STS-131/19A FD 10 Execute Package MSG Page(s) Title 075A 1 - 15 FD10 Flight Plan Revision 076 16 - 17 FD10 Mission Summary 077 18 - 20 FD10 Transfer Message 078 21 FD10 Crew Choice Downlink 079 22 FD10 EVA Deltas 080 23 - 24 Big Picture for Myco Experiment during 19A 081 25 - 39 19A EVA Restow and ULF4 Tool Config 082A 40 CBM Center Disk Cover Locate 083 --- FD10 PAO Event Summary Message: Eastern Guilford High School 084 --- FD10 PAO Event Summary Message: Joint Crew News Conference 085A 41 - 46 5MLE Bag Layout Updates Approved by FAO: L. Rush Last Updated: Apr 14 2010 3:20 AM GMT JEDI (Joint Execute package Development and Integration), v3.0 Comedy is on the inside cover.

Upload: others

Post on 23-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

STS-131/19A FD 10 Execute Package

MSG Page(s) Title

075A 1 - 15 FD10 Flight Plan Revision

076 16 - 17 FD10 Mission Summary

077 18 - 20 FD10 Transfer Message

078 21 FD10 Crew Choice Downlink

079 22 FD10 EVA Deltas

080 23 - 24 Big Picture for Myco Experiment during 19A

081 25 - 39 19A EVA Restow and ULF4 Tool Config

082A 40 CBM Center Disk Cover Locate

083 --- FD10 PAO Event Summary Message: Eastern Guilford High School

084 --- FD10 PAO Event Summary Message: Joint Crew News Conference

085A 41 - 46 5MLE Bag Layout Updates Approved by FAO: L. Rush

Last Updated: Apr 14 2010 3:20 AM GMT JEDI (Joint Execute package Development and Integration), v3.0 Comedy is on the inside cover.

Page 2: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well
Page 3: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

MSG 075A - FD10 FLIGHT PLAN REVISION

1 MSG INDEX 2

3 MSG NO. TITLE 4

5 6 7 8 9

10 11 12 13 14 15 16 17

MSG-075 FD10 Flight Plan Revision MSG-076 FD10 Mission Summary MSG-077 FD10 Transfer Message MSG-078 FD10 Crew Choice Downlink MSG-079 FD 10 EVA Deltas MSG-080 Big Picture for Myco Experiment during 19A MSG-081 19A EVA Restow and ULF4 Tool Config MSG-082A CBM Center Disk Cover Locate MSG-083 FD10 PAO Event Summary Message: Eastern Guilford High School MSG-084 FD10 PAO Event Summary Message: Joint Crew News Conference MSG-085A 5MLE Bag Layout Updates 1. Post-Sleep Cryo Config 18

19

20

21

22

23

For today's post-sleep cryo config, O2 and H2 tanks 1 and 5 will be active. R1 O2,H2 MANF VLV TK1 (two) - OP (tb-OP) Pre-Sleep Cryo Config 24

25

26

27

28

29 30

31

32

33

34

35

36

37

38

39

40 41

√MCC for deltas prior to configuring for pre-sleep. For tonight's pre-sleep cryo config, manifold 2 will be closed with O2 tanks 2, 3 and 4, and H2 tanks 2 and 5 active. R1 O2 TK1 HTR A - OFF TK2 HTR A - AUTO TK3 HTR A - AUTO H2 TK1 HTRS A,B (two) - OFF TK2 HTRS A,B (two) - AUTO O2, H2 MANF VLV TK2 (two) - CL (tb-CL) A11 CRYO TK4 HTR O2 A - AUTO

A15 CRYO TK5 HTR O2 A - OFF

2. Comm Loop Overview for Flight Day 10: 42 S/G 1 & A/G 1 S/G 2 A/G 2 43

44 45 46 47 48 49 50

Node 2 CBM CPA Ops PAO Event Transfer O2 Transfer Setup/Init Educational Event All other STS Comm Russian Ops ISS Payloads DPC ISS Crew PFCs All other ISS Comm

END OF PAGE 1 OF 15, MSG 075A 111

Page 4: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

MSG 075A - FD10 FLIGHT PLAN REVISION

END OF PAGE 2 OF 15, MSG 075A

1 3. STS-131/19A FD9 - MMT Summary 2

The MMT met very briefly today to review orbiter systems and mission progress. 3 4 5 6 7 8 9

10 11 12 13 14

Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well. The engineering team has no concerns with the MMOD hit (< 1mm) on the window 1 thermal pane. The bounding analysis performed on previous flights indicates anything less than 12mm in diameter (.49 inches) is not a concern for the windows. Enjoy your well deserved “OFF DUTY” Part II.

4. CDR PFC 15 Dex, due to ratty Shuttle comm at the time of your PFC, we have moved your PFC to an SSC in the ISS. Please tag up with one of the ISS Crew to configure the SSC and S/G 2 audio. Please inform MCC which SSC you will be using.

16 17 18 19

5. WHC/WCS Configuration & Management 20 We have evaluated the waste generation data and have confirmed that you can return to the preflight agreement of 4 Shuttle crew on the WHC and 3 Shuttle crew on the WCS starting this morning. EECOM predicts a Shuttle waste tank quantity of ~88% at the start of the FD13 post-undocking waste dump.

21 22 23 24 25

27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

6. REPLACE PAGES 2-34, 2-36, 2-38 AND 3-106 THROUGH 3-115. 26

222

Page 5: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

FLT PLN/131/FLT

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

FD09

β =

6

FD10

REPLANNED

2-34

S T S - 1 3 1

17

18

19

20

21

22

23

04/14

01

02

03

04

GMT 04/13/10 (103)

06

07

08

09

10

11

12

13

14

15

16

17

18

MET

Day 008

CDR

SLEEP

PRE SLEEP

PMC

A/G

PRE SLEEP

POST SLEEP

PLT

SLEEP

PRE SLEEP

POST SLEEP

MS1

SLEEP

PRE SLEEP

POST SLEEP

A S P R N

MS2

SLEEP

POST SLEEP

PRE SLEEP

MS3

SLEEP

L O GPOST SLEEP

PRE SLEEP

MS4

L O GSLEEP

X F E R

T A G U P

XFER

BRIEF

POST SLEEP

PRE SLEEP

PRE

SLEEP

P R E

S L E E P

MS5

SLEEP

PRE SLEEP

POST SLEEP

A S P R N

L O G

TDRS

W E ZDAY/NIGHT

ORBIT

131

132

133

134

135

136

137

138

BIAS -XLV -ZVV

ORB ATT

TDRS

AVAIL

NOTES

2-34

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

FD09

β =

6

FD10

REPLANNED

S T S - 1 3 1

17

18

19

20

21

22

23

04/14

01

02

03

04

GMT 04/13/10 (103)

06

07

08

09

10

11

12

13

14

15

16

17

18

MET

Day 008

CDR

SLEEP

PRE SLEEP

PMC

A/G

PRE SLEEP

POST SLEEP

PLT

SLEEP

PRE SLEEP

POST SLEEP

MS1

SLEEP

PRE SLEEP

POST SLEEP

A S P R N

MS2

SLEEP

POST SLEEP

PRE SLEEP

MS3

SLEEP

L O GPOST SLEEP

PRE SLEEP

MS4

L O GSLEEP

X F E R

T A G U P

XFER

BRIEF

POST SLEEP

PRE SLEEP

PRE

SLEEP

P R E

S L E E P

MS5

SLEEP

PRE SLEEP

POST SLEEP

A S P R N

L O G

TDRS

W E ZDAY/NIGHT

ORBIT

131

132

133

134

135

136

137

138

ORB ATT

BIAS -XLV -ZVV

TDRS

AVAIL

NOTES

333

Page 6: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

FLT PLN/131/FLT

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

FD10

β =

8

REPLANNED

2-36

S T S - 1 3 1

05

06

07

08

09

10

11

12

13

14

15

16

GMT 04/14/10 (104)

18

19

20

21

22

23

009/00

01

02

03

04

05

06

MET

Day 008

CDR

C R E W

P H O T O

POST SLEEP

MEAL

OFF DUTY

PFC

OCA

EXERCISE

OFF DUTY

C W C

X F E R

C W C # 5

I N I T

C W C

T E R M

PWR

#1

FILL

N 2 - I

N 2 - T

I M U

CREW

CONF

OFF DUTY

P W R

X F E R

POST

SLEEP

PLT

W C S ^

C R E W

P H O T O

POST SLEEP

MEAL

OFF DUTY

PFC

OCA

E X E R

C I S E

MPLM XFER

P/TV08

EXT

SRVY

P T V 0 8

S / UOFF DUTY

CREW

CONF

P T V 0 8

MS1

C R E W

P H O T O

EVA TOOL RESTOW

POST SLEEP

MEAL

OFF DUTY

OFF DUTY

EXERCISE

PGT

C/O

MPLM XFER

CREW

CONF

MS2

C R E W

P H O T O

POST SLEEP

MEAL

OFF DUTY

EXERCISE

MPLM XFER

CREW

CONF

OFF DUTY

M C I U

MS3

C R E W

P H O T O

POST SLEEP

MEAL

OFF DUTY

OFF DUTY

EXERCISE

MPLM

RACK

CONFIG

X F E R

U P D A T

MPLM PIVOT REMOVE

CREW

CONF

MPLM XFER

MS4

MPLM

RACK

CONFIG

C R E W

P H O T O

POST SLEEP

MEAL

OFF DUTY

PFC

OCA

EXER-

CISE

MPLM XFER

M D D K

CREW

CONF

N S X F E R

OFF DUTY

MS5

C R E W

P H O T O

N2N-CBM-CPA-INSTALL

POST SLEEP

MEAL

OFF DUTY

PFC

OCA

EXERCISE

OFF DUTY

O F F

D U T Y

CREW

CONF

MPLM XFER

C D C

L O C A T E

TDRS

W E ZDAY/NIGHT

ORBIT

139

140

141

142

143

144

145

146

BIAS -XLV -ZVV

ORB ATT

TDRS

AVAIL

^COMPACT

NOTES

2-36

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

FD10

β =

8

REPLANNED

S T S - 1 3 1

05

06

07

08

09

10

11

12

13

14

15

16

GMT 04/14/10 (104)

18

19

20

21

22

23

009/00

01

02

03

04

05

06

MET

Day 008

CDR

C R E W

P H O T O

POST SLEEP

MEAL

OFF DUTY

PFC

OCA

EXERCISE

OFF DUTY

C W C

X F E R

C W C # 5

I N I T

C W C

T E R M

PWR

#1

FILL

N 2 - I

N 2 - T

I M U

CREW

CONF

OFF DUTY

P W R

X F E R

POST

SLEEP

PLT

W C S ^

C R E W

P H O T O

POST SLEEP

MEAL

OFF DUTY

PFC

OCA

E X E R

C I S E

MPLM XFER

P/TV08

EXT

SRVY

P T V 0 8

S / UOFF DUTY

CREW

CONF

P T V 0 8

MS1

C R E W

P H O T O

EVA TOOL RESTOW

POST SLEEP

MEAL

OFF DUTY

OFF DUTY

EXERCISE

PGT

C/O

MPLM XFER

CREW

CONF

MS2

C R E W

P H O T O

POST SLEEP

MEAL

OFF DUTY

EXERCISE

MPLM XFER

CREW

CONF

OFF DUTY

M C I U

MS3

C R E W

P H O T O

POST SLEEP

MEAL

OFF DUTY

OFF DUTY

EXERCISE

MPLM

RACK

CONFIG

X F E R

U P D A T

MPLM PIVOT REMOVE

CREW

CONF

MPLM XFER

MS4

MPLM

RACK

CONFIG

C R E W

P H O T O

POST SLEEP

MEAL

OFF DUTY

PFC

OCA

EXER-

CISE

MPLM XFER

M D D K

CREW

CONF

N S X F E R

OFF DUTY

MS5

C R E W

P H O T O

N2N-CBM-CPA-INSTALL

POST SLEEP

MEAL

OFF DUTY

PFC

OCA

EXERCISE

OFF DUTY

O F F

D U T Y

CREW

CONF

MPLM XFER

C D C

L O C A T E

TDRS

W E ZDAY/NIGHT

ORBIT

139

140

141

142

143

144

145

146

ORB ATT

BIAS -XLV -ZVV

TDRS

AVAIL

NOTES

^COMPACT

444

Page 7: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

FLT PLN/131/FLT

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

β =

11

FD10

REPLANNED

2-38

S T S - 1 3 1

17

18

19

20

21

22

23

04/15

01

02

03

04

GMT 04/14/10 (104)

06

07

08

09

10

11

12

13

14

15

16

17

18

MET

Day 009

CDR

P A O E D U

E V E N TSLEEP

PMC

A/G

PRE SLEEP

PRE SLEEP

OFF DUTY

PLT

SLEEP

EXER CISE

X F E R

T A G U P

PRE SLEEP

M Y C O *

MS1

SLEEP

PRE

SLEEPPFC

OCA

OFF DUTY

PRE SLEEP

M Y C O *

MS2

SLEEP

PFC

OCA

P A O E D U

E V E N TPRE SLEEP

OFF DUTY

PRE

SLEEP

MS3

P A O E D U

E V E N TSLEEP

PRE SLEEPPFC

OCA

OFF DUTY

A E M #

M D D K

PRE SLEEP

MS4

SLEEP

PRE SLEEP

OFF

DUTY

E X E R -

C I S E

XFER

BRIEF

X F E R

T A G U P

M Y C O *

PRE

SLEEP

MS5

SLEEP

OFF DUTY

P A O E D U

E V E N TPRE SLEEP

TDRS

W E ZDAY/NIGHT

ORBIT

147

148

149

150

151

152

153

154

BIAS -XLV -ZVV

ORB ATT

TDRS

AVAIL

*REVIEW

#STATUS CHECK

NOTES

2-38

POINDEXTER

DUTTON

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

METCALF-

LINDENBURGER

β =

11

FD10

REPLANNED

S T S - 1 3 1

17

18

19

20

21

22

23

04/15

01

02

03

04

GMT 04/14/10 (104)

06

07

08

09

10

11

12

13

14

15

16

17

18

MET

Day 009

CDR

P A O E D U

E V E N TSLEEP

PMC

A/G

PRE SLEEP

PRE SLEEP

OFF DUTY

PLT

SLEEP

EXER CISE

X F E R

T A G U P

PRE SLEEP

M Y C O *

MS1

SLEEP

PRE

SLEEPPFC

OCA

OFF DUTY

PRE SLEEP

M Y C O *

MS2

SLEEP

PFC

OCA

P A O E D U

E V E N TPRE SLEEP

OFF DUTY

PRE

SLEEP

MS3

P A O E D U

E V E N TSLEEP

PRE SLEEPPFC

OCA

OFF DUTY

A E M #

M D D K

PRE SLEEP

MS4

SLEEP

PRE SLEEP

OFF

DUTY

E X E R -

C I S E

XFER

BRIEF

X F E R

T A G U P

M Y C O *

PRE

SLEEP

MS5

SLEEP

OFF DUTY

P A O E D U

E V E N TPRE SLEEP

TDRS

W E ZDAY/NIGHT

ORBIT

147

148

149

150

151

152

153

154

ORB ATT

BIAS -XLV -ZVV

TDRS

AVAIL

NOTES

*REVIEW

#STATUS CHECK

555

Page 8: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

FLT PLN/131/FLT

FD10

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

FD10 EZ ACTIVITIES:

TEP

C (O

RB O

PS,

CREW

SYS

TEMS

) Ch

eck

Stat

us C

heck MDDK Duct Screen

Har

d re

boot

all

PGS

Cs n

ot

shut down overnight.

REPLANNED

AN2 REPRESS USING P/L N2 VLVS

(ORB OPS, ECLS)Steps 1,3-7

MCC will TMBU S/W FDA

3-106

STS-

131/

19A

FD

03:00

04:00

05:00

06:00

GMT

Date

04/14

(104)

16:00

17:00

18:00

19:00

20:00

MET

Day 008

WE

Z

T D R S

~

~

~

D / N

O R B 1 3 7 1 3 8 1 3 9 1 4 0

~ ~B I A S - X L V - Z V VS T S A T T

CDR

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

N2 REPRESS INIT A

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

P/TV08 EXTERNAL SURVEY

(P/TV, SCENES)

OPS, Item 2 for ISS Survey

~

P/TV08 EXTERNAL SURVEY

(P/TV, SCENES)

SETUP, Step 2

MS2

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

L17 Check MCIU filter screen

NOTES

3-106

FD10

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

FD10 EZ ACTIVITIES:

TEP

C (O

RB O

PS,

CREW

SYS

TEMS

) Ch

eck

Stat

us C

heck MDDK Duct Screen

Har

d re

boot

all

PGS

Cs n

ot

shut down overnight.

REPLANNED

AN2 REPRESS USING P/L N2 VLVS

(ORB OPS, ECLS)Steps 1,3-7

MCC will TMBU S/W FDA

STS-

131/

19A

FD

03:00

04:00

05:00

06:00

GMT

Date

04/14

(104)

16:00

17:00

18:00

19:00

20:00

MET

Day 008

WE

Z

T D R SD / N

O R B 1 3 7 1 3 8 1 3 9 1 4 0

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

~

SLEEP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

N2 REPRESS INIT A

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

~

SLEEP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

P/TV08 EXTERNAL SURVEY

(P/TV, SCENES)

OPS, Item 2 for ISS Survey

P/TV08 EXTERNAL SURVEY

(P/TV, SCENES)

SETUP, Step 2

MS2

~

SLEEP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

L17 Check MCIU filter screen

NOTES

666

Page 9: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

FLT PLN/131/FLT

FD10

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

REPLANNED

3-107

STS-

131/

19A

FD

03:00

04:00

05:00

06:00

GMT

Date

04/14

(104)

16:00

17:00

18:00

19:00

20:00

MET

Day 008

WE

Z

T D R S

~

~

~

D / N

O R B 1 3 7 1 3 8 1 3 9 1 4 0

~ ~B I A S - X L V - Z V VS T S A T T

MS1

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg)

MS3

SLEEP

~

SLEEP LOGBOOK (SDBI 1634)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DAILY TRANSFER LIST UPDATE

Ref. Transfer Lists & MSG 077

MS4

SLEEP LOGBOOK (SDBI 1634)

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS5

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg)

SLEEP LOGBOOK (SDBI 1634)

NOTES

3-107

FD10

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

REPLANNED

STS-

131/

19A

FD

03:00

04:00

05:00

06:00

GMT

Date

04/14

(104)

16:00

17:00

18:00

19:00

20:00

MET

Day 008

WE

Z

T D R SD / N

O R B 1 3 7 1 3 8 1 3 9 1 4 0

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

~

SLEEP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg)

MS3

~

SLEEP

SLEEP LOGBOOK (SDBI 1634)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DAILY TRANSFER LIST UPDATE

Ref. Transfer Lists & MSG 077

MS4

SLEEP LOGBOOK (SDBI 1634)

~

SLEEP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS5

~

SLEEP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA CREW: TAKE 1 ASPIRIN (325mg)

SLEEP LOGBOOK (SDBI 1634)

NOTES

777

Page 10: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

FLT PLN/131/FLT

FD10

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

BN2 REPRESS USING P/L N2 VLVS

(ORB OPS, ECLS)

on MCC go, perform steps 8-13

MCC will TMBU S/W FDA

REPLANNED

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

N2 REPRESS TERM (On MCC GO) B

3-108

STS-

131/

19A

FD

07:00

08:00

09:00

10:00

GMT

Date

04/14

(104)

20:00

21:00

22:00

23:00

00:00

MET

Day 008

WE

Z

T D R S

~

~

D / N

O R B 1 4 0 1 4 1 1 4 2

~ ~B I A S - X L V - Z V VS T S A T T

CDR

MEAL

~

CWC TRANSFER

Transfer 1 CWC to ISS

SHUTTLE/ISS H2O CONTAINER FILL (HC)

(ORB OPS, ECLS)

Perform CWC FILL #5, Ref. MSG 012

SHUTTLE/ISS H2O CONTAINER FILL (HC)

(ORB OPS, ECLS)

Perform FILL TERMINATION

PWR FILL

(ORB OPS, ECLS)

Init Fill #1 (S/N 1005)

Fill duration ~ 30 min

Ref. MSG 012

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

PWR TRANSFER

Transfer 1 PWR to ISS

~

PLT

WCS COMPACTOR OPS (DUAL-VANE)

(Cue Card, URINE COLLECTION)

MEAL

~

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 077

P/TV08 EXTERNAL SURVEY

(P/TV, SCENES)

OPS, Item 2 for ISS Survey

~

P/TV08 EXTERNAL SURVEY (DEACTIVATION)

(P/TV, SCENES)

MS2

MEAL

~

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 077

NOTES

3-108

FD10

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

BN2 REPRESS USING P/L N2 VLVS

(ORB OPS, ECLS)

on MCC go, perform steps 8-13

MCC will TMBU S/W FDA

REPLANNED

POST-SLEEP ACTIVITY (ORB OPS, CREW SYS)

N2 REPRESS TERM (On MCC GO) B

STS-

131/

19A

FD

07:00

08:00

09:00

10:00

GMT

Date

04/14

(104)

20:00

21:00

22:00

23:00

00:00

MET

Day 008

WE

Z

T D R SD / N

O R B 1 4 0 1 4 1 1 4 2

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

~

MEAL

CWC TRANSFER

Transfer 1 CWC to ISS

SHUTTLE/ISS H2O CONTAINER FILL (HC)

(ORB OPS, ECLS)

Perform CWC FILL #5, Ref. MSG 012

SHUTTLE/ISS H2O CONTAINER FILL (HC)

(ORB OPS, ECLS)

Perform FILL TERMINATION

PWR FILL

(ORB OPS, ECLS)

Init Fill #1 (S/N 1005)

Fill duration ~ 30 min

Ref. MSG 012

IMU STAR OF OPPTY ALIGN (ORB OPS, GNC)

PWR TRANSFER

Transfer 1 PWR to ISS

~

PLT

WCS COMPACTOR OPS (DUAL-VANE)

(Cue Card, URINE COLLECTION)

~

MEAL

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 077

~P/TV08 EXTERNAL SURVEY

(P/TV, SCENES)

OPS, Item 2 for ISS Survey

P/TV08 EXTERNAL SURVEY (DEACTIVATION)

(P/TV, SCENES)

MS2

~

MEAL

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 077

NOTES

888

Page 11: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

FLT PLN/131/FLT

FD10

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

REPLANNED

TRANSFER OPS

Transfer Nanoskelton samples

Ref. Middeck Transfer List:

Return Item 431.1

PGT C/O (EVA, TOOLS AND STOWAGE)

Checkout PGT s/n 1004

Ref. Transfer Lists: MPLM Resupply

item 187 & Middeck Return Item 707

3-109

STS-

131/

19A

FD

07:00

08:00

09:00

10:00

GMT

Date

04/14

(104)

20:00

21:00

22:00

23:00

00:00

MET

Day 008

WE

Z

T D R S

~

~

D / N

O R B 1 4 0 1 4 1 1 4 2

~ ~B I A S - X L V - Z V VS T S A T T

MS1

EVA TOOL RESTOW

Ref. MSG 079

Ref. MSG 081

MEAL

~

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 077

MS3

MEAL

~

S&M: 1.260 CONFIGURE MPLM

RACKS FOR ENTRY

S&M: 1.262 RSP/RSR ROTATE UP

Steps 1-4

Ref. MPLM Return Transfer

List: Item 824

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 077

MS4

S&M: 1.260 CONFIGURE MPLM

RACKS FOR ENTRY MEAL

~

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 077

MERLIN STATUS CK (Cue Card)

GLACIER STATUS CK (Cue Card)

STL STATUS CK (Cue Card)

MS5

S&M: 1.100 CBM CONTROLLER PANEL

ASSEMBLY INSTALLATION - GENERIC

MEAL

~

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 077

CBM CENTER DISK COVER

LOCATE

Ref. MSG 082

NOTES

3-109

FD10

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

REPLANNED

TRANSFER OPS

Transfer Nanoskelton samples

Ref. Middeck Transfer List:

Return Item 431.1

PGT C/O (EVA, TOOLS AND STOWAGE)

Checkout PGT s/n 1004

Ref. Transfer Lists: MPLM Resupply

item 187 & Middeck Return Item 707

STS-

131/

19A

FD

07:00

08:00

09:00

10:00

GMT

Date

04/14

(104)

20:00

21:00

22:00

23:00

00:00

MET

Day 008

WE

Z

T D R SD / N

O R B 1 4 0 1 4 1 1 4 2

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

EVA TOOL RESTOW

Ref. MSG 079

Ref. MSG 081

~

MEAL

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 077

MS3

~

MEAL

S&M: 1.260 CONFIGURE MPLM

RACKS FOR ENTRY

S&M: 1.262 RSP/RSR ROTATE UP

Steps 1-4

Ref. MPLM Return Transfer

List: Item 824

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 077

MS4

S&M: 1.260 CONFIGURE MPLM

RACKS FOR ENTRY

~

MEAL

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 077

MERLIN STATUS CK (Cue Card)

GLACIER STATUS CK (Cue Card)

STL STATUS CK (Cue Card)

MS5

S&M: 1.100 CBM CONTROLLER PANEL

ASSEMBLY INSTALLATION - GENERIC

~

MEAL

TRANSFER OPS

Ref. MPLM Transfer Lists

and MSG 077

CBM CENTER DISK COVER

LOCATE

Ref. MSG 082

NOTES

999

Page 12: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

FLT PLN/131/FLT

FD10

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

REPLANNED

3-110

STS-

131/

19A

FD

11:00

12:00

13:00

14:00

GMT

Date

04/14

(104)

00:00

01:00

02:00

03:00

04:00

MET

Day 009

WE

Z

T D R S

~

~~

D / N

O R B 1 4 3 1 4 4 1 4 5

~ ~B I A S - X L V - Z V VS T S A T T

CDR

CREW PHOTO

MEAL

~

OFF DUTY

EXERCISE

OFF DUTY

~

CREW CONFERENCE

ISS KU AVAIL (01:06-01:47)

Ref. MSG 084

PLT

CREW PHOTO

MEAL

~

OFF DUTY

~

CREW CONFERENCE

ISS KU AVAIL (01:06-01:47)

Ref. MSG 084

MS2

CREW PHOTO

MEAL

~

OFF DUTY

EXERCISE

~

CREW CONFERENCE

ISS KU AVAIL (01:06-01:47)

Ref. MSG 084

NOTES

3-110

FD10

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

REPLANNED

STS-

131/

19A

FD

11:00

12:00

13:00

14:00

GMT

Date

04/14

(104)

00:00

01:00

02:00

03:00

04:00

MET

Day 009

WE

Z

T D R SD / N

O R B 1 4 3 1 4 4 1 4 5

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

CREW PHOTO

~

MEAL

OFF DUTY

EXERCISE

~

OFF DUTY

CREW CONFERENCE

ISS KU AVAIL (01:06-01:47)

Ref. MSG 084

PLT

CREW PHOTO

~

MEAL

~

OFF DUTY

CREW CONFERENCE

ISS KU AVAIL (01:06-01:47)

Ref. MSG 084

MS2

CREW PHOTO

~

MEAL

OFF DUTY

~

EXERCISE

CREW CONFERENCE

ISS KU AVAIL (01:06-01:47)

Ref. MSG 084

NOTES

101010

Page 13: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

FLT PLN/131/FLT

FD10

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

C Omit Steps 1.2 & 3

Use A/G 2 for Audio

Inform MCC of which PGSC

will be used

L9 PS ATU A/G (two) - OFF

NETMEETING VIDEO CONFERENCING

(ORB OPS, PGSC)

Private Family Conference

ISS KU AVAIL (02:37-03:23) C

REPLANNED

L9 PS ATU A/G (two) - OFF

NETMEETING VIDEO CONFERENCING

(ORB OPS, PGSC)

Private Family Conference

ISS KU AVAIL (02:37-03:23) C

3-111

STS-

131/

19A

FD

11:00

12:00

13:00

14:00

GMT

Date

04/14

(104)

00:00

01:00

02:00

03:00

04:00

MET

Day 009

WE

Z

T D R S

~

~~

D / N

O R B 1 4 3 1 4 4 1 4 5

~ ~B I A S - X L V - Z V VS T S A T T

MS1

CREW PHOTO

MEAL

~

OFF DUTY

EXERCISE

~

CREW CONFERENCE

ISS KU AVAIL (01:06-01:47)

Ref. MSG 084

MS3

CREW PHOTO

MEAL

~

OFF DUTY

~

CREW CONFERENCE

ISS KU AVAIL (01:06-01:47)

Ref. MSG 084

MS4

CREW PHOTO

MEAL

~

OFF DUTY

CREW CONFERENCE

ISS KU AVAIL (01:06-01:47)

Ref. MSG 084

OFF DUTY

~

MS5

CREW PHOTO

MEAL

~

OFF DUTY

OFF DUTY

~

CREW CONFERENCE

ISS KU AVAIL (01:06-01:47)

Ref. MSG 084

NOTES

3-111

FD10

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

C Omit Steps 1.2 & 3

Use A/G 2 for Audio

Inform MCC of which PGSC

will be used

L9 PS ATU A/G (two) - OFF

NETMEETING VIDEO CONFERENCING

(ORB OPS, PGSC)

Private Family Conference

ISS KU AVAIL (02:37-03:23) C

REPLANNED

L9 PS ATU A/G (two) - OFF

NETMEETING VIDEO CONFERENCING

(ORB OPS, PGSC)

Private Family Conference

ISS KU AVAIL (02:37-03:23) C

STS-

131/

19A

FD

11:00

12:00

13:00

14:00

GMT

Date

04/14

(104)

00:00

01:00

02:00

03:00

04:00

MET

Day 009

WE

Z

T D R SD / N

O R B 1 4 3 1 4 4 1 4 5

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

CREW PHOTO

~

MEAL

OFF DUTY

~

EXERCISE

CREW CONFERENCE

ISS KU AVAIL (01:06-01:47)

Ref. MSG 084

MS3

CREW PHOTO

~

MEAL

~

OFF DUTY

CREW CONFERENCE

ISS KU AVAIL (01:06-01:47)

Ref. MSG 084

MS4

CREW PHOTO

~

MEAL

OFF DUTY

CREW CONFERENCE

ISS KU AVAIL (01:06-01:47)

Ref. MSG 084

~

OFF DUTY

MS5

CREW PHOTO

~

MEAL

OFF DUTY

~

OFF DUTY

CREW CONFERENCE

ISS KU AVAIL (01:06-01:47)

Ref. MSG 084

NOTES

111111

Page 14: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

FLT PLN/131/FLT

FD10

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

REPLANNED

MYCO BODY SAMPLE COLLECTION

(ASSY OPS, P/L) Rvw Proc & Ref. MSG 080

L9 PS ATU A/G (two) - OFF

NETMEETING VIDEO CONFERENCING (ORB OPS, PGSC)

Private Family Conference

ISS KU TDRW (04:12-04:56) C

Ratty S-BD until 04:17

OFF DUTY

C Omit Steps 1.2 & 3

Use A/G 2 for Audio

Inform MCC of which PGSC will be used

3-112

STS-

131/

19A

FD

15:00

16:00

17:00

18:00

GMT

Date

04/14

(104)

04:00

05:00

06:00

07:00

08:00

MET

Day 009

WE

Z

T D R S

~

~~

D / N

O R B 1 4 5 1 4 6 1 4 7 1 4 8

~ ~B I A S - X L V - Z V VS T S A T T

CDR

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (06:27-07:12)

Ref. MSG 083

PRIVATE FAMILY CONFERENCE

Ref. MSG 075, item 4

ISS KU AVAIL (05:02-05:17)

OFF DUTY

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OFF DUTY

PLT

~

EXERCISE

TRANSFER TAGUP

Coordinate with transfer

counterparts

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OFF DUTY

MS2

EXERCISE

~

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (06:27-07:12)

Ref. MSG 083

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OFF DUTY

NOTES

3-112

FD10

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

REPLANNED

MYCO BODY SAMPLE COLLECTION

(ASSY OPS, P/L) Rvw Proc & Ref. MSG 080

L9 PS ATU A/G (two) - OFF

NETMEETING VIDEO CONFERENCING (ORB OPS, PGSC)

Private Family Conference

ISS KU TDRW (04:12-04:56) C

Ratty S-BD until 04:17

OFF DUTY

C Omit Steps 1.2 & 3

Use A/G 2 for Audio

Inform MCC of which PGSC will be used

STS-

131/

19A

FD

15:00

16:00

17:00

18:00

GMT

Date

04/14

(104)

04:00

05:00

06:00

07:00

08:00

MET

Day 009

WE

Z

T D R SD / N

O R B 1 4 5 1 4 6 1 4 7 1 4 8

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (06:27-07:12)

Ref. MSG 083

PRIVATE FAMILY CONFERENCE

Ref. MSG 075, item 4

ISS KU AVAIL (05:02-05:17)

~

OFF DUTY

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OFF DUTY

PLT

~

EXERCISE

TRANSFER TAGUP

Coordinate with transfer

counterparts ~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OFF DUTY

MS2

~

EXERCISE

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (06:27-07:12)

Ref. MSG 083

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OFF DUTY

NOTES

121212

Page 15: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

FLT PLN/131/FLT

FD10

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

C Omit Steps 1.2 & 3

Use A/G 2 for Audio

Inform MCC of which

PGSC will be used

AEM UNIT#1 CK (Cue Card)

AEM UNIT#2 CK (Cue Card)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

REPLANNED

TRANSFER TAGUP

Coordinate with transfer

counterparts

MYCO BODY SAMPLE COLLECTION

(ASSY OPS, P/L) Rvw Proc &

Ref. MSG 080

L9 PS ATU A/G (two) - OFF

NETMEETING VIDEO CONFERENCING

(ORB OPS, PGSC)

Private Family Conference

ISS KU AVAIL (07:34-08:08) C

MYCO BODY SAMPLE COLLECTION

(ASSY OPS, P/L) Rvw Proc &

Ref. MSG 080

3-113

STS-

131/

19A

FD

15:00

16:00

17:00

18:00

GMT

Date

04/14

(104)

04:00

05:00

06:00

07:00

08:00

MET

Day 009

WE

Z

T D R S

~

~~

D / N

O R B 1 4 5 1 4 6 1 4 7 1 4 8

~ ~B I A S - X L V - Z V VS T S A T T

MS1

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OFF DUTY

EXERCISE

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS3

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (06:27-07:12)

Ref. MSG 083

~

OFF DUTY

~

OFF DUTY

EXERCISE

MERLIN STATUS CK (Cue Card)

GLACIER STATUS CK (Cue Card)

STL STATUS CK (Cue Card)

MS4

OFF DUTY

EXERCISE

TRANSFER BRIEF

Call down status to MCC

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OFF DUTY

~

MS5

EXERCISE

OFF DUTY

~

OFF DUTY

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (06:27-07:12)

Ref. MSG 083

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-113

FD10

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

C Omit Steps 1.2 & 3

Use A/G 2 for Audio

Inform MCC of which

PGSC will be used

AEM UNIT#1 CK (Cue Card)

AEM UNIT#2 CK (Cue Card)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

REPLANNED

TRANSFER TAGUP

Coordinate with transfer

counterparts

MYCO BODY SAMPLE COLLECTION

(ASSY OPS, P/L) Rvw Proc &

Ref. MSG 080

L9 PS ATU A/G (two) - OFF

NETMEETING VIDEO CONFERENCING

(ORB OPS, PGSC)

Private Family Conference

ISS KU AVAIL (07:34-08:08) C

MYCO BODY SAMPLE COLLECTION

(ASSY OPS, P/L) Rvw Proc &

Ref. MSG 080

STS-

131/

19A

FD

15:00

16:00

17:00

18:00

GMT

Date

04/14

(104)

04:00

05:00

06:00

07:00

08:00

MET

Day 009

WE

Z

T D R SD / N

O R B 1 4 5 1 4 6 1 4 7 1 4 8

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

OFF DUTY

~

EXERCISE

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (06:27-07:12)

Ref. MSG 083

~~

OFF DUTY

OFF DUTY

EXERCISE

MERLIN STATUS CK (Cue Card)

GLACIER STATUS CK (Cue Card)

STL STATUS CK (Cue Card)

MS4

OFF DUTY

EXERCISE

~

TRANSFER BRIEF

Call down status to MCC

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

OFF DUTY

MS5

EXERCISE

~

OFF DUTY

OFF DUTY

PUBLIC AFFAIRS EVENT

ISS KU AVAIL (06:27-07:12)

Ref. MSG 083

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

131313

Page 16: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

FLT PLN/131/FLT

FD10

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

C Omit Steps 1.2 & 3

Use A/G 2 for Audio

Inform MCC of which PGSC will be used

L9 PS ATU A/G (two) - OFF

NETMEETING VIDEO CONFERENCING (ORB OPS,PGSC)

Private Family Conference

ISS KU AVAIL (09:16-09:58) C

REPLANNED

CREW WAKEUP AT 09/18:00

3-114

STS-

131/

19A

FD

19:00

20:00

21:00

22:00

GMT

Date

04/14

(104)

08:00

09:00

10:00

11:00

12:00

MET

Day 009

WE

Z

T D R S

~

~~

D / N

O R B 1 4 8 1 4 9 1 5 0

~ ~B I A S - X L V - Z V VS T S A T T

CDR

SLEEP

~

L9 PS ATU A/G (two) - OFF

PRIVATE MEDICAL CONFERENCE VIA A/G 2

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PLT

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS2

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

3-114

FD10

POINDEXTER

DUTTON

METCALF-

LINDENBURGER

C Omit Steps 1.2 & 3

Use A/G 2 for Audio

Inform MCC of which PGSC will be used

L9 PS ATU A/G (two) - OFF

NETMEETING VIDEO CONFERENCING (ORB OPS,PGSC)

Private Family Conference

ISS KU AVAIL (09:16-09:58) C

REPLANNED

CREW WAKEUP AT 09/18:00

STS-

131/

19A

FD

19:00

20:00

21:00

22:00

GMT

Date

04/14

(104)

08:00

09:00

10:00

11:00

12:00

MET

Day 009

WE

Z

T D R SD / N

O R B 1 4 8 1 4 9 1 5 0

S T S A T T ~ ~B I A S - X L V - Z V V

CDR

~

SLEEP

L9 PS ATU A/G (two) - OFF

PRIVATE MEDICAL CONFERENCE VIA A/G 2

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

141414

Page 17: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

FLT PLN/131/FLT

FD10

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

C Omit Steps 1.2 & 3

Use A/G 2 for Audio

Inform MCC of which

PGSC will be used

L9 PS ATU A/G (two) - OFF

NETMEETING VIDEO CONFERENCING

(ORB OPS, PGSC)

Private Family Conference

ISS KU TDRE (08:10-08:36) C

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

REPLANNED

CREW WAKEUP AT 09/18:00

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

3-115

STS-

131/

19A

FD

19:00

20:00

21:00

22:00

GMT

Date

04/14

(104)

08:00

09:00

10:00

11:00

12:00

MET

Day 009

WE

Z

T D R S

~

~~

D / N

O R B 1 4 8 1 4 9 1 5 0

~ ~B I A S - X L V - Z V VS T S A T T

MS1

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS3

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS4

SLEEP

~

TRANSFER BRIEF

Call down status to MCC

~

MS5

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-115

FD10

MASTRACCHIO

WILSON

YAMAZAKI

ANDERSON

C Omit Steps 1.2 & 3

Use A/G 2 for Audio

Inform MCC of which

PGSC will be used

L9 PS ATU A/G (two) - OFF

NETMEETING VIDEO CONFERENCING

(ORB OPS, PGSC)

Private Family Conference

ISS KU TDRE (08:10-08:36) C

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

REPLANNED

CREW WAKEUP AT 09/18:00

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

STS-

131/

19A

FD

19:00

20:00

21:00

22:00

GMT

Date

04/14

(104)

08:00

09:00

10:00

11:00

12:00

MET

Day 009

WE

Z

T D R SD / N

O R B 1 4 8 1 4 9 1 5 0

S T S A T T ~ ~B I A S - X L V - Z V V

MS1

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

SLEEP

~TRANSFER BRIEF

Call down status to MCC

MS5

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

151515

Page 18: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

MSG 076 - FD10 MISSION SUMMARY

Good Morning Discovery, 1 2 3 4 5 6 7 8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Congratulations on another great day of robotics, EVA, and transfer activities! Enjoy your well-earned off duty time today! YOUR CURRENT ORBIT IS: 190 X 182 NM NOTAMS (ADDED NTU, YHZ, YQX, KBO)

EDW - EDT 22R/04L IN USE. EDW 22/04 CLOSED FOR CONSTRUCTION. EDW - LAKEBED RWYS RED. NOR - LAKEBED RWYS GREEN. NTU - RWY 23L/05R CLOSED. FOK - RWY 06/24 CLOSED. DOV - RWY 32 REIL OTS. FMH - RWY 23 ALS OTS. YHZ - RWY 23/05 CLOSED. YYT - TACAN UYT23 AZIMUTH OTS. YQX - DME YQX74 OTS. JTY - RWY 18 ALS OTS. MYR - RWY 18/36 CLOSED FROM 0340 - 0930 GMT. KKI - TACAN RIY92 OTS. MRN - RWY 20 THRESHOLD DISPLACED. RWY 02/20 LDA = 9085 FT. KBO - TACAN GIX18 OTS. PTN - RWY 14/32 CLOSED. IKF - NOT USABLE. NO AGREEMENT. BEN - NOT RECOMMENDED/NOT SUPPORTED.

NEXT 2 PLS OPPORTUNITIES: 29

30 31 32 33

EDR22R ORB 145 – 09/04:07 SCT250 7 200/07P11 EDR22R ORB 161 – 10/04:32 BKN200 7 220/08P12 OMS TANK FAIL CAPABILITY: 34

35 36 37 38

L OMS FAILS: NO R OMS FAILS: NO LEAKING OMS PRPLT BURN: 39

40 41 42 43

L OMS LEAK: ALWAYS BURN RETROGRADE R OMS LEAK: ALWAYS BURN RETROGRADE OMS QUANTITIES(%) 44

45 46 47 48 49 50 51

L OMS OX = 34.08 R OMS OX = 35.28 FU = 33.60 FU = 35.21

END OF PAGE 1 OF 2, MSG 076 161616

Page 19: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

MSG 076 - FD10 MISSION SUMMARY

END OF PAGE 2 OF 2, MSG 076

DELTA V AVAILABLE: 1 2 3

OMS 369 FPS ARCS (TOTAL ABOVE QTY1) 31 FPS 4

5 6 7 8 9

10 11 12 13 14

TOTAL IN THE AFT 400 FPS ARCS (TOTAL ABOVE QTY2) 64 FPS FRCS (ABOVE QTY 1) 27 FPS AFT QTY 1 80 % AFT QTY 2 42 % SYSTEM FAILURE IMPACT WORK AROUND

EVA Misalignment of spherical bearing caused the clevis to bend when applying torque to ATA bolt 1.

Difficulty engaging ATA bolt 1 during installation on LMC. Loss of crew time and loss of EVA and mission objectives, including LWAPA Retrieve and P1 Radiator Grapple Fixture Beam Inspection.

Crew released bolt 3 and were able to install bolt 1 to proper torque. Bolt 3 was reengaged, requiring multiple attempts with the torque multiplier to achieve acceptable torque and turns.

15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41

171717

Page 20: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

MSG 077 (23-0274) - FD10 TRANSFER MESSAGE Page 1 of 3

1 2 3 4 5 6 7 8 9

10 11 12 13 14 15

Good Morning Naoko and Steph, Today’s your last day of MPLM transfer! Just a few more items to pack up and then you’ll be ready to button up the MPLM one last time. Today you’ll be packing a second RFTA in the MPLM following the R&R activity. Shortly thereafter the CPAs will be installed, which will limit you to transferring small items only. Then at the end of the day, after the MPLM is ready to go, you’ll be scavenging the remaining four LHAs, leaving the MPLM a rather dark place. The Transfer List Excel file, FD10_Transfer_List_STS131.xls, locations are:

• Shuttle: C:\OCA-up\transfer (KFX machine) • Station: K:\OCA-up\transfer

Transfer Notes 16

17

19 20 21

23 24 25 26 27

29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

• Lost Return Items and WHC Return Items: Considering a couple items are still 18

missing for MPLM return and you’ve identified some additional used WHC hardware, we have updated your return plan to backfill Item 629 with the used WHC hardware.

• Item 721 (Catalytic Reactor): Steph, the Catalytic Reactor can be stowed in Bag C 22 without the top piece of Catalytic Reactor foam; however, there are additional pieces of white foam already in Bag C that can be used to protect the ORU. The Middeck Stowage team has sent you directions for stowing the Catalytic Reactor for return (ref MSG 085).

• Item 950 (Imaging Processing Unit Stowage Bag): Steph, we understand you were 28 not able to find Item 950 in 3.0 CTB s/n 1068 yesterday. You can also try looking at COL1A2 if you still haven’t found it. It is a blue nomex kit, as shown in the photo below.

Imaging Processing Unit Stowage Bag

Page 1 of 3, MSG 077 (23-0274) 181818

Page 21: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

MSG 077 (23-0274) - FD10 TRANSFER MESSAGE Page 2 of 3

1

4

8

• Small Pieces of Foam: If you still have smaller pieces of foam to stow, we recommend 2 you utilize MPL1P4_A1. 3

• Item 431.1: Naoko, please remember to transfer the JAXA Nanoskeleton samples only 5

after 2.5 hours following the MELFI retrieval activity to ensure they completely thaw and 6 reach a safe touch temperature. Your timeline reflects this constraint as well. 7

FD10 Choreography (in timeline order) 9

18

22

23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

• Item 1000: Transfer RFTA (s/n 011) to MPLM for return following the RFTA R&R. 10

• Install CBM CPAs. 11

• Items 187 and 707: Swap PGTs following a successful checkout of the new PGT. 12

• Item 431.1: Transfer JAXA Nanoskeleton samples 2.5hrs after MELFI retrieval activity 13

• Item 750: Stow black clips from MPLM Kit in MPLM for return. 14

• Item 294: Transfer endcone bungee jail to ISS. 15

• Item 109: Transfer A1 inter-rack bungee jail to ISS. 16

• MPLM Cleanup 17 o Item 824: Return Pivot Fittings used to rotate RSPs to ISS.

• Configure MPLM racks for entry. 19

• Item 105: Scavenge MPL1PA1, PA2, PF1, and PF3 LHAs - call MCC to open RPCs. 20

• Transfer all remaining MPLM items: 21

• Resupply: 106, 107, 137, 171, 174, 175, 186, 199, 200, 201, 260, 261 • Return: 423, 629, 807, 809, 810, 813, 821, 822, 823, 1008, 1009, 1010, 1011,

1012 Please incorporate uplink pages as follows (we’ve listed the updates in the order they printed out for you): In the Middeck Transfer List RETURN tab Pen & Ink on the following pages: Return 1 - Item 431.1: update activity day in notes from “FD09” to “FD10” Return 4 - Item 702: update activity day in notes from “FD11” to “FD13” Return 6 - Item 713: update activity day in notes from “FD11” to “FD13” Return 6 - Item 716: update activity day in notes from “FD10” to “FD11” In the MPLM Return Transfer List RETURN tab Replace the following page:

Return 17

Add the following page: Return 32 In the MPLM Return Transfer List MPLM CLEANUP tab Pen & Ink on the following pages: Return 30 - Item 824: update Stowage at Undock location from “NOD2O5_A2” to

“LAB1P1_A2”

Page 2 of 3, MSG 077 (23-0274) 191919

Page 22: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

MSG 077 (23-0274) - FD10 TRANSFER MESSAGE Page 3 of 3

Page 3 of 3, MSG 077 (23-0274)

1 FD11 Choreography (in timeline order) 2

5 6

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51

• Items 822 & 823: Return the MPLM PBA and PFE to ISS. 3

• Transfer the following EVA items to the Middeck: 4 o Items 703 & 704: EMU’s s/n 3008 & 3017 o Item 708: EVA Systems Transfer Bag

• Item 716: Transfer the NLP Cells 3 Stow Bag per CGBA-5 NLP CELLS REMOVE 7 activity. 8

- The STS-131 Transfer Team

202020

Page 23: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

MSG 078 (23-0275) - FD10 CREW CHOICE DOWNLINK

Page 1 of 1

1

2

3

The following times indicate good Shuttle Sband on A/G 2 and ISS Ku for crew choice downlink.

AOS LOS Delta (min) Notes 09/06:27 09/07:11 44 A/G 20 second H/O at 06:42:51 09/07:34 09/08:51 77 A/G gap from 07:58:16-08:03:38

KU 20 second H/O at 08:09:21 A/G 20 second H/O at 08:34:42 KU gap from 08:37:00-08:39:00

09/09:15 09/09:58 43 A/G 20 second H/O at 09:32:56 4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

Note: Please notify MCC-H 10 minutes prior to the event to allow for ground network configuration.

Page 1 of 1, MSG 078 (23-0275)

2121

Page 24: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

23-0271 (MSG 079): FD 10 EVA DELTAS. Page 1 of 1

PAGE 1 of 1, 23-0271 ( MSG 079)

Great job completing all three EVAs! 1 2 You heard yesterday that we had a few issues with the NTA. This has no 3 correlation to your EVA activities. The ground sees good data on the S1 ATA 4 and it looks to be in great shape! 5 6 Both sets of EMU gloves have been cleared for contingency EVA use. 7 8 The EVA Tool Restow scheduled for Rick, TJ and Tracy today is scheduled for a 9 duration of 1:25. Please reference message 23-0266 (131-081) for details. We 10 don't expect you'll have time to complete everything, so we are working to 11 schedule more time. Feel free to use crew notes in OSTPV to give us input on 12 the restow matrix. 13 14 We have a stowage question for you as well as some pen and ink changes to 15 your EVA Checklist for new items you are bringing home. 16 17 Stowage Question 18 What was the final stowage location of Soichi's prime CCA (s/n 1215) in the ISS 19 A/L? This was the CCA that TJ gave to you during EVA Prep for EVA 2 as a 20 second back-up CCA. 21 22 EVA Checklist Pen and Inks 23 We will be bringing home a total of 6 wire ties from ISS. These wire ties protect 24 for a RCC repair contingency EVA if required post-undock. The EVA trash bags 25 that would be used as a holster for the NOAX gun are currently stowed in the 26 STBD TSA, so these wire ties would be used instead to fashion a holster and 27 provide rabbit ears. There is no need to configure the wire ties at this time. 28 29 1. Add the following to the table after step 28 of FS 2-14 Post EVA EMU 30 Reconfig: 31 32

EVA Systems Transfer Bag Current Location Item A/L Deployed Short Wire Tires (4)

Long Wire Tires (2) 33 34 2. Add the following in step 1 of FS 2-16 EVA Unpack and Stow to the table 35 under EVA Systems Transfer Bag: 36 37 Item Final Location Short Wire Tires (4) Long Wire Tires (2) A/L Floor Bag

38 39

222222

Page 25: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

23-0074 (MSG 80): Big Picture for Myco Experiment during 19A Page 1 of 2  

 

1

2

4

7

9

10

Big Picture for Myco Experiment during 19A

1. Timeline for Myco Experiment 3

Myco Experiment will be performed within 60 hours before hatch close. 5

Myco SAMPLE CLCT and the following MELFI INS should be time critical tasks. 6

(Blue marked in the Fig. 1) Joint operations between Shuttle crew and ISS crew are very important. 8

Night before Myco Experiment Myco Experiment Day

MYCO PREP : Preparation of Myco Kit and Drinking Water Container*1. 11

CREW REVIEW : Procedure review. Review scientific constraints of the experiment. 12

SAMPLE CLCT : Collection of body samples. Hand your Myco Kit to Soichi (FE5). 13

MELFI INS : Insertion of all Myco Kit into MELFI. 14

MERLIN PACK : Transfer of Myco Kit from MELFI to MERLIN. 15

16

17

18

19

*1 Drinking Water Container is for rinsing mouth before pharynx sample collection

Fig. 1 Big picture for Myco Experiment Operations Flow in 19A

MYCO PREP

Undock Day

MERLIN PACK

CREW REVIEW

CREW REVIEW

CREW REVIEW

CREW REVIEW

CREW REVIEW

SAMPLE CLCT MELFI INS

SAMPLE CLCT

SAMPLE CLCT

SAMPLE CLCT

SAMPLE CLCT

Soichi (FE5) will distribute Myco Kit and Drinking Water Container to all participants

Must be performed first thing in the morning.

Right after SAMPLE CLCT, hand your Myco Kit to Soichi for MELFI INS

Must be performed within 4 hours after sampling

Samples must be stowed in MELFI for at least 8 hours prior to MERLIN pack

FD10 FD11 FD13

FE-5

FE-6

PLT

MS1

MS4

ISS Crew

Shuttle Crew

Page 1 of 2. 23-0074 (MSG 80): 232323

Page 26: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

23-0074 (MSG 80): Big Picture for Myco Experiment during 19A Page 2 of 2  

 

Page 2 of 2. 23-0074 (MSG 80):

2

2. Precautions and important notice for Myco Experiment 1

Precautions 3

5

7 8

The sample collection must be performed first thing in the morning because 4

we need samples from the body in the “just-woke-up” condition. Please do not eat/drink anything except water, wash your face, brush your teeth, 6

or gargle after you wake up to avoid science loss.

Important Notice 9

11

13

14

15

16

17

18 19

MELFI Insertion must be performed within 4 hours after Sample Collection to 10

avoid deterioration of the samples. Myco Kit must be stowed in MELFI at +4 deg C for at least 8 hours before it is 12

moved into MERLIN for return. For this reason, replan is not an option based on the latest timeline.

 

242424

Page 27: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

Item

#

Loca

tion

Item

QTY

P/N

S/N

B/C

Fina

l Loc

atio

nN

otes

1M

WS

Bas

epla

te[M

odul

ar B

asep

late

Ass

embl

y]1

SE

G33

1104

90-3

0310

0100

0087

35J

2M

WS

T-B

ar1

SE

G33

1104

93-3

0510

31-

3S

mal

l EV

A T

rash

Bag

1S

EG

3310

6678

-301

1006

-C

rew

lock

Bag

#3

CO

NFI

RM

em

pty

& z

ippe

d up

.

4S

win

g A

rm A

ssy,

RH

1S

EG

3311

0491

-307

1004

-

5P

GT

1G

E15

5700

0#6

-

67/

16 x

6" W

obbl

e1

SE

G33

1069

31-3

0110

1900

4343

J

7B

ody

Res

train

t Tet

her

[BR

T A

ssem

bly]

1S

EG

3311

0400

-309

1001

-

8A

/L1O

0

1.0

CTB

: EV

A

Mis

cella

neou

s To

ols

#1, S

/N

1075

, B/C

004

069J

EV

A T

rash

Bag

[Shu

ttle

Sty

le]

110

165-

1006

5-03

1017

-C

ON

FIR

M e

mpt

y &

zip

ped

up.

STO

W o

n T-

Bar

.

9W

ire T

ies

[Sho

rt]4

SD

G33

1081

30-0

01-

-ST

OW

(don

't co

nfig

ure)

on

the

T-ba

r as

teth

er lo

ops.

10W

ire T

ie[L

ong]

2S

DG

3310

8130

-003

--

STO

W (d

on't

conf

igur

e) w

ire ti

es

on B

RT.

EV1

NO

TE: T

hese

will

be

swap

ped

with

a

new

bas

epla

te a

nd t-

bar w

hen

they

arr

ive

with

ULF

4.

EV1

OVE

RVI

EW:

This

mes

sage

is d

esig

ned

to re

stow

the

tool

s de

ploy

ed fo

r the

19A

EV

As

and

conf

igur

e fo

r the

ULF

4 E

VA

s.

PRO

CED

UR

E:

1. C

ON

FIR

M th

at th

ere

is a

D-R

ing

Ext

ende

r on

A/L

D-R

ing.

2. R

EMO

VE a

ll te

ther

s an

d D

-rin

g ex

tend

ers

from

all

bags

, MW

S a

nd s

uits

and

STO

W th

em o

n th

e te

ther

sta

ging

are

a. A

lso

TEM

P ST

OW

any

wire

ties

you

con

side

r re-

usab

le fo

r ULF

4.

3. M

OVE

any

item

s in

side

the

mes

h ba

gs, c

rew

lock

bag

s, a

nd d

eplo

yed

OR

U b

ags

into

the

"Don

e To

ols"

mes

h ba

g.

4. R

EMO

VE a

ny la

bels

from

Cre

wlo

ck B

ags.

5

. REL

AB

EL a

n em

pty

mes

h ba

g: "

ULF

4 To

ols"

.

6. C

OM

PLET

E Ta

bles

A -

K.

7

. REP

OR

T to

MC

C-H

whe

n ac

tivity

is c

ompl

ete,

the

requ

este

d S

/N in

form

atio

n, a

nd a

ny d

elta

s.

For h

elp

iden

tifyi

ng th

e co

rrec

t S/N

's, r

efer

ence

2.2

20.1

00 E

VA

Too

l Ser

ial N

umbe

r Ref

eren

ce (S

OD

F: E

VA

TA

SK

: TO

OLS

RE

FER

EN

CE

).

Tabl

e A

: Con

figur

e EV

1 M

WS

EV1

EV1

Tem

p St

owed

(use

d fo

r 19A

)or

A/L

1O0

Zipl

ock

252525

pdwhite
Typewritten Text
23-0266 (MSG 081): 19A EVA Restow & ULF4 Tool Config Page 1 of 15
Page 28: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

11A

/L D

eplo

yed

Mes

h B

ag: 1

9A

Don

e To

ols

WIF

Ada

pter

1S

EG

3310

6863

-309

1013

-ST

OW

on

RE

T w

/ PIP

Pin

at

tach

ed to

the

T-B

ar.

12Ite

m D

elet

ed

13Ite

m D

elet

ed14

Eq

Hk

RE

T[S

m-S

m]

2S

EG

3310

6164

-381

--

Use

Red

RET

s

STO

W 1

on

the

BR

T an

d us

e 1

to

conn

ect t

he P

GT

to th

e sw

ing

arm

.

15E

q H

k R

ET

w/P

ip P

in2

SE

G33

1061

64-3

83-

-U

se R

ed R

ETs

STO

W o

n th

e T-

Bar

. U

se 1

to

conn

ect W

IF A

dapt

er to

T-B

ar.

16A

djus

tabl

e E

quip

men

t Tet

her

[Sm

-Sm

]2

SE

G33

1069

45-3

07-

-R

EPO

RT

S/N

s to

MC

C-H

.

STO

W d

irect

ly o

n th

e T-

Bar

.

17Ite

m D

elet

ed

A/L

1D2

Teth

er S

tagi

ng

Are

a

EV1

262626

pdwhite
Typewritten Text
23-0266 (MSG 081): 19A EVA Restow & ULF4 Tool Config Page 2 of 15
Page 29: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

Item

#

Loca

tion

Item

QTY

P/N

S/N

B/C

Fina

l Loc

atio

nN

otes

18M

WS

Bas

epla

te[M

odul

ar B

asep

late

Ass

embl

y]1

SE

G33

1104

90-3

0310

02-

19M

WS

T-B

ar1

SE

G33

1104

93-3

0510

06-

20S

mal

l EV

A T

rash

Bag

1S

EG

3310

6678

-301

1007

-C

ON

FIR

M e

mpt

y &

zip

ped

up.

21S

win

g A

rm A

ssy,

RH

1S

EG

3311

0491

-307

1003

-

22P

GT

1G

E15

5700

0#1

-

237/

16 x

6" W

obbl

e1

SE

G33

1069

31-3

0110

07-

24B

ody

Res

train

t Tet

her

[BR

T A

ssem

bly]

1S

EG

3311

0400

-309

1021

-

Tabl

e B

: C

onfig

ure

EV2

MW

S

EV2

NO

TE: T

hese

will

be

swap

ped

with

a

new

bas

epla

te a

nd t-

bar w

hen

they

arr

ive

with

ULF

4.

EV2

EV1:

MW

S -

(Item

#1)

T-B

ar -

(Item

#2)

Shu

ttle

Sty

le T

rash

Bag

- (It

em #

8)

□ 4

– W

ire ti

es a

s te

ther

loop

s - (

Item

#9)

RE

T (P

IP-p

in) -

(Ite

m #

15)

RE

T (P

IP -

pin)

- (It

em #

15)

□ W

IF A

dapt

er -

(Item

#11

)

□ 2

– A

ETs

- (It

em #

16)

Sw

ing

Arm

(rig

ht s

ide)

- (It

em #

4)

RE

T sm

-sm

- (It

em #

14)

PG

T -

(Item

#5)

6-in

ext

- (It

em #

6)

□ B

RT

(left

side

) - (I

tem

#7)

□ R

ET

sm-s

m -

(Item

#14

)

2 –

long

wire

ties

- (It

em #

10)

REP

OR

T an

y ad

ditio

nal i

tem

s fo

und

to M

CC

-H.

272727

pdwhite
Typewritten Text
23-0266 (MSG 081): 19A EVA Restow & ULF4 Tool Config Page 3 of 15
Page 30: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

25E

q H

k R

ET

[Sm

-Sm

]2

SE

G33

1061

64-3

81-

-U

se R

ed R

ETs

STO

W 1

on

the

BR

T an

d us

e on

e to

con

nect

the

PG

T to

the

swin

g ar

m.

26E

q H

k R

ET

w/P

ip P

in2

SE

G33

1061

64-3

83-

-U

se R

ed R

ETs

STO

W b

oth

on th

e T-

Bar

.

27Ite

m D

elet

ed28

Item

Del

eted

29Ite

m D

elet

ed30

Wire

Tie

s[S

hort]

3S

DG

3310

8130

-001

--

STO

W (d

on't

conf

igur

e) 1

wire

ties

on

BR

T an

d 2

on th

e T-

bar a

s te

ther

loop

s.

31W

ire T

ie[L

ong]

1S

DG

3310

8130

-003

--

STO

W (d

on't

conf

igur

e) 1

wire

tie

on B

RT.

Tem

p St

owed

(use

d fo

r 19A

)or

A/L

1O0

Zipl

ock

EV2

A/L

1D2

Teth

er S

tagi

ng

Are

a

282828

pdwhite
Typewritten Text
23-0266 (MSG 081): 19A EVA Restow & ULF4 Tool Config Page 4 of 15
Page 31: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

Item

#

Loca

tion

Item

QTY

P/N

S/N

B/C

Fina

l Loc

atio

nN

otes

32A

djus

tabl

e Fu

se T

ethe

r[F

ish

Stri

nger

]1

SE

D39

1272

00-7

0510

11-

33

Nee

dle

Nos

e P

liers

1S

EG

3310

6921

-301

1007

-M

OVE

to F

ish

Stri

nger

#10

32.

34W

ire T

ie C

addy

Ass

y1

SE

G33

1115

86-3

0110

05-

CO

NFI

RM

that

this

cad

dy c

onta

ins

9 w

ire ti

es.

35Ta

pe a

nd V

elcr

o C

addy

1S

ED

3310

4207

-301

1005

-

36P

GT

1G

E15

5700

0#4

-

37

7/1

6 x

6" W

obbl

e1

SE

G33

1069

31-3

0110

18-

REM

OVE

from

PG

T an

d ST

OW

on

EV

A R

atch

et.

38E

VA

Rat

chet

1S

EG

3310

6927

-303

1012

-

EV2:

MW

S -

(Item

#18

)

T-B

ar -

(Item

#19

)

□ S

mal

l Tra

sh B

ag -

(Item

#20

)

□ 2

– W

ire ti

e as

teth

er lo

ops

- (Ite

m #

30)

2 –

RE

T (P

IP-p

in) -

(Ite

m #

26)

Sw

ing

Arm

(rig

ht s

ide)

- (It

em #

21)

RE

T sm

-sm

- (It

em #

25)

□ P

GT

- (Ite

m #

22)

6-in

ext

- (It

em #

23)

□ B

RT

(left

side

) - (I

tem

#24

)

RE

T sm

-sm

- (It

em #

25)

1 –

sho

rt w

ire ti

e - (

Item

#30

)

1 –

long

wire

tie

- (Ite

m #

31)

REP

OR

T an

y ad

ditio

nal i

tem

s fo

und

to M

CC

-H.

A/L

Cre

wlo

ckS

tagi

ng B

ag

Tabl

e C

: Con

firm

Sta

ging

Bag

Con

fig

A/L

Cre

wlo

ckS

tagi

ng B

ag

292929

pdwhite
Typewritten Text
23-0266 (MSG 081): 19A EVA Restow & ULF4 Tool Config Page 5 of 15
Page 32: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

397/

16 x

9" R

igid

1S

EG

3310

6930

-305

1013

0019

56J

A/L

1O0

1.0

CTB

: EV

A

Mis

cella

neou

s To

ols

#2, S

/N 1

161,

B/C

00

4155

J

REM

OVE

from

EV

A R

atch

et.

40S

afet

y Te

ther

85f

t1

SE

D33

1161

09-3

07-

-A

/L1D

2Te

ther

Sta

ging

Are

aR

EPO

RT

larg

e ID

# to

MC

C-H

.

41W

IF A

dapt

er1

SE

G33

1068

63-3

0910

15-

42A

djus

tabl

e Fu

se T

ethe

r[F

ish

Stri

nger

]1

SE

D39

1272

00-7

0510

32-

43C

onne

ctor

Cle

aner

Too

l Kit

1S

JG33

1116

30-3

0110

10-

MO

VE fr

om h

ook

#1 to

hoo

k #2

44M

MW

S K

ey S

trap

Ass

embl

y1

SE

G33

1108

12-3

0110

0800

0086

53J

On

wire

tie,

to s

trap.

45LD

TD T

ethe

r1

SE

G33

1138

60-3

0110

06-

MO

VEto

Fis

h S

tring

er #

1011

hoo

k #6

.

46C

heat

er B

ar1

SE

G33

1069

26-3

0110

02-

47E

q H

k R

ET

[Sm

-Sm

]1

SE

G33

1061

64-3

81-

-A

/L1D

2Te

ther

Sta

ging

Are

a

48B

RS

Too

l 1

SE

G33

1136

44-3

0510

01-

A/L

1D2

1.0

CTB

: Uni

que

EV

A T

ools

, S/N

10

22, B

/C 0

0231

7J

INSP

ECT

tool

for a

ny d

amag

e.

REP

OR

T to

MC

C-H

.

VER

IFY

BR

S S

heat

h in

stal

led

on

the

tool

.49

Rig

ht A

ngle

Driv

e1

SE

G33

1069

25-3

0510

09-

A/L

1O0

1.0

CTB

: EV

A

Mis

cella

neou

s To

ols

#2, S

/N 1

161,

B/C

00

4155

J

50A

/L1O

0

1.0

CTB

: EV

A

Mis

cella

neou

s To

ols

#2, S

/N

1161

, B/C

004

155J

Enh

ance

d R

ight

Ang

le D

rive

1S

EG

3312

0447

-301

1002

-

51Ite

m D

elet

ed

A/L

Cre

wlo

ckS

tagi

ng B

ag

A/L

Cre

wlo

ckS

tagi

ng B

ag

A/L

Cre

wlo

ckS

tagi

ng B

ag

303030

pdwhite
Typewritten Text
23-0266 (MSG 081): 19A EVA Restow & ULF4 Tool Config Page 6 of 15
Page 33: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

52P

ry B

ar1

SD

G33

1069

24-0

0110

0400

0011

99J

STO

W o

n fis

h st

ringe

r 103

2.

53LD

TD T

ethe

r2

SE

G33

1138

60-3

01-

-H

OO

K w

ith th

e ot

her L

DTD

Tet

her

on F

ish

strin

ger #

1011

hoo

k #6

(all

thre

e LD

TD c

hain

ed to

geth

er).

54V

ise

Grip

Plie

rs1

SE

G33

1069

22-3

0110

01-

STO

W o

n fis

h st

ringe

r 101

1.

55P

in S

traig

hten

er A

ssy

1S

EG

3310

6913

-301

1001

0019

48J

56P

RO

BE

1S

EG

3310

6923

-701

1001

-

A/L

Dep

loye

dM

esh

Bag

: 19A

D

one

Tool

s

A/L

Cre

wlo

ckS

tagi

ng B

ag

Stag

ing

Bag

:

Fis

h S

tring

er -

(Item

#32

)

Wire

Tie

Cad

dy (h

ook

#1) -

(Ite

m #

34)

9 w

ire ti

es -

(Item

#34

)

Vel

cro/

Tape

Cad

dy (h

ook

#2) -

(Ite

m #

35)

P

GT

(hoo

k #3

) - (

Item

#36

)

Vis

e G

rips

(hoo

k #4

) - (I

tem

#54

)

Rat

chet

Wre

nch

(hoo

k #5

) - (I

tem

#38

)

7/1

6-in

(wob

ble)

Soc

ket –

6 e

xt -

(Item

#37

)

3 - L

ong

Dur

atio

n Ti

e D

own

Teth

ers

(hoo

k #6

) - (I

tem

s #4

5 &

#53

)

WIF

Ada

pter

(hoo

k #7

) - (

Item

#41

)

Fis

h S

tring

er #

2 - (

Item

#42

)

ER

AD

(hoo

k #1

) - (I

tem

#50

)

Con

nect

or C

lean

er T

ool K

it (h

ook

#2) -

(Ite

m #

43)

P

in S

traig

hten

er A

ssy

(hoo

k #3

) - (I

tem

#55

)

Pro

be (h

ook

#4) -

(Ite

m #

56)

P

ryba

r (ho

ok #

5) -

(Item

#52

)

Nee

dlen

ose

Plie

rs (h

ook

#6) -

(Ite

m #

33)

C

heat

er B

ar (h

ook

#7) -

(Ite

m #

46)

M

WS

Key

Stra

p A

ssy

(on

wire

tie,

to s

trap)

- (It

em #

44)

REP

OR

T an

y ad

ditio

nal i

tem

s fo

und

to M

CC

-H.

313131

pdwhite
Typewritten Text
23-0266 (MSG 081): 19A EVA Restow & ULF4 Tool Config Page 7 of 15
Page 34: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

Item

#

Loca

tion

Item

QTY

P/N

S/N

B/C

Fina

l Loc

atio

nN

otes

57IS

S C

onta

min

atio

n D

etec

tion

Kit

1S

JG39

1360

50-3

0210

01-

58To

wel

[Wra

pped

with

sho

rt w

ire ti

e]2

--

-

59E

q H

k R

ET

[Sm

-Sm

]1

SE

G33

1061

64-3

8140

62-

60S

AFE

R H

and

Con

trolle

r Mou

nt[D

CM

Plu

g]1

SV

1006

962-

2'0

0004

0005

1187

J

61S

AFE

R H

and

Con

trolle

r Mou

nt[D

CM

Plu

g]1

SV

1006

962-

2'0

0007

0005

9995

J

62E

q H

k R

ET

[Sm

-Sm

]1

SE

G33

1061

64-3

8140

63-

63IS

S G

P C

addy

1S

EG

3311

3531

-301

1008

-

64A

djus

tabl

e Th

erm

al M

itten

101

06-8

1154

0-03

'022

EM

UG

15J

65A

djus

tabl

e Th

erm

al M

itten

101

06-8

1154

0-04

'022

EM

UA

16J

66IS

S G

P C

addy

1S

EG

3311

3531

-301

1010

-

67A

djus

tabl

e Th

erm

al M

itten

101

06-8

1154

0-03

'023

EM

UG

19J

68A

djus

tabl

e Th

erm

al M

itten

101

06-8

1154

0-04

'023

EM

UG

20J

69E

q H

k R

ET

[Sm

-Sm

]1

SE

G33

1061

64-3

8140

73-

70S

ocke

t Cad

dy A

ssy

1S

EG

3310

6938

-301

1011

-

711/

2 x

8" W

obbl

e1

SE

G33

1084

23-3

0110

04-

727/

16 x

6" W

obbl

e1

SE

G33

1069

31-3

0110

14-

73A

mm

onia

Con

tam

inat

ion

Cue

Car

d1

--

-

A/L

Cre

wlo

ckIV

Bag

Tabl

e D

: Con

firm

IV B

ag C

onfig

CO

NFI

RM

con

tent

s an

d co

nfig

urat

ion

of IV

Bag

.

Bla

ck R

ETs

sta

y in

this

bag

(not

fo

r EV

A).

A/L

Cre

wlo

ckIV

Bag

323232

pdwhite
Typewritten Text
23-0266 (MSG 081): 19A EVA Restow & ULF4 Tool Config Page 8 of 15
Page 35: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

Item

#

Loca

tion

Item

QTY

P/N

S/N

B/C

Fina

l Loc

atio

nN

otes

74Lg

-Eq

RE

T[L

g-S

m]

1S

EG

3310

6164

-385

--

Use

Red

RET

75E

q H

k R

ET

[Sm

-Sm

]1

SE

G33

1061

64-3

81-

-U

se R

ed R

ET

76LA

B1D

40.

5 C

TB: H

OD

GE

P

OD

GE

2, S

/N

1294

PD

GF

UN

IVE

RS

AL

MC

F A

DA

PTE

R A

SS

EM

BLY

(P

UM

AA

)1

2602

13-2

0767

6-55

1-

-

77A

/L D

eplo

yed

Mes

h B

ag: 1

9A

Don

e To

ols

Rou

nd S

coop

1S

EG

3310

7677

-301

1002

-

IV B

ag:

Am

mon

ia C

onta

min

atio

n C

ue C

ard

- (Ite

m #

73)

2 -

Tow

els

- (Ite

m #

58)

Con

tam

inat

ion

Det

ectio

n K

it - (

Item

#57

)

RE

T (s

m-s

m, b

lack

) - (I

tem

#59

)

□ 2

- D

CM

Plu

g - (

Item

#60

& 6

1)

RE

T (s

m-s

m, b

lack

) - (I

tem

#62

)

□ 2

- G

P C

addy

- (It

em #

63 &

#66

)

2 -

Adj

usta

ble

Ther

mal

Mitt

ens

- (Ite

m #

64, #

65, #

67, &

#68

)

RE

T (s

m-s

m, b

lack

) - (I

tem

#69

)

□ S

ocke

t Cad

dy -

(Item

#70

)

1/2

-in S

ocke

t-8 e

xt -

(Item

#71

)

7/1

6 (w

obbl

e) S

ocke

t-6 e

xt -

(spa

re) (

Item

#72

)

REP

OR

T an

y ad

ditio

nal i

tem

s fo

und

to M

CC

-H.

A/L

Dep

loye

d

Tabl

e E:

Con

figur

e A

/L R

ETs

A/L

Dep

loye

d R

ETs:

RE

T Lg

-sm

- (It

em #

74)

Rou

nd S

coop

- (It

em #

77)

PU

MA

A -

(Item

#76

)

Eq

Hk

RE

T sm

-sm

- (It

em #

75)

REP

OR

T an

y ad

ditio

nal i

tem

s fo

und

to M

CC

-H.

A/L

Dep

loye

dLg

-Eq

RE

T

A/L

1D2

Teth

er S

tagi

ng

Are

a

333333

pdwhite
Typewritten Text
23-0266 (MSG 081): 19A EVA Restow & ULF4 Tool Config Page 9 of 15
Page 36: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

Item

#

Loca

tion

Item

QTY

P/N

S/N

B/C

Fina

l Loc

atio

nN

otes

78A

/L D

eplo

yed

Med

ium

OR

U T

rans

fer B

ag1

SE

G33

1144

94-3

0910

04-

79Lg

-Eq

RE

T[L

g-S

m]

1S

EG

3310

6164

-385

--

Use

Red

RET

.

Use

RE

T to

atta

ch M

ediu

m O

RU

B

ag to

A/L

.

80E

q H

k R

ET

[Sm

-Sm

]5

SE

G33

1061

64-3

81-

-U

se R

ed R

ET

STO

W o

n in

tern

al D

-rin

g.

81A

djus

tabl

e Fu

se T

ethe

r[F

ish

Stri

nger

]1

SE

D39

1272

00-7

05-

-R

EPO

RT

S/N

to M

CC

-H.

STO

W o

n R

ET.

82A

djus

tabl

e E

quip

men

t Tet

her

[Sm

-Sm

]1

SE

G33

1069

45-3

07-

-R

EPO

RT

S/N

to M

CC

-H.

STO

W o

n ex

tern

al D

-Rin

gs

83A

djus

tabl

e E

quip

men

t Tet

her

[Lg-

Sm

]1

SE

G33

1069

45-3

09-

-R

EPO

RT

S/N

to M

CC

-H.

STO

W o

n ex

tern

al D

-Rin

gs

84D

rop

Pro

of T

ethe

r Ada

pter

1S

EG

3310

6947

-301

1013

-ST

OW

on

Soc

ket C

addy

.

85S

quar

e To

rque

Mul

tiplie

r1

SE

G33

1062

61-3

0110

03-

867/

16" S

ocke

t Rec

esse

d S

quar

e To

rque

M

ultip

lier

1S

DG

3310

7087

-009

1010

-VE

RIF

Y so

cket

inst

alle

d on

Tor

que

Mul

tiplie

r.

87A

/L D

eplo

yed

Cre

wlo

ck B

ag #

21

SE

G33

1117

51-3

0310

04-

Cen

ter d

ivid

er s

napp

ed in

pla

ce.

Stow

on

RE

T.

887/

16 x

2" R

igid

2S

EG

3310

6930

-301

1006

1008

-ST

OW

bot

h so

cket

s on

EV

A

Rat

chet

s (it

em #

90)

89S

ocke

t Cad

dy1

SE

G33

1069

38-3

0110

01ST

OW

on

fish

strin

ger.

90E

VA

Rat

chet

2S

EG

3310

6927

-303

1011

1015

-St

ow o

n se

para

te h

ooks

.

A/L

Dep

loye

dM

esh

Bag

: 19A

D

one

Tool

s

A/L

1O0

1.

0 C

TB: E

VA

M

isce

llane

ous

Tool

s #2

, S/N

11

61, B

/C 0

0415

5J

Tabl

e F:

Con

figur

e M

ediu

m O

RU

Bag

: EO

TP B

ag

A/L

Dep

loye

d

A/L

1D2

Teth

er S

tagi

ng

Are

a

A/L

Dep

loye

dM

ediu

m O

RU

Bag

343434

pdwhite
Typewritten Text
23-0266 (MSG 081): 19A EVA Restow & ULF4 Tool Config Page 10 of 15
Page 37: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

91To

rque

Wre

nch

Bag

1S

EG

3311

0183

-301

1003

-St

ow o

n R

ET.

92To

rque

Wre

nch

1S

EG

3310

6948

-301

1007

-

Med

ium

OR

U B

ag:

RE

T Lg

-sm

(A/L

sto

wag

e) -

(Item

#79

)

□ M

ed O

RU

– E

OTP

Bag

- (It

em #

78)

Inte

rnal

D-r

ings

□ R

ET

sm-s

m -

(Item

#80

)

Fis

h S

tring

er -

(Item

#81

)

□ E

mpt

y (h

ook

#1, c

lose

st to

Fis

h S

tring

er h

ook

atta

ched

to R

ET)

Soc

ket C

addy

(hoo

k #2

) (Ite

m #

89)

□ D

PTA

(Ite

m #

84)

Em

pty

(hoo

k #3

)

□ R

atch

et W

renc

h (h

ook

#4) (

Item

#90

)

7/

16 x

2" R

igid

- (It

em #

88)

Rat

chet

Wre

nch

(hoo

k #5

) (Ite

m #

90)

7/16

x 2

" Rig

id -

(Item

#88

)

□ R

ET

sm-s

m (h

ook

#6)

- (Ite

m #

80)

Cre

wlo

ck B

ag (I

tem

#87

)

□ T

orqu

e M

ultip

lier (

hook

#4)

(Ite

m #

85)

7/1

6" S

ocke

t Rec

esse

d S

quar

e To

rque

Mul

tiplie

r (Ite

m #

86)

□ R

ET

sm-s

m -

(Item

#80

)

RE

T sm

-sm

- (It

em #

80)

□ T

orqu

e W

renc

h (in

bag

) - (I

tem

s #9

1 &

#92

)

RE

T sm

-sm

- (It

em #

80)

Ext

erna

l D-r

ings

□ 1

– A

ET

Sm

-Sm

(Ite

m #

82)

□ 1

– A

ET

Lg-S

m (I

tem

#83

)

REP

OR

T an

y ad

ditio

nal i

tem

s fo

und

to M

CC

-H.

A/L

1O1

M-0

2 B

ag, S

/N

1038

A/L

Dep

loye

dM

ediu

m O

RU

Bag

353535

pdwhite
Typewritten Text
23-0266 (MSG 081): 19A EVA Restow & ULF4 Tool Config Page 11 of 15
Page 38: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

Item

#

Loca

tion

Item

QTY

P/N

S/N

B/C

Fina

l Loc

atio

nN

otes

93A

/L D

eplo

yed

Med

ium

OR

U T

rans

fer B

ag1

SE

G33

1144

94-3

0910

05-

94Lg

-Eq

RE

T[L

g-S

m]

1S

EG

3310

6164

-385

--

Use

Red

RET

.

Use

1 R

ET

to a

ttach

Med

ium

OR

U

Bag

to A

/L.

95E

q H

k R

ET

[Sm

-Sm

]6

SE

G33

1061

64-3

81-

-U

se R

ed R

ET

96A

djus

tabl

e Fu

se T

ethe

r[F

ish

Stri

nger

]2

SE

D39

1272

00-7

05-

-R

EPO

RT

S/N

to M

CC

-H.

97A

djus

tabl

e E

quip

men

t Tet

her

[Sm

-Sm

]3

SE

G33

1069

45-3

07-

-R

EPO

RT

S/N

s to

MC

C-H

.

STO

W 2

insi

de th

e m

ediu

m O

RU

ba

g 1

on th

e ex

tern

al D

-Rin

gs.

98A

djus

tabl

e E

quip

men

t Tet

her

[Lg-

Sm

]1

SE

G33

1069

45-3

09-

-R

EPO

RT

S/N

s to

MC

C-H

.

STO

W o

n th

e ex

tern

al D

-Rin

gs.

99E

nhan

ced

Rig

ht A

ngle

Driv

e1

SE

G33

1204

47-3

0110

03-

100

Rou

nd S

coop

1S

EG

3310

7677

-301

1001

-

101

A/L

Dep

loye

dM

esh

Bag

: 19A

D

one

Tool

s

CO

NN

EC

TOR

HA

ND

LE[a

ka C

anno

n C

onne

ctor

Too

l]1

S22

698-

006-

005

--

102

A/L

1D2

1.

0 C

TB: U

niqu

e E

VA

Too

ls, S

/N

1022

, B/C

002

317J

CO

NN

EC

TOR

HA

ND

LE[a

ka C

anno

n C

onne

ctor

Too

l]1

S22

698-

006-

005

--

Tabl

e G

: Con

figur

e M

ediu

m O

RU

Bag

: SG

AN

T B

ag

A/L

Dep

loye

d

A/L

Dep

loye

d(M

ed O

RU

Bag

)

A/L

1D2

Teth

er S

tagi

ng

Are

a

A/L

1O0

1.

0 C

TB: E

VA

M

isce

llane

ous

Tool

s #2

, S/N

11

61, B

/C 0

0415

5J

363636

pdwhite
Typewritten Text
pdwhite
Typewritten Text
23-0266 (MSG 081): 19A EVA Restow & ULF4 Tool Config Page 12 of 15
Page 39: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

Item

#

Loca

tion

Item

QTY

P/N

S/N

B/C

Fina

l Loc

atio

nN

otes

102

MU

T E

nd E

ffect

or A

ssy

2S

EG

3310

6890

-303

1001

1004

0003

186J

0001

8512

JST

OW

on

Inte

gral

RE

Ts.

103

Bal

lsta

ck1

SE

G33

1068

70-7

0310

13-

104

A/L

1D2

Teth

er S

tagi

ng

Are

a

Adj

usta

ble

Equ

ipm

ent T

ethe

r[S

m-S

m]

1S

EG

3310

6945

-307

--

REP

OR

T S

/Ns

to M

CC

-H.

STO

W o

n ba

llsta

ck.

Med

ium

OR

U B

ag:

RE

T Lg

-sm

(A/L

sto

wag

e) -

(Item

#94

)

□ M

ed O

RU

– S

GA

NT

Bag

- (It

em #

93)

In

tern

al D

-rin

gs

□ R

ET

sm-s

m -

(Item

#95

)

Fis

h S

tring

er #

1 - (

Item

#96

)

Rou

nd S

coop

(hoo

k #1

, clo

sest

to F

ish

Stri

nger

hoo

k at

tach

ed to

RE

T) -

(Item

#10

0)

RE

T sm

-sm

(hoo

k #2

) - (I

tem

#95

)

□ A

ET

- (Ite

m #

97)

□ E

mpt

y (h

ook

#3)

□ E

mpt

y (h

ook

#4)

□ E

mpt

y (h

ook

#5)

□ E

mpt

y (h

ook

#6 w

ill b

e fo

r the

AG

IT H

eat S

hiel

d ar

rivin

g on

ULF

4)

□ E

RA

D (h

ook

#7) -

(Ite

m #

99)

RE

T sm

-sm

- (It

em #

95)

Fis

h S

tring

er #

2 - (

Item

#96

)

Em

pty

(hoo

k #1

, clo

sest

to F

ish

Stri

nger

hoo

k at

tach

ed to

RE

T)

Em

pty

(hoo

k #2

)

Em

pty

(hoo

k #3

)

Em

pty

(hoo

k #4

)

Em

pty

(hoo

k #5

)

AE

T (to

pro

vide

2 te

ther

poi

nts)

(hoo

k #6

) - (I

tem

#97

)

2 -

RE

T sm

-sm

- (It

em #

95)

Can

non

Con

nect

or T

ool t

o R

ET

hook

#1-

(Ite

m #

101)

Can

non

Con

nect

or T

ool t

o R

ET

hook

#2-

(Ite

m #

102)

RE

T sm

-sm

- (It

em #

95)

E

xter

nal D

-rin

gs

□ 1

– A

ET

Sm

-sm

- (It

em #

97)

1 –

AE

T Lg

-sm

- (It

em #

98)

REP

OR

T an

y ad

ditio

nal i

tem

s fo

und

to M

CC

-H.

A/L

1O0

1.0

CTB

, S/N

10

13, B

/C 0

0230

8J

Tabl

e H

: Con

figur

e C

rew

lock

Bag

#3

and

mar

k "T

" w

ith T

ape

Cre

wlo

ck B

ag #

3

373737

pdwhite
Typewritten Text
23-0266 (MSG 081): 19A EVA Restow & ULF4 Tool Config Page 13 of 15
Page 40: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

Item

#

Loca

tion

Item

QTY

P/N

S/N

B/C

Fina

l Loc

atio

nN

otes

105

A/L

Dep

loye

dM

esh

Bag

: 19A

D

one

Tool

s

Squ

are

Sco

op1

SE

G33

1063

30-3

0110

01-

106

A/L

1O0

1.

0 C

TB: E

VA

M

isce

llane

ous

Tool

s #2

, S/N

11

61, B

/C 0

0415

5J

Squ

are

Sco

op3

SE

G33

1063

30-3

0110

0210

0310

04

-

Item

#

Loca

tion

Item

QTY

P/N

S/N

B/C

Fina

l Loc

atio

nN

otes

107

A/L

1D2

Teth

er S

tagi

ng

Are

a

Lg-E

q R

ET

[Lg-

Sm

]1

SE

G33

1061

64-3

85-

-A

/L D

eplo

yed

Use

Red

RET

A/L

□ R

ET

Lg-S

m -

(Item

#10

7)

REP

OR

T an

y ad

ditio

nal i

tem

s fo

und

to M

CC

-H.

Tabl

e I:

Con

figur

e C

rew

lock

Bag

#4

and

mar

k "P

" w

ith T

ape

Cre

wlo

ck B

ag #

4

Cre

wlo

ck B

ag #

4:In

tegr

al R

ETs

Squ

are

Sco

op -

(Ite

m #

105)

Squ

are

Sco

op -

(Ite

m #

106)

Squ

are

Sco

op -

(Ite

m #

106)

Squ

are

Sco

op -

(Ite

m #

106)

REP

OR

T an

y ad

ditio

nal i

tem

s fo

und

to M

CC

-H.

Tabl

e J:

Dep

loy

Teth

er in

A/L

for C

amer

a

Cre

wlo

ck B

ag #

3:In

tegr

al R

ETs

MU

T E

E -

(Ite

m #

102)

MU

T E

E -

(Ite

m #

102)

ISS

sm

all t

rash

bag

- (I

tem

#3)

Inte

rnal

D-r

ings

Bal

lsta

ck -

(Ite

m #

103)

AE

T sm

-sm

(one

hoo

k on

inte

rnal

D-r

ing,

one

hoo

k on

bal

lsta

ck te

ther

loop

) - (

Item

#10

4)

383838

pdwhite
Typewritten Text
23-0266 (MSG 081): 19A EVA Restow & ULF4 Tool Config Page 14 of 15
Page 41: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

Item

#

Loca

tion

Item

QTY

P/N

S/N

B/C

Fina

l Loc

atio

nN

otes

108

Mes

h B

ag1

SK

D13

1014

94-3

05-

-C

rew

lock

Dep

loye

dLA

BEL

"U

LF4

Tool

s"

109

OR

U T

rans

fer B

ag L

arge

1S

EG

3311

4494

-307

1002

0000

8707

JA

/L A

ttic

110

1/4"

X1/

2" A

llen

Driv

er[M

MO

D S

hiel

d T-

Han

dle

(Sho

rt)]

2S

ED

3912

7091

-301

1003

-

111

Soc

ket C

addy

Ass

y1

SE

G33

1069

38-3

0110

1000

1945

J

112

5/8

x 7.

8" R

igid

1S

EG

3310

6934

-301

1002

-

113

Rou

nd T

orqu

e M

ultip

lier

1S

EG

3310

6260

-301

1002

-

114

7/16

" Soc

ket F

lush

Rou

nd T

orqu

e M

ultip

lier

1S

DG

3310

7087

-003

1012

-

115

NH

3 Q

D C

ap2

1F45

580-

1-

-

116

NH

3 Q

D C

ap2

1F45

580-

501

--

117

EP

1 M

LI B

lank

et1

--

-A

/L A

ttic

118

Inbo

ard

Sto

wag

e B

eam

11F

8123

8-1

--

REP

OR

T S/

N to

MC

C-H

119

Out

boar

d S

tow

age

Bea

m1

1F81

240-

1-

-R

EPO

RT

S/N

to M

CC

-H

A/L

Dep

loye

dM

esh

Bag

: Don

e To

ols

NO

D1D

2

A/L

1D2

1.0

CTB

: Uni

que

EV

A T

ools

, S/N

10

22, B

/C 0

0231

7J

RET

RIE

VE a

n em

pty

Zipl

ock

and

stow

thes

e ca

ps in

side

. LA

BEL

zi

ploc

k, "C

aps

from

19A

". S

TOW

th

ese

caps

insi

de th

e zi

ploc

k.

Tabl

e K

: Res

tow

Item

s in

the

Don

e To

ols

Mes

h B

ag a

nd R

elab

el "

ULF

4 D

one

Tool

s"

A/L

1O0

1.0

CTB

: EV

A

Mis

cella

neou

s To

ols

#2, S

/N 1

161,

B/C

00

4155

J

A/L

Dep

loye

dM

esh

Bag

: Don

e To

ols

A/L

Dep

loye

d

393939

pdwhite
Typewritten Text
23-0266 (MSG 081): 19A EVA Restow & ULF4 Tool Config Page 15 of 15
Page 42: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

23-0252A (MSG-082A) CBM CENTER DISK COVER LOCATE Page 1 of 1 page

13 APR 10

OBJECTIVE: Confirm configuration of the CBM Center Disk Covers prior to vestibule closeout. DURATION: 20 minutes CREW: One MATERIALS: Sharpie Kapton Tape PARTS: CBM Center Disk Cover P/N 683-14575-14 or 683-14575-15 1. Retrieve damaged CBM Center Disk Cover from NOD2P1. This CBM Center Disk

Cover has a broken pip pin on the turnbuckle and a brown damaged spot on the MLI.

NOTE Multiple labels with different part numbers and serial numbers are present on the CBM Center Disk Cover. Only the part number for the label marked 683-14575-14 or 683-14575-15 should be recorded.

1.1. Confirm P/N (683-14575-14 or 683-14575-15): ________ 1.2. Record S/N: ________ 1.3. Label damaged CBM Center Disk Cover as “Damaged/Removed GMT XXX”

(Sharpie, Kapton Tape).

2. Locate replacement CBM Center Disk Cover. Possible locations for replacement (in order of likelihood): NOD3D0 (Endcone), NOD2S2, COL1D1.

NOTE

Multiple labels with different part numbers and serial numbers are present on the CBM Center Disk Cover. Only the part number for the label marked 683-14575-14 or 683-14575-15 should be recorded.

2.1. Record P/N (683-14575-14 or 683-14575-15): ________ 2.2. Record S/N: ________

3. Stow damaged CBM Center Disk Cover where you found the replacement CBM

Center Disk Cover. 4. Temp stow replacement CBM Center Disk Cover for use on FD11 for Node 2 Nadir

Vestibule Config for Demate. 5. Report to MCC-H damaged and replacement CBM Center Disk Cover P/Ns, S/Ns,

and locations.

404040

Page 43: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

Goo

d Morning, 

Below you

 will find

 two up

dated 5‐MLE bag layouts (sho

wn first) and

 the tw

o remaining

 layouts. Stowage 

instructions fo

r the Catalytic

 Reactor have be

en includ

ed in

 the layout fo

r Ba

g C. The

 current 5‐M

LE bag 

configurations optim

ize the weight a

nd c.g. of the

 stacks. 

‐ The STS‐13

1 Midde

ck Stowage Team

 

                         

MD CEIL STBD

1(BAG H) 

MD CEIL PO

RT 1

(BAG E) 

MD CEIL PO

RT 2

(BAG F) 

MD CEIL STBD

2(BAG G) 

**UPD

ATED**

 

MD FLO

OR PO

RT 2

(BAG A) 

**UPD

ATED**

 

MD FLO

OR STBD

2(BAG D) 

MD FLO

OR STBD

 1(BAG C) 

MD FLO

ORPO

RT 1

(BAG B) 

VIEW

: DITCH

 LOOKING AFT

MS

G08

5A -

5MLE

BA

G L

AY

OU

T U

PD

ATE

S

Pag

e 1

of 6

41

Page 44: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

MD CEIL STBD

 2(BAG G) 

                                    

MS

G08

5A -

5MLE

BA

G L

AY

OU

T U

PD

ATE

S

Pag

e 2

of 6

42

Page 45: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

MD FLO

OR PO

RT 2 (B

AG A) 

                                                  

#950

MS

G08

5A -

5MLE

BA

G L

AY

OU

T U

PD

ATE

S

Pag

e 3

of 6

43

Page 46: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

EXT A/L FLO

OR (BAG I) 

                                                    

MS

G08

5A -

5MLE

BA

G L

AY

OU

T U

PD

ATE

S

Pag

e 4

of 6

44

Page 47: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

MD FLO

OR STBD

 1 ( BA

G C) –

 Catalytic Reactor ORU

 Stowage Instructions: 

  The following pages contain the instructions fo

r the return stowage configuration of th

e Catalytic

 Re

actor.  

  1. Please remove the  fo

am labe

led “CCC

/Foo

d containe

r”  and

 place th

is fo

am into eith

er end

 of 

Bag A (R

FTA). 

2. O

nce you have retrieved

 the Catalytic

 Reactor fo

am box (R

eturn Item

 721)  place the ORU

 in th

e bo

x as sho

wn be

low: 

                  3. Please place foam

 pieces in th

e four side voids, indicated by

 the arrows (abo

ve).  

  

MS

G08

5A -

5MLE

BA

G L

AY

OU

T U

PD

ATE

S

Pag

e 5

of 6

45

Page 48: FD10 FLIGHT PLAN REVISION · 14/04/2010  · Kudos on completion of all three EVAs and the great teamwork to overcome the various challenges. Discovery continues to perform very well

Catalytic

  Stowage Instructions (C

ontin

ued): 

    3. Use th

e “loo

se piece” of m

inicell 

(white) foam             located in Bag 

C to rep

lace th

e lost fo

am lid. 

4. Place ORU

/foam con

figuration 

in Bag C (as show

n on

 pictorial) 

5. Place final foam piece           on 

top of bag 

6. Rep

ort com

pletion of plan. 

2

2  1

 

MS

G08

5A -

5MLE

BA

G L

AY

OU

T U

PD

ATE

S

Pag

e 6

of 6

46