Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 1
Faneuil Branch LibraryCommunity Meeting #1 October 21, 2019
CITY OF BOSTON
Martin J. Walsh, Mayor Patrick I. Brophy, Chief of Operations
CITY OF BOSTON PUBLIC FACILITIES DEPARTMENT Patricia M. Lyons, Director
BOSTON PUBLIC LIBRARY
OUDENS ELLO ARCHITECTURE
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 2
Agenda
1. Introduction
2. Project Team
3. Process and Schedule
4. Project Goals 5. Existing Conditions Assessment 6. Community Input 7. Next Steps
8. Feedback Contact
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 3
Project Team
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 4
Oudens Ello Architecture
Project Team
Mayor’s Office of Neighborhood
Services
Boston Public Library
Brighton Community
City of Boston Public Facilities
Department
Consultants & Engineers
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 5
Oudens Ello Architecture
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 6
Process & Schedule
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 7
Process
1. Program Study
Duration Approx. 6 – 12 months
THE BOSTON PUBLIC LIBRARY
COMPASS: Strategic Plan
Final Report – 11/23/2015
Faneuil Branch of the Boston Public Library Programming Study Brighton, MA
Faneuil Branch Library Programming Study PCM Project No. 7043
Pre‐construction rendering of the Faneuil Branch of the Boston Public Library
Current axonometric cutaway
Completed Fall 2015 A study is performed to determine all the different areas and rooms needed in the library and what size they should be. Conceptual floor plans are created to show how all the spaces can fit together on the site with thoughtful adjacencies of spaces.
During this phase are 2-3 Community meetings.
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 8
Process
1. Program Study 2. Design
We are here
Duration Approx. 6 – 12 months
Duration Approx. 12 – 18 months
Completed Fall 2015 A study is performed to determine all the different areas and rooms needed in the library and what size they should be. Conceptual floor plans are created to show how all the spaces can fit together on the site with thoughtful adjacencies of spaces.
During this phase are 2-3 Community meetings.
Summer 2019 — Ongoing The architects take the information from the programming study and start to design a building with the assistance of engineers. Design has 3 phases: Conceptual Design, Schematic Design and Design Development. In each phase the design becomes more refined and detailed. Following the Design Development phase the architects put together construction documents.
During this phase are 2-3 Community meetings.
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 9
Process
3. ConstructionEstimated Start Fall 2020 Once the construction documents are completed they are put out to bid for a construction company. Once a construction company is chosen ground is broken and the building is built.
1. Program StudyCompleted Fall 2015 A study is performed to determine all the different areas and rooms needed in the library and what size they should be. Conceptual floor plans are created to show how all the spaces can fit together on the site with thoughtful adjacencies of spaces.
During this phase are 2-3 Community meetings.
2. Design
We are here
Summer 2019 — Ongoing The architects take the information from the programming study and start to design a building with the assistance of engineers. Design has 3 phases: Conceptual Design, Schematic Design and Design Development. In each phase the design becomes more refined and detailed. Following the Design Development phase the architects put together construction documents.
During this phase are 2-3 Community meetings.
Duration Approx. 6 – 12 months
Duration Approx. 12 – 18 months
Duration Approx. 12 – 18 months
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 10
2014-15
Com
mun
ity M
eetin
g 10
/29/
14Estimated Schedule
Program Study
Com
mun
ity M
eetin
g 12
/18/
14Co
mm
unity
Mee
ting
4/1/
15Co
mm
unity
Mee
ting
6/10
/15
July Aug Sep Oct Nov Dec Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec
Schematic Design
Construction Documents
Bidding
Construction
2020 2021
Com
mun
ity M
tg 2
(Win
ter)
Com
mun
ity M
tg 3
(Spr
ing)
Com
mun
ity M
tg 1
Design Development
2016-18
Funding & Designer Selection
2019
We are here
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 11
Project Goals
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 12
Project Goals
The 2015 Programming Study serves as a Road Map for the design phase
Project Goals
Faneuil Branch of the Boston Public Library Programming Study Final Report PCM Project No. 7043 EXECUTIVE SUMMARY
1
EXECUTIVE SUMMARY The Faneuil Branch of the Boston Public Library is a remarkable and well-loved building and institution. Opened in 1932, the 7,600 square foot branch is a well preserved example of a well-constructed Art Deco building, with intact details inside and out. The stone building is a solid anchor located at the geographical and cultural heart of the community.
GENERAL FACILITY INFORMATION
The library is located on a roughly rectangular site at the intersection of Bigelow Street and Faneuil Street in Brighton. The site abuts a Fire Station to the West on Faneuil Street and the residential community to the North. The building is well positioned on the urban open space of Oak Square, sharing frontage on the Square with other prominent civic institutions (YMCA, Fire Station, Church, bank), as well as local business.
There have been a series of minor improvement and maintenance projects over the decades (including replacement windows in 2004), but the building remains a largely intact example of the Art Deco style and the only building in this style in the Boston Public Library system. The building is one and one-half stories, with the main level used for the majority of public services and basement primarily for staff functions and public toilets. There is also a crawl space under a portion of the building.
The purpose of this study has been to investigate options for improvements to the Faneuil Branch of the Boston Public Library to maintain its utility
and to enhance services for the 21st century. This study has been completed through a process of assessing the building's existing condition, establishing the programmatic requirements for the future, and then developing conceptual designs. The conceptual designs became the basis for a construction cost projection.
The work was closely coordinated through the City of Boston’s Public Facilities Department and the BPL. The local community participated actively at every phase of the process through a series of public meetings.
The foundation for the library assessment, programming and conceptual design was the Boston Public Library’s strategic plan, the “BPL Compass.” The BPL Compass served as a guiding document that directed the development of library enhancement initiatives. Its principals were incorporated into all phases of the study, setting a basis for our existing conditions analysis, shaping our programming dialog with the community and guiding the development of the conceptual designs.
Faneuil Branch of the Boston Public Library Programming Study Final Report PCM Project No. 7043 STUDY METHODOLOGY
6
These events are limited to being held after regular library hours so as not to interfere with public service in the Children’s Room. By contrast, the Brighton and Honan-Allston branches rank 4th and 16th for community meetings respectively, indicating that there is
community demand for public gathering spaces in the neighborhood. The Faneuil branch could help to meet this need if a more suitable space were available to the public for use.
ACCESSIBILITY: The existing facility does not meet current standards for ADA accessibility.
Project Goals & Objectives emerged from the BPL general agenda, branch use statistics, demographic composition of the service population, community desires for library services, the City need to provide and maintain quality facilities and the consultant team experience with library buildings. Combining all these factors, the following general goals and objectives emerged. Establish the library’s welcoming character and become an accessible library with all patron services on one level. Achieve this goal without dramatically changing the exterior appearance of the historic building. Facilitate an “active library” accommodating “next generation” library service, without compromising the historic integrity of the library’s interior spaces. Re-establish quality spaces and programs for Children which support early literacy and learning, without disturbing the essential character of the spaces which have become well loved by several generations. Maintain quality collections, without encroaching on space for patrons to spend time in the library. Update furnishings while maintaining and/or restoring important pieces that carry forth the
unique history of the library for subsequent generations. Support community groups in their need to have spaces to gather and share ideas, while maintaining a high “utilization rate” for all of the library’s spaces. Improve (or replace) building systems in general (plumbing, lighting, heating, cooling, fire protection). Support future enhanced technologies for communicating and producing as well as garnering information, even though we do not yet know what they will be. Efficiently support staff functions while having offices and support on the lower level and community service points on the main level.
Further space-specific goals are articulated in the Program section.
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 13
Project Goals
Faneuil Branch of the Boston Public Library Programming Study Final Report PCM Project No. 7043 BUILDING PROGRAM
21
PROGRAM SUMMARY On the following pages are a quantitative summary and then room data sheets or functional area descriptions. On these sheets, space‐by‐space goals and objectives are summarized as they apply to each of the various functional areas of the library. The spaces of the library are organized into 6 basic use zones:
Some of these spaces are not currently in Faneuil branch and are included only in Scope 3, described earlier. In the section that follows, different aspects of the various library spaces are also identified as part of Scope 1, 2, or 3.
Welcome Zone Entrance & Vestibule Borrower Service Desk – Circulation & InfoSelf‐Service Holds Browsing/New Books Friends Booksale Space
Commons Zone/Shared Services
Community Gathering Space Casual Seating & Networking Zone Group Study/Consultation Space Copy/Print Services Public Restrooms
Adult Services Information/Reference Adult Fiction/Non‐Fiction Collections CDs & DVDs Magazines/Reading Adult Seating/Reading Adult Computers Quiet Reading/Study Area
Children’s Services
Children's Fiction/Non‐Fiction & AV Collections
Children's Picture Book Area Children's Computers Children's Program Area Children's Storage
Teen’s Services
Teen Collections Teen Gathering & Seating Spaces Teen Computers
Administration/Support
Staff Workroom Branch Librarian Office Staff Break Room Building Maint./Custodial Closet/ Custodian’s Desk Tele/Data Closet Storage
Area DesignationNet Area (existing) CollectionStaff Stns.Seating PCs
Faneuil Branch of the Boston Public LibraryProgramming StudyPCM Project No. 7043 BUILDING PROGRAM
Program Space Summary
Final Report
A. Welcome ZoneEnt r ance & Ve s t ibu l e 40 00 0 040
Bor rower Se rv i ce De sk 395 10 0 0395
Brows ing/New Books 300 00 200 040
Se l f -Se rv i ce Ho ld s 75 00 200 040
Fr i end s Book Sa l e Space 75 00 100 020
B. Commons Zone/Shared ServicesCommuni ty Ga the r ing Space 900 028 0 00
Casua l Sea t ing & Network ing Zone inc. above 00 0 00
Group S tudy/Consu l t a t ion Space inc. above 06 0 00
Copy/Pr in t Se rv i ce s 80 00 0 040
Pub l i c Res t rooms 300 00 0 065
C. Adult ServicesIn fo rma t ion/Re fe rence inc. above 11 0 1inc. above
Adul t F i c t ion/Non-F ic t ion Co l l ec t ion s 700 00 8853 0560
CDs & DVDs 400 00 4441 0150
Magaz ine s/Read ing inc. above 00 20 0inc. above
Adu l t Sea t ing/Read ing 700 014 0 0560
Adul t Compute r s 300 05 0 5560
Quie t Read ing/S tudy Area inc. above 00 NA 00
D. Children's ServicesChi ld ren ' s Se rv i ce s - Gene ra l 1500 140 inc. below 4995
Chi ld ren ' s F i c t ion/Non-F ic t ion & AV Col l e c t ion s inc. above 00 15186 0inc. above
Pic tu re Book Area inc. above 00 inc. above 0inc. above
Chi ld ren ' s Compute r s inc. above 00 0 0inc. above
Chi ld ren ' s P rog r am Area inc. above 020 * 0 065
Chi ld ren ' s S to r age 100 00 0 060
F. Teen's ServicesTeen Se rv i ce s - Gene r a l 400 010 inc. below 0360
Teen Co l l e c t ion s inc. above 00 1620 0inc. above
page P-2222
The 2015 Programming Study serves as a Road Map for the design phase
Project Goals Program
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 14
Project Goals
Faneuil Branch of the Boston Public Library Programming Study Final Report PCM Project No. 7043 STUDY METHODOLOGY
12
The exercise encouraged the community to get into some detail with the narrative about the program, but in small enough sections that it was not overwhelming. Although the exercise could not be replicated on-line, the notes and presentation from the meeting were posted for the benefit of those who could not attend the meeting in person. We recognized the community feedback and suggestions and incorporated them as appropriate into the final program.
CONCEPTUAL DESIGN
At the 2nd community meeting scope options were introduced as a method for investigating alternative schemes and programmatic options for development. Described in more detail later in this report, the basic options were:
Scope 1
ADA Accessibility & Basic Systems Upgrades
Scope 2
Accessibility, System Upgrades + Moderate Expansion
Scope 3
Accessibility, Maintenance + Comprehensive Improvements/ Expansion
These Scope Options were developed into similar Design Options during Conceptual Design:
Scope 1
Light Intervention
Scope 2
Moderate Intervention
Scope 3
Major Intervention
Several variations on the options were developed and reviewed with BPL, from which preferred options were selected for presentation to the community. Common to all options was an accessible entrance, accessible toilets and elevator to serve both levels. Each option was reviewed at a community meeting, and the presentation and meeting notes were posted on the BPL web site so that community members who could not be present could review and comment.
After the period for review and comment from the community ended, the input was incorporated into revised drawings, virtual models and perspective renderings. The updated drawings became the basis for the construction cost estimate.
Faneuil Branch of the Boston Public Library Programming Study Final Report PCM Project No. 7043 RECOMMENDED LAYOUTS & OPTIONS
63
Optional arrangements for the multipurpose community gathering space The space is configured to not only have light from the large north‐facing windows, but also have light from clerestory windows above the existing rear elevation. In this way, the addition is enhanced with the increased daylight and the interior space near the existing windows still has access to daylight. Because this addition is directly contiguous with the elevator and stair, which extend to the basement level, a partial basement is included. (the basement does not extend all the way to the Children's wing to avoid costly underpinning of the existing foundation.) Being convenient to the elevator, this new basement space enhances the functionality of the multi‐purpose space by providing the storage necessary for the folding tables, stacking chairs and portable performance platform or "stage" that allows the space above to be arranged for larger community meetings (such as are currently held in the over‐crowded Children's Library).
Multiple options are potentially available for the location of the mobile service desk and the mobile bookstacks within Children’s services. The expansion toward the street accommodates seating and houses part of the targeted collection (opening space in the original Children's Library for seating there as well.)
Community gathering space from the existing back of the Library, looking out the north facing windows to the landscape
Community gathering space looking through a former window into the Children’s Library
The 2015 Programming Study serves as a Road Map for the design phase
Project Goals Program Scope of Work
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 15
Project GoalsFROM 2015 PROGRAMMING STUDY
Accessibility: Accessible entrance and restrooms w/ all patron services on one level Preservation: Maintain historic character of exterior and interior spaces Technology: Upgrade technology and adaptability of systems Collections: Collection that is responsive to community needs Community Room: Create a space that will allow for programs for all ages at all times of day Children’s Spaces: Incorporate high quality spaces and programs for children Building Systems: Integrate modern, energy efficient building systems Finishes & Furnishings: Update interior finishes and furniture
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 16
Project Goals
ADDED DURING DESIGN PHASE
Sightlines: Optimize visibility and clear sightlines throughout library Sustainability: Maximize energy efficiency, daylighting, and interior comfort
FROM 2015 PROGRAMMING STUDY
Accessibility: Accessible entrance and restrooms w/ all patron services on one level Preservation: Maintain historic character of exterior and interior spaces Technology: Upgrade technology and adaptability of systems Collections: Collection that is responsive to community needs Community Room: Create a space that will allow for programs for all ages at all times of day Children’s Spaces: Incorporate high quality spaces and programs for children Building Systems: Integrate modern, energy efficient building systems Finishes & Furnishings: Update interior finishes and furniture
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 17
Light Intervention Moderate Intervention Major Intervention
FROM 2015 PROGRAMMING STUDY
• Accessibility • Basic Systems Upgrades
• Accessibility • Systems Upgrades • Moderate Addition to
Children’s Wing
• Accessibility • Systems Upgrades • Moderate Addition to
Children’s Wing • Larger addition for
Community Room
Addresses: Addresses: Addresses:
Scope of Work
10,042 GSF (+1,281 SF) 10,271 GSF (+1,510 SF) 11,860 GSF (+3,099 SF)
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 18
Light Intervention Moderate Intervention Major Intervention
FROM 2015 PROGRAMMING STUDY
• Accessibility • Basic Systems Upgrades
• Accessibility • Systems Upgrades • Moderate Addition
• Accessibility • Systems Upgrades • Larger Addition • Community Room
Addresses: Addresses: Addresses:
Scope of Work
10,042 GSF (+1,281 SF) 10,271 GSF (+1,510 SF) 11,860 GSF (+3,099 SF)
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 19
Existing Conditions Assessment Summer 2019
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 20
Existing Conditions Assessment
Surveys • Site Survey • Building Survey
Reports • Building Code Report • Building Enclosure Report • Geotechnical Report
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 21
Site Survey
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 22
Site Survey Grading & Building Levels
+5’-8”
+3’-8”
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 23
Site Survey Grading & Building Levels
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 24
Building Survey
3D Laser Scanning Station
3D Laser Scanning Technology
• Develop accurate measured drawings for renovation work
• Document historic interior andexterior details
• Verify building dimensions and square footages from Programming Study
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 25
3D Laser Scanning Technology
• Develop accurate measured drawings for renovation work
• Document historic interior andexterior details
• Verify building dimensions and square footages from Programming Study
Building Survey
3D Laser Scanning Station
*Actual building area approx. 1,000 SF less than assumed in Programming Study
Bigelow Street
Faneuil Street Oak Square
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 26
3D Building Scan Building Survey 3D Scan
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 27
3D Building Scan Building Survey 3D Scan
Bigelow Street
Faneuil Street Oak Square
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 28
Building Survey 3D Scan
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 29
Building Survey 3D Model
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 30
Building Survey 3D Model
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 31
Basement-9' - 5"
First Floor0' - 0"
Upper Roof19' - 4 13/32"
Low Roof9' - 9"
Mechanical-13' - 3 1/2"
9' -
7 13
/32"
9' -
9"9'
- 5"
3' -
10 1
/2"
Basement-9' - 5"
First Floor0' - 0"
Upper Roof19' - 4 13/32"
Mechanical-13' - 3 1/2"
5' -
9 1/
32"
0' -
7"
13' -
5"
1' -
0"
0' -
9 1/
2"
1' -
8 1/
4"
0' -
7 1/
2"
7' -
4"
19' -
4 1
3/32
"9'
- 5"
3' -
10 1
/2" Basement
-9' - 5"
First Floor0' - 0"
Upper Roof19' - 4 13/32"
Low Roof9' - 9"
9' -
7 13
/32"
9' -
9"9'
- 5"
Basement-9' - 5"
First Floor0' - 0"
Upper Roof19' - 4 13/32"
Low Roof9' - 9"
Mechanical-13' - 3 1/2"3'
- 10
1/2
"9'
- 5"
9' -
9"9'
- 7
13/3
2"
Basement-9' - 5"
First Floor0' - 0"
Upper Roof19' - 4 13/32"
Low Roof9' - 9"
9' -
7 13
/32"
9' -
9"9'
- 5"
Scale:
Drawn By:
Existing Conditions Surveys Inc.398 Columbus Avenue #334Boston, MA 02116 USA
T 617.247.9161F 617.249.0746E [email protected]
The Most AccurateExisting Conditions Surveys and
As-Built Surveys
www.existingconditions.com
Date:
www.existingconditions.com
All projects are measured using the mostadvanced laser measuring equipment andour best standards and practices. All workwill be field verified by client prior todesign or construction or other use, pleasevisit www.existingconditions.com for termsand conditions of use.
General Notes:
1. It is expressly understood by client that ECS is notan architectural or engineering entity. None of thedocuments prepared by ECS for client shall haveany stamping or certification of such tradeprofessionals.
2. This is not a structural or MEP analysis or duediligence model. Visible and accessible elementsare modeled for location and size. Furtherstructural or MEP analysis could be necessary byothers.
3. STANDARD OF PRACTICE. Services performed byECS under this Agreement will be conducted in amanner consistent with that level of care and skillordinarily exercised by members of the professioncurrently practicing in the same locality undersimilar conditions. No other representation,expressed or implied, and no warranty orguarantee is included or intended in thisAgreement, or in any report, opinion, document orotherwise. Client shall field verify all work prior todesign construction, or other use.
Laser Scanning Notes:
1. Visit FARO.com and leica-geosystems.com for 3Dlaser scanner tolerances, range information andproduct specifications.
2. Laser scanning equipment uses light waves tomeasure distances, unforeseen site conditionssuch as dust, moisture, vibration, surfacereflectivity, lighting conditions, temperature,humidity, ferromagnetic materials, buildingconfiguration etc. may impact registration betweenscan locations.
3. Accuracy over long distances can be improved ifthe client provides survey benchmarks prior toscanning in order to reference the laser scan datainto a coordinate system.
4. The Revit file contains the most completealignment of point cloud data. All laser scanning bydefault is in a localized coordinate system. Laserscans completed on multiple days may be tied intoprevious laser scans by use of site specificfeatures and targets. Point cloud adjustments aremade in Revit for a final verification.
TM
REV01042019
1/8" = 1'-0"
Existing ExteriorElevations
EX04ECS
8/9/19
Faneuil Branch -Boston PublicLibrary419 Faneuil St, Brighton, MA
Revision Schedule
RevisionNumber
RevisionDescription
RevisionDate
1/8" = 1'-0"1 South Elevation
1/8" = 1'-0"2 West Elevation
1/8" = 1'-0"3 Partial West Elevation
1/8" = 1'-0"4 North Elevation1/8" = 1'-0"5 Partial North Elevation
Building Survey Measured Drawings
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 32
EX04
4
EX04 2
EX051
EX04
1
UP
DN
MECH ROOM
UP
EX052
EX04 3
EX04
5
WINDOW WELL, TYP.
UNABLE TO ACCESS THIS AREA
EX04
4
EX04 2
EX051
EX04
1
UP
UP
ROOF TO ENTRYBELOW
DOWN
UNABLE TOVERIFY THISAREA
RAISED PLATFORM
UP
EX052
EX04 3
EX04
5
DESK
BOOK SHELVES, TYP.
FIREPLACEBOOK SHELVES, TYP.
WINDOW WELL, TYP.
BOOK SHELVES, TYP.
27' - 9 3/32" 14' - 6 13/32" 27' - 9 1/16"
70' - 0 19/32"
21' -
9 1
3/16
"30
' - 2
25/
32"
19' - 0 5/32" 30' - 11 19/32"
25' - 8"
2' -
9 3/
4"11
' - 5
1/2
"
36' -
5 1
5/32
"50
' - 8
3/4
"
25' -
9 3
/16"
30' -
3 2
3/32
"
Scale:
Drawn By:
Existing Conditions Surveys Inc.398 Columbus Avenue #334Boston, MA 02116 USA
T 617.247.9161F 617.249.0746E [email protected]
The Most AccurateExisting Conditions Surveys and
As-Built Surveys
www.existingconditions.com
Date:
www.existingconditions.com
All projects are measured using the mostadvanced laser measuring equipment andour best standards and practices. All workwill be field verified by client prior todesign or construction or other use, pleasevisit www.existingconditions.com for termsand conditions of use.
General Notes:
1. It is expressly understood by client that ECS is notan architectural or engineering entity. None of thedocuments prepared by ECS for client shall haveany stamping or certification of such tradeprofessionals.
2. This is not a structural or MEP analysis or duediligence model. Visible and accessible elementsare modeled for location and size. Furtherstructural or MEP analysis could be necessary byothers.
3. STANDARD OF PRACTICE. Services performed byECS under this Agreement will be conducted in amanner consistent with that level of care and skillordinarily exercised by members of the professioncurrently practicing in the same locality undersimilar conditions. No other representation,expressed or implied, and no warranty orguarantee is included or intended in thisAgreement, or in any report, opinion, document orotherwise. Client shall field verify all work prior todesign construction, or other use.
Laser Scanning Notes:
1. Visit FARO.com and leica-geosystems.com for 3Dlaser scanner tolerances, range information andproduct specifications.
2. Laser scanning equipment uses light waves tomeasure distances, unforeseen site conditionssuch as dust, moisture, vibration, surfacereflectivity, lighting conditions, temperature,humidity, ferromagnetic materials, buildingconfiguration etc. may impact registration betweenscan locations.
3. Accuracy over long distances can be improved ifthe client provides survey benchmarks prior toscanning in order to reference the laser scan datainto a coordinate system.
4. The Revit file contains the most completealignment of point cloud data. All laser scanning bydefault is in a localized coordinate system. Laserscans completed on multiple days may be tied intoprevious laser scans by use of site specificfeatures and targets. Point cloud adjustments aremade in Revit for a final verification.
TM
REV01042019
1/8" = 1'-0"
Existing FloorPlans
EX01ECS
8/9/19
Faneuil Branch -Boston PublicLibrary419 Faneuil St, Brighton, MA
1/8" = 1'-0"1 Basement
1/8" = 1'-0"2 First Floor
Revision Schedule
RevisionNumber
RevisionDescription
RevisionDate
1 Revision 1 Date 1
Building Survey Measured Drawings
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 33
Original Current
Building Survey Historic Features
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 34
Original
Current
Building Survey Historic Features
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 35
Reports
Building Code Building Enclosure Geotechnical
Geotechnical Data and Engineering Report
Boston Public Library - Faneuil Branch 419 Faneuil Street
Brighton, MA 02135
Prepared for
Mr. Conrad Ello Oudens Ello Architecture, LLC
46 Waltham Street, Suite 4A Boston, MA 02118
Prepared by RSE Associates, Inc.
63 Pleasant Street Suite 300
Watertown, MA 02472
Project Number: 19078-01
5 September 2019
Chapter 34 Investigation &
Evaluation Report
Project:
Boston Public Library – Faneuil Branch 419 Faneuil Street Boston, MA 02135
September 3, 2019
Prepared for:
Oudens Ello Architecture, LLC 46 Waltham Street, Suite 4A
Boston, MA 02118
20 September 2019 Conrad Ello, AIA Principal Oudens Ello Architecture, LLC 46 Waltham Street, Suite 4A Boston, MA 02118 Project 191226 – Boston Public Library, Faneuil Branch, 419 Faneuil St., Brighton, MA Dear Mr. Ello: Per your request, Jason Der Ananian and Gert Guldentops of Simpson Gumpertz & Heger Inc. (SGH) visited the above-named site on 30 July 2019 to perform a building enclosure condition assessment. We reviewed the exterior walls, windows, doors, skylight, and roof assemblies from the building exterior and reviewed the building interior for signs of water infiltration or deterioration. This letter summarizes our limited on-site observations, and, based on our visual survey, provides our recommendations for remedial work.
1. BACKGROUND
The Faneuil Branch Library, a Brighton branch of the Boston Public Library (BPL), is a 1-1/2 story, 7,600 sq ft Art Deco mass masonry building constructed in 1932 (Photo 1). The above-grade walls are limestone clad and contain steel windows (fixed sash and operable casements) with insulating glass units in punched openings (Photo 2). Several punched openings are infilled with plywood and contain air-conditioning units (Photo 2). The primary roofing system on the high and low roofs consists of low-slope single-ply membrane with internal roof drains and perimeter metal flashing (Photo 3). The high roof contains a unit skylight with monolithic polycarbonate glazing and a translucent laylight over the main-level reading room and service desk (Photo 4). The limestone parapet above the main entrance is covered with flat-seam metal panels with soldered joints (Photo 5). The main level is primarily used for public services, and the basement is primarily used for staff functions, storage, mechanical equipment, and public restrooms. An addition (date unknown) was constructed on the north elevation and consists of the same cladding and roofing assemblies as the original building but contains a crawlspace in lieu of a full basement. Recent building renovations (circa 2003/2004) included repointing limestone mortar joints, repairing cracked limestone lintels and installing flashing, repairing interior finishes, installing replacement windows, and replacing the low-slope roof assemblies. We understand that Oudens Ello Architecture, LLC (OEA) is the Architect of Record for a planned building renovation and addition, the design of which is scheduled to commence in May 2019, with an anticipated project completion date of September 2021. OEA retained SGH to conduct a visual survey of the building enclosure and provide recommendations for remedial work. Our scope of work did not include making probe openings in the roof or wall assemblies to identify
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 36
Building Enclosure Survey
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 37
SHEET NO.
PROJECT NO.
DATE
CLIENT BY
SUBJECT CHECKED BY
Oudens Ello Architecture, LLCBoston Public Library, Faneuil Branch, Condition Assesment.
Figure 4/5191226.00
30 July 2019GGJSD
Area obstructed by tree.
Mortar joints inlimestone deteriorated.
Deteriorated mortarjoints at wall return near
parapet
Areas are weathered
Area stained withcopper oxide.
Fire alarm wirepenetration.
Mortar joints inlimestone deteriorated.
Small areas of limestone spallingin this area. Approximately 50% of limestonejoints deteriorated.
Observations at exteriorstaircase noted onisometric on the left.
Legend:SpallWeathered areaCrackDeteriorated mortar jointMortar patch (deteriorated or color mismatch)
Building Enclosure Survey
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 38
Geotechnical Survey
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 39
Community Input
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 40
Community Input
• What types of programs have you attended at the library?
• What additional programs would you like to see happening at the library given an expanded community room that could accommodate 50+ people?
• What would you like to see in the community room when not in use for group activities? Types of seating, collections?
• What would you like to see in a children’s area? Types of seating, collections?
• What kinds of material would you like to see in the collection?
• Are there additional services that would benefit the community?
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 41
Next Steps
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 42
2014-15
Com
mun
ity M
eetin
g 10
/29/
14Estimated Schedule
Program Study
Com
mun
ity M
eetin
g 12
/18/
14Co
mm
unity
Mee
ting
4/1/
15Co
mm
unity
Mee
ting
6/10
/15
July Aug Sep Oct Nov Dec Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec
Schematic Design
Construction Documents
Bidding
Construction
2020 2021
Com
mun
ity M
tg 2
(Win
ter)
Com
mun
ity M
tg 3
(Spr
ing)
Com
mun
ity M
tg 1
Design Development
2016-18
Funding & Designer Selection
2019
We are here
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 43
Thank You
Oudens Ello Architecture Boston Public LibraryFaneuil Branch Library Renovations City of Boston 44
Feedback?
3. Feel free to contact: Priscilla Foley, Director of Neighborhood Services [email protected]
1. Leave a suggestion in the Comment Box located in the library
2. Provide feedback online using the BPL’s Faneuil Project page: https://www.bpl.org/faneuil-project/
This presentation and all feedback will be uploaded to the BPL’s Faneuil Branch Library project page: https://www.bpl.org/faneuil-project/