falsework by paul markham. definition of falsework from bs5975:2008 falsework : temporary structure...

43
Falsework By Paul Markham

Upload: angela-horn

Post on 19-Jan-2016

256 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

Falsework

By

Paul Markham

Page 2: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

2

Definition of falsework from BS5975:2008

Falsework : temporary structure used to support a permanent structure while it is not self supporting.

The term is used particularly for the temporary support to concrete slabs.

Page 3: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

3

Definition of falsework from BS5975:2008

Falsework : temporary structure used to support a permanent structure while it is not self supporting.

The term is used particularly for the temporary support to concrete slabs.

Page 4: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

4

Falsework

Page 5: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

5

Falsework

Page 6: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

6

Falsework

Page 7: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

7

Falsework

Page 8: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

8

Falsework

Page 9: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

9

Falsework

Page 10: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

10

Formwork

Page 11: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

11

Limit state or permissible stress?BS5975:2008 written in terms of permissible stress but large parts refer to British Standards which were withdrawn on 31 March 2010. BSI has an obligation to remove anything which contradicts Eurocodes so it is likely that the next revision of BS5975 will remove the references to permissible stress codes. It would be possible to design the timber secondaries to BS EN 1995 (Eurocode 5). However, PlySoldiers All have to be designed in accordance with permissible stress.Tie rods

Page 12: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

12

FalseworkTypically the falsework design makes an allowance of 1.5kPa for controlled heaping of concrete.

Page 13: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

13

Falsework

Page 14: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

14

Falsework

Page 15: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

15

Falsework

Page 16: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

16

Falsework

Page 17: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

17

Falsework

Page 18: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

18

Falsework

Page 19: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

19

Falsework

Page 20: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

20

Falsework

Page 21: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

21

Permanent falsework

Page 22: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

22

Permanent falsework

Page 23: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

23

Permanent Falsework

Page 24: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

24

Permanent falsework

Page 25: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

25

Permanent Falsework

Page 26: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

26

Permanent Falsework

Page 27: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

27

Falsework – design of primary member

Slab 500 thick. Weight density of concrete = 25kN/m3

Design to EC5:Unfavourable permanent action, gG = 1.35

Unfavourable variable action, gQ = 1.5

Design pressure, Pd = weight of concrete + weight of falsework + allowance for live load.

= 0.5 x 25 x 1.35 + 0.5 x 1.35 + 1.5 x 1.5 = 19.8kPa

Say props on 1.5 x 1.5m grid. Therefore primary beams must span 1.5m and characteristic line load on primary, w = 19.8 x 1.25 (allowance for continuity of secondaries) x 1.5 = 37.1kN/m.

Select suitable timber:

Page 28: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

28

Timber design to EC5

Try twin 147 x 72 timbers –

Page 29: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

29

Timber design to EC5

Need a picture of the falsework

From Formwork a Guide to Good Practice, for a two span continuous beam:

Deflection, d = 0.00541 W L3 / EI Second moment of area, I = bd3 / 12 = 2 x 72 x 1473 / 12 = 38.1 x 106mm3

Therefore, d = 0.00541 (37.1) x 15003 / (7.4 x 103 x 38.1 x 106) = 2.4mm1500/2.4 = Span/625 – OK

Page 30: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

30

Timber design to EC5

C24 timber: Characteristic bending strength, fm,k = 24 MPa (BS EN 338)

Various factors must be applied to this to get the design bending strength:

kh,m Depth factorkmod Modification factor for duration of load and moisture contentksys System strength factorkcrit Factor for lateral bucklinggM Partial factor for material properties

Page 31: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

31

Timber design to EC5

Clause 3.2 (3)Depth factor, kh,m = lower of (150/h)0.2 and 1.3. Where h is the depth

(150/h)0.2 = (150/147)0.2 = 1.004

Page 32: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

32

Timber design to EC5

Modification factor for duration of load and moisture content, kmod :

Therefore, medium term loading .The falsework will be erected outdoors and subject to rain. Therefore Service Class 3.

Use Table 3.1 to find kmod

Page 33: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

33

Timber design to EC5

Page 34: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

34

Timber design to EC5

ksys System strength factor – Clause 6.6

The secondaries can be used to distribute the loads from one member to the adjacent members. They will be overloaded but this is an accidental situation and that overloading would be acceptable. Therefore use ksys = 1.1.

Page 35: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

35

Timber design to EC5

kcrit is a factor to account for lateral buckling see Clause 6.3.3 (5)

The primaries in this falsework will be located in U-heads which will provide torsional restraint at the supports. There will be sufficient friction with the secondaries to prevent lateral displacement of the top of the timber. Therefore use kcrit = 1.0.

Page 36: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

36

Timber design to EC5

gM is the familiar partial factor for material properties (Table 2.3)

So use gM= 1.3.

Page 37: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

37

Timber design to EC5

Design bending strength, fm,d = kh,m x kmod x ksys x kcrit x fm,k / gM

= 1.004 x 0.65 x 1.1 x 1.0 x 24 / 1.3 = 13.3MPa

Therefore the bending resistance, Md = fm,d x Wy Where wy is the section modulus. wy = N x b x h2 / 6 = 2 x 72 x 1472 / 6 = 518 600mm3. Therefore Md = 13.3 x 518600 = 6.9kNm.

Applied moment, M = wl2/8 = 37.1 x 1.52/8 = 10.43kNm therefore fails

Page 38: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

38

Timber design to EC5

Check shear: F = 0.375 w l = 0.375 x 37.1 x 1.5 = 20.9kN

Applied shear stress td = 3 x F / 2 x A = 3 x 20.9 x 103 / (2 x 2 x 72 x 147) = 1.48 MPa

C24 timber: Characteristic shear strength, fv,k = 2.5MPa (BS EN 338)

Various factors must be applied to this to get the design shear strength:kmod Modification factor for duration of load and moisture contentksys System strength factorgM Partial factor for material propertiesFactor of 1.5 allowed by BS 5975 for falsework

Page 39: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

39

Timber design to EC5

Therefore, design shear strength,fm,d = kmod x ksys x fv,k x 1.5 / gM

= 0.65 x 1.1 x 2.5 x 1.5 / 1.3 = 2.06MPa > Applied, therefore ok

Page 40: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

40

Falsework

Page 41: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

41

Falsework

Page 42: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

42

Falsework

Page 43: Falsework By Paul Markham. Definition of falsework from BS5975:2008 Falsework : temporary structure used to support a permanent structure while it is

43

Falsework

Any questions?