Page 1: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

J U LY 2 1 , 2 0 1 6

F C P S B U S FA C I L I T Y F E A S I B I L I T Y S T U DY

Page 2: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

AGENDA

• Feedback from Phase 1 BOE Presentation on July 13

• Plan bus driver outreach at In-Service Trainings Aug 9-10

• Discuss rubric for evaluation of candidate sites

• Begin discussion of FCPS properties

• Next steps

Page 3: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

F E E D B A C K F R O M P H A S E 1 B O E P R E S E N T A T I O NJ U LY 1 3 , 2 0 1 6 , 2 P M

Page 4: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

PHASE 1 BOE PRESENTATION

• We need to look at partnerships with the County

– Look at synergies discussion from a few years ago

• We need to consider outsourcing

– Direct and indirect costs of operation

– Look at cost per student or mile for other LEAs

– There may be elements that could be more easily outsourced than others

• We need to consider facility needs but also ways to address the needs until the time a new

facility can be built

Page 5: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

B U S D R I V E R I N -S E R V I C E T R A I N I N GA U G U S T 9 - 1 0

Page 6: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

IN-SERVICE OUTREACH

• 15 minute presentation

• Table with information

• Survey during the transportation manager portion of the day?

Page 7: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

D E V E L O P M E N T O F S I T E E V A L U AT I O N R U B R I C

Page 8: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

LEGAL ASPECTS

Measurement Evaluation Criteria

Ownership Higher ranking for FCPS owned

Jurisdiction

Zoning

Cost of site Lower cost ranks higher

Neighboring residential land uses

Page 9: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

SIZEMeasurement Evaluation Criteria

Site size (acres) At least 5 acres per site, total of 16-20 acres in all

Buildable area (acres) At least 3.5 acres per site, total of 13.5 acres in all

Existing building size (sq ft) if

applicable

Minimum square footage from space summary for services planned

Existing parking (acres) if applicable Parking for at least 30 buses

Ability to expand building or parking

on site in future?

Higher ranking for sites with more extra acreage

Page 10: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

GEOGRAPHICAL EFFICIENCY

Measurement Evaluation Criteria

High school feeder area Informational

Number of bus riders within 3 miles

Number of schools within 3 miles

Number of bus routes within the

feeder (regular)

Higher ranking for more routes

Number of special needs bus routes

within the feeder

Higher ranking for more routes

Number of employees in feeder

interested in a break room

Higher ranking for a garage facility with high interest in break room

Trips with the feeder Higher ranking for more trips

Mileage within the feeder

Page 11: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

ACCESS

Measurement Evaluation Criteria

Nearest highway on-ramp

Distance to nearest highway on-ramp Shorter distance gets higher ranking

Alternate access available?

Distances to HS feeder centroids

Drive time to HS feeder centroids

Page 12: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

SECURITY

Measurement Evaluation Criteria

Ability to have a fence?

Ability to have security cameras?

Ability to provide lighting

Number of currently unsecured buses

that could be secured on the site

Total number of buses that could be

parked there (including buses that

park at home currently)

Page 13: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

PHYSICAL

Measurement Evaluation Criteria

Cost of SWPPP compliance

Water and sewer available

Access to utilities

Page 14: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

B E G I N D I S C U S S I O N O F S I T E O P T I O N S

Page 15: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

FCPS SITES

Page 16: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

OTHER SITES

• Monocacy Walmart

• Fountain Rock industrial site

• Public Safety Training Facility

• Knowledge Farms

• Future fire station sites for temporary parking?

– Hamptons West

– Monrovia drag strip

– Sanner Farm

– Ed McClain Rd & 80

• Green Valley fire station site (after station is rebuilt)

Page 17: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

N E X T S T E P S

Page 18: FCPS BUS FACILITY FEASIBILITY STUDY · FCPS BUS FACILITY FEASIBILITY STUDY. AGENDA •Feedback from Phase 1 BOE Presentation on July 13 ... •Discuss rubric for evaluation of candidate

NEXT STEPS

• Tuesday, July 26 10 AM – visit Public Safety Training Facility land

• August 4 – continue discussion of FCPS and other sites

• August 18 – continue discussion of FCPS and other sites