14
Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026 FCS Program Update 12 April 2007 FCS Program Update 12 April 2007 Glenn Rossi Chief Engineer, Technology, Future Combat Systems Glenn Rossi Chief Engineer, Technology, Future Combat Systems

Upload: hanhi

Post on 05-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

FCS Program Update12 April 2007

FCS Program Update12 April 2007

Glenn RossiChief Engineer, Technology, Future Combat Systems

Glenn RossiChief Engineer, Technology, Future Combat Systems

2Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

FCS Brigade Combat Team...

Manned Ground Vehicles (MGV)

Non-Line of Sight Cannon(NLOS-C)

Non-Line of Sight Mortar(NLOS-M)

Medical VehicleTreatment (MV-T)

FCS Recovery and Maintenance Vehicle (FRMV)

Unmanned Aerial Systems (UAS)

Class I UAV Class IV UAV

Unattended Ground Systems (UGS)

Tactical and Urban Unattended

Ground Sensors

Unmanned Ground Vehicles (UGV)

Small UGV (SUGV)

Armed Robotic Vehicle – Assault (Light) (ARV-A-L)

MULE-C MULE-T

Mounted Combat System (MCS)

Infantry CarrierVehicle (ICV)

T-UGS U-UGS

Medical VehicleEvacuation (MV-E)

Non-Line of Sight Launch System

(NLOS-LS)

Multifunction Utility/ Logistics

and Equipment Countermine and

Transport

Reconnaissance And Surveillance Vehicle (RSV)

Command andControl Vehicle (C2V)

Common Chassis

6 Feb 07

3Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

FCS (BCT) System-of-Systems Schedule

2-23-07

4Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

Future

Related Advanced Developments

– ARH (2009)

– LUH (2008)

– DCGS-A (V3) (2007)

– Excalibur (2007)

HeavyInfantry StrykerFCS

HeavyInfantry Stryker

– WIN-T (2014)

– JTRS AMF (2011-12)

– JTRS (GMR/HMS)

– Apache Longbow Block III (2011)

Lessons learned

OIF and OEF

RAVEN Tactical UAV

Interceptor Body Armor (IBA)

Counter IED (Warlock, Duke)

Uparmored Vehicles (UAH, AoA)

Buffalo mine-clearing vehicle

FCS – System Development and DemonstrationSpin-out 1 FY 2008-10

Spin-out 2 FY 2010-12

Spin-out 3 FY 2012-14

Networked Sensors/ Shooters

- Limited Battle Command

- JTRS (GMR/HMS)

- Unattended groundsensors

- Non-line of sight launch systems

Systems/ Component

-APS

- Mast Mounted

Sensor

Options:

- Small UGV

- Class 1 UAV

Network and Ground/ Air Vehicles- ABCS to FCS

Battle Command

- ARV-A-L- Small UGV- Class I UAV- Class IV UAV

Core Program Delivery FY 2015

Joint

Networked

System of

Systems

Current To Future Force through Technology Spin Outs

Fielding 6 current force BCTs/yr (76) Fielding 6 current force BCTs/yr (76) Fielding 6 current force BCTs/yr (76) Fielding 6 current force BCTs/yr (76)

Fielding 15 FCS BCTsFielding 15 FCS BCTsFielding 15 FCS BCTsFielding 15 FCS BCTs

Current

5Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

FCS(BCT) Network

POLICYSPECTRUM

DOCTRINE

GOVERNANCE

ARCHITECTURE

ENGINEERINGSTANDARDS

SINCGARS

SATCOMTELEPORT

MSS

RF NETS

WIRELESS COMMSDISN

JTRS

COMMERCIAL FIBEREPLRS SMART-T

TROJAN SPIRIT

LINK 16

WIN-T PoP

CDL

HMS

SCAMP WIN-T TCDL

WIN-T PoP

DNSPUB/SUB

LDAPWEB SERVICES

JVMF

SW DIST

FROM CENTRAL LOCWEB SERVICES

SERVICESEMAIL DELIVERY

NCES USMTF ASSURED COMPUTING

TRANSPORT(Telecommunications)

FCS SOSCOELINK 16

Standard EditionReal Time Edition Micro Edition

SERVICES

JC2MCS

AMDWSMEDICAL

GCCS BCS3

IMETS

GCCS-A

AFATDSDTSS

TAISBUSINESS

APPLICATIONS

NE

TW

OR

K O

PE

RA

TIO

NS

FBCB2ASAS

FCS BATTLE COMMAND

INF

OR

MA

TIO

N M

AN

AG

EM

EN

T

CVNDDG

2C

FORCENET

F35

JSTARS

RQ-4A

E

MARINES

F22EFV

STRYKER

BRADLEY

DCGS-A

CMD TOC

MCS

MV

NLOS-C

CL IVCL I

ARV-A(L)MULE-C

NLOS-LS

SUGV

SOLDIER

DCGS-A(M)

APPLICATIONS

SENSORS

GLOBAL INFORMATION GRID

LANDWARNET

MC2A

AWACSTSAT

C2 CONSTELLATION

C130

ABRAMS

APACHE

C2VICV

RSV

MULE-T

FRMV

NLOS-M

USG

JTRS GMR

Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

6Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

45 Months into SDD – On Cost, On Schedule, On Performance45 Months into SDD – On Cost, On Schedule, On Performance

Key Accomplishments

• Completed System Functional Reviews

• Completed NLOS-LS and UGS Critical Design Reviews

• Initiated testing of first MGV Firing Platform (NLOS-C)

• Executed Experiment 1.1/Soldier Exercise

• 42 major test activities underway

• Delivered SOSCOE V1.8 Formal Qualification Test

• One Team Partners delivered Software for SO1

• Updated program plan for POM 08-13

Class I UAVMULE

Experiment 1.1

NLOS-C

C2V

Mock-Up

UGS

SUGV 1 Prototypes

7Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

One Team

Best of Industry Approach

41 States plus the District of Columbia ,

234 Congressional Districts, 600 Suppliers

As of 30 September 2006

“One Team”

Management

Framework

AdvocacyTeam

Advisory

Council

Advisory

Council

CEO

Council

WorkingTogether

AdvocacyTeam

Advisory

Council

Advisory

Council

CEO

Council

WorkingTogether

8Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

Recent Significant Events

120 MM

Breech Mortar

SUGV 1st Prototypes

NLOS-LS Transport

U-UGS

MULE

NLOS-LS test

Active Protection Systems

NLOS-C

ICS Mounted in Bradley

T-UGS

Unattended Ground Sensor

Software Build 1 at SoSIL

JTRS GMR in M1151A1

120 MM Cannon

C2V Mock-up MV-E Litter Lift System

Class I UAV

Centralized Controller

Traction Drive System

5L Diesel Engine

Demonstrations and Technologies On Track

Experiment 1.1Class IV UAV

Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

9Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

FY07 Objectives

SO 1 & Current Systems Integration

FY

06 Q4 Q1 Q2

FY

07

Q3 Q4

SOSCOE

Build 2.0

Software

Builds

SoS Framework

(S2F) Build 1.0

Available

SOSCOE

Build 1.8Initial LDSS and

PSMRS Prototypes

FY

08

Unit Designation

AETF

x

UGS

CL IV

ASTAMIDS NLOS-LSAPS

IV1 / IMT

Dry Runs IMT

UGV

PDRClass I

PDR

SUGV

PDR

NLOS-C

DR3Design Reviews

Program Reviews

ICT

QFR

JEFX-08

Develop HW & SW

Network Lab Integration and Testing

Network Test and Verification• NLOS-LS, UGS IQT• Bradley, Abrams, HMMWV Developmental test with A/B kits

Experiment 1.1

Phase 1

Engineering LabExperiment

SoSIL Huntington Beach, CA

Phase 2

Engineering Field Experiment

WSMR, NM

Phase 3

Tactical

Field Demo

WSMR, NM

IP1

FBCB2 GMR

NLOS-Cannon Firing

Platform Testing @ YPG

SO1 &

Early

Hardware

Prototypes

ICS

UGS

ICS

Battle Command

Build 1 final

EM1

UGS

PDR

CLU Qual Test

Test &

Evaluation

MULE Engineering Evaluation unit testing

GSTAMIDS Prototype Testing

NLOS-Cannon / NLOS-M Firing Platform Testing

MULE-

CM

IQT

CL I & CL IV Component Test

DAB IPR

QFR JROCJCB

AROC

(T)

Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

10Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

Experiment 1.1 Objectives and Description

Phase 1Engineering Lab Experiment

Phase 2Engineering Field Experiment

Phase 3Tactical Field Demo

Jul – Oct 06 Sep – mid Dec 06 Jan – early Feb 07

Soldier ParticipantsSoldier Observers

C4ISR Lab• Hardware/Software Integration• Systems Interoperability• Mission Thread Checkout• Interoperability Sub-experiments

SE2L• PKI/CDG/IDS Sub-Experiments

SoSIL• DFM Sub-Experiments

Multi-purpose/multi-venue – technical, doctrinal and training impact

• Objective – Network and Spin Out 1 risk reduction

and early hands-on feedback from Soldiers

– Engineering (material) risk reduction

– Early input into Doctrine, Organization and Training

• 5 Key Objective Areas

– Network communications

– Distributed fusion management

– FCS interoperability

– Information assurance

– Progress and maturity of selected technologies

• Integration (RF and range infrastructure)• Dry Runs• Four Sub-experiments

1. Radios and QOS, 2. DFM3. Interop, 4. Progress & Maturity

Supporting One Team Partners

Phase 3A• Soldier Orientation and Training• Soldier Prep/Rehearsals• INF PLT Collective Training Sim & Live• Live Task Loading Sub-ExperimentPhase 3B• VIPs onsite

Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

11Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

Ta

rge

t Data

Wire

SINCGARS

SLICE

Wire

SLICE waveform

- Red & Blue Locations

EPLRS

- Status

- Detection Alerts

- UGS Images

SLICE

- Detection Alerts

SLICE

- UAV Video

- Vehicle Control

- UHF

- L-Band

- Status

- Detection Alerts

- UGS Images

SLICE

- Red & Blue Locations

- Voice

SLICE

- Red & Blue

Locations

SLICE

- Red & Blue

Locations

SLICESLICE

- Red & Blue

Locations

SLICE

- Red & Blue

Locations

SLICESLICE

- Red & Blue

Locations

SLICE

- Red & Blue

Locations

SLICESLICE

- Red & Blue Locations

- UAV Video

- Apache Display Image

VRC-99

Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

12Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

FY08 ObjectivesF

Y0

7

Q1 Q2FY

08

Q3 Q4

FY

09

Design Reviews

Program Reviews

Q4

Software

Builds

Core

Hardware

Prototype

SO1

IP2

DAB (T)

IP1

SUGV

CDR

CL ICDR

MGVPDR

CCTT TNG

BCT SW

Build 1

CL IVPDR

CL IV

SOSCOE

Build 2.5

UGS

B-Kitted

CFVsS01 Test Prep

S01

TFT

S01

FDTE

S01

PT

S01

LUT

Log

Demo

NLOS-LS

TADSS

SO 1 & Current Systems Integration

CLU Qual Test

Exp 2.1 (JEFX 08)

Spiral #2 Exp 2.1 (JEFX 08)

Spiral #3

Exp 2.1 (JEFX 08)

MAINEX

AutoNav

SIM

SUGV / MULE

SIM

B 2

BC SW

Build 2

NLOS-LS

NLOS-LS

CC version 1 EDM

to SOSIL

CC SWIT, Class I

UAV integration

CC version 1 EDM

to SOSIL

CC SWIT, Class I

UAV integration

New Equipment Tng

IMI &

L 3 IETMsTSP

Individual

Robotic Convoy Phase 1

Robotic Convoy Phase 2

NLOS-Cannon P1

P3

P4

P5

120mm Cannon

Test Fire

MULE

PDR ANSCDR

GSTAMIDS Prototype Testing

CL I & CL IV Component Test

SOSCOE

Build 2.0

NLOS-C/ NLOS-M Firing Platform MCS Firing Fix MV Mission Equipt Bench test FMRV Wench & CraneTest &

Evaluation

MULE-A(L)

IQT

SoS PDR

IV1 / IMT

Dry Runs IMT

Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

13Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

“Spin Out 1” to the Current Force

Bradley HMMWVAbrams

4 Channel

JTRS

Integrated

Computer

Relevant to Today’s Force Relevant to Today’s Force

Current Force

Interface

Network Capability Integration Kit

SOSCOE

&

Battle Command

Unattended

Ground SensorsNon-Line-of-Sight

Launch System

Unattended Munitions

Capability Improvements:

Force protection

Precision networked fires

Interoperability

Milestones:

Critical Design Review – Q2 FY07

First Network Kit Delivery – Q2 FY07

Software Qualification – Q4 FY07

Limited User Test – Q4 FY08

Milestone C – Q2 FY09

14Approved for public release, distribution unlimited, TACOM 26 FEB 2007, FCS Case # GOVT 07- 7026

FCS Program Summary

• Program keeping pace with Army needs…Maintain Velocity

• 42 major test activities underway…All Platforms in Testing

• FY07 is a critical execution year…Systems in Build Phase

• FY 08 PB Funded at $3.7B…RDTE & Production

• Focused on Our Soldiers…The Future is Here Now.