fealac eco business promotion conference …installed capacity of geothermal power plants in the...

25
Tadashi Kaneda Assit General Manager Fuji Electric Co., Ltd. Head of Geothermal WG FEALAC ECO Business Promotion Conference Geothermal Power Generation Japanese Public and Private Business Alliance November 13, 2012 Geothermal Power Generation WG 1

Upload: others

Post on 11-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Tadashi KanedaAssit General ManagerFuji Electric Co., Ltd.

Head of Geothermal WG

FEALAC ECO Business Promotion Conference

Geothermal Power Generation Japanese Public and Private Business Alliance

November 13, 2012

Geothermal Power Generation WG

1

Page 2: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WG

1. INTRODUCTION OF WG

2

2. INDONESIAN Sub WG

3. LATIN AMERICAN Sub WG

4. OTHER ACTIVITY

CONTENTS

Page 3: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WG

1. INTRODUCTION OF WG

3

2. INDONESIAN Sub WG

3. LATIN AMERICAN Sub WG

4. OTHER ACTIVITY

Page 4: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Japanese BusinessAlliance forSmartEnergy- Worldwide

Chairman of JASE-World:

Mr. H. Yonekura

Member: 72companies 20 associations

Observer: 12 governmental organizations

Promote Japanese Smart Energy Products & Technologies

to the World on Business Basis

Objectives of JASE-World

Contribute to Solve:

Global Warming & Energy

Security Issues

Major Activities

• Publication of “Japanese Smart Energy Products & Technologies”• Discussion & Practice of Project Finding by 4 Working Groups

(Energy saving solution, Heat pump & Inverter, Solar power generation, Geothermal power generation)

• Arrangement of Business matching Meeting Abroad• Introduction of JASE-World activities at International Exhibitions and other occasions

Geothermal Power Generation WG

4

Page 5: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

The objective of the WG is to study any and all possibilities for implementing overseas geothermal power projects.

The Indonesia SWG and Latin American SWG were organized to review and analyze the business opportunities among members under cooperation with METI, JICA, JBIC and JETRO.

WG also set up the workshop with other countries (such as New Zealand and Iceland) to talk about bilateral collaboration for development of geothermal power plant in the world.

Working Group forWorking Group for Geothermal PowerGeothermal Power GenerationGeneration

Geothermal Power Generation WG

5

Page 6: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Corporate members: Fuji Electric Co., Ltd. (Leader), Mizuho Corporate Bank Ltd, Itochu Corporation, Kyushu Electric Power Co., Inc., JFE Engineering Corp., JFE Steel Corp., Nippon Steel & Sumikin Engineering Co., Ltd., Sumitomo Corp., Sojitsu Corp., Electric Power Development Co., Ltd., Toshiba Corp., Toyo Engineering Corp., Toyota Tsusho Corp., JGC Corp., Nippon Koei Co., Ltd., Hitachi Zosen Corp., Marubeni Corp., Mitsui Sumitomo Corporate Bank, Mitsui and Co. Ltd, Mitsubishi Heavy Industries, Ltd., Mitsubishi Corp., Tokyo Mitsubishi UFJ Corp Bank, Mitsubishi UFJ lease & Finance, Yokogawa Electric Co., Ltd. (24 companies)

Association members:Japan Geothermal Developers' Council

Observers: Ministry of Economy, Trade and Industry (METI) Japan International Cooperation Agency (JICA) Japan Bank for International Cooperation (JBIC) The Institute of Energy Economics, Japan (IEEJ) Japan External Trade Organization (JETRO)

Geothermal Power Generation WG

6

Page 7: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WG

Steam Turbine / EPC

Project Coordination

Engineering & Consultation

Operation and Maintenance

Many of Expertise by Japanese Alliance

Finance (with support of JICA/JBIC)7

33%

20%

23%

24%

ABCOthers

Japanese Turbine Manufacturer(A+B+C) Almost 70% of share

Many of geothermalproject has been successfully constructedwith JICA ODA loan

Japanese EPC contractoraccumulated its knowhow of project management with many experience in overseas.

Page 8: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Installed Capacity of Geothermal Power Plants in the World

0 5,000 10,000 15,000 20,000

2015

2010

2005

2000

1995

1990

USA PhilippinesMexico

Indonesia

Italy

Japan

New Zealand

Iceland

Others(forcast)

Source : Geothermal Power Generation in the World, 2005-2010 Update ReportRuggero Bertani, Proceedings World Geothermal Congress 2010, etc.

Geothermal Power Generation WG

8

Page 9: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WG

9

Subjects of Geothermal Development

Legal framework or business development model etc

Coordination with local community or environmental certification

Local community

Solution SubjectsItems

FIT, tax incentive and other support

$/KWH is relatively high compared with other non-RE type power source

Incentive

Technical R & DFinancial solution (insurance, fund etc)

Initial stages for drilling to ensure the capability

Resource Risk

Page 10: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WG

1. INTRODUCTION OF WG

10

2. INDONESIAN Sub WG

3. LATIN AMERICAN Sub WG

4. OTHER ACTIVITY

Page 11: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WGLatin American SWG

SWG Leader:

SWG Sub Leader:

SWG Members:

Indonesia SWG

Observer: METI, JICA, JETRO 11

Page 12: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WG

Potential of Geothermal in Indonesia is the largest in the world, 40% of world reserve, amounting about 29,000MW.Indonesian Government is keen in development of geothermal and established the road map targeting 9,500MW by 2025.

Japanese private sectors are in high level of its technology and experiencein steam turbine, engineering, resource management, project coordination andinvestment. We are much interested in the emerging market of Indonesia andready to support of the program of development in Indonesia

STRONG PARTNERSHIP OF INDONESIA AND JAPAN

COLLABORATION OF MUTUAL BENEFIT

Indonesia Japan

12

Page 13: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WG

Example : Project Constructed by Consortium of Japanese CompanyUlubelu (Indonesia) – JICA Loan

Location: South Sumatra, Indonesia

Rated Output:Unit 1: 55MW Unit 2: 55MW

(Scheduled Completion Year 2012)

Owner: PT PLN (PERSERO) Steam Turbine Type:

Single Cylinder, Reaction,Condensing

Scope:EPC 13

Ulubelu Site

Page 14: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Indonesia SWG

StartedDec, 2010

First Mission

July 2011

Second Mission

Dec 2011

Implementation of Pre-FSIn Flores

From Sept 2012 to Feb 2013

Report to Indonesia and discussion for

next stepMarch 2013

Schedule of Project Finding TARGET

Aim of SWG1. SWG sent a pre-mission in July and a public-private joint mission in December 2011 to

Indonesia for finding a suitable project for pre-FS through discussion with MEMR, PLN and Local Government

2. SWG has selected a suitable potential site at Ulumbu in Flores and started a pre-FS in 2012. Closer coordination and discussion is being made by and between both parties during the pre-FS.

3. SWG will report a result of the pre-FS to MEMR and other key organizations in Indonesia and discuss for a further progress. SWG will prepare and submit several options of scenario for development for discussion. 14

Page 15: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WG

Period: Dec 12 – 22 , 2011 Schedule: Dec 12: Arrival to JKT

Dec 13: Meeting with MEMR, JICADec 15: Meeting with PLN/Retung

Site Visit to UlumbuDec 16: PLN Kupang, Pemda Propinsi NTT,

Dinas Pertambangan dan Energi, Propinsi NTT

Dec 18: Site Visit to Oka Ile Ange Dec 20: Meeting with Dinas ESDM Jambi Dec 21: Leaving from JKT

Indonesia Mission (2nd mission in Dec 2011)

Member: METI, Fuji Electric, Nippon Koei, MHI, Itochu Corp, Nippon Steel Engineering

Place to Visit: MEMR, PLN, Dinas ESDM, EOJ, JICA etc

Purpose: 1) Discussion and exchange of opinion2) Finding of potential geothermal sites3) Preparation for scheme of pre-FS

15

Page 16: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WG

Area BerlistrikArea sulit dijangkau Jaringan Listrik karena TerpencarJaringan Jaringan 20 kVRencana interkoneksi terkendala hutan lindungPLTD              PLTP

Area BerlistrikArea sulit dijangkau Jaringan Listrik karena TerpencarJaringan Jaringan 20 kVRencana interkoneksi terkendala hutan lindungPLTD              PLTP

Ulumbu

Ulumbu in Flores (Indonesia)

Pre-FS of potential geothermal site in NTT area for mutual cooperation

Site Location: Ulumbu (Not existing WKP of PLN, but extended area as free zone) Capacity: 1 x 20MW or 2 x 10MW Pre-FS period: from September 2012 to February 2013Project Scheme: Private project utilizing public private partnership (PPP) under JICA

or other type of support (several options of scenario) 16

Page 17: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WG

1. INTRODUCTION OF WG

17

2. INDONESIAN Sub WG

3. LATIN AMERICAN Sub WG

4. OTHER ACTIVITY

Page 18: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WGLatin American SWG

SWG Leader:

SWG Sub Leader:

SWG Members:

Latin American SWG

Observer: METI, JICA, JETRO 18

Page 19: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WGLatin American SWG

SWG StartedFeb, 2012

Pre Mission

Sept 2012

Main Mission Feb 2013

Proposal to Host Country

Objective of this Mission

This mission is to collect the necessary information, site investigation and establishment of network with host country’s organization to make necessary preparation for Feasibility Study by Japanese Government SupportProgram in 2013.

TARGET COUNTRIES

COLOMBIAPERUGUATEMARA and other potential countries

Collection of InformationSite investigation andNetwork Establishment

Feasibility StudyUnder Japanese GovernmentalSupport

YEAR 2012 YEAR 2013

19

Page 20: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WG

Period: Sept 5 – 14 , 2012 Schedule: Sept 6 – 8 Guatemala

MEM, SEGEPLAN, INDESept 9 – 12 Colombia

APC, MME, IPSE, UPME, INGEOMINASCREG, ISAGEN, EPM

Sept 13 - 14 PeruMEF, SERNANP, INGEMMET, OSINERGMINMEM

Latin American Mission (1st mission in Sept 2012)

Member: Nippon Koei, Itochu Corp, Toshiba etcPlace to Visit: Guatemala, Colombia and Peru

EOJ, JICA, JETRO etcPurpose: 1) Discussion and exchange of opinion

2) Finding of potential geothermal sites3) Preparation for scheme of pre-FS

20

Page 21: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WG

1. INTRODUCTION OF WG

21

2. INDONESIAN Sub WG

3. LATIN AMERICAN Sub WG

4. OTHER ACTIVITY

Page 22: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WG

22

1. Presentation inviting guest presenterfrom New Zealand, Iceland etc for geothermaldevelopment and exchange opinion at WG

New Zealand : Sept 30, 2011Presenter Mighty River PowerFeb 27, 2012Presenter Auckland University

Iceland : Dec 5, 2011Presenter Iceland Embassy

Takanawa Partners

Page 23: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WG

23

2. Investigation and Study of overseas countriesof geothermal development

WG set up the special SWG for this purposeto investigate and study update informationof the geothermal in fifteen (15) countries forpower plant reference, geothermal resource,government incentive, future project schedule,etc.

Page 24: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

Geothermal Power Generation WG

Conculusion

WG and Japanese private sectors would like to continue to developgeothermal projects world wide with strong support by Japanese

government agencies. We will be pleased to render our services of providing a state-of the-art

technology for steam turbine, geothermal resources & plant engineering, financing support and other expertise by Japan which have been

successfully applied in many countries.

24

Page 25: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico

THANK YOU

Address : c/o Energy Conservation Center, Japan Geo Hatchobori Bldg.,3-19-9,Hatchobori, Chuo-ku, Tokyo 104-0032, Japan

Tel : +81-3-5543-3024 Fax +81-5543-3032 E-mail : [email protected] : http://www.jase-w.eccj.or.jp

Japanese Business Alliance for Smart Energy Worldwide(JASE-World)

Geothermal Power Generation WG

25