fama group: solstad offshore's mv normand draupne's main engine overhauls
TRANSCRIPT
M/V Normand Draupne (Solstad Offshore)
Mechanical Repairs: Overhauling of 2 Main Engine Wärtsilä, dismantling of one Vulkan
coupling, fabrication of sprinkler system piping, overhauling of fifi cannons, HBR
Maintenance, Prime pumps overhauling, overhauling of main deck Winches, various Other
Machinery & Minor Steel Repairs. Mob/Demob