fearnlet proctor investigation report stuckpipe octg.pdf
DESCRIPTION
Investigation Report for stuck drill pipeTRANSCRIPT
![Page 1: Fearnlet Proctor Investigation report stuckpipe OCTG.pdf](https://reader036.vdocuments.us/reader036/viewer/2022080904/55cf9b38550346d033a52da7/html5/thumbnails/1.jpg)
autopsy1.doc OCTG Procter Consultancy Ltd
Stuck pipe, Casing or logging tool AUTOPSY SHEET
Rig/Platform: Well: Field Unit:
Date of failure: Sticking Mechanism:(Solids/differential other)
Hole size: (in)
Stuck Depth: Drilled depth: (ft MD) Mud type:
Last casing size: Last casing depth: (ft MD) Deviation: (State max. dev. andDLS)
Time Stuck: Sidetrack: NPT Hours associated
Drill pipe size Jar type Accelerator type
Description of sticking:
Brief description of previous problems
Hole condition: (comment on any tight or over gauge hole sections, or other condition that may haveinfluenced the failure)
Drilling Parameters: (at time of failure)
Rotary torque: (ft-lbs) Rotary speed: Weight on bit. (lbs)
Standpipe pressure: (psi) Pump strokes/minute: GPM:
Pickup weight: (lbs) Slackoff weight: (lbs) BHA weight: (lbs in mud)
Off bottom rotating weight: (lbs)
Any further comments that may assist in the investigation:
Please attach a electronic copy of the survey and geolograph chart dataor equivalent for the whole hole section
Optional
------------------------------------------- ------------------------------------------ ------------------------------------------Signature Name Date