![Page 1: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/1.jpg)
Tadashi KanedaAssit General ManagerFuji Electric Co., Ltd.
Head of Geothermal WG
FEALAC ECO Business Promotion Conference
Geothermal Power Generation Japanese Public and Private Business Alliance
November 13, 2012
Geothermal Power Generation WG
1
![Page 2: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/2.jpg)
Geothermal Power Generation WG
1. INTRODUCTION OF WG
2
2. INDONESIAN Sub WG
3. LATIN AMERICAN Sub WG
4. OTHER ACTIVITY
CONTENTS
![Page 3: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/3.jpg)
Geothermal Power Generation WG
1. INTRODUCTION OF WG
3
2. INDONESIAN Sub WG
3. LATIN AMERICAN Sub WG
4. OTHER ACTIVITY
![Page 4: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/4.jpg)
Japanese BusinessAlliance forSmartEnergy- Worldwide
Chairman of JASE-World:
Mr. H. Yonekura
Member: 72companies 20 associations
Observer: 12 governmental organizations
Promote Japanese Smart Energy Products & Technologies
to the World on Business Basis
Objectives of JASE-World
Contribute to Solve:
Global Warming & Energy
Security Issues
Major Activities
• Publication of “Japanese Smart Energy Products & Technologies”• Discussion & Practice of Project Finding by 4 Working Groups
(Energy saving solution, Heat pump & Inverter, Solar power generation, Geothermal power generation)
• Arrangement of Business matching Meeting Abroad• Introduction of JASE-World activities at International Exhibitions and other occasions
Geothermal Power Generation WG
4
![Page 5: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/5.jpg)
The objective of the WG is to study any and all possibilities for implementing overseas geothermal power projects.
The Indonesia SWG and Latin American SWG were organized to review and analyze the business opportunities among members under cooperation with METI, JICA, JBIC and JETRO.
WG also set up the workshop with other countries (such as New Zealand and Iceland) to talk about bilateral collaboration for development of geothermal power plant in the world.
Working Group forWorking Group for Geothermal PowerGeothermal Power GenerationGeneration
Geothermal Power Generation WG
5
![Page 6: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/6.jpg)
Corporate members: Fuji Electric Co., Ltd. (Leader), Mizuho Corporate Bank Ltd, Itochu Corporation, Kyushu Electric Power Co., Inc., JFE Engineering Corp., JFE Steel Corp., Nippon Steel & Sumikin Engineering Co., Ltd., Sumitomo Corp., Sojitsu Corp., Electric Power Development Co., Ltd., Toshiba Corp., Toyo Engineering Corp., Toyota Tsusho Corp., JGC Corp., Nippon Koei Co., Ltd., Hitachi Zosen Corp., Marubeni Corp., Mitsui Sumitomo Corporate Bank, Mitsui and Co. Ltd, Mitsubishi Heavy Industries, Ltd., Mitsubishi Corp., Tokyo Mitsubishi UFJ Corp Bank, Mitsubishi UFJ lease & Finance, Yokogawa Electric Co., Ltd. (24 companies)
Association members:Japan Geothermal Developers' Council
Observers: Ministry of Economy, Trade and Industry (METI) Japan International Cooperation Agency (JICA) Japan Bank for International Cooperation (JBIC) The Institute of Energy Economics, Japan (IEEJ) Japan External Trade Organization (JETRO)
Geothermal Power Generation WG
6
![Page 7: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/7.jpg)
Geothermal Power Generation WG
Steam Turbine / EPC
Project Coordination
Engineering & Consultation
Operation and Maintenance
Many of Expertise by Japanese Alliance
Finance (with support of JICA/JBIC)7
33%
20%
23%
24%
ABCOthers
Japanese Turbine Manufacturer(A+B+C) Almost 70% of share
Many of geothermalproject has been successfully constructedwith JICA ODA loan
Japanese EPC contractoraccumulated its knowhow of project management with many experience in overseas.
![Page 8: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/8.jpg)
Installed Capacity of Geothermal Power Plants in the World
0 5,000 10,000 15,000 20,000
2015
2010
2005
2000
1995
1990
USA PhilippinesMexico
Indonesia
Italy
Japan
New Zealand
Iceland
Others(forcast)
Source : Geothermal Power Generation in the World, 2005-2010 Update ReportRuggero Bertani, Proceedings World Geothermal Congress 2010, etc.
Geothermal Power Generation WG
8
![Page 9: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/9.jpg)
Geothermal Power Generation WG
9
Subjects of Geothermal Development
Legal framework or business development model etc
Coordination with local community or environmental certification
Local community
Solution SubjectsItems
FIT, tax incentive and other support
$/KWH is relatively high compared with other non-RE type power source
Incentive
Technical R & DFinancial solution (insurance, fund etc)
Initial stages for drilling to ensure the capability
Resource Risk
![Page 10: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/10.jpg)
Geothermal Power Generation WG
1. INTRODUCTION OF WG
10
2. INDONESIAN Sub WG
3. LATIN AMERICAN Sub WG
4. OTHER ACTIVITY
![Page 11: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/11.jpg)
Geothermal Power Generation WGLatin American SWG
SWG Leader:
SWG Sub Leader:
SWG Members:
Indonesia SWG
Observer: METI, JICA, JETRO 11
![Page 12: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/12.jpg)
Geothermal Power Generation WG
Potential of Geothermal in Indonesia is the largest in the world, 40% of world reserve, amounting about 29,000MW.Indonesian Government is keen in development of geothermal and established the road map targeting 9,500MW by 2025.
Japanese private sectors are in high level of its technology and experiencein steam turbine, engineering, resource management, project coordination andinvestment. We are much interested in the emerging market of Indonesia andready to support of the program of development in Indonesia
STRONG PARTNERSHIP OF INDONESIA AND JAPAN
COLLABORATION OF MUTUAL BENEFIT
Indonesia Japan
12
![Page 13: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/13.jpg)
Geothermal Power Generation WG
Example : Project Constructed by Consortium of Japanese CompanyUlubelu (Indonesia) – JICA Loan
Location: South Sumatra, Indonesia
Rated Output:Unit 1: 55MW Unit 2: 55MW
(Scheduled Completion Year 2012)
Owner: PT PLN (PERSERO) Steam Turbine Type:
Single Cylinder, Reaction,Condensing
Scope:EPC 13
Ulubelu Site
![Page 14: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/14.jpg)
Indonesia SWG
StartedDec, 2010
First Mission
July 2011
Second Mission
Dec 2011
Implementation of Pre-FSIn Flores
From Sept 2012 to Feb 2013
Report to Indonesia and discussion for
next stepMarch 2013
Schedule of Project Finding TARGET
Aim of SWG1. SWG sent a pre-mission in July and a public-private joint mission in December 2011 to
Indonesia for finding a suitable project for pre-FS through discussion with MEMR, PLN and Local Government
2. SWG has selected a suitable potential site at Ulumbu in Flores and started a pre-FS in 2012. Closer coordination and discussion is being made by and between both parties during the pre-FS.
3. SWG will report a result of the pre-FS to MEMR and other key organizations in Indonesia and discuss for a further progress. SWG will prepare and submit several options of scenario for development for discussion. 14
![Page 15: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/15.jpg)
Geothermal Power Generation WG
Period: Dec 12 – 22 , 2011 Schedule: Dec 12: Arrival to JKT
Dec 13: Meeting with MEMR, JICADec 15: Meeting with PLN/Retung
Site Visit to UlumbuDec 16: PLN Kupang, Pemda Propinsi NTT,
Dinas Pertambangan dan Energi, Propinsi NTT
Dec 18: Site Visit to Oka Ile Ange Dec 20: Meeting with Dinas ESDM Jambi Dec 21: Leaving from JKT
Indonesia Mission (2nd mission in Dec 2011)
Member: METI, Fuji Electric, Nippon Koei, MHI, Itochu Corp, Nippon Steel Engineering
Place to Visit: MEMR, PLN, Dinas ESDM, EOJ, JICA etc
Purpose: 1) Discussion and exchange of opinion2) Finding of potential geothermal sites3) Preparation for scheme of pre-FS
15
![Page 16: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/16.jpg)
Geothermal Power Generation WG
Area BerlistrikArea sulit dijangkau Jaringan Listrik karena TerpencarJaringan Jaringan 20 kVRencana interkoneksi terkendala hutan lindungPLTD PLTP
Area BerlistrikArea sulit dijangkau Jaringan Listrik karena TerpencarJaringan Jaringan 20 kVRencana interkoneksi terkendala hutan lindungPLTD PLTP
Ulumbu
Ulumbu in Flores (Indonesia)
Pre-FS of potential geothermal site in NTT area for mutual cooperation
Site Location: Ulumbu (Not existing WKP of PLN, but extended area as free zone) Capacity: 1 x 20MW or 2 x 10MW Pre-FS period: from September 2012 to February 2013Project Scheme: Private project utilizing public private partnership (PPP) under JICA
or other type of support (several options of scenario) 16
![Page 17: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/17.jpg)
Geothermal Power Generation WG
1. INTRODUCTION OF WG
17
2. INDONESIAN Sub WG
3. LATIN AMERICAN Sub WG
4. OTHER ACTIVITY
![Page 18: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/18.jpg)
Geothermal Power Generation WGLatin American SWG
SWG Leader:
SWG Sub Leader:
SWG Members:
Latin American SWG
Observer: METI, JICA, JETRO 18
![Page 19: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/19.jpg)
Geothermal Power Generation WGLatin American SWG
SWG StartedFeb, 2012
Pre Mission
Sept 2012
Main Mission Feb 2013
Proposal to Host Country
Objective of this Mission
This mission is to collect the necessary information, site investigation and establishment of network with host country’s organization to make necessary preparation for Feasibility Study by Japanese Government SupportProgram in 2013.
TARGET COUNTRIES
COLOMBIAPERUGUATEMARA and other potential countries
Collection of InformationSite investigation andNetwork Establishment
Feasibility StudyUnder Japanese GovernmentalSupport
YEAR 2012 YEAR 2013
19
![Page 20: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/20.jpg)
Geothermal Power Generation WG
Period: Sept 5 – 14 , 2012 Schedule: Sept 6 – 8 Guatemala
MEM, SEGEPLAN, INDESept 9 – 12 Colombia
APC, MME, IPSE, UPME, INGEOMINASCREG, ISAGEN, EPM
Sept 13 - 14 PeruMEF, SERNANP, INGEMMET, OSINERGMINMEM
Latin American Mission (1st mission in Sept 2012)
Member: Nippon Koei, Itochu Corp, Toshiba etcPlace to Visit: Guatemala, Colombia and Peru
EOJ, JICA, JETRO etcPurpose: 1) Discussion and exchange of opinion
2) Finding of potential geothermal sites3) Preparation for scheme of pre-FS
20
![Page 21: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/21.jpg)
Geothermal Power Generation WG
1. INTRODUCTION OF WG
21
2. INDONESIAN Sub WG
3. LATIN AMERICAN Sub WG
4. OTHER ACTIVITY
![Page 22: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/22.jpg)
Geothermal Power Generation WG
22
1. Presentation inviting guest presenterfrom New Zealand, Iceland etc for geothermaldevelopment and exchange opinion at WG
New Zealand : Sept 30, 2011Presenter Mighty River PowerFeb 27, 2012Presenter Auckland University
Iceland : Dec 5, 2011Presenter Iceland Embassy
Takanawa Partners
![Page 23: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/23.jpg)
Geothermal Power Generation WG
23
2. Investigation and Study of overseas countriesof geothermal development
WG set up the special SWG for this purposeto investigate and study update informationof the geothermal in fifteen (15) countries forpower plant reference, geothermal resource,government incentive, future project schedule,etc.
![Page 24: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/24.jpg)
Geothermal Power Generation WG
Conculusion
WG and Japanese private sectors would like to continue to developgeothermal projects world wide with strong support by Japanese
government agencies. We will be pleased to render our services of providing a state-of the-art
technology for steam turbine, geothermal resources & plant engineering, financing support and other expertise by Japan which have been
successfully applied in many countries.
24
![Page 25: FEALAC ECO Business Promotion Conference …Installed Capacity of Geothermal Power Plants in the World 0 5,000 10,000 15,000 20,000 2015 2010 2005 2000 1995 1990 USA Philippines Mexico](https://reader034.vdocuments.us/reader034/viewer/2022042316/5f054c2a7e708231d4124445/html5/thumbnails/25.jpg)
THANK YOU
Address : c/o Energy Conservation Center, Japan Geo Hatchobori Bldg.,3-19-9,Hatchobori, Chuo-ku, Tokyo 104-0032, Japan
Tel : +81-3-5543-3024 Fax +81-5543-3032 E-mail : [email protected] : http://www.jase-w.eccj.or.jp
Japanese Business Alliance for Smart Energy Worldwide(JASE-World)
Geothermal Power Generation WG
25