FRECCIAROSSA 1000: FASHION AND TECHNOLOGY CERTIFIED BY ITALCERTIFER

Italcertifer is a Company belonging to the Italian Railways

Group (FS); it has been established in 2001 to perform

products and systems certification, audits, inspections and

other assessments in the field of guided transport, par-

ticularly railway.

Its Shareholders are:

The Company

Ferrovie dello Stato Italiane Holding

University of Neaples Federico II

University of Florence

University of Pisa

Polytechnic of Milan

Tuscan Region

The Organization

CertificationCommittee

ImpartialityCommittee

Technical Support Division

Certification & Inspection

Division

TrainingDivision

LaboratoriesDivision

President & CEO

Marketing & Sales

Planning

Quality

Administration

Country Subject Start Activity

Austria/

Italy

- Brennero Tunnel: high speed line 55 km - speed 250 km/h 2013 Project Verification and E.C. Certification

INF, ENE, CCS

Poland - Wrocław - Zgorzelec, Imbramowice - Żarów (Walbrzych):

conventional lines 24 km

- Tunel - Łódź: conventional lines 2 km

- Bytom Północ - Tarnowskie Góry, Kalety - Strzebin: conventional

lines 7 km

- Dolna Odra Station

- Zastów - Krąków Przedmieście: conventional line 8 km

- Poznań - Wągrowiec: conventional line 52 km , ETCS Lev.1

- Kluczbork - Ostrzeszów: conventional lines 59+25 km

- Gryfino Station

- Kraków - Balice: conventional line 12 km

- Radzionków - Tarnowskie Góry: conventional line 8 km

- Psary - Kozłów: high speed line 35km, ETCS Lev. 1

- Nowa Sól - Zielona Góra: conventional line 28 km

- Sleepers and big sleepers

- Kalety - Kluczbork: conventional line 69 km

- Ostrzeszów - Antonin: conventional line 11 km

- Lubartów Station

- Koluszki - Częstochowa: conventional line 125 km

- Opole - Fosowskie: conventional line 2 km

2012

2013

2013

2013

2013

2013

2013

2014

2014

2014

2014

2014

2014

2014

2014

2014

2015

2015

E.C. Certification INF, ENE

E.C. Certification PRM, SRT

E.C. Certification ENE

E.C. Certification ENE

E.C. Certification ENE

E.C. Certification CCS

E.C. Certification ENE

E.C. Certification INF

E.C. Certification INF, PRM, ENE, CCS

E.C. Certification INF, ENE

E.C. Certification CCS

E.C. Certification INF

Quality Management System Certification

E.C. Certification INF, PRM

E.C. Certification INF

E.C. Certification INF

EC Certification INF, ENE

EC Certification INF

Some references - Europe

Country Subject Start Activity

Sweden - Haparanda: high speed line 114 km, 8 stations, ETCS Lev.2 2010 E.C. Certification RBC

Finland - Ring Rail Line Helsinki : conventional line 18 km (7 in tunnel) 2010 E.C. Certification INF, SRT

Bulgaria - Plovdiv - Burgas: conventional line 122 km - Speed 130 km/h 2013 E.C. Certification INF, ENE

Greece - ERTMS L1 on board equipments

- Athens Station - Tris Gefyres: conventional line 5 km

- Thitorea - Domokos: high speed double track line 106 km, 5 stations,

ETCS lev. 1

2013

2014

2014

E.C. Certification

Project Verification INF, SRT

E.C. Certification INF, PRM, SRT, ENE, CCS

Serbia - Level crossing system (Galeb Company)

- External and connecting train doors (Gosa Company)

- Axle Counter (Institute Mihailo Pupin)

2011

2014

2014

ISA Certification

ISA Certification

ISA Certification Generic Product and

Application

Switzerland - ACC Chiasso

- Paradiso station (Lugano): renewal of electric traction

2015

2015

Project Verification INFRA, ENE, CCS

Project Verification INFRA, ENE

Germany - Train Velaro: ERTMS L1, speed 250 km/h (Siemens) 2014 Conformity Assessment for the use on

Turkish network

Spain - High Speed Train: ERTMS L1 & L2, speed 250/300

km/h (Talgo)

2014 Safety Verification Engineering for the use on

the Mecca-Medina High Speed line

Czech

Republic

- Poricany - Kolin: conventional line 22km, 3 stations, ETCS Lev.2 2010 E.C. Certification CCS - Radio Block Centre

(RBC)

Some references - Europe

Country Subject Start Activity

Arabian Emirates - Shan - Habshan - Ruways: conventional lines 270 km 2012 Certification CCS

Saudi Arabia - Mecca - Medina: high speed line 444 km, Speed 320 km/h,

ETCS L. 2

- Riyadh: Metro line 3, 42 km, 22 stations

2015

2013

Project Checking and Certification INF, SRT,

ENE, CCS, RST

Independent Checking Engineering (ICE)

Australia

- Rio Tinto Company: Iron mine conventional line about 1300 km,

ETCS modified (driverless)

- Roy Hill Company: mine conventional line 350 km - local ETCS

modified (satellite location & communication)

2013

2014

Certification CCS

Certification CCS

China - Zhengzhou - Xi’an: high speed line about 500 km, 10 stations,

local adaptation to ETCS L. 2

2010 Certification RBC

India - Chennai - Gummipundi: suburban line 46 km, ETCS L.1

TPWS Delhi - Agra: conventional line 187 km, ETCS L.1

2012

2013

Certification CCS

Certification CCS

Chile - Roger 800 (test and inspection vehicle) 2015 Functional assessment

Turkey

- Ankara - Konya: high speed line 210 km, speed 250 km/h,

ETCS Lev.1

- Ankara - Sinkhan: conventional line 16 km

- Mersin - Toprakkale, Bogazkopru - Yenice: conventional lines

>200 km

- Irmak - Zonguldak: conventional line 414 km

- Gezbe - Kosekoy: conventional line 56 km - ETCS L.1

- Inonu - Kosekoy: conventional line 136 km - ETCS L.1

- Ankara - Konya: High Speed Line 210 km, upgrade to 300 km/h

and ETCS L.2

- Karaman - Konya: doubling of conventional line 200 km

- Eskisehir station

2010

2010

2012

2013

2013

2013

2014

2015

2015

Certification INF, ENE, CCS

Certification INF, ENE

Certification CCS

Certification INF, CCS, TLC

Certification INF, ENE, CCS

Certification ENE, INF, CCS

Certification CCS, ENE, INF

Certification INF

Certification INF, ENE, CCS

Some references - World

Planned to enter in service on the Italian

High Speed network on 2015

Producer: Ansaldo Breda-BombardierYear: 2013-2015

Characteristics:• Fully interoperable train suitable for all

European Countries• Commercial speed : 350 km/h

Italcertifer Activity:Certification of the whole train

AnsaldoBreda-Bombardier train ETR 1000

The certification steps

1. Design documents evaluation

2. Construction survey

3. Test in laboratory for single compo-

nents and for the whole train

4. Test on line

Activites performed - 2

Issuing of verification reports for each WBS

issue and for each related phase

Phase 1 - Concept design

Phase 2 - Detailed Design

Phase 3 - Type tests

Phase 4 - Track Tests

Verification that the design and construction are compliant

with the existing “Codes of Practice” (TSI requirements and

EN standard) in order to assess that the mitigation mea-

sures lead the hazards to an acceptable risk level (as per

EU Regulation 352/2009)

Issuing of national certificates and EC certificates according

to the Rolling Stock TSIs for a service speed of 300 km/h.

Several tests have been performed in lab in order to verify the resistance, strength and

endurance of the pantograph, simulating in a short time the entire lifecyle

Pantograph lab tests

Pantograph running tests

Innovative measure set up based on optical sensors with Fibre Bragg Grating (FBG), located

on the roof and intrinsically isolated.

Video surveillance camera and arching detectors customized for the high speed test with

great attention to aerodynamic impact in order to verify the interactions pantograph-catenary

Acceleration and Displacement tests….

180 acceleration test points measured on 4 different trains with the scope of characterize

comfort, running stability, active lateral suspension response.

20 displacements test points measured on suspensions, dampers and actuators in order to

characterize the running dynamic and the dynamic response of the different system (suspended

motor, active lateral suspension, primary suspension…)

Strain gauges tests

100 full bridge channels (about 900 strain gauges) on 6 instrumented wheelsets, 140 telemetry

channels with the scope of characterize track-wheel interaction forces and axle strain.

Forces tests

Many parts of the train have been instrumented and calibrated in order to measure

forces during the on-track test to characterize sub-system of the vehicle: Active Lateral

Suspension, Traction’s performance.

Pressure tests

50 measurement points: 30 external, to characterize the pressure on the train surface

and the air speed; 20 internal, to characterize the pressure comfort inside the train

Temperature measurements

20 measurements points to characterize the temperature of the electrical and mechanical

system and 12 measurements points on braked wheel web in order to characterize the

web temperature during the braking

The body-bogie rotation

The vehicle’ bogie-

body rotation has

been tested by using

the specific bench

available in our rol-

ling stock laboratory,

located in Osman-

noro (near Florence)

Some benches used…

Semi-anechoic chamber Body resistance

Simulation of track distorsion Brake components

…in the railway laboratories

The tests on line in Italy…

The tests on line covered

both the mechanical and

technological components,

like wheels, braking sys-

tem, body, engines, signa-

ling equipments,...

The tests on line covered

both the mechanical and

technological components,

like wheels, braking sys-

tem, body, engines, signa-

ling equipments,...

…and on trial site in Velim

The numbers…..

• track test campaign completed up to 338

km/h test speed

• three trains under test simultaneously

• 380 nights, more than 13000 hours of engi-

neers involved

• 25 test authorization process completed

• 100 test and monitoring procedures issued

• 50 test reports elaborated

• More than 400 phisical quantities measured

during the test on 4 trains having run more than

180.000 km

• 1 integrated Team since the beginning

• 75 Specialists involved

• 350 assessment reports issued

• 6000 documents evaluated

• 50 CSM (Common Safety Method) assessment

reports issued

• 100 functional tests witnessed

• 100 technical meetings completed side by side

with design engineers

The dates…

September 2013 - December 2014: First tuning on trainset TS01 in Velim up to 200 km/h

December 2014 - June 2014: Tuning of trainesets TS02, TS03 and TS04 on Italian lines up

to 340 km/h

June 2014 - December 2014: Type test on Italian lines up to 340 km/h with TS02, TS03 and

TS04 to certificate the train for the commercial speed of 300 km/h

January 2015 - today: Further investigations in order to prepare the next set of test up to

390 km/h to certificate the train-set for the commercial speed of 350 km/h

The next steps ….

The issuing of the EC certificates for 350 km/h service speed is

foreseen by the end of 2015.

The relative tests are planned on a suitable Trial Site already identified

(the Italian High Speed Line Milan-Turin)

Carlo Carganico

Italcertifer CEO and President

[email protected]