fast professional solutions - · pdf filethe best grades from ericsson, ... building...

24
WWW.KONSING.COM FAST , PROFESSIONAL SOLUTIONS in Radio Communications & Information Technologies Design I Consulting I Engineering I Maintenance Contact Information: St. Bulevar Peka Dapcevica 25, Belgrade, Serbia, T: + 381 11 7151 707, [email protected]

Upload: phungdung

Post on 31-Jan-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

WWW.KONSING.COM

FAST, PROFESSIONAL

SOLUTIONS in Radio Communications & Information Technologies

Design I Consulting I Engineering I Maintenance

Contact Information: St. Bulevar Peka Dapcevica 25, Belgrade, Serbia, T: + 381 11 7151 707, [email protected]

Page 2: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

THE GROUP

Intelligent & creative

KONSING GROUP consists of the following companies:

• KONSING GROUP LTD BELGRADE, Serbia, founded in 1995

• KONSING GROUP AS, Norway, founded in 2012

• KONSING BS, Bosnia & Herzegovina, founded in 2007

• CG KONSING, Montenegro, founded in 2005

• KONSING GROUP is a design, consulting, engineering and maintenance

company specialized in the fields of radio communications, power supply

systems and information technologies

• Strong worldwide experience in building of telecommunication

networks during the past 23 years

• KONSING GROUP has more than 100 employees, 50 of which have

university degrees of all of the necessary specialties, in the fields of

telecommunications and IT. Continuous training and improvement of all

employees are two of management's priorities

About Company

Page 3: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

Services

Mobile Telephony Consulting, network planning, radio planning, site acquisition, negotiation and lease contracting, obtaining permits, design, civil works, steel structures, power supply systems, equipment installation and comissioning, maintenance, drive testing and network optimization

Wireless Networks, Transmission Systems, Broadcasting Networks, Radio Navigation Systems Consulting, network planning, radio planning, site acquisition, negotiation and lease contracting, obtaining permits, design, civil works, steel structures, power supply systems, equipment installation and comissioning, maintenance, drive testing and network optimization

Power Supply Systems Design, installation and maintenance of power supply systems for telecommunication and IT sites, with high level of stability and redundancy

Lightning Protection Systems Design and installation of systems for site and equipment protection from the effects of atmospheric discharges and overvoltages

IT Networks Design, installation and commissioning, maintenance

Power Lines Design, installation and maintenance of power

lines up to 35 kV

Intelligent Buildings Design, installation and integration of power consumption control and measurements, lightning protection, access control and Time & Attendance system, anti-theft protection, video surveillance, fire protection, CO detection, HVAC control, cable and satellite TV signal distribution, multimedia system, VoIP telephony, video interphone systems, structural cable networks

WWW.KONSING.COM

Page 4: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

All round Network Services

1. Consulting Market research Technical strategy for operators

2. Design Network design Site design

4. Civil Works

5. Installation & Commissioning Core BTS Transmission

6. Radio Planning & Optimization Radio Planning Drive Testing Radio Network Optimization

7. Maintenance Preventive Corrective (24/7)

3. Site Acquisition Legal and technical site assessment Contract negotiations Permitting

WWW.KONSING.COM

Page 5: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

WWW.KONSING.COM

Radio Design, Planning and Optimization

PROCESSING TOOLS

• Network Planning & Optimization:

• - NICE (Hexagon) NIR

• - ATOLL

• - TEMS Cell Planner 9

• - WIPS (Wireless Indoor Planning Solution)

• Drive Test:

• - TEMS Investigation

• - TEMS (Q-Voice) Symphony

• Post-Processing:

• - TEMS Discovery

• - MAPINFO

Full range of special radio prediction and radio

optimization services:

• Consulting (Radio Network Planning, Optimization and

Analysis)

• Radio Network Planning (Coverage Planning, Frequency

& Scrambling Code Planning, Capacity Planning)

• Radio Network Optimization (Radio Parameters

Optimization, BSC, RNC & MSC Setup and Tweaking, KPI

Monitoring, Network debugging, Cell neighbors Planning

and Optimization)

• Radio Network Analysis (BSC/RNC Database, Radio

Spectrum Management, Traffic Distribution, Link Budget

KPI Analysis)

• Drive Test (Benchmark DT, Troubleshooting DT,

Optimization DT, Acceptance DT)

• Post – Processing (KPI Calculation, Drive Test Reports)

Page 6: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

WWW.KONSING.COM

Knowledge: Graduated engineers and technicians of various skills: telecommunications, power supply,

civil, mechanical

Experience: Huge database of technical solutions for various types of networks and sites

Quality control: Direct feedback from civil work and installation teams helped in improving and perfecting

of technical solutions

Tools: Modern SW for calculations and design: STAAD, Tower, Relux Professional, AUTOCAD, REVIT, etc.

Design department assets

Page 7: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

WWW.KONSING.COM

Resources of civil work department:

Knowledge: Graduated engineers who supervise

and organize civil works: telecommunications,

power supply, civil and mechanical engineers

Experience: Experience on various types of

networks and sites in different weather and

terrain conditions

Reliable contractors: Long term cooperation with

companies who perform concrete works and

steel structure manufacturing and mounting

Quality control: Control of all built-in materials

and elements in order to enable safe and fast

installation of telecom equipment

Civil Works

Page 8: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

WWW.KONSING.COM

Key role in 15 telecommunication network deployment during past 23 years

During those 23 years, Konsing Group Ltd Belgrade performed more than 8900 BTS

installations, optimizations or complete equipment swap, with impeccable record

The best grades from Ericsson, Huawei, NSN, ALU and ZTE are achieved by using the best:

• planning and preparation, with backup scenarios

• real time control of the whole process

• fast and competent personnel

Installation & Commissioning

WWW.KONSING.COM

Page 9: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

TELECOMMUNICATION TOWERS

Telecommunication towers, poles, tree-shape poles, totem hidden towers

CAMOUFLAGE SOLUTIONS

Custom made radio transparent masks

(false chimneys, walls, window blinds)

WWW.KONSING.COM

Towers & Masks

Page 10: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

WWW.KONSING.COM

Integrated Management System Policies:

• Highest quality and efficiency, in accordance with implemented Integrated

Management System (Quality and HSE):

• Full support of all companies in the Group for wide scale project

• Engagement:

- Telecom project: turn-key, new rollouts, network renovation projects

- Strong long-term cooperation with solid local partners

- Nationwide presence, throughout Norway

KONSING GROUP has been established next social responsibility subjects, in

accordance with certified ISO 26000:

Subject 1: Human rights

Subject 2: Labor practice - respect and maintenance all labor standards, as well as:

Child labor, Health and safety, Freedom of association, Discrimination, Employment

conditions

Subject 3: The environment

Subject 4: Fair operating practices

Subject 5: Customers issues

Subject 6: Community involvement and development

All those subjects are incorporated in all company’s organization parts, at all levels

ISO 9001:2008: Quality Management System

ISO 14001:2004: Environmental Management System

OHSAS 18001:2007: Occupational Health and Safety Management System

Page 11: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

Licenses

WWW.KONSING.COM

License for the issue for certificates of energy

efficiency of buildings, from the Ministry of

Construction and Urban Planning of the Republic of

Serbia

Licenses for preparation of technical

documentation:

P111E3 – telecommunication network and system

designs for building facilities at airport complexes

(passenger terminals, cargo terminals, airport bases

– hangars, infrastructure facilities and facilities for

radio navigation equipment)

P150E3 – designs for telecommunication networks

and systems of telecommunication facilities within

the communication systems of international and

arterial importance

P203G1 – building construction projects for buildings

50m or more

Licenses for construction of facilities:

I150E3 – telecommunication networks and systems

on the telecommunication facilities in

communication systems of international and arterial

importance

I203G1 – building construction objects up to 50m or

more meters

LICENSES IN MONTENEGRO

Licenses for preparation of technical documentation:

1-48658-00 - license for construction and construction craft works on the

architectural objects, the installation of high and low voltage power supply

systems

11570/2005 - license for structural objects designing, as well as high and low

voltage power supply system designing

LICENSES IN BOSNIA & HERZEGOVINA

3396/07 - license for telecommunication and power supply system

designing

3397/07 - license for telecommunication and power supply system

installation

LICENSES IN NORWAY

Nkom authorized - Authorization “ENA 8379 Innvilget ekomnettautorisasjon“

issued by Post and Telecommunications authority - license for installation of

radio and cable telecommunication networks, as well as cable TV networks

DSB authorized – Design of electrical systems; Construction and

maintenance of electrical installations; Repair of electrical equipment

Climbing and RoofTop Course – according to Norwegian requirements

• Utførelse av Montering av bærende metall- eller betongkonstruksjoner i

tiltaksklasse 2

• Prosjektering av Konstruksjonssikkerhet i tiltaksklasse 2

Licenses in countries where we operate Licenses in Serbia

Page 12: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

Fully incorporated ISO 18001:

• Internal control system: Regular and

unannounced audits, H&S controller, Personal

protection equipment controller, H&S external

licensed expert, H&S as a part of IMS

(Integrated Management System)

• External control system: ISO regular

evaluations by certifying body, regular

medical exams and evaluations

• All required personnel has Work-on-Height

certificates: IRATA Rope Access, Industrial

Rope Technician Certificates, Medical On-

Height permission (over 100 employees), On-

Height and On-Tower Safety License, Söll Safe

Climbing Systems, etc.

• Zero serious accidents for the last 23 years

The last external checks:

„Supplier code of conduit audit”, performed by

Ericsson on 21.05.2014. and „Business Assurance

Audit“ performed by Telenor Serbia on 18.6.2014.

resulted in the highest scores and positive findings in

all 9 areas, including:

Health and Safety (Personal protection equipment,

Records in incidents/ accidents for preventive

action, etc.)

Social responsibility (Employee contracts, Labor

and Environmental legislation/ Child Labor/

Freedom of association, Working hours and

overtime, etc.)

Strengths: health & safety

WWW.KONSING.COM

Page 13: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

Continuous training and improvement of all the

employees is a Company’s management

priority

Konsing Group ltd Belgrade has Training

Certificates of following Companies: Ericsson,

Nokia SIemens Networks, Huawei, Alcatel-

Lucent, ZTE, NEC, Cisco, Microsoft, Alvarion,

Bosch, Airspan, Axis communications, CISCO,

Celtro, Redline Communications, APC, Kathrein,

Irata, ALP, Franklin France, Intel, SOLL, NEC, LGC

Wireless, Glenayre, MikroTik

Feature partners:

Eblink, SME-Soluciones, Franklin France, Cisco Systems,

Microsoft, SevOne, Axis Communications, A.P.Systems

Domestic and foreign partners:

Telenor, VIP Mobile, Telekom Srbija, m:tel, Netel Norway,

Ericsson, Nokia Siemens Networks, Huawei, Alcatel-Lucent,

ZTE, Park Air Systems, Franklin France, Alvarion, CISCO,

Microsoft, Honeywell, Axis communications, EBlink,

Domital Corporation, Redline communications, Celtro,

Topex, Government of the Republica of Serbia, Proscom,

BSProcesor, SionNet, Uno-Lux NS, IP Way, SevOne, SME

Soluciones, AP Systems

Training Partners

Training & Partners

WWW.KONSING.COM

Page 14: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

WWW.KONSING.COM

References

Page 15: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

Overview of References

MOBILE TELEPHONY

• Over 3850 sites for operators in Norway and Netherlands (Telenor, Netcom,

Direktoratet for nødkommunikasjon (dNk), Tele2, T Mobile Netherlands) – design, civil

works where needed, installation, commissioning and integration

• Over 1200 sites for operators in region (Montenegro, Bosnia and Herzegovina,

Bulgaria, Turkey) – design, civil works, installation, commissioning and integration

• Over 3750 sites for operators in Serbia (Telekom, Telenor, VIP Mobile) – design, civil

works, installation, commissioning and integration

TRANSMISSION SYSTEMS

• Over 4000 MW hops including several backbone rings for operators in Serbia, region,

Norway – design, installation, commissioning and integration

FIXED WIRELESS COMMUNICATIONS, FIXED BROADBAND TELEPHONY, BROADCASTING

NETWORKS

• Over 500 sites for clients in Serbia and worldwide (Czech Republic, Poland, Ireland,

Sri Lanka) – design, civil works, installation, commissioning and integration

Page 16: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

Operator Vendor Projects Number of sites/ hops Scope of work Year / Period

UNITED KINGDOM

O2 NSN London Olympic Park – UMTS RAN Modeling Preparation for global sport events in 2012, Final RAN coverage and

capacity validation 2011

O2 NSN Radio planning & Design verification HAMPDEN PARK Glasgow and RICOH ARENA Coventry - radio

planning and design verification 2011

NETHERLANDS

T Mobile Huawei Infrastructure Morernization Project (InfraMod 12 sites

Swap of the equipment and antenna system, commissioning and

integration 2015

T Mobile Huawei SRAN Project (SWAP of RAN) 25 sites Swap of the equipment, commissioning and integration 2015

Worldwide references

Operator Projects Number of sites/ hops Scope of services

Telenor Norge AS, Norway

BRAIN RAN “SWAP Project” 102 sites

Technical Site Survey Reports, Site Design,

Installation, Commissioning and integration,

DT/WT TEMS measurements, RAN planning,

Site acquisition

LTE Roll-out 200+ sites

Radiolinje 50+ hops (MW links)

“ON Time” engagement (LTE1800, Wintersport) 1000+ sites

BID0 and BID2 270+ sites

Norkring “ON Time” engagement (DAB) 40+ sites Euqipment installation

TeliaSonera Norge AS/

NetCom, Norway

Huawei swap – NeMo Project 2G/3G swap and new 4G 650+ sites with max capacity of 60 sites per month

Technical Site Survey Reports, Site Design,

Installation, Commissioning and integration,

WT TEMS measurements

BSC & RNC expansion 10+ sites

4G Rollout 400+ sites

Rollout (new sites) 20+ sites

B.U.L.L. 250+ sites

Mobile Norway/ Tele2 Huawei 4G pilot in Drammen

40+ sites Technical Site Survey Reports, Installation,

Commissioning and integration Tunnels Project

dNK

Nodnett 640+ sites with max capacity of 35 sites per month

Design, Site preparation and equipment

installation, Commissioning and integration in

Phase 2 (South Norway) and in Phase 5

(North Norway)

Nodnett expansion 220+

Design, Site preparation and equipment

installation, Commissioning and integration

all over the Norway

NORWAY

Page 17: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

Detailed references

FIXED WIRELESS COMMUNICATIONS - WORLD WIDE Operator Customer Vendor Projects Number of sites Scope of work

Santel Sri Lanka Airspan Airspan WLL CDMA Network Rollout 23 sites supervision of civil works, installation,

commissioning, network integration

Aliatel Czech

Republic Airspan Airspan WLL CDMA Network Rollout 18 sites commissioning, network integration

Telebeskid Poland Airspan Airspan WLL CDMA Network Rollout 2 sites installation, commissioning, troubleshooting,

network optimization, CPE installation

Eircom Ireland Airspan Airspan WLL CDMA Network Rollout 31 sites installation, commissioning, network integration

WORLD – WIRELESS COMMUNICATIONS

Page 18: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

MOBILE TELEPHONY

Operator Customer Vendor Project Number of sites

Scope of work Year / Period

Aria, Turkey Ericsson Ericsson Aria GSM Network Rollout 130 site acquisition and design, civil works and installation supervision

2000-2001

Bulgarian Telecommunications Company

Ericsson Ericsson BTC GSM Network Rollout 250 RNP verification and update 2005

Telenor Montenegro Huawei Huawei Huawei swap - 2G/3G swap and new 4G 130 Technical Site Survey Reports, Site Design, Installation, Commissioning and integration

2017

M:Tel Montenegro M:Tel Montenegro

Ericsson M:Tel GSM/UMTS Network Rollout 200 design, civil works, installation, commissioning 2007-2016

M:Tel Montenegro Ericsson Ericsson M:Tel GSM/UMTS Network Modernization 35 design, civil works, swap of the equipment, commissioning 2014

Telenor Montenegro Alcatel-Lucent Alcatel-Lucent M:Tel LTE Network Pilot 5 design, civil works, installation, commissioning 2014

M:Tel Bosnia and Herzegovina M:Tel B&H Siemens M:Tel GSM/UMTS Network Rollout 60 design, civil works, installation, commissioning 2007-2008

M:Tel Bosnia and Herzegovina M:Tel B&H Huawei RAN modernization 300 Installation, commissioning 2017

Eronet Bosnia &Herzegovina Ericsson Ericsson Eronet GSM/UMTS Network Rollout 12 installation, commissioning 2012-2013

Eronet Bosnia &Herzegovina Unis Telekom Ericsson Eronet GSM/UMTS Network Rollout 151 installation, commissioning 2012-2015

TRANSMISSION SYSTEMS

Operator Customer Vendor (Equipment) Projects Number of hops

Scope of work Year / Period

M:Tel Montenegro M:Tel Montenegro Ericsson - Marcony (Long Haul)

M:Tel Montenegro MW Backbone Network Rollout 30 design, installation, commissioning 2007-2008

M:Tel Montenegro M:Tel Montenegro Ericsson (ML E, TN) M:Tel Montenegro MW Access Network Rollout 95 design, installation, commissioning 2007-2013

M:Tel Montenegro M:Tel Montenegro NEC Pasolink M:Tel Montenegro MW Access Network Rollout 140 design, installation, commissioning 2016-2017

Telenor Montenegro Telenor Montenegro NEC Pasolink M:Tel Montenegro MW Access Network Rollout 60 design, installation, commissioning 2016-2017

M:Tel Montenegro M:Tel Montenegro NERA (PDH) M:Tel Montenegro Access Network Modernization (Swap) 32 design, installation, commissioning 2014

M:Tel Bosnia &Herzegovina

M:Tel B&H DMC (ML 18, 23) M:Tel B&H MW Access Network Rollout 10 design, installation, commissioning 2007

VARIOUS REFERENCES

Field Customer Projects Scope of work Year / Period

Power Supply Systems Elektroprivreda Crne Gore Underwater 20/35 kV conductor cable in lake Skadar civil works, installation 2008

Power Supply Systems Elektroprivreda Crne Gore 35 kV power line on Cetinje civil works, installation 2008

Power Supply Systems Elektroprivreda Crne Gore 10 kV distribution network in Bar civil works, installation 2008

Fixed Broadband Telephony

T:COM, Vendor: Huawei DWDM, MSAN, 40 sites Installation, commissioning 2016-2017

Detailed references REGION – MOBILE TELEPHONY, TRANSMISSION SYSTEMS, VARIOUS

Page 19: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

Detailed references SERBIA – MOBILE TELEPHONY

Operator Customer Vendor Project Number

of sites Scope of work

Year /

Period

Telekom Srbija Telekom Srbija Glenayre Paging System Rollout 41 design, civil works, installation, commissioning 1995

Telekom Srbija Ericsson Ericsson MTS GSM Network Rollout 120 design, civil works, installation, commissioning 1998-2000

Telekom Srbija Telekom Srbija Ericsson MTS GSM/UMTS Network Rollout 980 design, civil works, installation, commissioning 2000-2017

Telekom Srbija Ericsson Ericsson MTS GSM/UMTS Network Rollout 103 design, civil works, installation, commissioning 2005-2006

Telekom Srbija Telekom Srbija Siemens MTS GSM/UMTS Network Rollout 35 installation 2005-2006

Telekom Srbija Telekom Srbija LGC Wireless MTS GSM/UMTS Network In Building Rollout 4 indoor installation, commissioning 2007-2008

Telekom Srbija Ericsson Ericsson MTS GSM/UMTS/LTE Network Rollout 225 installation, commissioning 2010-2015

Telekom Srbija Ericsson Ericsson MTS GSM/UMTS/LTE Network Maintenance 1400 maintenance 2010-2015

Telekom Srbija Ericsson Ericsson MTS GSM/UMTS Network Modernization 220 design, civil works, swap of the equipment,

commissioning 2012-2017

Telenor (Mobtel) Telenor (Mobtel) Ericsson 063 Mobtel Analogue Mobile Network, NMT 900 30 design, civil works, installation, commissioning 1995-1996

Telenor (Mobtel) Telenor (Mobtel) Center for Supervision of NMT Network design, implementation 1995-1996

Telenor (Mobtel) Telenor (Mobtel) Ericsson 063 Mobtel GSM Network Rollout 224 civil works, installation, commissioning 1996 -1998

Telenor Telenor Huawei Telenor GSM/UMTS Network Modernization Pilot 12 design, civil works, swap of the equipment,

commissioning 2011

Telenor Huawei Huawei Telenor GSM/UMTS Network Modernization 1700 maintenance 2011-2012

Telenor Huawei Huawei Telenor GSM/UMTS Network Modernization 700 drive testing and optimization of the network 2011-2012

Telenor Telenor Huawei Telenor GSM/UMTS/LTE Network Rollout 800 civil works, installation 2013-2017

Vip Mobile Vip Mobile ALU, Nortel, NSN VIP Mobile GSM/UMTS Network Rollout 950 site acqusition, design, civil works, installation,

commissioning 2007-2012

Vip Mobile Vip Mobile Alcatel-Lucent VIP Mobile UMTS Network Swap 132 design, civil works, swap of the equipment,

commissioning 2009

Vip Mobile ZTE ZTE VIP Mobile UMTS Network Pilot 10 design, civil works, installation, commissioning 2009

Vip Mobile Vip Mobile ALU, NSN VIP Mobile Measurement Campaign -

Benchmark Drive Testing 4200

drive testing of the network, comparison of

operators 2009-2011

Vip Mobile NSN NSN VIP Mobile UMTS Network Swap 129 design, civil works, swap of the equipment,

commissioning 2010

Vip Mobile NSN NSN VIP Mobile UMTS Network Rollout 88 design, civil works, installation, commissioning 2012

Vip Mobile NSN NSN VIP Mobile GSM Network Swap 56 design, civil works, swap of the equipment,

commissioning 2013

Page 20: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

Detailed references SERBIA – TRANSMISSION SYSTEMS

Operator Customer Vendor (Equipment) Project Number of hops

Scope of work Year / Period

Telekom Srbija Telekom Srbija Ericsson (ML C, E, TN) Telekom Srbija MW Access Network Rollout 420 design, installation, commissioning 1998-2015

Telekom Srbija Telekom Srbija Various HDSL vendors (Alcatel, Ascom, Siemens, Ericsson)

Telekom Srbija Access Network Rollout 300 design, installation, commissioning 1998-2005

Telekom Srbija Telekom Srbija IMTEL (RRU 13, 18, 23) Telekom Srbija MW Access Network Rollout 304 design, installation, commissioning 1999-2006

Telekom Srbija Telekom Srbija Teletra (HT12) Telekom Srbija MW Backbone Network Rollout

9 optimization 2002

Telekom Srbija Telekom Srbija Siemens (DRS140) Telekom Srbija MW Backbone Network Rollout

6 design, installation, commissioning 2003

Telekom Srbija Telekom Srbija IRITEL (ODS155) Telekom Srbija Fiber Optics Backbone Network Rollout

5 design 2005

Telekom Srbija Telekom Srbija NEC (Pasolink NEO, iPasolink, V4) Telekom Srbija MW Access Network Rollout 800 design, installation, commissioning 2005-2015

Telekom Srbija Telekom Srbija Nera (SDH) Telekom Srbija MW Backbone Network Rollout

3 design, installation, commissioning 2009-2010

Telekom Srbija Telekom Srbija NEC (C-node) Telekom Srbija Fiber Optics Backbone Network Rollout

20 design, installation, commissioning 2009-2010

Telekom Srbija Telekom Srbija NEC (Pasolink) Telekom Srbija MW Access Network Optimization

40 optimization 2013-2015

Telenor (Mobtel)

Telenor (Mobtel)

Ericsson (ML C, E) Mobtel MW Access Network Rollout 186 design, installation, commissioning 1995-1998

Telenor (Mobtel)

Telenor (Mobtel)

BOSCH (STM1 155 Mb/s) Mobtel MW Backbone Network Rollout 6 design, installation, commissioning 1997-1998

Telenor Telenor Huawei Telenor MW Access Network Rollout 50 design, installation, commissioning 2013-2015

VIP Mobile VIP Mobile Siemens, NSN (SRAL XD) VIP Mobile MW Access Network Rollout 690 design, installation, commissioning 2007-2011

VIP Mobile VIP Mobile Siemens, NSN (SRA4, Surpass 7030) VIP Mobile MW BAckbone Network Rollout 35 design, installation, commissioning 2008-2009

VIP Mobile ZTE ZTE VIP Mobile UMTS Network Pilot 10 design, installation, commissioning 2009

VIP Mobile VIP Mobile Siemens, NSN (SRAL XD) VIP Mobile MW Access Network Modernization

710 optimization 2012

VIP Mobile VIP Mobile Ericsson (TN) VIP Mobile MW Access Network Modernization (Swap)

325 design, installation, commissioning 2013

Page 21: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

Detailed references SERBIA – FIXED WIRELESS COMMUNICATIONS, FIXED BROADBAND TELEPHONY, BROADCASTING NETWORKS

FIXED WIRELESS COMMUNICATIONS

Operator Customer Vendor Project Number of sites

Scope of work Year / Period

Telekom Srbija Telekom Srbija Alvarion WLL eMGW Network Rollout in Southwestern Serbia (20.000 subscribers)

32 sites site acquisition, design, civil works, installation, commissioning, subscriber equipment installation

2003-2004

Telekom Srbija Telekom Srbija Alvarion WLL eMGW Network Maintenance 32 sites maintenance 2003-2012

Telekom Srbija Huawei Huawei CDMA Network Pilot 10 sites design, civil works, installation, commissioning

2006

FIXED BROADBAND TELEPHONY

Operator Customer Vendor Project Number of sites

Scope of work Year / Period

Telekom Srbija Alcatel-Lucent Alcatel-Lucent FTTN network in Belgrade and Central Serbia (MSAN and DSLAM)

142 sites design, installation, commissioning 2011

Telekom Srbija Alcatel-Lucent Alcatel-Lucent FTTB network in Belgrade and Central Serbia (mini IPAN)

143 sites design, installation, commissioning 2012

Telekom Srbija Alcatel-Lucent Alcatel-Lucent DWDM optical rings (OR13, OR14, OR17 and OR18)

4 rings design, installation, commissioning 2011-2012

Vip Mobile Alcatel-Lucent Alcatel-Lucent DWDM 12 siites installation and commissioning 2012

Telekom Srbija Huawei Huawei DWDM 30 sites installation and commissioning 2016-2017

BROADCASTING NETWORKS

End user Customer Vendor Project Number of sites

Scope of work Year / Period

Ministry of Trade, Tourism and Telecommunications

Ministry of Trade, Tourism and Telecommunications

Design and Feasibility study for Radio coverage with digital TV DVB-T2 signal on the territory of the Republic of Serbia

design and economic analysis 2011

Ministry of Trade, Tourism and Telecommunications

Ministry of Trade, Tourism and Telecommunications

Design of DVB-T2 transmission network infrastructure

25 sites design 2011-2012

Ministry of Trade, Tourism and Telecommunications

European Commission Rohde Schwarz Installation of 67 DVB-T2 Transmitters 67 sites design, installation, commissioning, troubleshooting

2012

Page 22: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

Detailed references SERBIA – INFORMATION TECHNOLOGIES

INFORMATION TECHNOLOGIES

Customer Project Number of

ports / sites Scope of work Year / Period

Ministry of Justice,

Republic of Serbia LAN in seven cities in Serbia 3000 ports design, installation 1997-1999

Srbijavode LAN and telephone network for Srbijavode business building 200 ports design, installation 2004

Konsing Group LAN and telephone network for Konsing business building, Surcinski put 1a, Belgrade 250 ports design, installation, maintenance 2005

City of Belgrade Reconstruction of „Stari Dvor" building design of LAN & telephone network 2006-2007

Telekom Srbija WLAN - MTS064 10 sites design 2007-2008

M:TEL Montenegro Montenegro WiMAX Network Design 15 sites design 2008

Konsing Group LAN and telephone network for Konsing business building, Surcinski put 13, Belgrade 350 ports design, installation, maintenance 2008

PRESS Publishing Group VPN, LAN, VoIP, IP Video Surveillance in Press printing house 400 ports design, installation, maintenance 2009

Microsoft Software Ltd LAN and Server room Infrastructure, Microsoft office Belgrade 730 ports design, installation 2012, 2014

VARIOUS REFERENCES

Field Customer Vendor Project Number of sites Scope of work Year / Period

Power Supply Systems Telekom Srbija, Telenor, VIP Mobile various LV and MV Power Supply Systems for mobile network sites

2300+ sites design, installation 1995-2015

Lightning Protection Systems

Telekom Srbija, Telenor, VIP Mobile Franklin France, various

Lightning protection of mobile network sites

2300+ sites design, installation 1995-2015

Navigation Systems Federal Air Traffic Control Authority (FATCA), Belgrade, Serbia

Park Air Electronics, United Kingdom

Digital Ground-to-air Radio Communication System

system design 2002-2003

Navigation Systems Federal Air Traffic Control Authority (FATCA), Belgrade, Serbia

Alcatel PDH radio system for radar and voice networking

installation, commissioning 2002-2003

Consulting Ministry of Capital Investments and City of Belgrade

Reconstruction of TV Tower on Avala

Consulting for design of: telecommunication technology concept, system for video surveillance, system for access control, installation of telecommunication and computer network

2006-2007

Page 23: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

GOAL

MISSION &VISION

EXPERIENCE

• Knowledge: graduated engineers and technicians,

highly skilled and trained

• Experience: 23 years of experience in roll-outs of large

telecommunication networks, especially wireless networks

• Organization: Principle of ”production line” – meaning that all

activities are carefully planned and organized

• Quality control: Teams dedicated to internal quality control in order

to prevent repetition of errors during implementation process

Significant

position on the

telecommunication

market

We help facilitate the integration of

Serbia and surrounding countries

with Europe and the world;

implement new technologies and

modern standards to achieve the

shared vision with our partners

WWW.KONSING.NO WWW.KONSING.COM

Page 24: FAST PROFESSIONAL SOLUTIONS -   · PDF fileThe best grades from Ericsson, ... building construction objects up to 50m or ... Ericsson on 21.05.2014. and „Business Assurance

System guarantees the best work organization and quality control

Highly motivated and trained employees

Fulfilling the highest standards in:

• Quality control

• Social responsibility

• Health and Safety

Worldwide proven quality and efficiency, impeccable reference

WHY

KONSING GROUP?

Thank You!

WWW.KONSING.COM

Konsing Group Contact Information

St. Bulevar Peka Dapcevica, 11000 Belgrade, Serbia, T: +381 11 7151 707, [email protected] I www.konsing.com