4.1.1-1 Power Demand Projection for Male’ Island (STELCO).................................. 4-1 Figure 4.1.1-2 Power Demand Projection for Male’ Island (Comparison with the Study

    Team’s Projection)........................................................................................... 4-2 Figure 4.1.2-1 Estimated Power Demand on Hulhumale’ Island (STELCO) ......................... 4-3 Figure 4.1.2-2 Estimated Power Demand on Hulhumale’ Island (Study Team) ..................... 4-3 Figure 4.2-1 Hulhumale’ Island Solar irradiation Data Analysis Findings .......................... 4-4

    vi

  • Figure 4.2-2 Pyranometer Accuracy Confirmation Findings (May 19, clear skies)............. 4-5 Figure 4.2-3 Pyranometer Accuracy Confirmation Findings (May 24, rain) ....................... 4-5 Figure 4.2-4 Horizontal Plane Solar irradiation Data Applied in the Study......................... 4-6 Figure 4.3-1 OJT on the Solar Irradiation Obstruction Measurement Method..................... 4-9 Figure 4.3-2 Hourly Changes in Solar irradiation Intensity ................................................. 4-10 Figure 4.6-1 Calculation Results of Distribution Line Voltage Flow Simulation at Time

    of PV System Interconnection (Male’ Island, Feeder 2).................................. 4-18 Figure 4.6-2 Calculation Results of Distribution Line Voltage Flow Simulation at Time

    of PV System Interconnection (Male’ Island, Feeder 3).................................. 4-18 Figure 4.6-3 Calculation Results of Distribution Line Voltage Flow Simulation at Time

    of PV System Interconnection (Male’ Island, Feeder 4).................................. 4-19 Figure 4.6-4 Calculation Results of Distribution Line Voltage Flow Simulation at Time

    of PV System Interconnection (Male’ Island, Feeder 6).................................. 4-19 Figure 4.6-5 Calculation Results of Distribution Line Voltage Flow Simulation at Time

    of PV System Interconnection (Male’ Island, Feeder 7).................................. 4-20 Figure 4.6-6 Calculation Results of Distribution Line Voltage Flow Simulation at Time

    of PV System Interconnection (Male’ Island, Feeder 8).................................. 4-20 Figure 4.6-7 Calculation Results of Distribution Line Voltage Flow Simulation at Time

    of PV System Interconnection (Male’ Island, Feeder 9).................................. 4-21 Figure 4.6-8 Calculation Results of Distribution Line Voltage Flow Simulation at Time

    of PV System Interconnection (Hulhumale’ Island, Feeder 2) ........................ 4-21 Figure 4.7-1 IEC Flicker Measurement Results (Pst, Plt)[Measurement Point:

    National Stadium on the Distribution Tr Low Voltage Side] .......................... 4-25 Figure 4.7-2 Results of High Frequency Voltage Distortion Measurement

    [Measurement Point: National Stadium on the Distribution Tr Low Voltage Side] ................................................................................................................. 4-26

    Figure 4.7-3 Results of Frequency Fluctuation Measurement [Measurement Point: National Stadium on the Distribution Tr Low Voltage Side] .......................... 4-27

    Figure 4.7-4 Voltage Fluctuation Measurement Results [Measurement Point: National Stadium on the Distribution Tr Low Voltage Side] ......................................... 4-28

    Figure 4.8-1 Possible PV Capacity on Male' Island ............................................................. 4-30 Figure 4.8-2 Possible PV Capacity on Hulhumale' Island.................................................... 4-30 Figure 4.8-3 Relationship between Allowable Frequency Fluctuation

    and Possible PV Capacity on Male' Island....................................................... 4-31 Figure 4.8-4 Relationship between Allowable Frequency Fluctuation

    and Possible PV Capacity on Hulhumale' Island ............................................. 4-31 Figure 4.11.1-1 Monthly Power Generation Estimation (STELCO Building).......................... 4-40 Figure 4.11.1-2 Monthly Power Generation Estimation (Dharubaaruge) ................................. 4-41

    vii

  • Figure 4.11.1-3 Monthly Power Generation Estimation (Giyaasudheen School) ..................... 4-41 Figure 4.11.1-4 Monthly Power Generation Estimation (Kalaafaanu School).......................... 4-41 Figure 4.11.1-5 Monthly Power Generation Estimation (Maldives Center for

    Social Education) ............................................................................................. 4-42 Figure 4.11.1-6 Monthly Power Generation Estimation (Thaajuddeen School) ....................... 4-42 Figure 4.11.1-7 Monthly Power Generation Estimation (New Secondary School for Girls) .... 4-42 Figure 4.11.1-8 Monthly Power Generation Estimation (Faculty of Engineering) ................... 4-43 Figure 4.11.1-9 Monthly Power Generation Estimation (National Stadium)............................ 4-43 Figure 4.11.1-10 Monthly Power Generation Estimation (Faculty of Education) ...................... 4-43 Figure 4.11.1-11 Monthly Power Generation Estimation (Grand Friday Mosque)..................... 4-44 Figure 4.11.1-12 Monthly Power Generation Estimation (Jumhooree Maidhaan) ..................... 4-44 Figure 4.11.1-13 Monthly Power Generation Estimation (President’s Office) ........................... 4-44 Figure 4.11.1-14 Monthly Power Generation Estimation (Hulhumale’ Hospital) ...................... 4-45 Figure 4.11.1-15 Movements in Power Generation by Year ....................................................... 4-45 Figure 4.12-1 Category of PV Cells by material .................................................................... 4-47 Figure 4.12-2 Trend of PV introduction capacity in the world .............................................. 4-49 Figure 4.13-1 Image for metering of grid-connected PV system (STELCO’s installation) ... 4-51 Figure 4.13-2 Image for metering of grid-connected PV system (except for STELCO’s installation) ................................................................. 4-52 Figure 4.17.1-1 Environmental Impact Assessment (or Initial Environmental Examination)

    Review Process ................................................................................................ 4-58 Figure 4.17.3-1 Expected Storage Battery Recycling System................................................... 4-61 Table 4.2-1 Specifications of the Pyranometer and Data Logger Used for Comparison .... 4-5 Table 4.3-1 Measurement Results concerning Solar irradiation Obstruction ..................... 4-7 Table 4.3-2 Solar Irradiation in January on Male’ Island ................................................... 4-11 Table 4.3-3 Estimated Solar Irradiation on each Potential Site........................................... 4-12 Table 4.4-1 List of Selected Potential Sites ........................................................................ 4-14 Table 4.6-1 Survey Findings Regarding Capacity of Transformers at Interconnection

    Points ............................................................................................................... 4-16 Table 4.6-2 Simulation Condition ....................................................................................... 4-17 Table 4.6-3 Impacts of PV Interconnection on Existing Distribution Lines ....................... 4-22 Table 4.7-1 Specifications of Measuring Instruments......................................................... 4-24 Table 4.8-1 Examination Results regarding PV Connection Capacity to Distribution

    Lines (Male’ Island)......................................................................................... 4-32 Table 4.8-2 Examination Results regarding PV Connection Capacity to Distribution

    Lines (Hulhumale’ Island) ............................................................................... 4-32

    viii

  • Table 4.8-3 Target Grid-Connected PV Installation Capacity on Male’ Island and Hulhumale’ Island............................................................................................ 4-33

    Table 4.9-1 Standard Design Specifications of the Grid-Connected PV System................ 4-33 Table 4.10-1 Results of PV Array Examination at Potential Sites on Male’ Island.............. 4-36 Table 4.10-2 Results of PV Array Examination at Potential Sites on Hulhumale’ Island .... 4-38 Table 4.11.1-1 Estimated Annual Power Generation at Each Potential Site............................ 4-40 Table 4.11.2-1 Fuel Consumption at Diesel Power Plants on Male’ Island and Hulhumale’

    Island................................................................................................................ 4-46 Table 4.11.2-2 Yearly Diesel Fuel Saving ............................................................................... 4-46 Table 4.11.3-1 Yearly CO2 Reductions ................................................................................... 4-47 Table 4.12-1 Type of PV Cells and Characteristice .............................................................. 4-48 Table 4.13-1 Expected Model of Grid-Connected PV System Introduction

    in the Pilot Project and Period until 2014 ........................................................ 4-50 Table 4.13-2 Expected Model of Grid-Connected PV System Introduction

    in the Period from 2015 to 2020 ...................................................................... 4-50 Table 4.13-3 Metering method for grid-connected PV system ............................................. 4-51 Table 4.14-1 Assumed Loads when Installing PV Panels..................................................... 4-53 Table 4.15-1 Contents and Results of Examination on PV Panel Supports .......................... 4-54 Table 4.16.1-1 Rough Project Cost Estimation Conditions ..................................................... 4-55 Table 4.16.2-1 Breakdown for Project cost (Japanese supply) ................................................ 4-56 Table 4.16.2-2 Grid-Connected PV System Installed Capacity and Project Cost.................... 4-56 Table 4.17.3-1 Pilot Project Screening..................................................................................... 4-59

    Chapter 5 Figure 5.1-1 Flow of Economic and Financial Analysis ...................................................... 5-1 Figure 5.2.2-1 Movements in Total Cost of Grid-Connected PV Systems ............................. 5-7 Figure 5.2.2-2 Movements in Grid-Connected PV System Sub-System Costs ....................... 5-7 Figure 5.2.2-3 Scenario of PV System Economy Improvement in the Roadmap ................... 5-8 Figure 5.5.1-1 Quantities and Prices of CER Futures Trading on the ECX

    (March 2008-May 2009).................................................................................. 5-30 Table 5.2.1-1 Power Generation, Consumption and Fuel Oil Consumption (2009-2020)..... 5-4 Table 5.2.1-2 Introduced Capacity and Generation by Implementing Body (2009 – 2020) .. 5-6 Table 5.2.2-1 PV System Price Projection ............................................................................. 5-9 Table 5.2.2-2 Introduced Capacity and Project Cost.............................................................. 5-9 Table 5.3.2-1 Cashflow of Introduction the Grid-Connected PV System.............................. 5-12 Table 5.3.2-2 Fiscal Revenue and Expenditure of the Central Government .......................... 5-15 Table 5.3.2-3 Financial Assistance Necessary for Initial Investment and STELCO’s Cost .. 5-15

    ix

  • Table 5.3.2-4 Cashflow for Introduction of the Grid-Connected PV System with Capacity 3MW......................................................................................................................... 5-17

    Table 5.3.2-5 Amount of Financial Assistance by Contribution Rate from the Green Tax ... 5-19 Table 5.3.2-6 Amount per kWh for the Case that the Shortfall is divided evenly to the

    Customers ........................................................................................................ 5-19 Table 5.3.3-1 Results of the Cases of Rise in Decreasing Rate of the PV System Price ....... 5-20 Table 5.3.3-2 Results of the Cases of Initial Unit Price Decrease in PV System ................. 5-20 Table 5.3.3-3 Results of the Cases of Increase in O&M Cost................................................ 5-20 Table 5.3.3-4 Results of the Cases of Increase in Electricity Tariff....................................... 5-21 Table 5.3.3-5 Results of the Cases of Increase/Decrease in Fuel Price.................................. 5-21 Table 5.3.3-6 Results of Analysis by Percentage of Excess Power and Purchasing Price..... 5-22 Table 5.4.1-1 Comparison of Cost between Private Power Generation and Power Purchasing

    from STELCO.................................................................................................. 5-23 Table 5.4.2-1 Results of Economic Analysis for the Capacity of 3MW................................ 5-24 Table 5.4.3-1 Results of the Cases of Rise in Decreasing Rate of the PV System Price ....... 5-25 Table 5.4.3-2 R Results of the Cases of Initial Unit Price Decrease in PV System ............. 5-26 Table 5.4.3-3 Results of the Cases of Increase in O&M Cost................................................ 5-26 Table 5.4.3-4 Results of the Cases of Increase in Electricity Tariff....................................... 5-26 Table 5.4.3-5 Results of the Cases of Increase/Decrease in Fuel Price.................................. 5-27 Table 5.4.3-6 Results of Analysis by Percentage of Excess Power and Purchasing Price..... 5-27 Table 5.4.4-1 Results of Investment Profitability of Private Investment in the PV System .. 5-28 Table 5.5.1-1 Major Factors Affecting the Price of Emission Credits ................................... 5-30 Table 5.5.1-2 CO2 Reductions and CER Sales ...................................................................... 5-31 Table 5.5.2-1 Transaction Costs of CDM Project Formulation ............................................. 5-32 Table 5.5.2-2 Transaction Costs in Small-Scale CDM Project Formulation ......................... 5-32 Table 5.5.2-3 Costs in the Operational Stage (Until 2020) .................................................... 5-33 Table 5.5.3-1 Profit from CDM Project Formulation............................................................. 5-34 Table 5.6-1 Investment Financing Plan for Installation of PV System with Capacity of 3MW

    ......................................................................................................................... 5-36 Table 5.6-2 Financial Projection of STELCO..................................................................... 5-37 Table 5.7-1 Contribution Ration from Green Tax and Shortfall ......................................... 5-38

    Chapter 6 Figure 6.1-1 Map of the Pilot Project Sites .......................................................................... 6-2 Figure 6.2-1 Detailed Design Procedure of the Pilot project................................................ 6-2 Figure 6.3-1 Working Flowchart which affects details design............................................. 6-4 Figure 6.5.1-1 Estimated Monthly PV Power Generation (STELCO Building) ..................... 6-9 Figure 6.5.1-2 Estimated Monthly PV Power Generation (Kalaafaanu School) ..................... 6-9

    x

  • Figure 6.5.1-3 Estimated Monthly PV Power Generation (Maldives Center for Social Education)........................................................... 6-10

    Figure 6.5.1-4 Estimated Monthly PV Power Generation (Thaajuddeen School) .................. 6-10 Figure 6.5.1-5 Estimated Monthly Power Generation (New Secondary School for Girls) ..... 6-10 Figure 6.5.1-6 Estimated Monthly PV Power Generation (President’s Office) ...................... 6-11 Table 6.1-1 Selection Criteria of Pilot Project Sites............................................................ 6-1 Table 6.1-2 Pilot Project Sites........................................................................................... 6-1 Table 6.3-1 Detail examination result for Building in the Pilot Project Sites ................... 6-5 Table 6.5.1-1 Annual PV Power Generation at Each Pilot Project Site ............................... 6-9

    Chapter 7 Figure 7.1.1-1 Results of Power Consumption Survey in 27 Households and Commercial and

    Public Facilities in the SMILE Project ............................................................ 7-2 Figure 7.1.1-2 DSM Education Poster..................................................................................... 7-2 Figure 7.1.2-1 Step for inserting HP........................................................................................ 7-5 Figure 7.1.2-2 Example of Shikoku Electric Power Company................................................ 7-8 Figure 7.1.2-3 Record of shifting peak load in Japan by introducting the thermal storage AC

    system .............................................................................................................. 7-11 Figure 7.1.2-4 Daily load curve in the Bank of Maldives ....................................................... 7-12 Figure 7.1.5-1 Proposal schedule in the view point of the medium & long term.................... 7-19 Figure 7.2.1-1 Breakdown of CO2 Emissions in the Energy Sector ....................................... 7-20 Figure 7.2.2-1 CDM Project Application and Approval Process (Draft) ................................ 7-26 Figure 7.2.3-1 Image of Program CDM .................................................................................. 7-27 Table 7.1.2-1 Purpose of DSM Techniques ........................................................................... 7-3 Table 7.1.2-2 Examples of Concrete DSM Techniques (Supply Side and Demand Side)

    Appropriate to Maldives .................................................................................. 7-4 Table 7.1.2-3 The items to be considered regarding introduction of Time of using of Electricity

    ......................................................................................................................... 7-8 Table 7.1.3-1 The main elements for the designated factories in the Japanese Energy

    Conservation Act ............................................................................................. 7-16 Table 7.1.3-2 The main elements for the construction in the Japanese Energy Conservation Act

    ......................................................................................................................... 7-17 Table 7.2.1-1 CDM Potential Projects ................................................................................... 7-20 Table 7.2.1-2 Policies, Systems and Surrounding Conditions Concerning CDM Promotion 7-21 Table 7.2.2-1 Sustainable Development Criteria (SD Criteria) (Draft) ................................. 7-23 Table 7.2.2-2 CDM Project Application Document Format (Draft) ...................................... 7-24

    Chapter 8

    xi

  • Figure 8.2.1-1 Combining Policies for Disseminating Renewable Energies........................... 8-3 Figure 8.2.1-2 Outline of Japan’s Surplus Power Purchasing System .................................... 8-4 Figure 8.2.2-1 RPS Systems Introduced in the United States ................................................. 8-8 Figure 8.2.3-1 Examination Procedure for Measures Geared to Supporting Introduction

    of Grid-Connected PV Systems ....................................................................... 8-10 Figure 8.2.3-2 Conceptual Image of Dissemination Measures................................................ 8-14 Figure 8.2.3-3 Introduction amount of Grid-connected PV system......................................... 8-14 Figure 8.4-1 Roadmap (Draft) Geared to Dissemination of Grid-Connected PV Systems .. 8-19 Figure 8.6.4-1 Equipment for Practical Training at Faculty of Engineering Technology(FET)

    ......................................................................................................................... 8-33 Table 8.1-1 Japanese Laws concerning New Energies ....................................................... 8-1 Table 8.1-2 Necessary Items of the Japanese New Energy Law

    when Applying to the Maldives ....................................................................... 8-1 Table 8.2.3-1 Necessary amount of price in Green Tax. Development Tax and Carbon Tax after

    import Tax Exemption in Measure D .............................................................. 8-13 Table 8.2.3-2 Projection From of Policies and Systems for Introducing and Disseminating

    Grid-Connected PV Systems in Measure D..................................................... 8-15 Table 8.2.4-1 Future Examination Issues regarding Dissemination Polocoes and Systems .. 8-16 Table 8.3-1 Technical Requirements of Grid-Connection Guidelines and Results of

    Examination of Application to the Maldives ................................................... 8-18 Table 8.5-1 Action Plans for Dissemination of Grid-Connected PV Systems.................... 8-25 Table 8.6.1-1 Off-JT by STELCO (Fiscal 2008) ................................................................... 8-28 Table 8.6.2-1 Direction of Human Resources Development (Draft) ..................................... 8-30 Table 8.6.3-1 Contents of Technical Transfer Implemented in the Study

    (including Counterpart Training) ..................................................................... 8-31 Table 8.6.3-3 Contents of Technical Transfer Required in Future......................................... 8-32 Table 8.6.4-1 Outline Topic for the “Renewable Energy Systems and Maintenance”(Draft) 8-33

    xii

  • ABBREVIATIONS

    ADB Asian Development Bank

    CER Certified Emission Reduction

    CDM Clean Development Mechanism

    DANIDA Danish International Development Cooperation Agency

    DNA Designated National Authority

    DRP Dhivehi Rayyithunge Party

    DSM Demand Side Management

    ECX European Climate Exchange

    US EIA Energy Information Administration

    EIA Environmental Impact Assessment

    EIRR Economic Internal Rate of Return

    EPA Environmental Protection Agency

    EUA EU-Allowance

    FIRR Financial Internal Rate of Return

    FIP Feed-in Premium

    FIT Feed-in Tariff

    GDP Gross Domestic Product

    GEF Global Environment Facility

    GHG Green House Gas

    HDC Hulhumale’ Development Corporation LTD

    IEC International Electrotechnical Commission

    IEA International Energy Agency

    IEE Initial Environmental Examination

    JICA Japan International Cooperation Agency

    JIS Japanese Industrial Standards

    MATI Maldives Association of Tourism Industry

    MCPI Ministry of Construction and Public Infrastructure

    MCST Ministry of Communications, Science and Technology

    MDP Maldivian Democratic Party

    MEA Maldives Energy Authority

    MEB Maldives Electricity Bureau

    xiii

  • xiv

    MEEW Ministry of Environment, Energy and Water

    MHTE Ministry of Housing, Transportation and Environment

    MMA Maldivian Monetary Authority

    MTAC Ministry of Tourism, Arts and Culture

    NEDO New Energy and Industrial Technology Development Organization

    NPC National Planning Council

    Off-JT Off the Job Training

    O&M Operation and Maintenance

    OJT On the Job Training

    PLC Programmable Logic Controller

    PPP Public Private Partnership

    PV Photovoltaic

    RETDAP Renewable Energy Technology Development and Application Project

    RPS Renewables Portfolio Standard

    SCADA Supervisory Control and Data Acquisition System

    SHS Solar Home System

    SSM Supply Side Management

    STELCO State Electric Company Limited

    STO State Trading Organization

    UNDP United Nations Development Programme

    UNFCCC United Nations Framework Convention on Climate Change

  • CHAPTER 1 BACKGROUND AND BASIC CONCEPT OF THE STUDY

    1.1 Background and Objectives of the Study

    The Republic of Maldives (hereinafter referred to as Maldives) is an island nation situated southwest of India and Sri Lanka. It is composed of approximately 1,190 coral islands, of which 199 are inhabited. The national population is approximately 299,000 (2006 national census), of which 104,000 people or approximately 35% of the total population, live on Male’ Island. Male’ is home to the national capital functions and the most employment opportunities, however, problems of declining security and deteriorating living environment caused by this population concentration have become social problems on the island. The tourism industry of the Maldives was badly affected in the wake of the September 11-terrorist attacks in the United States, although the economy has displayed steady recovery since then. However, the Indian Ocean tsunami disaster of December 2004 caused 82 fatalities, 26 persons missing, destruction of around 2,000 homes and other massive damage especially in outer islands with little or no seawalls and other infrastructure. The financial cost of the tsunami damage amounted to approximately 62% of GDP and caused the GDP growth rate to plunge to minus 4.6% in 2005. Since then, however, the tourism and fisheries industries, which account for approximately 40% of GDP, have recovered and GDP growth rate of 19.1% and 6.6% was recorded in 2006 and 2007 respectively. As a result, there has been a construction boom in Male’ and with more and more people who suffered damage on outer islands moving to Male’ in search of employment and safer living conditions, which accelerated more population concentration.

    Power supply on the 10 islands which including capital Male’ is carried out by STELCO, which is 100% government financed electric utility, and power generation on Male’ accounts for approximately 72% of generated power in inhabited islands (185,553 MWh) in 2006. Power demand in Male’ is expected to grow rapidly at more than 11% per year, and it is forecasted that peak demand over the next five to seven years will reach more than double the capacity of generation facilities. Accordingly, STELCO is planning to procure new diesel generators, however, due to limited space any further expansion of power stations in Male’ will be difficult. Moreover, with more than 80% of primary energy demand and almost all power generation depend on diesel fuel, the recent inflation in the price of diesel (22% in 2007) has badly affected the financial condition of STELCO and threatens the energy security of the country.

    In response to these issues, the Government of Maldives (GOM) has reclaimed land (Hulhumale’ Island: total area 7.85 square kilometers) off the coast of Male’, and it is implementing a comprehensive development plan that includes the resettlement of residents in Male’. According to the plan, residential and commercial districts as well as cultural and education districts will be

    1-1

  • constructed. In addition, tourism districts will be built by introducing foreign capital. Thus it is forecasted that the power demand in Hulhumale’ will grow rapidly from now on.

    Furthermore, since Maldives is an island nation with an average altitude of just 1 m above sea level, it is one of the countries most prone to the effects of rising sea level caused by climate change. For this reason, in the Manifesto 2008~2013 and Strategic Action Plan, the current government aims to achieve the carbon neutral within 10 years time. GOM aims to reduce greenhouse gas emissions from diesel power station and to ensure energy security.

    Under these circumstances, GOM issued a request to Government of Japan for implementation of a development study for the introduction of grid-connected photovoltaic (PV) system, as a way to improve energy efficiency and mitigate climate change for the purpose of realizing stable power supply in the medium to long term.

    The objectives of the Study are as follows: (1) To conduct technical and economic/financial feasibility study (F/S) and confirm the conditions required in order to introduce the grid-connected PV system in Male’ and Hulhumale’ Islands; and (2) To examine the required legislation, systems, regulations and human resources development plan, etc. and finalize long-term plan and action plan for the introduction and proper operation of the grid-connected PV system. At the same time, detailed design for the introduction of grid-connected PV system will be conducted on five or six potential sites, with a view to building the capacity of the organizations primarily responsible for introducing the system.

    1.2 Basic Concept of the Study

    (1) In the Study, it is necessary to select potential sites for the grid-connected PV system and to complete detailed design for potential sites during a short period. Accordingly, the Study Team has already commenced the preliminary planning and design of PV systems based on available data. Detailed design will be commenced immediately after potential sites are finalized in the joint work with the counterparts.

    (2) As a result of the final round of voting in the presidential election held in October 2008, President Maumoon Abdul Gayoom, who had held office for the previous 30 years, was defeated, and Mohamed Nasheed, the leader of the opposition Democratic Party of the Maldives, became the new president. In line with this, the Ministry of Environment, Energy and Water (MEEW), which was expected to be the counterpart Ministry, was reorganized and combined with the Ministry of Construction and Public Infrastructure (MCPI), Ministry of Environment, Energy and Water (MEEW), Ministry of Transport and Communication (MTC) and Ministry of Housing and Urban Development (MHUD) to make the new Ministry of Housing, Transport and Environment

    1-2

  • 1-3

    (MHTE). Accordingly, in the first field survey, full explanations will be given to the counterpart agency concerning background of the Study, the Study concept, methodology and schedule, etc. in order to facilitate the smooth introduction of the Study.

    (3) On the densely populated island of Male’, where buildings are already crowded, potential sites for the grid-connected PV system will be selected from the wide variety of candidate sites such as buildings, public facilities, stadium, pedestrian walks and bus stops while taking the impact on existing 11 kV distribution grid into account. Meanwhile, on Hulhumale’ Island, potential sites will be selected utilizing vacant spaces on the roof of public and commercial facilities which are under planning phase, in consideration of economic advantage and operation after commissioning.

  • 2-1

    CHAPTER 2 SOCIOECONOMIC CONDITIONS AND DEVELOPMENT PLANS

    2.1 Socio-economic Conditions

    In the aftermath of the Indian Ocean tsunami disaster in December 2004, tourism, which is the primary industry of the Maldives, was depressed and the economy recorded negative growth. From 2006 onwards, however, tourism recovered from a recession and the economy return to positive growth due to growth of secondary industries and tertiary industries excluding tourism (see Table 2.1-1). In the years up to 2004, fisheries and tourism in outlying resort islands formed the backbone of the economy, accounting for approximately 40% of real GDP, however, this ratio fell to 30% from 2005 onwards. Tertiary industries including tourism have constantly accounted for around 80% of GDP, while the share of primary industries fell from 12.2% in 1995 (when it was almost equivalent to the share of secondary industries) to 7% in 2008. In contrast, the share of secondary industries increased from 12.8% to 17.6% over the same period. This trend shows that the industrial structure has shifted. Looking at performance by sector, tourism has remained the key industry over this period, while the secondary sectors of electric power, public water supply and construction, and tertiary sectors of transport, communications and government services have made remarkable growth.

    Table 2.1-1 Transitions in GDP

    Unit: Million MRf 1995 2000 2004 2005 2006 2007 2008 Primary sector 521 595 760 850 846 719 761

    Agriculture 155 175 205 204 204 205 207Fisheries 335 381 507 596 590 460 499Coral and sand mining 31 39 48 50 52 54 55

    Secondary sector 659 1,047 1,539 1,621 1,891 2,071 2,215Manufacturing 336 505 660 594 680 706 730Fisheries processing 112 132 204 247 299 300 300Electricity and water supply 78 204 313 363 409 447 486Construction 133 206 362 417 503 618 699

    Tertiary sector 3,205 4,836 6,217 5,703 6,917 7,574 8,226Wholesaling and retail trade 234 288 326 336 357 386 412Tourism (resorts, etc.) 1,474 2,094 2,689 1,798 2,560 2,800 2,991Transport and communications 478 919 1,263 1,456 1,729 1,893 1,993Financial services 151 215 269 262 287 300 310Real estate 390 497 571 575 595 611 628Business services 129 184 223 222 233 239 245Government administration 400 751 1,062 1,213 1,380 1,592 1,917Education, health and social services 124 137 146 149 152 155 157

    Financial services indirectly measured (FISIM) -175 -249 -332 -308 -376 -402 -427

    Total 4,385 6,478 8,516 8,174 9,654 10,364 11,202Source : Statistical Yearbook of Maldives 2008 Note: Figures are 1995-base prices and estimate values for 2008.

  • 2-2

    The international balance of payments shows a current account deficit, arising from excess imports over exports, is offset by foreign currency revenues derived from tourism. The current account deficit has increased steadily since 2005. The exchange rate has been pegged to the U.S. dollar at a rate of 12.80 MRf to the dollar since 2002.

    Table 2.1-2 shows the fiscal balance of the Maldives government. Tax revenues declined in 2005 due to the impact of the Indian Ocean tsunami disaster on the tourism industry, however, they have recorded major increases again from 2006 onwards. Concerning revenue, non-tax revenue has recorded faster growth than tax revenue, and this is largely derived from rental of government assets (including rental of government-owned resorts). Expenditure is increasing every year as revenue increases; in particular, the increase in current expenditure from 2005 onwards has been conspicuous, and the fiscal deficit is growing year by year. Looking at expenditure by sector, spending on social services such as social security and community programs, etc. accounted for a major share in 2007, however, spending on economic services such as agriculture, fisheries, transport and electric power almost doubled in 2008.

    The public sector comprises the government and state-owned enterprises and has traditionally played an important role in the economy. The state-owned enterprises have been active in numerous sectors such as banking, aviation, marine transport, international freight, telecommunications, electric power, fishing ports and importing, however, in recent years there has been a growing trend of privatization and shrinking of services supplied by the state-owned enterprises.

    Table 2.1-2 Fiscal Balance of the Government of the Maldives

    Unit: Million MRf (Maldives rufiyaa) 2002 2003 2004 2005 2006 2007 2008

    Revenue and donations Tax revenue 1,091.7 1,268.7 1,647.2 1,722.8 2,370.3 2,855.5 3,291.5Nontax revenue 1,490.7 1,695.6 1,704.6 2,065.5 2,916.3 3,813.9 5,653.0Grants 132.5 123.6 72.9 824.6 867.4 1,183.2 812.5

    Total revenue 2,714.9 3,087.9 3,424.7 4,612.9 6,154.0 7,852.6 9,757.0Expenditure and net lending

    Current expenditure 2,109.4 2,345.7 2,788.1 4,643.3 5,607.8 7,083.7 8,755.7Capital expenditure 1,026.1 1,206.2 991.0 1,132.1 1,458.4 1,952.6 2,760.7Net lending -18.2 -163.7 -196.5 -117.8 -118.1 -122.0 -194.8

    Total expenditure 3,117.3 3,388.2 3,582.6 5,657.6 6,948.1 8,914.3 11,321.6Balance -402.4 -300.3 -157.9 -1,044.7 -794.1 -1,061.7 -1,564.6

    GDP per capita(US$) 1,482 1,986 2,439 2,293 2,649 2,804 2,992GDP growth rate (%) - 4.8 9.5 -4.6 18.0 7.6 8.3

    Source : Statistical Yearbook of Maldives 2007 and 2008 Note : Figures for 2007 are provisional values, while those for 2008 are budget estimate values.

  • 2-3

    Table 2.1-3 shows the population of Male’ Island and Hulhumale’ Island according to the census of 2006. Compared with the findings of the 2000 census, the population of Male’ Island grew by 5.8% per year, far faster than the national average of 1.7% per year, highlighting the trend of population concentration into Male’s Island. Furthermore, when foreign workers and residents registered outside of Male’s Island are also taken into account, the island population is approximately two times greater than the number of residents registered in Male’.

    Table 2.1-3 Population in the Study Area

    2000 2006 Growth Rate Registered residents in 2005Male’ Island 72,230 102,377 5.8 46,647Hulhumale’ Island - 2,866 NA 189National 270,101 298,968 1.7 302,726

    Source : Statistical Yearbook of Maldives 2007 and 2008

    According to Population Division, Department of Economic and Social Affairs, the Un