fd10 flight plan revision · 14/04/2010 · kudos on completion of all three evas and the great...
TRANSCRIPT
![Page 1: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/1.jpg)
STS-131/19A FD 10 Execute Package
MSG Page(s) Title
075A 1 - 15 FD10 Flight Plan Revision
076 16 - 17 FD10 Mission Summary
077 18 - 20 FD10 Transfer Message
078 21 FD10 Crew Choice Downlink
079 22 FD10 EVA Deltas
080 23 - 24 Big Picture for Myco Experiment during 19A
081 25 - 39 19A EVA Restow and ULF4 Tool Config
082A 40 CBM Center Disk Cover Locate
083 --- FD10 PAO Event Summary Message: Eastern Guilford High School
084 --- FD10 PAO Event Summary Message: Joint Crew News Conference
085A 41 - 46 5MLE Bag Layout Updates Approved by FAO: L. Rush
Last Updated: Apr 14 2010 3:20 AM GMT JEDI (Joint Execute package Development and Integration), v3.0 Comedy is on the inside cover.
![Page 2: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/2.jpg)
![Page 3: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/3.jpg)
MSG 075A - FD10 FLIGHT PLAN REVISION
1 MSG INDEX 2
3 MSG NO. TITLE 4
5 6 7 8 9
10 11 12 13 14 15 16 17
MSG-075 FD10 Flight Plan Revision MSG-076 FD10 Mission Summary MSG-077 FD10 Transfer Message MSG-078 FD10 Crew Choice Downlink MSG-079 FD 10 EVA Deltas MSG-080 Big Picture for Myco Experiment during 19A MSG-081 19A EVA Restow and ULF4 Tool Config MSG-082A CBM Center Disk Cover Locate MSG-083 FD10 PAO Event Summary Message: Eastern Guilford High School MSG-084 FD10 PAO Event Summary Message: Joint Crew News Conference MSG-085A 5MLE Bag Layout Updates 1. Post-Sleep Cryo Config 18
19
20
21
22
23
For today's post-sleep cryo config, O2 and H2 tanks 1 and 5 will be active. R1 O2,H2 MANF VLV TK1 (two) - OP (tb-OP) Pre-Sleep Cryo Config 24
25
26
27
28
29 30
31
32
33
34
35
36
37
38
39
40 41
√MCC for deltas prior to configuring for pre-sleep. For tonight's pre-sleep cryo config, manifold 2 will be closed with O2 tanks 2, 3 and 4, and H2 tanks 2 and 5 active. R1 O2 TK1 HTR A - OFF TK2 HTR A - AUTO TK3 HTR A - AUTO H2 TK1 HTRS A,B (two) - OFF TK2 HTRS A,B (two) - AUTO O2, H2 MANF VLV TK2 (two) - CL (tb-CL) A11 CRYO TK4 HTR O2 A - AUTO
A15 CRYO TK5 HTR O2 A - OFF
2. Comm Loop Overview for Flight Day 10: 42 S/G 1 & A/G 1 S/G 2 A/G 2 43
44 45 46 47 48 49 50
Node 2 CBM CPA Ops PAO Event Transfer O2 Transfer Setup/Init Educational Event All other STS Comm Russian Ops ISS Payloads DPC ISS Crew PFCs All other ISS Comm
END OF PAGE 1 OF 15, MSG 075A 111
![Page 4: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/4.jpg)
MSG 075A - FD10 FLIGHT PLAN REVISION
END OF PAGE 2 OF 15, MSG 075A
1 3. STS-131/19A FD9 - MMT Summary 2
The MMT met very briefly today to review orbiter systems and mission progress. 3 4 5 6 7 8 9
10 11 12 13 14
Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well. The engineering team has no concerns with the MMOD hit (< 1mm) on the window 1 thermal pane. The bounding analysis performed on previous flights indicates anything less than 12mm in diameter (.49 inches) is not a concern for the windows. Enjoy your well deserved “OFF DUTY” Part II.
4. CDR PFC 15 Dex, due to ratty Shuttle comm at the time of your PFC, we have moved your PFC to an SSC in the ISS. Please tag up with one of the ISS Crew to configure the SSC and S/G 2 audio. Please inform MCC which SSC you will be using.
16 17 18 19
5. WHC/WCS Configuration & Management 20 We have evaluated the waste generation data and have confirmed that you can return to the preflight agreement of 4 Shuttle crew on the WHC and 3 Shuttle crew on the WCS starting this morning. EECOM predicts a Shuttle waste tank quantity of ~88% at the start of the FD13 post-undocking waste dump.
21 22 23 24 25
27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
6. REPLACE PAGES 2-34, 2-36, 2-38 AND 3-106 THROUGH 3-115. 26
222
![Page 5: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/5.jpg)
FLT PLN/131/FLT
POINDEXTER
DUTTON
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
METCALF-
LINDENBURGER
FD09
β =
6
FD10
REPLANNED
2-34
S T S - 1 3 1
17
18
19
20
21
22
23
04/14
01
02
03
04
GMT 04/13/10 (103)
06
07
08
09
10
11
12
13
14
15
16
17
18
MET
Day 008
CDR
SLEEP
PRE SLEEP
PMC
A/G
PRE SLEEP
POST SLEEP
PLT
SLEEP
PRE SLEEP
POST SLEEP
MS1
SLEEP
PRE SLEEP
POST SLEEP
A S P R N
MS2
SLEEP
POST SLEEP
PRE SLEEP
MS3
SLEEP
L O GPOST SLEEP
PRE SLEEP
MS4
L O GSLEEP
X F E R
T A G U P
XFER
BRIEF
POST SLEEP
PRE SLEEP
PRE
SLEEP
P R E
S L E E P
MS5
SLEEP
PRE SLEEP
POST SLEEP
A S P R N
L O G
TDRS
W E ZDAY/NIGHT
ORBIT
131
132
133
134
135
136
137
138
BIAS -XLV -ZVV
ORB ATT
TDRS
AVAIL
NOTES
2-34
POINDEXTER
DUTTON
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
METCALF-
LINDENBURGER
FD09
β =
6
FD10
REPLANNED
S T S - 1 3 1
17
18
19
20
21
22
23
04/14
01
02
03
04
GMT 04/13/10 (103)
06
07
08
09
10
11
12
13
14
15
16
17
18
MET
Day 008
CDR
SLEEP
PRE SLEEP
PMC
A/G
PRE SLEEP
POST SLEEP
PLT
SLEEP
PRE SLEEP
POST SLEEP
MS1
SLEEP
PRE SLEEP
POST SLEEP
A S P R N
MS2
SLEEP
POST SLEEP
PRE SLEEP
MS3
SLEEP
L O GPOST SLEEP
PRE SLEEP
MS4
L O GSLEEP
X F E R
T A G U P
XFER
BRIEF
POST SLEEP
PRE SLEEP
PRE
SLEEP
P R E
S L E E P
MS5
SLEEP
PRE SLEEP
POST SLEEP
A S P R N
L O G
TDRS
W E ZDAY/NIGHT
ORBIT
131
132
133
134
135
136
137
138
ORB ATT
BIAS -XLV -ZVV
TDRS
AVAIL
NOTES
333
![Page 6: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/6.jpg)
FLT PLN/131/FLT
POINDEXTER
DUTTON
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
METCALF-
LINDENBURGER
FD10
β =
8
REPLANNED
2-36
S T S - 1 3 1
05
06
07
08
09
10
11
12
13
14
15
16
GMT 04/14/10 (104)
18
19
20
21
22
23
009/00
01
02
03
04
05
06
MET
Day 008
CDR
C R E W
P H O T O
POST SLEEP
MEAL
OFF DUTY
PFC
OCA
EXERCISE
OFF DUTY
C W C
X F E R
C W C # 5
I N I T
C W C
T E R M
PWR
#1
FILL
N 2 - I
N 2 - T
I M U
CREW
CONF
OFF DUTY
P W R
X F E R
POST
SLEEP
PLT
W C S ^
C R E W
P H O T O
POST SLEEP
MEAL
OFF DUTY
PFC
OCA
E X E R
C I S E
MPLM XFER
P/TV08
EXT
SRVY
P T V 0 8
S / UOFF DUTY
CREW
CONF
P T V 0 8
MS1
C R E W
P H O T O
EVA TOOL RESTOW
POST SLEEP
MEAL
OFF DUTY
OFF DUTY
EXERCISE
PGT
C/O
MPLM XFER
CREW
CONF
MS2
C R E W
P H O T O
POST SLEEP
MEAL
OFF DUTY
EXERCISE
MPLM XFER
CREW
CONF
OFF DUTY
M C I U
MS3
C R E W
P H O T O
POST SLEEP
MEAL
OFF DUTY
OFF DUTY
EXERCISE
MPLM
RACK
CONFIG
X F E R
U P D A T
MPLM PIVOT REMOVE
CREW
CONF
MPLM XFER
MS4
MPLM
RACK
CONFIG
C R E W
P H O T O
POST SLEEP
MEAL
OFF DUTY
PFC
OCA
EXER-
CISE
MPLM XFER
M D D K
CREW
CONF
N S X F E R
OFF DUTY
MS5
C R E W
P H O T O
N2N-CBM-CPA-INSTALL
POST SLEEP
MEAL
OFF DUTY
PFC
OCA
EXERCISE
OFF DUTY
O F F
D U T Y
CREW
CONF
MPLM XFER
C D C
L O C A T E
TDRS
W E ZDAY/NIGHT
ORBIT
139
140
141
142
143
144
145
146
BIAS -XLV -ZVV
ORB ATT
TDRS
AVAIL
^COMPACT
NOTES
2-36
POINDEXTER
DUTTON
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
METCALF-
LINDENBURGER
FD10
β =
8
REPLANNED
S T S - 1 3 1
05
06
07
08
09
10
11
12
13
14
15
16
GMT 04/14/10 (104)
18
19
20
21
22
23
009/00
01
02
03
04
05
06
MET
Day 008
CDR
C R E W
P H O T O
POST SLEEP
MEAL
OFF DUTY
PFC
OCA
EXERCISE
OFF DUTY
C W C
X F E R
C W C # 5
I N I T
C W C
T E R M
PWR
#1
FILL
N 2 - I
N 2 - T
I M U
CREW
CONF
OFF DUTY
P W R
X F E R
POST
SLEEP
PLT
W C S ^
C R E W
P H O T O
POST SLEEP
MEAL
OFF DUTY
PFC
OCA
E X E R
C I S E
MPLM XFER
P/TV08
EXT
SRVY
P T V 0 8
S / UOFF DUTY
CREW
CONF
P T V 0 8
MS1
C R E W
P H O T O
EVA TOOL RESTOW
POST SLEEP
MEAL
OFF DUTY
OFF DUTY
EXERCISE
PGT
C/O
MPLM XFER
CREW
CONF
MS2
C R E W
P H O T O
POST SLEEP
MEAL
OFF DUTY
EXERCISE
MPLM XFER
CREW
CONF
OFF DUTY
M C I U
MS3
C R E W
P H O T O
POST SLEEP
MEAL
OFF DUTY
OFF DUTY
EXERCISE
MPLM
RACK
CONFIG
X F E R
U P D A T
MPLM PIVOT REMOVE
CREW
CONF
MPLM XFER
MS4
MPLM
RACK
CONFIG
C R E W
P H O T O
POST SLEEP
MEAL
OFF DUTY
PFC
OCA
EXER-
CISE
MPLM XFER
M D D K
CREW
CONF
N S X F E R
OFF DUTY
MS5
C R E W
P H O T O
N2N-CBM-CPA-INSTALL
POST SLEEP
MEAL
OFF DUTY
PFC
OCA
EXERCISE
OFF DUTY
O F F
D U T Y
CREW
CONF
MPLM XFER
C D C
L O C A T E
TDRS
W E ZDAY/NIGHT
ORBIT
139
140
141
142
143
144
145
146
ORB ATT
BIAS -XLV -ZVV
TDRS
AVAIL
NOTES
^COMPACT
444
![Page 7: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/7.jpg)
FLT PLN/131/FLT
POINDEXTER
DUTTON
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
METCALF-
LINDENBURGER
β =
11
FD10
REPLANNED
2-38
S T S - 1 3 1
17
18
19
20
21
22
23
04/15
01
02
03
04
GMT 04/14/10 (104)
06
07
08
09
10
11
12
13
14
15
16
17
18
MET
Day 009
CDR
P A O E D U
E V E N TSLEEP
PMC
A/G
PRE SLEEP
PRE SLEEP
OFF DUTY
PLT
SLEEP
EXER CISE
X F E R
T A G U P
PRE SLEEP
M Y C O *
MS1
SLEEP
PRE
SLEEPPFC
OCA
OFF DUTY
PRE SLEEP
M Y C O *
MS2
SLEEP
PFC
OCA
P A O E D U
E V E N TPRE SLEEP
OFF DUTY
PRE
SLEEP
MS3
P A O E D U
E V E N TSLEEP
PRE SLEEPPFC
OCA
OFF DUTY
A E M #
M D D K
PRE SLEEP
MS4
SLEEP
PRE SLEEP
OFF
DUTY
E X E R -
C I S E
XFER
BRIEF
X F E R
T A G U P
M Y C O *
PRE
SLEEP
MS5
SLEEP
OFF DUTY
P A O E D U
E V E N TPRE SLEEP
TDRS
W E ZDAY/NIGHT
ORBIT
147
148
149
150
151
152
153
154
BIAS -XLV -ZVV
ORB ATT
TDRS
AVAIL
*REVIEW
#STATUS CHECK
NOTES
2-38
POINDEXTER
DUTTON
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
METCALF-
LINDENBURGER
β =
11
FD10
REPLANNED
S T S - 1 3 1
17
18
19
20
21
22
23
04/15
01
02
03
04
GMT 04/14/10 (104)
06
07
08
09
10
11
12
13
14
15
16
17
18
MET
Day 009
CDR
P A O E D U
E V E N TSLEEP
PMC
A/G
PRE SLEEP
PRE SLEEP
OFF DUTY
PLT
SLEEP
EXER CISE
X F E R
T A G U P
PRE SLEEP
M Y C O *
MS1
SLEEP
PRE
SLEEPPFC
OCA
OFF DUTY
PRE SLEEP
M Y C O *
MS2
SLEEP
PFC
OCA
P A O E D U
E V E N TPRE SLEEP
OFF DUTY
PRE
SLEEP
MS3
P A O E D U
E V E N TSLEEP
PRE SLEEPPFC
OCA
OFF DUTY
A E M #
M D D K
PRE SLEEP
MS4
SLEEP
PRE SLEEP
OFF
DUTY
E X E R -
C I S E
XFER
BRIEF
X F E R
T A G U P
M Y C O *
PRE
SLEEP
MS5
SLEEP
OFF DUTY
P A O E D U
E V E N TPRE SLEEP
TDRS
W E ZDAY/NIGHT
ORBIT
147
148
149
150
151
152
153
154
ORB ATT
BIAS -XLV -ZVV
TDRS
AVAIL
NOTES
*REVIEW
#STATUS CHECK
555
![Page 8: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/8.jpg)
FLT PLN/131/FLT
FD10
POINDEXTER
DUTTON
METCALF-
LINDENBURGER
FD10 EZ ACTIVITIES:
TEP
C (O
RB O
PS,
CREW
SYS
TEMS
) Ch
eck
Stat
us C
heck MDDK Duct Screen
Har
d re
boot
all
PGS
Cs n
ot
shut down overnight.
REPLANNED
AN2 REPRESS USING P/L N2 VLVS
(ORB OPS, ECLS)Steps 1,3-7
MCC will TMBU S/W FDA
3-106
STS-
131/
19A
FD
03:00
04:00
05:00
06:00
GMT
Date
04/14
(104)
16:00
17:00
18:00
19:00
20:00
MET
Day 008
WE
Z
T D R S
~
~
~
D / N
O R B 1 3 7 1 3 8 1 3 9 1 4 0
~ ~B I A S - X L V - Z V VS T S A T T
CDR
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
N2 REPRESS INIT A
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
PLT
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
P/TV08 EXTERNAL SURVEY
(P/TV, SCENES)
OPS, Item 2 for ISS Survey
~
P/TV08 EXTERNAL SURVEY
(P/TV, SCENES)
SETUP, Step 2
MS2
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
L17 Check MCIU filter screen
NOTES
3-106
FD10
POINDEXTER
DUTTON
METCALF-
LINDENBURGER
FD10 EZ ACTIVITIES:
TEP
C (O
RB O
PS,
CREW
SYS
TEMS
) Ch
eck
Stat
us C
heck MDDK Duct Screen
Har
d re
boot
all
PGS
Cs n
ot
shut down overnight.
REPLANNED
AN2 REPRESS USING P/L N2 VLVS
(ORB OPS, ECLS)Steps 1,3-7
MCC will TMBU S/W FDA
STS-
131/
19A
FD
03:00
04:00
05:00
06:00
GMT
Date
04/14
(104)
16:00
17:00
18:00
19:00
20:00
MET
Day 008
WE
Z
T D R SD / N
O R B 1 3 7 1 3 8 1 3 9 1 4 0
S T S A T T ~ ~B I A S - X L V - Z V V
CDR
~
SLEEP
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
N2 REPRESS INIT A
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
PLT
~
SLEEP
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
P/TV08 EXTERNAL SURVEY
(P/TV, SCENES)
OPS, Item 2 for ISS Survey
P/TV08 EXTERNAL SURVEY
(P/TV, SCENES)
SETUP, Step 2
MS2
~
SLEEP
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
L17 Check MCIU filter screen
NOTES
666
![Page 9: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/9.jpg)
FLT PLN/131/FLT
FD10
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
REPLANNED
3-107
STS-
131/
19A
FD
03:00
04:00
05:00
06:00
GMT
Date
04/14
(104)
16:00
17:00
18:00
19:00
20:00
MET
Day 008
WE
Z
T D R S
~
~
~
D / N
O R B 1 3 7 1 3 8 1 3 9 1 4 0
~ ~B I A S - X L V - Z V VS T S A T T
MS1
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EVA CREW: TAKE 1 ASPIRIN (325mg)
MS3
SLEEP
~
SLEEP LOGBOOK (SDBI 1634)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
DAILY TRANSFER LIST UPDATE
Ref. Transfer Lists & MSG 077
MS4
SLEEP LOGBOOK (SDBI 1634)
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS5
SLEEP
~
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EVA CREW: TAKE 1 ASPIRIN (325mg)
SLEEP LOGBOOK (SDBI 1634)
NOTES
3-107
FD10
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
REPLANNED
STS-
131/
19A
FD
03:00
04:00
05:00
06:00
GMT
Date
04/14
(104)
16:00
17:00
18:00
19:00
20:00
MET
Day 008
WE
Z
T D R SD / N
O R B 1 3 7 1 3 8 1 3 9 1 4 0
S T S A T T ~ ~B I A S - X L V - Z V V
MS1
~
SLEEP
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EVA CREW: TAKE 1 ASPIRIN (325mg)
MS3
~
SLEEP
SLEEP LOGBOOK (SDBI 1634)
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
DAILY TRANSFER LIST UPDATE
Ref. Transfer Lists & MSG 077
MS4
SLEEP LOGBOOK (SDBI 1634)
~
SLEEP
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS5
~
SLEEP
POST-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
EVA CREW: TAKE 1 ASPIRIN (325mg)
SLEEP LOGBOOK (SDBI 1634)
NOTES
777
![Page 10: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/10.jpg)
FLT PLN/131/FLT
FD10
POINDEXTER
DUTTON
METCALF-
LINDENBURGER
BN2 REPRESS USING P/L N2 VLVS
(ORB OPS, ECLS)
on MCC go, perform steps 8-13
MCC will TMBU S/W FDA
REPLANNED
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
N2 REPRESS TERM (On MCC GO) B
3-108
STS-
131/
19A
FD
07:00
08:00
09:00
10:00
GMT
Date
04/14
(104)
20:00
21:00
22:00
23:00
00:00
MET
Day 008
WE
Z
T D R S
~
~
D / N
O R B 1 4 0 1 4 1 1 4 2
~ ~B I A S - X L V - Z V VS T S A T T
CDR
MEAL
~
CWC TRANSFER
Transfer 1 CWC to ISS
SHUTTLE/ISS H2O CONTAINER FILL (HC)
(ORB OPS, ECLS)
Perform CWC FILL #5, Ref. MSG 012
SHUTTLE/ISS H2O CONTAINER FILL (HC)
(ORB OPS, ECLS)
Perform FILL TERMINATION
PWR FILL
(ORB OPS, ECLS)
Init Fill #1 (S/N 1005)
Fill duration ~ 30 min
Ref. MSG 012
IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)
PWR TRANSFER
Transfer 1 PWR to ISS
~
PLT
WCS COMPACTOR OPS (DUAL-VANE)
(Cue Card, URINE COLLECTION)
MEAL
~
TRANSFER OPS
Ref. MPLM Transfer Lists
and MSG 077
P/TV08 EXTERNAL SURVEY
(P/TV, SCENES)
OPS, Item 2 for ISS Survey
~
P/TV08 EXTERNAL SURVEY (DEACTIVATION)
(P/TV, SCENES)
MS2
MEAL
~
TRANSFER OPS
Ref. MPLM Transfer Lists
and MSG 077
NOTES
3-108
FD10
POINDEXTER
DUTTON
METCALF-
LINDENBURGER
BN2 REPRESS USING P/L N2 VLVS
(ORB OPS, ECLS)
on MCC go, perform steps 8-13
MCC will TMBU S/W FDA
REPLANNED
POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)
N2 REPRESS TERM (On MCC GO) B
STS-
131/
19A
FD
07:00
08:00
09:00
10:00
GMT
Date
04/14
(104)
20:00
21:00
22:00
23:00
00:00
MET
Day 008
WE
Z
T D R SD / N
O R B 1 4 0 1 4 1 1 4 2
S T S A T T ~ ~B I A S - X L V - Z V V
CDR
~
MEAL
CWC TRANSFER
Transfer 1 CWC to ISS
SHUTTLE/ISS H2O CONTAINER FILL (HC)
(ORB OPS, ECLS)
Perform CWC FILL #5, Ref. MSG 012
SHUTTLE/ISS H2O CONTAINER FILL (HC)
(ORB OPS, ECLS)
Perform FILL TERMINATION
PWR FILL
(ORB OPS, ECLS)
Init Fill #1 (S/N 1005)
Fill duration ~ 30 min
Ref. MSG 012
IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)
PWR TRANSFER
Transfer 1 PWR to ISS
~
PLT
WCS COMPACTOR OPS (DUAL-VANE)
(Cue Card, URINE COLLECTION)
~
MEAL
TRANSFER OPS
Ref. MPLM Transfer Lists
and MSG 077
~P/TV08 EXTERNAL SURVEY
(P/TV, SCENES)
OPS, Item 2 for ISS Survey
P/TV08 EXTERNAL SURVEY (DEACTIVATION)
(P/TV, SCENES)
MS2
~
MEAL
TRANSFER OPS
Ref. MPLM Transfer Lists
and MSG 077
NOTES
888
![Page 11: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/11.jpg)
FLT PLN/131/FLT
FD10
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
REPLANNED
TRANSFER OPS
Transfer Nanoskelton samples
Ref. Middeck Transfer List:
Return Item 431.1
PGT C/O (EVA, TOOLS AND STOWAGE)
Checkout PGT s/n 1004
Ref. Transfer Lists: MPLM Resupply
item 187 & Middeck Return Item 707
3-109
STS-
131/
19A
FD
07:00
08:00
09:00
10:00
GMT
Date
04/14
(104)
20:00
21:00
22:00
23:00
00:00
MET
Day 008
WE
Z
T D R S
~
~
D / N
O R B 1 4 0 1 4 1 1 4 2
~ ~B I A S - X L V - Z V VS T S A T T
MS1
EVA TOOL RESTOW
Ref. MSG 079
Ref. MSG 081
MEAL
~
TRANSFER OPS
Ref. MPLM Transfer Lists
and MSG 077
MS3
MEAL
~
S&M: 1.260 CONFIGURE MPLM
RACKS FOR ENTRY
S&M: 1.262 RSP/RSR ROTATE UP
Steps 1-4
Ref. MPLM Return Transfer
List: Item 824
TRANSFER OPS
Ref. MPLM Transfer Lists
and MSG 077
MS4
S&M: 1.260 CONFIGURE MPLM
RACKS FOR ENTRY MEAL
~
TRANSFER OPS
Ref. MPLM Transfer Lists
and MSG 077
MERLIN STATUS CK (Cue Card)
GLACIER STATUS CK (Cue Card)
STL STATUS CK (Cue Card)
MS5
S&M: 1.100 CBM CONTROLLER PANEL
ASSEMBLY INSTALLATION - GENERIC
MEAL
~
TRANSFER OPS
Ref. MPLM Transfer Lists
and MSG 077
CBM CENTER DISK COVER
LOCATE
Ref. MSG 082
NOTES
3-109
FD10
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
REPLANNED
TRANSFER OPS
Transfer Nanoskelton samples
Ref. Middeck Transfer List:
Return Item 431.1
PGT C/O (EVA, TOOLS AND STOWAGE)
Checkout PGT s/n 1004
Ref. Transfer Lists: MPLM Resupply
item 187 & Middeck Return Item 707
STS-
131/
19A
FD
07:00
08:00
09:00
10:00
GMT
Date
04/14
(104)
20:00
21:00
22:00
23:00
00:00
MET
Day 008
WE
Z
T D R SD / N
O R B 1 4 0 1 4 1 1 4 2
S T S A T T ~ ~B I A S - X L V - Z V V
MS1
EVA TOOL RESTOW
Ref. MSG 079
Ref. MSG 081
~
MEAL
TRANSFER OPS
Ref. MPLM Transfer Lists
and MSG 077
MS3
~
MEAL
S&M: 1.260 CONFIGURE MPLM
RACKS FOR ENTRY
S&M: 1.262 RSP/RSR ROTATE UP
Steps 1-4
Ref. MPLM Return Transfer
List: Item 824
TRANSFER OPS
Ref. MPLM Transfer Lists
and MSG 077
MS4
S&M: 1.260 CONFIGURE MPLM
RACKS FOR ENTRY
~
MEAL
TRANSFER OPS
Ref. MPLM Transfer Lists
and MSG 077
MERLIN STATUS CK (Cue Card)
GLACIER STATUS CK (Cue Card)
STL STATUS CK (Cue Card)
MS5
S&M: 1.100 CBM CONTROLLER PANEL
ASSEMBLY INSTALLATION - GENERIC
~
MEAL
TRANSFER OPS
Ref. MPLM Transfer Lists
and MSG 077
CBM CENTER DISK COVER
LOCATE
Ref. MSG 082
NOTES
999
![Page 12: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/12.jpg)
FLT PLN/131/FLT
FD10
POINDEXTER
DUTTON
METCALF-
LINDENBURGER
REPLANNED
3-110
STS-
131/
19A
FD
11:00
12:00
13:00
14:00
GMT
Date
04/14
(104)
00:00
01:00
02:00
03:00
04:00
MET
Day 009
WE
Z
T D R S
~
~~
D / N
O R B 1 4 3 1 4 4 1 4 5
~ ~B I A S - X L V - Z V VS T S A T T
CDR
CREW PHOTO
MEAL
~
OFF DUTY
EXERCISE
OFF DUTY
~
CREW CONFERENCE
ISS KU AVAIL (01:06-01:47)
Ref. MSG 084
PLT
CREW PHOTO
MEAL
~
OFF DUTY
~
CREW CONFERENCE
ISS KU AVAIL (01:06-01:47)
Ref. MSG 084
MS2
CREW PHOTO
MEAL
~
OFF DUTY
EXERCISE
~
CREW CONFERENCE
ISS KU AVAIL (01:06-01:47)
Ref. MSG 084
NOTES
3-110
FD10
POINDEXTER
DUTTON
METCALF-
LINDENBURGER
REPLANNED
STS-
131/
19A
FD
11:00
12:00
13:00
14:00
GMT
Date
04/14
(104)
00:00
01:00
02:00
03:00
04:00
MET
Day 009
WE
Z
T D R SD / N
O R B 1 4 3 1 4 4 1 4 5
S T S A T T ~ ~B I A S - X L V - Z V V
CDR
CREW PHOTO
~
MEAL
OFF DUTY
EXERCISE
~
OFF DUTY
CREW CONFERENCE
ISS KU AVAIL (01:06-01:47)
Ref. MSG 084
PLT
CREW PHOTO
~
MEAL
~
OFF DUTY
CREW CONFERENCE
ISS KU AVAIL (01:06-01:47)
Ref. MSG 084
MS2
CREW PHOTO
~
MEAL
OFF DUTY
~
EXERCISE
CREW CONFERENCE
ISS KU AVAIL (01:06-01:47)
Ref. MSG 084
NOTES
101010
![Page 13: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/13.jpg)
FLT PLN/131/FLT
FD10
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
C Omit Steps 1.2 & 3
Use A/G 2 for Audio
Inform MCC of which PGSC
will be used
L9 PS ATU A/G (two) - OFF
NETMEETING VIDEO CONFERENCING
(ORB OPS, PGSC)
Private Family Conference
ISS KU AVAIL (02:37-03:23) C
REPLANNED
L9 PS ATU A/G (two) - OFF
NETMEETING VIDEO CONFERENCING
(ORB OPS, PGSC)
Private Family Conference
ISS KU AVAIL (02:37-03:23) C
3-111
STS-
131/
19A
FD
11:00
12:00
13:00
14:00
GMT
Date
04/14
(104)
00:00
01:00
02:00
03:00
04:00
MET
Day 009
WE
Z
T D R S
~
~~
D / N
O R B 1 4 3 1 4 4 1 4 5
~ ~B I A S - X L V - Z V VS T S A T T
MS1
CREW PHOTO
MEAL
~
OFF DUTY
EXERCISE
~
CREW CONFERENCE
ISS KU AVAIL (01:06-01:47)
Ref. MSG 084
MS3
CREW PHOTO
MEAL
~
OFF DUTY
~
CREW CONFERENCE
ISS KU AVAIL (01:06-01:47)
Ref. MSG 084
MS4
CREW PHOTO
MEAL
~
OFF DUTY
CREW CONFERENCE
ISS KU AVAIL (01:06-01:47)
Ref. MSG 084
OFF DUTY
~
MS5
CREW PHOTO
MEAL
~
OFF DUTY
OFF DUTY
~
CREW CONFERENCE
ISS KU AVAIL (01:06-01:47)
Ref. MSG 084
NOTES
3-111
FD10
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
C Omit Steps 1.2 & 3
Use A/G 2 for Audio
Inform MCC of which PGSC
will be used
L9 PS ATU A/G (two) - OFF
NETMEETING VIDEO CONFERENCING
(ORB OPS, PGSC)
Private Family Conference
ISS KU AVAIL (02:37-03:23) C
REPLANNED
L9 PS ATU A/G (two) - OFF
NETMEETING VIDEO CONFERENCING
(ORB OPS, PGSC)
Private Family Conference
ISS KU AVAIL (02:37-03:23) C
STS-
131/
19A
FD
11:00
12:00
13:00
14:00
GMT
Date
04/14
(104)
00:00
01:00
02:00
03:00
04:00
MET
Day 009
WE
Z
T D R SD / N
O R B 1 4 3 1 4 4 1 4 5
S T S A T T ~ ~B I A S - X L V - Z V V
MS1
CREW PHOTO
~
MEAL
OFF DUTY
~
EXERCISE
CREW CONFERENCE
ISS KU AVAIL (01:06-01:47)
Ref. MSG 084
MS3
CREW PHOTO
~
MEAL
~
OFF DUTY
CREW CONFERENCE
ISS KU AVAIL (01:06-01:47)
Ref. MSG 084
MS4
CREW PHOTO
~
MEAL
OFF DUTY
CREW CONFERENCE
ISS KU AVAIL (01:06-01:47)
Ref. MSG 084
~
OFF DUTY
MS5
CREW PHOTO
~
MEAL
OFF DUTY
~
OFF DUTY
CREW CONFERENCE
ISS KU AVAIL (01:06-01:47)
Ref. MSG 084
NOTES
111111
![Page 14: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/14.jpg)
FLT PLN/131/FLT
FD10
POINDEXTER
DUTTON
METCALF-
LINDENBURGER
REPLANNED
MYCO BODY SAMPLE COLLECTION
(ASSY OPS, P/L) Rvw Proc & Ref. MSG 080
L9 PS ATU A/G (two) - OFF
NETMEETING VIDEO CONFERENCING (ORB OPS, PGSC)
Private Family Conference
ISS KU TDRW (04:12-04:56) C
Ratty S-BD until 04:17
OFF DUTY
C Omit Steps 1.2 & 3
Use A/G 2 for Audio
Inform MCC of which PGSC will be used
3-112
STS-
131/
19A
FD
15:00
16:00
17:00
18:00
GMT
Date
04/14
(104)
04:00
05:00
06:00
07:00
08:00
MET
Day 009
WE
Z
T D R S
~
~~
D / N
O R B 1 4 5 1 4 6 1 4 7 1 4 8
~ ~B I A S - X L V - Z V VS T S A T T
CDR
PUBLIC AFFAIRS EVENT
ISS KU AVAIL (06:27-07:12)
Ref. MSG 083
PRIVATE FAMILY CONFERENCE
Ref. MSG 075, item 4
ISS KU AVAIL (05:02-05:17)
OFF DUTY
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
OFF DUTY
PLT
~
EXERCISE
TRANSFER TAGUP
Coordinate with transfer
counterparts
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
OFF DUTY
MS2
EXERCISE
~
PUBLIC AFFAIRS EVENT
ISS KU AVAIL (06:27-07:12)
Ref. MSG 083
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
OFF DUTY
NOTES
3-112
FD10
POINDEXTER
DUTTON
METCALF-
LINDENBURGER
REPLANNED
MYCO BODY SAMPLE COLLECTION
(ASSY OPS, P/L) Rvw Proc & Ref. MSG 080
L9 PS ATU A/G (two) - OFF
NETMEETING VIDEO CONFERENCING (ORB OPS, PGSC)
Private Family Conference
ISS KU TDRW (04:12-04:56) C
Ratty S-BD until 04:17
OFF DUTY
C Omit Steps 1.2 & 3
Use A/G 2 for Audio
Inform MCC of which PGSC will be used
STS-
131/
19A
FD
15:00
16:00
17:00
18:00
GMT
Date
04/14
(104)
04:00
05:00
06:00
07:00
08:00
MET
Day 009
WE
Z
T D R SD / N
O R B 1 4 5 1 4 6 1 4 7 1 4 8
S T S A T T ~ ~B I A S - X L V - Z V V
CDR
PUBLIC AFFAIRS EVENT
ISS KU AVAIL (06:27-07:12)
Ref. MSG 083
PRIVATE FAMILY CONFERENCE
Ref. MSG 075, item 4
ISS KU AVAIL (05:02-05:17)
~
OFF DUTY
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
OFF DUTY
PLT
~
EXERCISE
TRANSFER TAGUP
Coordinate with transfer
counterparts ~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
OFF DUTY
MS2
~
EXERCISE
PUBLIC AFFAIRS EVENT
ISS KU AVAIL (06:27-07:12)
Ref. MSG 083
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
OFF DUTY
NOTES
121212
![Page 15: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/15.jpg)
FLT PLN/131/FLT
FD10
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
C Omit Steps 1.2 & 3
Use A/G 2 for Audio
Inform MCC of which
PGSC will be used
AEM UNIT#1 CK (Cue Card)
AEM UNIT#2 CK (Cue Card)
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
REPLANNED
TRANSFER TAGUP
Coordinate with transfer
counterparts
MYCO BODY SAMPLE COLLECTION
(ASSY OPS, P/L) Rvw Proc &
Ref. MSG 080
L9 PS ATU A/G (two) - OFF
NETMEETING VIDEO CONFERENCING
(ORB OPS, PGSC)
Private Family Conference
ISS KU AVAIL (07:34-08:08) C
MYCO BODY SAMPLE COLLECTION
(ASSY OPS, P/L) Rvw Proc &
Ref. MSG 080
3-113
STS-
131/
19A
FD
15:00
16:00
17:00
18:00
GMT
Date
04/14
(104)
04:00
05:00
06:00
07:00
08:00
MET
Day 009
WE
Z
T D R S
~
~~
D / N
O R B 1 4 5 1 4 6 1 4 7 1 4 8
~ ~B I A S - X L V - Z V VS T S A T T
MS1
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
OFF DUTY
EXERCISE
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
MS3
PUBLIC AFFAIRS EVENT
ISS KU AVAIL (06:27-07:12)
Ref. MSG 083
~
OFF DUTY
~
OFF DUTY
EXERCISE
MERLIN STATUS CK (Cue Card)
GLACIER STATUS CK (Cue Card)
STL STATUS CK (Cue Card)
MS4
OFF DUTY
EXERCISE
TRANSFER BRIEF
Call down status to MCC
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
OFF DUTY
~
MS5
EXERCISE
OFF DUTY
~
OFF DUTY
PUBLIC AFFAIRS EVENT
ISS KU AVAIL (06:27-07:12)
Ref. MSG 083
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
NOTES
3-113
FD10
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
C Omit Steps 1.2 & 3
Use A/G 2 for Audio
Inform MCC of which
PGSC will be used
AEM UNIT#1 CK (Cue Card)
AEM UNIT#2 CK (Cue Card)
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
REPLANNED
TRANSFER TAGUP
Coordinate with transfer
counterparts
MYCO BODY SAMPLE COLLECTION
(ASSY OPS, P/L) Rvw Proc &
Ref. MSG 080
L9 PS ATU A/G (two) - OFF
NETMEETING VIDEO CONFERENCING
(ORB OPS, PGSC)
Private Family Conference
ISS KU AVAIL (07:34-08:08) C
MYCO BODY SAMPLE COLLECTION
(ASSY OPS, P/L) Rvw Proc &
Ref. MSG 080
STS-
131/
19A
FD
15:00
16:00
17:00
18:00
GMT
Date
04/14
(104)
04:00
05:00
06:00
07:00
08:00
MET
Day 009
WE
Z
T D R SD / N
O R B 1 4 5 1 4 6 1 4 7 1 4 8
S T S A T T ~ ~B I A S - X L V - Z V V
MS1
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
OFF DUTY
~
EXERCISE
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS3
PUBLIC AFFAIRS EVENT
ISS KU AVAIL (06:27-07:12)
Ref. MSG 083
~~
OFF DUTY
OFF DUTY
EXERCISE
MERLIN STATUS CK (Cue Card)
GLACIER STATUS CK (Cue Card)
STL STATUS CK (Cue Card)
MS4
OFF DUTY
EXERCISE
~
TRANSFER BRIEF
Call down status to MCC
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
OFF DUTY
MS5
EXERCISE
~
OFF DUTY
OFF DUTY
PUBLIC AFFAIRS EVENT
ISS KU AVAIL (06:27-07:12)
Ref. MSG 083
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
NOTES
131313
![Page 16: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/16.jpg)
FLT PLN/131/FLT
FD10
POINDEXTER
DUTTON
METCALF-
LINDENBURGER
C Omit Steps 1.2 & 3
Use A/G 2 for Audio
Inform MCC of which PGSC will be used
L9 PS ATU A/G (two) - OFF
NETMEETING VIDEO CONFERENCING (ORB OPS,PGSC)
Private Family Conference
ISS KU AVAIL (09:16-09:58) C
REPLANNED
CREW WAKEUP AT 09/18:00
3-114
STS-
131/
19A
FD
19:00
20:00
21:00
22:00
GMT
Date
04/14
(104)
08:00
09:00
10:00
11:00
12:00
MET
Day 009
WE
Z
T D R S
~
~~
D / N
O R B 1 4 8 1 4 9 1 5 0
~ ~B I A S - X L V - Z V VS T S A T T
CDR
SLEEP
~
L9 PS ATU A/G (two) - OFF
PRIVATE MEDICAL CONFERENCE VIA A/G 2
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
PLT
SLEEP
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
MS2
SLEEP
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
NOTES
3-114
FD10
POINDEXTER
DUTTON
METCALF-
LINDENBURGER
C Omit Steps 1.2 & 3
Use A/G 2 for Audio
Inform MCC of which PGSC will be used
L9 PS ATU A/G (two) - OFF
NETMEETING VIDEO CONFERENCING (ORB OPS,PGSC)
Private Family Conference
ISS KU AVAIL (09:16-09:58) C
REPLANNED
CREW WAKEUP AT 09/18:00
STS-
131/
19A
FD
19:00
20:00
21:00
22:00
GMT
Date
04/14
(104)
08:00
09:00
10:00
11:00
12:00
MET
Day 009
WE
Z
T D R SD / N
O R B 1 4 8 1 4 9 1 5 0
S T S A T T ~ ~B I A S - X L V - Z V V
CDR
~
SLEEP
L9 PS ATU A/G (two) - OFF
PRIVATE MEDICAL CONFERENCE VIA A/G 2
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
PLT
~
SLEEP
~PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS2
~
SLEEP
~PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
NOTES
141414
![Page 17: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/17.jpg)
FLT PLN/131/FLT
FD10
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
C Omit Steps 1.2 & 3
Use A/G 2 for Audio
Inform MCC of which
PGSC will be used
L9 PS ATU A/G (two) - OFF
NETMEETING VIDEO CONFERENCING
(ORB OPS, PGSC)
Private Family Conference
ISS KU TDRE (08:10-08:36) C
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
REPLANNED
CREW WAKEUP AT 09/18:00
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
3-115
STS-
131/
19A
FD
19:00
20:00
21:00
22:00
GMT
Date
04/14
(104)
08:00
09:00
10:00
11:00
12:00
MET
Day 009
WE
Z
T D R S
~
~~
D / N
O R B 1 4 8 1 4 9 1 5 0
~ ~B I A S - X L V - Z V VS T S A T T
MS1
SLEEP
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
MS3
SLEEP
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
MS4
SLEEP
~
TRANSFER BRIEF
Call down status to MCC
~
MS5
SLEEP
~
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
~
NOTES
3-115
FD10
MASTRACCHIO
WILSON
YAMAZAKI
ANDERSON
C Omit Steps 1.2 & 3
Use A/G 2 for Audio
Inform MCC of which
PGSC will be used
L9 PS ATU A/G (two) - OFF
NETMEETING VIDEO CONFERENCING
(ORB OPS, PGSC)
Private Family Conference
ISS KU TDRE (08:10-08:36) C
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
REPLANNED
CREW WAKEUP AT 09/18:00
PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
STS-
131/
19A
FD
19:00
20:00
21:00
22:00
GMT
Date
04/14
(104)
08:00
09:00
10:00
11:00
12:00
MET
Day 009
WE
Z
T D R SD / N
O R B 1 4 8 1 4 9 1 5 0
S T S A T T ~ ~B I A S - X L V - Z V V
MS1
~
SLEEP
~PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS3
~
SLEEP
~PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
MS4
~
SLEEP
~TRANSFER BRIEF
Call down status to MCC
MS5
~
SLEEP
~PRE-SLEEP ACTIVITY
(ORB OPS, CREW SYS)
NOTES
151515
![Page 18: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/18.jpg)
MSG 076 - FD10 MISSION SUMMARY
Good Morning Discovery, 1 2 3 4 5 6 7 8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Congratulations on another great day of robotics, EVA, and transfer activities! Enjoy your well-earned off duty time today! YOUR CURRENT ORBIT IS: 190 X 182 NM NOTAMS (ADDED NTU, YHZ, YQX, KBO)
EDW - EDT 22R/04L IN USE. EDW 22/04 CLOSED FOR CONSTRUCTION. EDW - LAKEBED RWYS RED. NOR - LAKEBED RWYS GREEN. NTU - RWY 23L/05R CLOSED. FOK - RWY 06/24 CLOSED. DOV - RWY 32 REIL OTS. FMH - RWY 23 ALS OTS. YHZ - RWY 23/05 CLOSED. YYT - TACAN UYT23 AZIMUTH OTS. YQX - DME YQX74 OTS. JTY - RWY 18 ALS OTS. MYR - RWY 18/36 CLOSED FROM 0340 - 0930 GMT. KKI - TACAN RIY92 OTS. MRN - RWY 20 THRESHOLD DISPLACED. RWY 02/20 LDA = 9085 FT. KBO - TACAN GIX18 OTS. PTN - RWY 14/32 CLOSED. IKF - NOT USABLE. NO AGREEMENT. BEN - NOT RECOMMENDED/NOT SUPPORTED.
NEXT 2 PLS OPPORTUNITIES: 29
30 31 32 33
EDR22R ORB 145 – 09/04:07 SCT250 7 200/07P11 EDR22R ORB 161 – 10/04:32 BKN200 7 220/08P12 OMS TANK FAIL CAPABILITY: 34
35 36 37 38
L OMS FAILS: NO R OMS FAILS: NO LEAKING OMS PRPLT BURN: 39
40 41 42 43
L OMS LEAK: ALWAYS BURN RETROGRADE R OMS LEAK: ALWAYS BURN RETROGRADE OMS QUANTITIES(%) 44
45 46 47 48 49 50 51
L OMS OX = 34.08 R OMS OX = 35.28 FU = 33.60 FU = 35.21
END OF PAGE 1 OF 2, MSG 076 161616
![Page 19: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/19.jpg)
MSG 076 - FD10 MISSION SUMMARY
END OF PAGE 2 OF 2, MSG 076
DELTA V AVAILABLE: 1 2 3
OMS 369 FPS ARCS (TOTAL ABOVE QTY1) 31 FPS 4
5 6 7 8 9
10 11 12 13 14
TOTAL IN THE AFT 400 FPS ARCS (TOTAL ABOVE QTY2) 64 FPS FRCS (ABOVE QTY 1) 27 FPS AFT QTY 1 80 % AFT QTY 2 42 % SYSTEM FAILURE IMPACT WORK AROUND
EVA Misalignment of spherical bearing caused the clevis to bend when applying torque to ATA bolt 1.
Difficulty engaging ATA bolt 1 during installation on LMC. Loss of crew time and loss of EVA and mission objectives, including LWAPA Retrieve and P1 Radiator Grapple Fixture Beam Inspection.
Crew released bolt 3 and were able to install bolt 1 to proper torque. Bolt 3 was reengaged, requiring multiple attempts with the torque multiplier to achieve acceptable torque and turns.
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
171717
![Page 20: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/20.jpg)
MSG 077 (23-0274) - FD10 TRANSFER MESSAGE Page 1 of 3
1 2 3 4 5 6 7 8 9
10 11 12 13 14 15
Good Morning Naoko and Steph, Today’s your last day of MPLM transfer! Just a few more items to pack up and then you’ll be ready to button up the MPLM one last time. Today you’ll be packing a second RFTA in the MPLM following the R&R activity. Shortly thereafter the CPAs will be installed, which will limit you to transferring small items only. Then at the end of the day, after the MPLM is ready to go, you’ll be scavenging the remaining four LHAs, leaving the MPLM a rather dark place. The Transfer List Excel file, FD10_Transfer_List_STS131.xls, locations are:
• Shuttle: C:\OCA-up\transfer (KFX machine) • Station: K:\OCA-up\transfer
Transfer Notes 16
17
19 20 21
23 24 25 26 27
29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
• Lost Return Items and WHC Return Items: Considering a couple items are still 18
missing for MPLM return and you’ve identified some additional used WHC hardware, we have updated your return plan to backfill Item 629 with the used WHC hardware.
• Item 721 (Catalytic Reactor): Steph, the Catalytic Reactor can be stowed in Bag C 22 without the top piece of Catalytic Reactor foam; however, there are additional pieces of white foam already in Bag C that can be used to protect the ORU. The Middeck Stowage team has sent you directions for stowing the Catalytic Reactor for return (ref MSG 085).
• Item 950 (Imaging Processing Unit Stowage Bag): Steph, we understand you were 28 not able to find Item 950 in 3.0 CTB s/n 1068 yesterday. You can also try looking at COL1A2 if you still haven’t found it. It is a blue nomex kit, as shown in the photo below.
Imaging Processing Unit Stowage Bag
Page 1 of 3, MSG 077 (23-0274) 181818
![Page 21: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/21.jpg)
MSG 077 (23-0274) - FD10 TRANSFER MESSAGE Page 2 of 3
1
4
8
• Small Pieces of Foam: If you still have smaller pieces of foam to stow, we recommend 2 you utilize MPL1P4_A1. 3
• Item 431.1: Naoko, please remember to transfer the JAXA Nanoskeleton samples only 5
after 2.5 hours following the MELFI retrieval activity to ensure they completely thaw and 6 reach a safe touch temperature. Your timeline reflects this constraint as well. 7
FD10 Choreography (in timeline order) 9
18
22
23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
• Item 1000: Transfer RFTA (s/n 011) to MPLM for return following the RFTA R&R. 10
• Install CBM CPAs. 11
• Items 187 and 707: Swap PGTs following a successful checkout of the new PGT. 12
• Item 431.1: Transfer JAXA Nanoskeleton samples 2.5hrs after MELFI retrieval activity 13
• Item 750: Stow black clips from MPLM Kit in MPLM for return. 14
• Item 294: Transfer endcone bungee jail to ISS. 15
• Item 109: Transfer A1 inter-rack bungee jail to ISS. 16
• MPLM Cleanup 17 o Item 824: Return Pivot Fittings used to rotate RSPs to ISS.
• Configure MPLM racks for entry. 19
• Item 105: Scavenge MPL1PA1, PA2, PF1, and PF3 LHAs - call MCC to open RPCs. 20
• Transfer all remaining MPLM items: 21
• Resupply: 106, 107, 137, 171, 174, 175, 186, 199, 200, 201, 260, 261 • Return: 423, 629, 807, 809, 810, 813, 821, 822, 823, 1008, 1009, 1010, 1011,
1012 Please incorporate uplink pages as follows (we’ve listed the updates in the order they printed out for you): In the Middeck Transfer List RETURN tab Pen & Ink on the following pages: Return 1 - Item 431.1: update activity day in notes from “FD09” to “FD10” Return 4 - Item 702: update activity day in notes from “FD11” to “FD13” Return 6 - Item 713: update activity day in notes from “FD11” to “FD13” Return 6 - Item 716: update activity day in notes from “FD10” to “FD11” In the MPLM Return Transfer List RETURN tab Replace the following page:
Return 17
Add the following page: Return 32 In the MPLM Return Transfer List MPLM CLEANUP tab Pen & Ink on the following pages: Return 30 - Item 824: update Stowage at Undock location from “NOD2O5_A2” to
“LAB1P1_A2”
Page 2 of 3, MSG 077 (23-0274) 191919
![Page 22: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/22.jpg)
MSG 077 (23-0274) - FD10 TRANSFER MESSAGE Page 3 of 3
Page 3 of 3, MSG 077 (23-0274)
1 FD11 Choreography (in timeline order) 2
5 6
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
• Items 822 & 823: Return the MPLM PBA and PFE to ISS. 3
• Transfer the following EVA items to the Middeck: 4 o Items 703 & 704: EMU’s s/n 3008 & 3017 o Item 708: EVA Systems Transfer Bag
• Item 716: Transfer the NLP Cells 3 Stow Bag per CGBA-5 NLP CELLS REMOVE 7 activity. 8
- The STS-131 Transfer Team
202020
![Page 23: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/23.jpg)
MSG 078 (23-0275) - FD10 CREW CHOICE DOWNLINK
Page 1 of 1
1
2
3
The following times indicate good Shuttle Sband on A/G 2 and ISS Ku for crew choice downlink.
AOS LOS Delta (min) Notes 09/06:27 09/07:11 44 A/G 20 second H/O at 06:42:51 09/07:34 09/08:51 77 A/G gap from 07:58:16-08:03:38
KU 20 second H/O at 08:09:21 A/G 20 second H/O at 08:34:42 KU gap from 08:37:00-08:39:00
09/09:15 09/09:58 43 A/G 20 second H/O at 09:32:56 4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Note: Please notify MCC-H 10 minutes prior to the event to allow for ground network configuration.
Page 1 of 1, MSG 078 (23-0275)
2121
![Page 24: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/24.jpg)
23-0271 (MSG 079): FD 10 EVA DELTAS. Page 1 of 1
PAGE 1 of 1, 23-0271 ( MSG 079)
Great job completing all three EVAs! 1 2 You heard yesterday that we had a few issues with the NTA. This has no 3 correlation to your EVA activities. The ground sees good data on the S1 ATA 4 and it looks to be in great shape! 5 6 Both sets of EMU gloves have been cleared for contingency EVA use. 7 8 The EVA Tool Restow scheduled for Rick, TJ and Tracy today is scheduled for a 9 duration of 1:25. Please reference message 23-0266 (131-081) for details. We 10 don't expect you'll have time to complete everything, so we are working to 11 schedule more time. Feel free to use crew notes in OSTPV to give us input on 12 the restow matrix. 13 14 We have a stowage question for you as well as some pen and ink changes to 15 your EVA Checklist for new items you are bringing home. 16 17 Stowage Question 18 What was the final stowage location of Soichi's prime CCA (s/n 1215) in the ISS 19 A/L? This was the CCA that TJ gave to you during EVA Prep for EVA 2 as a 20 second back-up CCA. 21 22 EVA Checklist Pen and Inks 23 We will be bringing home a total of 6 wire ties from ISS. These wire ties protect 24 for a RCC repair contingency EVA if required post-undock. The EVA trash bags 25 that would be used as a holster for the NOAX gun are currently stowed in the 26 STBD TSA, so these wire ties would be used instead to fashion a holster and 27 provide rabbit ears. There is no need to configure the wire ties at this time. 28 29 1. Add the following to the table after step 28 of FS 2-14 Post EVA EMU 30 Reconfig: 31 32
EVA Systems Transfer Bag Current Location Item A/L Deployed Short Wire Tires (4)
Long Wire Tires (2) 33 34 2. Add the following in step 1 of FS 2-16 EVA Unpack and Stow to the table 35 under EVA Systems Transfer Bag: 36 37 Item Final Location Short Wire Tires (4) Long Wire Tires (2) A/L Floor Bag
38 39
222222
![Page 25: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/25.jpg)
23-0074 (MSG 80): Big Picture for Myco Experiment during 19A Page 1 of 2
1
2
4
7
9
10
Big Picture for Myco Experiment during 19A
1. Timeline for Myco Experiment 3
Myco Experiment will be performed within 60 hours before hatch close. 5
Myco SAMPLE CLCT and the following MELFI INS should be time critical tasks. 6
(Blue marked in the Fig. 1) Joint operations between Shuttle crew and ISS crew are very important. 8
Night before Myco Experiment Myco Experiment Day
MYCO PREP : Preparation of Myco Kit and Drinking Water Container*1. 11
CREW REVIEW : Procedure review. Review scientific constraints of the experiment. 12
SAMPLE CLCT : Collection of body samples. Hand your Myco Kit to Soichi (FE5). 13
MELFI INS : Insertion of all Myco Kit into MELFI. 14
MERLIN PACK : Transfer of Myco Kit from MELFI to MERLIN. 15
16
17
18
19
*1 Drinking Water Container is for rinsing mouth before pharynx sample collection
Fig. 1 Big picture for Myco Experiment Operations Flow in 19A
MYCO PREP
Undock Day
MERLIN PACK
CREW REVIEW
CREW REVIEW
CREW REVIEW
CREW REVIEW
CREW REVIEW
SAMPLE CLCT MELFI INS
SAMPLE CLCT
SAMPLE CLCT
SAMPLE CLCT
SAMPLE CLCT
Soichi (FE5) will distribute Myco Kit and Drinking Water Container to all participants
Must be performed first thing in the morning.
Right after SAMPLE CLCT, hand your Myco Kit to Soichi for MELFI INS
Must be performed within 4 hours after sampling
Samples must be stowed in MELFI for at least 8 hours prior to MERLIN pack
FD10 FD11 FD13
FE-5
FE-6
PLT
MS1
MS4
ISS Crew
Shuttle Crew
Page 1 of 2. 23-0074 (MSG 80): 232323
![Page 26: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/26.jpg)
23-0074 (MSG 80): Big Picture for Myco Experiment during 19A Page 2 of 2
Page 2 of 2. 23-0074 (MSG 80):
2
2. Precautions and important notice for Myco Experiment 1
Precautions 3
5
7 8
The sample collection must be performed first thing in the morning because 4
we need samples from the body in the “just-woke-up” condition. Please do not eat/drink anything except water, wash your face, brush your teeth, 6
or gargle after you wake up to avoid science loss.
Important Notice 9
11
13
14
15
16
17
18 19
MELFI Insertion must be performed within 4 hours after Sample Collection to 10
avoid deterioration of the samples. Myco Kit must be stowed in MELFI at +4 deg C for at least 8 hours before it is 12
moved into MERLIN for return. For this reason, replan is not an option based on the latest timeline.
242424
![Page 27: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/27.jpg)
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
1M
WS
Bas
epla
te[M
odul
ar B
asep
late
Ass
embl
y]1
SE
G33
1104
90-3
0310
0100
0087
35J
2M
WS
T-B
ar1
SE
G33
1104
93-3
0510
31-
3S
mal
l EV
A T
rash
Bag
1S
EG
3310
6678
-301
1006
-C
rew
lock
Bag
#3
CO
NFI
RM
em
pty
& z
ippe
d up
.
4S
win
g A
rm A
ssy,
RH
1S
EG
3311
0491
-307
1004
-
5P
GT
1G
E15
5700
0#6
-
67/
16 x
6" W
obbl
e1
SE
G33
1069
31-3
0110
1900
4343
J
7B
ody
Res
train
t Tet
her
[BR
T A
ssem
bly]
1S
EG
3311
0400
-309
1001
-
8A
/L1O
0
1.0
CTB
: EV
A
Mis
cella
neou
s To
ols
#1, S
/N
1075
, B/C
004
069J
EV
A T
rash
Bag
[Shu
ttle
Sty
le]
110
165-
1006
5-03
1017
-C
ON
FIR
M e
mpt
y &
zip
ped
up.
STO
W o
n T-
Bar
.
9W
ire T
ies
[Sho
rt]4
SD
G33
1081
30-0
01-
-ST
OW
(don
't co
nfig
ure)
on
the
T-ba
r as
teth
er lo
ops.
10W
ire T
ie[L
ong]
2S
DG
3310
8130
-003
--
STO
W (d
on't
conf
igur
e) w
ire ti
es
on B
RT.
EV1
NO
TE: T
hese
will
be
swap
ped
with
a
new
bas
epla
te a
nd t-
bar w
hen
they
arr
ive
with
ULF
4.
EV1
OVE
RVI
EW:
This
mes
sage
is d
esig
ned
to re
stow
the
tool
s de
ploy
ed fo
r the
19A
EV
As
and
conf
igur
e fo
r the
ULF
4 E
VA
s.
PRO
CED
UR
E:
1. C
ON
FIR
M th
at th
ere
is a
D-R
ing
Ext
ende
r on
A/L
D-R
ing.
2. R
EMO
VE a
ll te
ther
s an
d D
-rin
g ex
tend
ers
from
all
bags
, MW
S a
nd s
uits
and
STO
W th
em o
n th
e te
ther
sta
ging
are
a. A
lso
TEM
P ST
OW
any
wire
ties
you
con
side
r re-
usab
le fo
r ULF
4.
3. M
OVE
any
item
s in
side
the
mes
h ba
gs, c
rew
lock
bag
s, a
nd d
eplo
yed
OR
U b
ags
into
the
"Don
e To
ols"
mes
h ba
g.
4. R
EMO
VE a
ny la
bels
from
Cre
wlo
ck B
ags.
5
. REL
AB
EL a
n em
pty
mes
h ba
g: "
ULF
4 To
ols"
.
6. C
OM
PLET
E Ta
bles
A -
K.
7
. REP
OR
T to
MC
C-H
whe
n ac
tivity
is c
ompl
ete,
the
requ
este
d S
/N in
form
atio
n, a
nd a
ny d
elta
s.
For h
elp
iden
tifyi
ng th
e co
rrec
t S/N
's, r
efer
ence
2.2
20.1
00 E
VA
Too
l Ser
ial N
umbe
r Ref
eren
ce (S
OD
F: E
VA
TA
SK
: TO
OLS
RE
FER
EN
CE
).
Tabl
e A
: Con
figur
e EV
1 M
WS
EV1
EV1
Tem
p St
owed
(use
d fo
r 19A
)or
A/L
1O0
Zipl
ock
252525
![Page 28: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/28.jpg)
11A
/L D
eplo
yed
Mes
h B
ag: 1
9A
Don
e To
ols
WIF
Ada
pter
1S
EG
3310
6863
-309
1013
-ST
OW
on
RE
T w
/ PIP
Pin
at
tach
ed to
the
T-B
ar.
12Ite
m D
elet
ed
13Ite
m D
elet
ed14
Eq
Hk
RE
T[S
m-S
m]
2S
EG
3310
6164
-381
--
Use
Red
RET
s
STO
W 1
on
the
BR
T an
d us
e 1
to
conn
ect t
he P
GT
to th
e sw
ing
arm
.
15E
q H
k R
ET
w/P
ip P
in2
SE
G33
1061
64-3
83-
-U
se R
ed R
ETs
STO
W o
n th
e T-
Bar
. U
se 1
to
conn
ect W
IF A
dapt
er to
T-B
ar.
16A
djus
tabl
e E
quip
men
t Tet
her
[Sm
-Sm
]2
SE
G33
1069
45-3
07-
-R
EPO
RT
S/N
s to
MC
C-H
.
STO
W d
irect
ly o
n th
e T-
Bar
.
17Ite
m D
elet
ed
A/L
1D2
Teth
er S
tagi
ng
Are
a
EV1
262626
![Page 29: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/29.jpg)
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
18M
WS
Bas
epla
te[M
odul
ar B
asep
late
Ass
embl
y]1
SE
G33
1104
90-3
0310
02-
19M
WS
T-B
ar1
SE
G33
1104
93-3
0510
06-
20S
mal
l EV
A T
rash
Bag
1S
EG
3310
6678
-301
1007
-C
ON
FIR
M e
mpt
y &
zip
ped
up.
21S
win
g A
rm A
ssy,
RH
1S
EG
3311
0491
-307
1003
-
22P
GT
1G
E15
5700
0#1
-
237/
16 x
6" W
obbl
e1
SE
G33
1069
31-3
0110
07-
24B
ody
Res
train
t Tet
her
[BR
T A
ssem
bly]
1S
EG
3311
0400
-309
1021
-
Tabl
e B
: C
onfig
ure
EV2
MW
S
EV2
NO
TE: T
hese
will
be
swap
ped
with
a
new
bas
epla
te a
nd t-
bar w
hen
they
arr
ive
with
ULF
4.
EV2
EV1:
□
MW
S -
(Item
#1)
□
T-B
ar -
(Item
#2)
□
Shu
ttle
Sty
le T
rash
Bag
- (It
em #
8)
□ 4
– W
ire ti
es a
s te
ther
loop
s - (
Item
#9)
□
RE
T (P
IP-p
in) -
(Ite
m #
15)
□
RE
T (P
IP -
pin)
- (It
em #
15)
□ W
IF A
dapt
er -
(Item
#11
)
□ 2
– A
ETs
- (It
em #
16)
□
Sw
ing
Arm
(rig
ht s
ide)
- (It
em #
4)
□
RE
T sm
-sm
- (It
em #
14)
□
PG
T -
(Item
#5)
□
6-in
ext
- (It
em #
6)
□ B
RT
(left
side
) - (I
tem
#7)
□ R
ET
sm-s
m -
(Item
#14
)
□
2 –
long
wire
ties
- (It
em #
10)
REP
OR
T an
y ad
ditio
nal i
tem
s fo
und
to M
CC
-H.
272727
![Page 30: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/30.jpg)
25E
q H
k R
ET
[Sm
-Sm
]2
SE
G33
1061
64-3
81-
-U
se R
ed R
ETs
STO
W 1
on
the
BR
T an
d us
e on
e to
con
nect
the
PG
T to
the
swin
g ar
m.
26E
q H
k R
ET
w/P
ip P
in2
SE
G33
1061
64-3
83-
-U
se R
ed R
ETs
STO
W b
oth
on th
e T-
Bar
.
27Ite
m D
elet
ed28
Item
Del
eted
29Ite
m D
elet
ed30
Wire
Tie
s[S
hort]
3S
DG
3310
8130
-001
--
STO
W (d
on't
conf
igur
e) 1
wire
ties
on
BR
T an
d 2
on th
e T-
bar a
s te
ther
loop
s.
31W
ire T
ie[L
ong]
1S
DG
3310
8130
-003
--
STO
W (d
on't
conf
igur
e) 1
wire
tie
on B
RT.
Tem
p St
owed
(use
d fo
r 19A
)or
A/L
1O0
Zipl
ock
EV2
A/L
1D2
Teth
er S
tagi
ng
Are
a
282828
![Page 31: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/31.jpg)
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
32A
djus
tabl
e Fu
se T
ethe
r[F
ish
Stri
nger
]1
SE
D39
1272
00-7
0510
11-
33
Nee
dle
Nos
e P
liers
1S
EG
3310
6921
-301
1007
-M
OVE
to F
ish
Stri
nger
#10
32.
34W
ire T
ie C
addy
Ass
y1
SE
G33
1115
86-3
0110
05-
CO
NFI
RM
that
this
cad
dy c
onta
ins
9 w
ire ti
es.
35Ta
pe a
nd V
elcr
o C
addy
1S
ED
3310
4207
-301
1005
-
36P
GT
1G
E15
5700
0#4
-
37
7/1
6 x
6" W
obbl
e1
SE
G33
1069
31-3
0110
18-
REM
OVE
from
PG
T an
d ST
OW
on
EV
A R
atch
et.
38E
VA
Rat
chet
1S
EG
3310
6927
-303
1012
-
EV2:
□
MW
S -
(Item
#18
)
□
T-B
ar -
(Item
#19
)
□ S
mal
l Tra
sh B
ag -
(Item
#20
)
□ 2
– W
ire ti
e as
teth
er lo
ops
- (Ite
m #
30)
□
2 –
RE
T (P
IP-p
in) -
(Ite
m #
26)
□
Sw
ing
Arm
(rig
ht s
ide)
- (It
em #
21)
□
RE
T sm
-sm
- (It
em #
25)
□ P
GT
- (Ite
m #
22)
□
6-in
ext
- (It
em #
23)
□ B
RT
(left
side
) - (I
tem
#24
)
□
RE
T sm
-sm
- (It
em #
25)
□
1 –
sho
rt w
ire ti
e - (
Item
#30
)
□
1 –
long
wire
tie
- (Ite
m #
31)
REP
OR
T an
y ad
ditio
nal i
tem
s fo
und
to M
CC
-H.
A/L
Cre
wlo
ckS
tagi
ng B
ag
Tabl
e C
: Con
firm
Sta
ging
Bag
Con
fig
A/L
Cre
wlo
ckS
tagi
ng B
ag
292929
![Page 32: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/32.jpg)
397/
16 x
9" R
igid
1S
EG
3310
6930
-305
1013
0019
56J
A/L
1O0
1.0
CTB
: EV
A
Mis
cella
neou
s To
ols
#2, S
/N 1
161,
B/C
00
4155
J
REM
OVE
from
EV
A R
atch
et.
40S
afet
y Te
ther
85f
t1
SE
D33
1161
09-3
07-
-A
/L1D
2Te
ther
Sta
ging
Are
aR
EPO
RT
larg
e ID
# to
MC
C-H
.
41W
IF A
dapt
er1
SE
G33
1068
63-3
0910
15-
42A
djus
tabl
e Fu
se T
ethe
r[F
ish
Stri
nger
]1
SE
D39
1272
00-7
0510
32-
43C
onne
ctor
Cle
aner
Too
l Kit
1S
JG33
1116
30-3
0110
10-
MO
VE fr
om h
ook
#1 to
hoo
k #2
44M
MW
S K
ey S
trap
Ass
embl
y1
SE
G33
1108
12-3
0110
0800
0086
53J
On
wire
tie,
to s
trap.
45LD
TD T
ethe
r1
SE
G33
1138
60-3
0110
06-
MO
VEto
Fis
h S
tring
er #
1011
hoo
k #6
.
46C
heat
er B
ar1
SE
G33
1069
26-3
0110
02-
47E
q H
k R
ET
[Sm
-Sm
]1
SE
G33
1061
64-3
81-
-A
/L1D
2Te
ther
Sta
ging
Are
a
48B
RS
Too
l 1
SE
G33
1136
44-3
0510
01-
A/L
1D2
1.0
CTB
: Uni
que
EV
A T
ools
, S/N
10
22, B
/C 0
0231
7J
INSP
ECT
tool
for a
ny d
amag
e.
REP
OR
T to
MC
C-H
.
VER
IFY
BR
S S
heat
h in
stal
led
on
the
tool
.49
Rig
ht A
ngle
Driv
e1
SE
G33
1069
25-3
0510
09-
A/L
1O0
1.0
CTB
: EV
A
Mis
cella
neou
s To
ols
#2, S
/N 1
161,
B/C
00
4155
J
50A
/L1O
0
1.0
CTB
: EV
A
Mis
cella
neou
s To
ols
#2, S
/N
1161
, B/C
004
155J
Enh
ance
d R
ight
Ang
le D
rive
1S
EG
3312
0447
-301
1002
-
51Ite
m D
elet
ed
A/L
Cre
wlo
ckS
tagi
ng B
ag
A/L
Cre
wlo
ckS
tagi
ng B
ag
A/L
Cre
wlo
ckS
tagi
ng B
ag
303030
![Page 33: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/33.jpg)
52P
ry B
ar1
SD
G33
1069
24-0
0110
0400
0011
99J
STO
W o
n fis
h st
ringe
r 103
2.
53LD
TD T
ethe
r2
SE
G33
1138
60-3
01-
-H
OO
K w
ith th
e ot
her L
DTD
Tet
her
on F
ish
strin
ger #
1011
hoo
k #6
(all
thre
e LD
TD c
hain
ed to
geth
er).
54V
ise
Grip
Plie
rs1
SE
G33
1069
22-3
0110
01-
STO
W o
n fis
h st
ringe
r 101
1.
55P
in S
traig
hten
er A
ssy
1S
EG
3310
6913
-301
1001
0019
48J
56P
RO
BE
1S
EG
3310
6923
-701
1001
-
A/L
Dep
loye
dM
esh
Bag
: 19A
D
one
Tool
s
A/L
Cre
wlo
ckS
tagi
ng B
ag
Stag
ing
Bag
:
□
Fis
h S
tring
er -
(Item
#32
)
□
Wire
Tie
Cad
dy (h
ook
#1) -
(Ite
m #
34)
□
9 w
ire ti
es -
(Item
#34
)
□
Vel
cro/
Tape
Cad
dy (h
ook
#2) -
(Ite
m #
35)
□
P
GT
(hoo
k #3
) - (
Item
#36
)
□
Vis
e G
rips
(hoo
k #4
) - (I
tem
#54
)
□
Rat
chet
Wre
nch
(hoo
k #5
) - (I
tem
#38
)
□
7/1
6-in
(wob
ble)
Soc
ket –
6 e
xt -
(Item
#37
)
□
3 - L
ong
Dur
atio
n Ti
e D
own
Teth
ers
(hoo
k #6
) - (I
tem
s #4
5 &
#53
)
□
WIF
Ada
pter
(hoo
k #7
) - (
Item
#41
)
□
Fis
h S
tring
er #
2 - (
Item
#42
)
□
ER
AD
(hoo
k #1
) - (I
tem
#50
)
□
Con
nect
or C
lean
er T
ool K
it (h
ook
#2) -
(Ite
m #
43)
□
P
in S
traig
hten
er A
ssy
(hoo
k #3
) - (I
tem
#55
)
□
Pro
be (h
ook
#4) -
(Ite
m #
56)
□
P
ryba
r (ho
ok #
5) -
(Item
#52
)
□
Nee
dlen
ose
Plie
rs (h
ook
#6) -
(Ite
m #
33)
□
C
heat
er B
ar (h
ook
#7) -
(Ite
m #
46)
□
M
WS
Key
Stra
p A
ssy
(on
wire
tie,
to s
trap)
- (It
em #
44)
REP
OR
T an
y ad
ditio
nal i
tem
s fo
und
to M
CC
-H.
313131
![Page 34: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/34.jpg)
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
57IS
S C
onta
min
atio
n D
etec
tion
Kit
1S
JG39
1360
50-3
0210
01-
58To
wel
[Wra
pped
with
sho
rt w
ire ti
e]2
--
-
59E
q H
k R
ET
[Sm
-Sm
]1
SE
G33
1061
64-3
8140
62-
60S
AFE
R H
and
Con
trolle
r Mou
nt[D
CM
Plu
g]1
SV
1006
962-
2'0
0004
0005
1187
J
61S
AFE
R H
and
Con
trolle
r Mou
nt[D
CM
Plu
g]1
SV
1006
962-
2'0
0007
0005
9995
J
62E
q H
k R
ET
[Sm
-Sm
]1
SE
G33
1061
64-3
8140
63-
63IS
S G
P C
addy
1S
EG
3311
3531
-301
1008
-
64A
djus
tabl
e Th
erm
al M
itten
101
06-8
1154
0-03
'022
EM
UG
15J
65A
djus
tabl
e Th
erm
al M
itten
101
06-8
1154
0-04
'022
EM
UA
16J
66IS
S G
P C
addy
1S
EG
3311
3531
-301
1010
-
67A
djus
tabl
e Th
erm
al M
itten
101
06-8
1154
0-03
'023
EM
UG
19J
68A
djus
tabl
e Th
erm
al M
itten
101
06-8
1154
0-04
'023
EM
UG
20J
69E
q H
k R
ET
[Sm
-Sm
]1
SE
G33
1061
64-3
8140
73-
70S
ocke
t Cad
dy A
ssy
1S
EG
3310
6938
-301
1011
-
711/
2 x
8" W
obbl
e1
SE
G33
1084
23-3
0110
04-
727/
16 x
6" W
obbl
e1
SE
G33
1069
31-3
0110
14-
73A
mm
onia
Con
tam
inat
ion
Cue
Car
d1
--
-
A/L
Cre
wlo
ckIV
Bag
Tabl
e D
: Con
firm
IV B
ag C
onfig
CO
NFI
RM
con
tent
s an
d co
nfig
urat
ion
of IV
Bag
.
Bla
ck R
ETs
sta
y in
this
bag
(not
fo
r EV
A).
A/L
Cre
wlo
ckIV
Bag
323232
![Page 35: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/35.jpg)
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
74Lg
-Eq
RE
T[L
g-S
m]
1S
EG
3310
6164
-385
--
Use
Red
RET
75E
q H
k R
ET
[Sm
-Sm
]1
SE
G33
1061
64-3
81-
-U
se R
ed R
ET
76LA
B1D
40.
5 C
TB: H
OD
GE
P
OD
GE
2, S
/N
1294
PD
GF
UN
IVE
RS
AL
MC
F A
DA
PTE
R A
SS
EM
BLY
(P
UM
AA
)1
2602
13-2
0767
6-55
1-
-
77A
/L D
eplo
yed
Mes
h B
ag: 1
9A
Don
e To
ols
Rou
nd S
coop
1S
EG
3310
7677
-301
1002
-
IV B
ag:
□
Am
mon
ia C
onta
min
atio
n C
ue C
ard
- (Ite
m #
73)
□
2 -
Tow
els
- (Ite
m #
58)
□
Con
tam
inat
ion
Det
ectio
n K
it - (
Item
#57
)
□
RE
T (s
m-s
m, b
lack
) - (I
tem
#59
)
□ 2
- D
CM
Plu
g - (
Item
#60
& 6
1)
□
RE
T (s
m-s
m, b
lack
) - (I
tem
#62
)
□ 2
- G
P C
addy
- (It
em #
63 &
#66
)
□
2 -
Adj
usta
ble
Ther
mal
Mitt
ens
- (Ite
m #
64, #
65, #
67, &
#68
)
□
RE
T (s
m-s
m, b
lack
) - (I
tem
#69
)
□ S
ocke
t Cad
dy -
(Item
#70
)
□
1/2
-in S
ocke
t-8 e
xt -
(Item
#71
)
□
7/1
6 (w
obbl
e) S
ocke
t-6 e
xt -
(spa
re) (
Item
#72
)
REP
OR
T an
y ad
ditio
nal i
tem
s fo
und
to M
CC
-H.
A/L
Dep
loye
d
Tabl
e E:
Con
figur
e A
/L R
ETs
A/L
Dep
loye
d R
ETs:
□
RE
T Lg
-sm
- (It
em #
74)
□
Rou
nd S
coop
- (It
em #
77)
□
PU
MA
A -
(Item
#76
)
□
Eq
Hk
RE
T sm
-sm
- (It
em #
75)
REP
OR
T an
y ad
ditio
nal i
tem
s fo
und
to M
CC
-H.
A/L
Dep
loye
dLg
-Eq
RE
T
A/L
1D2
Teth
er S
tagi
ng
Are
a
333333
![Page 36: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/36.jpg)
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
78A
/L D
eplo
yed
Med
ium
OR
U T
rans
fer B
ag1
SE
G33
1144
94-3
0910
04-
79Lg
-Eq
RE
T[L
g-S
m]
1S
EG
3310
6164
-385
--
Use
Red
RET
.
Use
RE
T to
atta
ch M
ediu
m O
RU
B
ag to
A/L
.
80E
q H
k R
ET
[Sm
-Sm
]5
SE
G33
1061
64-3
81-
-U
se R
ed R
ET
STO
W o
n in
tern
al D
-rin
g.
81A
djus
tabl
e Fu
se T
ethe
r[F
ish
Stri
nger
]1
SE
D39
1272
00-7
05-
-R
EPO
RT
S/N
to M
CC
-H.
STO
W o
n R
ET.
82A
djus
tabl
e E
quip
men
t Tet
her
[Sm
-Sm
]1
SE
G33
1069
45-3
07-
-R
EPO
RT
S/N
to M
CC
-H.
STO
W o
n ex
tern
al D
-Rin
gs
83A
djus
tabl
e E
quip
men
t Tet
her
[Lg-
Sm
]1
SE
G33
1069
45-3
09-
-R
EPO
RT
S/N
to M
CC
-H.
STO
W o
n ex
tern
al D
-Rin
gs
84D
rop
Pro
of T
ethe
r Ada
pter
1S
EG
3310
6947
-301
1013
-ST
OW
on
Soc
ket C
addy
.
85S
quar
e To
rque
Mul
tiplie
r1
SE
G33
1062
61-3
0110
03-
867/
16" S
ocke
t Rec
esse
d S
quar
e To
rque
M
ultip
lier
1S
DG
3310
7087
-009
1010
-VE
RIF
Y so
cket
inst
alle
d on
Tor
que
Mul
tiplie
r.
87A
/L D
eplo
yed
Cre
wlo
ck B
ag #
21
SE
G33
1117
51-3
0310
04-
Cen
ter d
ivid
er s
napp
ed in
pla
ce.
Stow
on
RE
T.
887/
16 x
2" R
igid
2S
EG
3310
6930
-301
1006
1008
-ST
OW
bot
h so
cket
s on
EV
A
Rat
chet
s (it
em #
90)
89S
ocke
t Cad
dy1
SE
G33
1069
38-3
0110
01ST
OW
on
fish
strin
ger.
90E
VA
Rat
chet
2S
EG
3310
6927
-303
1011
1015
-St
ow o
n se
para
te h
ooks
.
A/L
Dep
loye
dM
esh
Bag
: 19A
D
one
Tool
s
A/L
1O0
1.
0 C
TB: E
VA
M
isce
llane
ous
Tool
s #2
, S/N
11
61, B
/C 0
0415
5J
Tabl
e F:
Con
figur
e M
ediu
m O
RU
Bag
: EO
TP B
ag
A/L
Dep
loye
d
A/L
1D2
Teth
er S
tagi
ng
Are
a
A/L
Dep
loye
dM
ediu
m O
RU
Bag
343434
![Page 37: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/37.jpg)
91To
rque
Wre
nch
Bag
1S
EG
3311
0183
-301
1003
-St
ow o
n R
ET.
92To
rque
Wre
nch
1S
EG
3310
6948
-301
1007
-
Med
ium
OR
U B
ag:
□
RE
T Lg
-sm
(A/L
sto
wag
e) -
(Item
#79
)
□ M
ed O
RU
– E
OTP
Bag
- (It
em #
78)
Inte
rnal
D-r
ings
□ R
ET
sm-s
m -
(Item
#80
)
□
Fis
h S
tring
er -
(Item
#81
)
□ E
mpt
y (h
ook
#1, c
lose
st to
Fis
h S
tring
er h
ook
atta
ched
to R
ET)
□
Soc
ket C
addy
(hoo
k #2
) (Ite
m #
89)
□ D
PTA
(Ite
m #
84)
□
Em
pty
(hoo
k #3
)
□ R
atch
et W
renc
h (h
ook
#4) (
Item
#90
)
□
7/
16 x
2" R
igid
- (It
em #
88)
□
Rat
chet
Wre
nch
(hoo
k #5
) (Ite
m #
90)
□
7/16
x 2
" Rig
id -
(Item
#88
)
□ R
ET
sm-s
m (h
ook
#6)
- (Ite
m #
80)
□
Cre
wlo
ck B
ag (I
tem
#87
)
□ T
orqu
e M
ultip
lier (
hook
#4)
(Ite
m #
85)
□
7/1
6" S
ocke
t Rec
esse
d S
quar
e To
rque
Mul
tiplie
r (Ite
m #
86)
□ R
ET
sm-s
m -
(Item
#80
)
□
RE
T sm
-sm
- (It
em #
80)
□ T
orqu
e W
renc
h (in
bag
) - (I
tem
s #9
1 &
#92
)
□
RE
T sm
-sm
- (It
em #
80)
Ext
erna
l D-r
ings
□ 1
– A
ET
Sm
-Sm
(Ite
m #
82)
□ 1
– A
ET
Lg-S
m (I
tem
#83
)
REP
OR
T an
y ad
ditio
nal i
tem
s fo
und
to M
CC
-H.
A/L
1O1
M-0
2 B
ag, S
/N
1038
A/L
Dep
loye
dM
ediu
m O
RU
Bag
353535
![Page 38: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/38.jpg)
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
93A
/L D
eplo
yed
Med
ium
OR
U T
rans
fer B
ag1
SE
G33
1144
94-3
0910
05-
94Lg
-Eq
RE
T[L
g-S
m]
1S
EG
3310
6164
-385
--
Use
Red
RET
.
Use
1 R
ET
to a
ttach
Med
ium
OR
U
Bag
to A
/L.
95E
q H
k R
ET
[Sm
-Sm
]6
SE
G33
1061
64-3
81-
-U
se R
ed R
ET
96A
djus
tabl
e Fu
se T
ethe
r[F
ish
Stri
nger
]2
SE
D39
1272
00-7
05-
-R
EPO
RT
S/N
to M
CC
-H.
97A
djus
tabl
e E
quip
men
t Tet
her
[Sm
-Sm
]3
SE
G33
1069
45-3
07-
-R
EPO
RT
S/N
s to
MC
C-H
.
STO
W 2
insi
de th
e m
ediu
m O
RU
ba
g 1
on th
e ex
tern
al D
-Rin
gs.
98A
djus
tabl
e E
quip
men
t Tet
her
[Lg-
Sm
]1
SE
G33
1069
45-3
09-
-R
EPO
RT
S/N
s to
MC
C-H
.
STO
W o
n th
e ex
tern
al D
-Rin
gs.
99E
nhan
ced
Rig
ht A
ngle
Driv
e1
SE
G33
1204
47-3
0110
03-
100
Rou
nd S
coop
1S
EG
3310
7677
-301
1001
-
101
A/L
Dep
loye
dM
esh
Bag
: 19A
D
one
Tool
s
CO
NN
EC
TOR
HA
ND
LE[a
ka C
anno
n C
onne
ctor
Too
l]1
S22
698-
006-
005
--
102
A/L
1D2
1.
0 C
TB: U
niqu
e E
VA
Too
ls, S
/N
1022
, B/C
002
317J
CO
NN
EC
TOR
HA
ND
LE[a
ka C
anno
n C
onne
ctor
Too
l]1
S22
698-
006-
005
--
Tabl
e G
: Con
figur
e M
ediu
m O
RU
Bag
: SG
AN
T B
ag
A/L
Dep
loye
d
A/L
Dep
loye
d(M
ed O
RU
Bag
)
A/L
1D2
Teth
er S
tagi
ng
Are
a
A/L
1O0
1.
0 C
TB: E
VA
M
isce
llane
ous
Tool
s #2
, S/N
11
61, B
/C 0
0415
5J
363636
![Page 39: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/39.jpg)
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
102
MU
T E
nd E
ffect
or A
ssy
2S
EG
3310
6890
-303
1001
1004
0003
186J
0001
8512
JST
OW
on
Inte
gral
RE
Ts.
103
Bal
lsta
ck1
SE
G33
1068
70-7
0310
13-
104
A/L
1D2
Teth
er S
tagi
ng
Are
a
Adj
usta
ble
Equ
ipm
ent T
ethe
r[S
m-S
m]
1S
EG
3310
6945
-307
--
REP
OR
T S
/Ns
to M
CC
-H.
STO
W o
n ba
llsta
ck.
Med
ium
OR
U B
ag:
□
RE
T Lg
-sm
(A/L
sto
wag
e) -
(Item
#94
)
□ M
ed O
RU
– S
GA
NT
Bag
- (It
em #
93)
In
tern
al D
-rin
gs
□ R
ET
sm-s
m -
(Item
#95
)
□
Fis
h S
tring
er #
1 - (
Item
#96
)
□
Rou
nd S
coop
(hoo
k #1
, clo
sest
to F
ish
Stri
nger
hoo
k at
tach
ed to
RE
T) -
(Item
#10
0)
□
RE
T sm
-sm
(hoo
k #2
) - (I
tem
#95
)
□ A
ET
- (Ite
m #
97)
□ E
mpt
y (h
ook
#3)
□ E
mpt
y (h
ook
#4)
□ E
mpt
y (h
ook
#5)
□ E
mpt
y (h
ook
#6 w
ill b
e fo
r the
AG
IT H
eat S
hiel
d ar
rivin
g on
ULF
4)
□ E
RA
D (h
ook
#7) -
(Ite
m #
99)
□
RE
T sm
-sm
- (It
em #
95)
□
Fis
h S
tring
er #
2 - (
Item
#96
)
□
Em
pty
(hoo
k #1
, clo
sest
to F
ish
Stri
nger
hoo
k at
tach
ed to
RE
T)
□
Em
pty
(hoo
k #2
)
□
Em
pty
(hoo
k #3
)
□
Em
pty
(hoo
k #4
)
□
Em
pty
(hoo
k #5
)
□
AE
T (to
pro
vide
2 te
ther
poi
nts)
(hoo
k #6
) - (I
tem
#97
)
□
2 -
RE
T sm
-sm
- (It
em #
95)
□
Can
non
Con
nect
or T
ool t
o R
ET
hook
#1-
(Ite
m #
101)
□
Can
non
Con
nect
or T
ool t
o R
ET
hook
#2-
(Ite
m #
102)
□
RE
T sm
-sm
- (It
em #
95)
E
xter
nal D
-rin
gs
□ 1
– A
ET
Sm
-sm
- (It
em #
97)
□
1 –
AE
T Lg
-sm
- (It
em #
98)
REP
OR
T an
y ad
ditio
nal i
tem
s fo
und
to M
CC
-H.
A/L
1O0
1.0
CTB
, S/N
10
13, B
/C 0
0230
8J
Tabl
e H
: Con
figur
e C
rew
lock
Bag
#3
and
mar
k "T
" w
ith T
ape
Cre
wlo
ck B
ag #
3
373737
![Page 40: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/40.jpg)
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
105
A/L
Dep
loye
dM
esh
Bag
: 19A
D
one
Tool
s
Squ
are
Sco
op1
SE
G33
1063
30-3
0110
01-
106
A/L
1O0
1.
0 C
TB: E
VA
M
isce
llane
ous
Tool
s #2
, S/N
11
61, B
/C 0
0415
5J
Squ
are
Sco
op3
SE
G33
1063
30-3
0110
0210
0310
04
-
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
107
A/L
1D2
Teth
er S
tagi
ng
Are
a
Lg-E
q R
ET
[Lg-
Sm
]1
SE
G33
1061
64-3
85-
-A
/L D
eplo
yed
Use
Red
RET
A/L
□ R
ET
Lg-S
m -
(Item
#10
7)
REP
OR
T an
y ad
ditio
nal i
tem
s fo
und
to M
CC
-H.
Tabl
e I:
Con
figur
e C
rew
lock
Bag
#4
and
mar
k "P
" w
ith T
ape
Cre
wlo
ck B
ag #
4
Cre
wlo
ck B
ag #
4:In
tegr
al R
ETs
□
Squ
are
Sco
op -
(Ite
m #
105)
□
Squ
are
Sco
op -
(Ite
m #
106)
□
Squ
are
Sco
op -
(Ite
m #
106)
□
Squ
are
Sco
op -
(Ite
m #
106)
REP
OR
T an
y ad
ditio
nal i
tem
s fo
und
to M
CC
-H.
Tabl
e J:
Dep
loy
Teth
er in
A/L
for C
amer
a
Cre
wlo
ck B
ag #
3:In
tegr
al R
ETs
□
MU
T E
E -
(Ite
m #
102)
□
MU
T E
E -
(Ite
m #
102)
□
ISS
sm
all t
rash
bag
- (I
tem
#3)
Inte
rnal
D-r
ings
□
Bal
lsta
ck -
(Ite
m #
103)
□
AE
T sm
-sm
(one
hoo
k on
inte
rnal
D-r
ing,
one
hoo
k on
bal
lsta
ck te
ther
loop
) - (
Item
#10
4)
383838
![Page 41: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/41.jpg)
Item
#
Loca
tion
Item
QTY
P/N
S/N
B/C
Fina
l Loc
atio
nN
otes
108
Mes
h B
ag1
SK
D13
1014
94-3
05-
-C
rew
lock
Dep
loye
dLA
BEL
"U
LF4
Tool
s"
109
OR
U T
rans
fer B
ag L
arge
1S
EG
3311
4494
-307
1002
0000
8707
JA
/L A
ttic
110
1/4"
X1/
2" A
llen
Driv
er[M
MO
D S
hiel
d T-
Han
dle
(Sho
rt)]
2S
ED
3912
7091
-301
1003
-
111
Soc
ket C
addy
Ass
y1
SE
G33
1069
38-3
0110
1000
1945
J
112
5/8
x 7.
8" R
igid
1S
EG
3310
6934
-301
1002
-
113
Rou
nd T
orqu
e M
ultip
lier
1S
EG
3310
6260
-301
1002
-
114
7/16
" Soc
ket F
lush
Rou
nd T
orqu
e M
ultip
lier
1S
DG
3310
7087
-003
1012
-
115
NH
3 Q
D C
ap2
1F45
580-
1-
-
116
NH
3 Q
D C
ap2
1F45
580-
501
--
117
EP
1 M
LI B
lank
et1
--
-A
/L A
ttic
118
Inbo
ard
Sto
wag
e B
eam
11F
8123
8-1
--
REP
OR
T S/
N to
MC
C-H
119
Out
boar
d S
tow
age
Bea
m1
1F81
240-
1-
-R
EPO
RT
S/N
to M
CC
-H
A/L
Dep
loye
dM
esh
Bag
: Don
e To
ols
NO
D1D
2
A/L
1D2
1.0
CTB
: Uni
que
EV
A T
ools
, S/N
10
22, B
/C 0
0231
7J
RET
RIE
VE a
n em
pty
Zipl
ock
and
stow
thes
e ca
ps in
side
. LA
BEL
zi
ploc
k, "C
aps
from
19A
". S
TOW
th
ese
caps
insi
de th
e zi
ploc
k.
Tabl
e K
: Res
tow
Item
s in
the
Don
e To
ols
Mes
h B
ag a
nd R
elab
el "
ULF
4 D
one
Tool
s"
A/L
1O0
1.0
CTB
: EV
A
Mis
cella
neou
s To
ols
#2, S
/N 1
161,
B/C
00
4155
J
A/L
Dep
loye
dM
esh
Bag
: Don
e To
ols
A/L
Dep
loye
d
393939
![Page 42: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/42.jpg)
23-0252A (MSG-082A) CBM CENTER DISK COVER LOCATE Page 1 of 1 page
13 APR 10
OBJECTIVE: Confirm configuration of the CBM Center Disk Covers prior to vestibule closeout. DURATION: 20 minutes CREW: One MATERIALS: Sharpie Kapton Tape PARTS: CBM Center Disk Cover P/N 683-14575-14 or 683-14575-15 1. Retrieve damaged CBM Center Disk Cover from NOD2P1. This CBM Center Disk
Cover has a broken pip pin on the turnbuckle and a brown damaged spot on the MLI.
NOTE Multiple labels with different part numbers and serial numbers are present on the CBM Center Disk Cover. Only the part number for the label marked 683-14575-14 or 683-14575-15 should be recorded.
1.1. Confirm P/N (683-14575-14 or 683-14575-15): ________ 1.2. Record S/N: ________ 1.3. Label damaged CBM Center Disk Cover as “Damaged/Removed GMT XXX”
(Sharpie, Kapton Tape).
2. Locate replacement CBM Center Disk Cover. Possible locations for replacement (in order of likelihood): NOD3D0 (Endcone), NOD2S2, COL1D1.
NOTE
Multiple labels with different part numbers and serial numbers are present on the CBM Center Disk Cover. Only the part number for the label marked 683-14575-14 or 683-14575-15 should be recorded.
2.1. Record P/N (683-14575-14 or 683-14575-15): ________ 2.2. Record S/N: ________
3. Stow damaged CBM Center Disk Cover where you found the replacement CBM
Center Disk Cover. 4. Temp stow replacement CBM Center Disk Cover for use on FD11 for Node 2 Nadir
Vestibule Config for Demate. 5. Report to MCC-H damaged and replacement CBM Center Disk Cover P/Ns, S/Ns,
and locations.
404040
![Page 43: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/43.jpg)
Goo
d Morning,
Below you
will find
two up
dated 5‐MLE bag layouts (sho
wn first) and
the tw
o remaining
layouts. Stowage
instructions fo
r the Catalytic
Reactor have be
en includ
ed in
the layout fo
r Ba
g C. The
current 5‐M
LE bag
configurations optim
ize the weight a
nd c.g. of the
stacks.
‐ The STS‐13
1 Midde
ck Stowage Team
MD CEIL STBD
1(BAG H)
MD CEIL PO
RT 1
(BAG E)
MD CEIL PO
RT 2
(BAG F)
MD CEIL STBD
2(BAG G)
**UPD
ATED**
MD FLO
OR PO
RT 2
(BAG A)
**UPD
ATED**
MD FLO
OR STBD
2(BAG D)
MD FLO
OR STBD
1(BAG C)
MD FLO
ORPO
RT 1
(BAG B)
VIEW
: DITCH
LOOKING AFT
MS
G08
5A -
5MLE
BA
G L
AY
OU
T U
PD
ATE
S
Pag
e 1
of 6
41
![Page 44: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/44.jpg)
MD CEIL STBD
2(BAG G)
MS
G08
5A -
5MLE
BA
G L
AY
OU
T U
PD
ATE
S
Pag
e 2
of 6
42
![Page 45: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/45.jpg)
MD FLO
OR PO
RT 2 (B
AG A)
#950
MS
G08
5A -
5MLE
BA
G L
AY
OU
T U
PD
ATE
S
Pag
e 3
of 6
43
![Page 46: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/46.jpg)
EXT A/L FLO
OR (BAG I)
MS
G08
5A -
5MLE
BA
G L
AY
OU
T U
PD
ATE
S
Pag
e 4
of 6
44
![Page 47: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/47.jpg)
MD FLO
OR STBD
1 ( BA
G C) –
Catalytic Reactor ORU
Stowage Instructions:
The following pages contain the instructions fo
r the return stowage configuration of th
e Catalytic
Re
actor.
1. Please remove the fo
am labe
led “CCC
/Foo
d containe
r” and
place th
is fo
am into eith
er end
of
Bag A (R
FTA).
2. O
nce you have retrieved
the Catalytic
Reactor fo
am box (R
eturn Item
721) place the ORU
in th
e bo
x as sho
wn be
low:
3. Please place foam
pieces in th
e four side voids, indicated by
the arrows (abo
ve).
MS
G08
5A -
5MLE
BA
G L
AY
OU
T U
PD
ATE
S
Pag
e 5
of 6
45
![Page 48: FD10 FLIGHT PLAN REVISION · 14/04/2010 · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well](https://reader033.vdocuments.us/reader033/viewer/2022050222/5f67f78373367f351720f6e2/html5/thumbnails/48.jpg)
Catalytic
Stowage Instructions (C
ontin
ued):
3. Use th
e “loo
se piece” of m
inicell
(white) foam located in Bag
C to rep
lace th
e lost fo
am lid.
4. Place ORU
/foam con
figuration
in Bag C (as show
n on
pictorial)
5. Place final foam piece on
top of bag
6. Rep
ort com
pletion of plan.
2
2 1
1
MS
G08
5A -
5MLE
BA
G L
AY
OU
T U
PD
ATE
S
Pag
e 6
of 6
46