D. CAO C. KOLESA I-1 GENERAL INFORMATION INSTRUMENTATION SYMBOLS AND LEGEND FOR GMP DEVELOPMENT ONLY NOT FOR CONSTRUCTION IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE CHECKED BY: DRAWN BY: DESIGNED BY: PROJECT ENGINEER: HAZEN AND SAWYER 4035 RIDGE TOP ROAD, SUITE 400 FAIRFAX, VIRGINIA 22030 CERTIFICATE OF AUTHORITY: 2771 REV ISSUED FOR DATE BY 0 1" 1/2" 32241-004 1 CONTRACT NO.: HAZEN NO.: DATE: OCTOBER 2016 DRAWING NUMBER: M. VANHORNE FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS AND ENVIRONMENTAL SERVICES NOMAN M. COLE, JR. POLLUTION CONTROL PLANT DISINFECTION FACILITIES - PHASE I J. CARROLL 1 PERMIT SUBMITTAL 10/16 MPV 2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

Upload: others

Post on 23-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

D. CAO

C. KOLESA

I-1

GENERAL INFORMATIONINSTRUMENTATION

SYMBOLS AND LEGEND

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

Page 2: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

FP-460-HH-1 (EXISTING, SEE NOTE 2)

HMI HMI

FP-460-HH-1 (EXISTING, SEE NOTE 2)

LEVEL LEVEL

SODIUM BISULFITE TEMPORARY TANK 2SODIUM BISULFITE TEMPORARY TANK 1

INTERLOCKS:1. REFER TO SECTION 17950 FOR TRANSFER PUMPS

AUTOMATIC SHUTDOWN INTERLOCKS BASED ONSTORAGE TANK AND EXISTING DAY TANK LEVELS.

2. PUMP AUTOMATIC SHUTDOWN ON LOW SUMPLEVEL.

(3) RELAYSIGNALS(3) RELAY

SIGNALS

SEE NOTE 1

NOTES:1. VENT TO OUTSIDE OF THE BUILDING WITH FRP

SCREEN.

2. ALL NEW I/O SIGNALS SHOWN HERE SHALL BETERMINATED TO EXISTING PLC REMOTE I/O RACKSFP-460-HH-1 IN BUILDING HH. DISCRETE INPUTSSHOWN ON THIS DRAWING WILL BE TERMINATEDTO EXISTING SPARE PLC DISCRETE INPUTS. IFSPARE I/O IS NOT AVAILABLE, NEW PLC DISCRETEINPUT MODULE SHALL BE PROVIDED ANDINSTALLED IN EXISTING PLC SPARE SLOTS.

US

EXISTING DAYTANKIN BUILDING HH

SODIUM BISULFITETRUCK LOADINGSTATION

US

EXISTINGSODIUM

BISULFITEDAYTANK CP INBUILDING HH(LOW LEVEL)

EXISTINGSODIUM

BISULFITEDAYTANK CP INBUILDING HH(HIGH LEVEL)

VOLUME (GAL)

VOLUME (GAL)

** *

*

*

VENT LINE TO SCRUBBER

SODIUM BISULFITETRUCK LOADINGSTATIONO

VER

FLOW

LINEO

VER

FLO

W L

INE

RECIRCULATION LINE RECIRCULATION LINE

FILL LINE FILL LINECONTINENTAL

CARBON VPC 1000AIR-PHASE CARBON

VESSEL

SUMP LEVEL HIGHLAH-395-1-3 &395-2-3RED STROBE

STORAGE TANKHIGH HIGHLAHH-395-1-3ALARM HORN

3

3

3

3

3

3

3

3 3

D. CAO

C. KOLESA

I-PP1-1

TEMPORARY CHEMICALBUILDING (PP1)

INSTRUMENTATIONSODIUM BISULFITE

TEMPORARY STORAGE

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV3 ADDENDUM 1 11/16 MPV

Page 3: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

D. WEBER

Z. ZDROJEWSKI

E-1

ELECTRICALLEGEND

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

#

FIRE ALARM INDICATOR MOUNTEDABOVE A FIRE ALARM PULLSTATION

RECEPTACLES: LEFT: SIMPLEX MIDDLE: DUPLEX RIGHT: QUADRUPLEX

MULTI-OUTLET RECEPTACLE: LEFT: SIMPLEX RIGHT: DUPLEX

OTHER RECEPTACLES: LEFT: 240 VOLT RIGHT: SPECIAL PURPOSE

EQUIPMENT CONNECTION

CONDUIT HOME RUN

CONDUIT EXPOSED

CONCRETE ENCASED CONDUIT

CONDUIT CONCEALED

MOTOR AND TYPICAL ADDITIONAL DEVICES: TSH: TEMPERATURE SWITCH MSH: MOTOR SPACE HEATER CF: COOLING FAN TE: TEMPERATURE ELEMENT ME: MOISTURE DETECTOR

FUSE

LOW-VOLTAGE POWER CIRCUIT BREAKER: LEFT: FIXED-MOUNT RIGHT: DRAWOUT E.O. DENOTES ELECTRICALLY OPERATED LSIG DENOTES INSTALLED TRIP FUNCTIONS: L DENOTES LONG-TIME S DENOTES SHORT-TIME I DENOTES INSTANTANEOUS G DENOTES GROUND FAULT Z DENOTES ZONE-SELECTIVE INTERLOCKING CTR DENOTES BREAKER-SPECIFIC CT AND RATIOS

MEDIUM-VOLTAGE DRAWOUT POWER CIRCUIT BREAKER: E.O. DENOTES ELECTRICALLY OPERATED BATT. DENOTES BATTERY BACKUP POWER

GROUND

PA UNIT

X

X

#

DD

F

HEAT DETECTORHCONDUIT TAGS: P DENOTES POWER C DENOTES CONTROL I DENOTES INSTRUMENTATION XXX-XXX DENOTES CONDUIT ID

INSTRUMENT TAG: X DENOTES INSTRUMENT TYPE # DENOTES INSTRUMENT NUMBERSEE DRAWING I1 FOR INSTRUMENT ABBREVIATIONS

#X

MOTOR SPACE HEATER

SELECTOR SWITCH: TEXT DENOTES LEGEND PLATE

PT: NUMBERS DENOTE PT WINDING VOLTAGES AND PT QUANTITY

480:120

(3)

50:5(1)

GROUND RODS: LEFT: BURIED RIGHT: IN TESTWELL

X DENOTES RECEPTACLE TYPE (TYP.): GFCI DENOTES GROUND FAULT CIRCUIT INTERRUPT UPS DENOTES UNINTERRUPTIBLE POWER SUPPLY WPCR DENOTES WEATHERPROOF CORROSION RESISTANT# DENOTES CIRCUIT NUMBER (TYP.)

LEFT: CONDUIT RISE (TURN UP)RIGHT: CONDUIT DROP (TURN DOWN)

MCCB-STYLE ATS OR MTS

DRAWOUT CB-STYLE ATS OR MTS

NORC NOFC NCRO NCFO

TIMEDELAY

SWITCHES

NO NC

DISCONNECTSWITCHES

CONTACTS

THERMAL OVERLOAD RELAYOL

TSH

ME

XXX

-YYY

YY INSTRUMENT TAG: X DENOTES INSTRUMENT TYPE Y DENOTES INSTRUMENT NUMBERSEE DRAWING I1 FOR INSTRUMENT ABBREVIATIONS

LOCATED IN FIELD

LOCATED IN STAND-ALONE MOTOR STARTER/CONTROLLER

LOCATED IN MCC

AFAT

100100

HP RPM

FUSED DISCONNECT SWITCH

FUSED DISCONNECT SWITCH

MCP30A

#%

XDBX

TRAYX

Y

AMCP

100

X X

X

#%

AMCP30

X

AMCP

M

F R

30

X

SPD

XXXkA

LOW-VOLTAGE MOLDED CASE CIRCUIT BREAKER LEFT: THERMAL-MAGNETIC TRIP UNIT RIGHT: ELECTRONIC TRIP UNIT

RECTANGULAR FIXTURE

EMERGENCY WALL-MOUNTED FIXTURE: LEFT: STANDARD RIGHT: REMOTE-HEAD

POLE-MOUNTED FIXTURE

X#

X

#

X#

X #

PHOTOCELL

LEFT: CEILING MOUNTED OCCUPANCY SENSORRIGHT: WALL MOUNTED OCCUPANCY SENSOR X DENOTES TYPE

X DENOTES FIXTURE TYPE (TYP.) SEE SPECIFICATION 16500 FOR FIXTURE SCHEDULE# DENOTES CIRCUIT NUMBER (TYP.)

XXX#

OS X

XXX

#

LEFT: CEILING MOUNTED FIXTURERIGHT: WALL MOUNTED FIXTURE

LEFT: CEILING MOUNTED EXIT SIGNRIGHT: WALL MOUNTED EXIT SIGN SHADED PORTION DENOTES SIGN FACE

XXX#

XXX#

OS X

PC

X

#

X#

X#

TS

TS

TS

TSTS

TS TS

TS TS

TS

SV

MSH

30A3P

30A3P

X X

6PULSEVFD

AMCP

100

5%

6PULSEVFD

IC

RVSS

IC

OC OC

AMCP

100

5%

RVSS

IC

OC

AMCP

100

L

S1 S2

ATS480V, 800A3Ø 4W 4P65kAOPEN TRANSITION

FIRE ALARM PULL STATION

FIRE ALARM CONTROL PANEL

FIRE ALARM ANNUNCIATOR PANEL

DUCT DETECTOR

FIRE ALARM INDICATOR: X DENOTES ALERT TYPE (TYP.): A DENOTES AUDIBLE V DENOTES VISIBLE (# DENOTES STROBE INTENSITY)

SMOKE DETECTOR: X DENOTES TYPE: Z DENOTES IONIZATION P DENOTES PHOTOELECTRIC T DENOTES THERMAL

THERMOSTAT

AMBIENT TEMPERATURE TRANSMITTER

WALL SWITCH: X DENOTES TYPE: NO SUBSCRIPT DENOTES SINGLE-POLE SWITCH 3 DENOTES 3-WAY SWITCH 4 DENOTES 4-WAY SWITCH M DENOTES MANUAL MOTOR STARTER # DENOTES CIRCUIT NUMBER WPCR DENOTES WEATHERPROOF CORROSION RESISTANT

COMBINATION MOTOR STARTER

DISCONNECT SWITCH

LOCAL CONTROL STATION

HORN/LIGHT DEVICE

PAGER RECEPTACLE

TELEPHONE OR NETWORK DROP

DUCTBANK SECTION CUT IDENTIFIER: DBXX DENOTES DUCTBANK ID EXX DENOTES DRAWING NUMBER

WHERE SECTION CUT IS LOCATED

FLEXIBLE CONDUIT

CONCRETE ENCASED DUCTBANK

3-POSITION SELECTOR SWITCH: HOA DENOTES HAND/OFF/AUTO OOA DENOTES ON/OFF/AUTO LOR DENOTES LOCAL/OFF/REMOTE FOR DENOTES FORWARD/OFF/REVERSE

PUSHBUTTON SWITCHES: LEFT: N.O./RIGHT: N.C. TEXT DENOTES LEGEND PLATEMUSHROOM HEAD EMERGENCYSTOP PUSHBUTTON SWITCH N.C.MAINTAINED: TEXT DENOTES LEGEND PLATEPUSHBUTTON SWITCH N.C. WITH LOCK-OUT: TEXT DENOTES LEGEND PLATE

INDICATOR LIGHT: LEFT: STANDARD/RIGHT: PUSH-TO-TEST X DENOTES COLOR

RUN TIME METER

MECHANICAL INTERLOCK CONNECTION

COIL: X DENOTES TYPE: M DENOTES MOTOR STARTER CR DENOTES CONTROL RELAY TD DENOTES TIME DELAY RELAY PR DENOTES INTERPOSING PILOT RELAY LC DENOTES LIGHTING CONTACTOR Y DENOTES REFERENCE LINE NUMBER

TRANSFORMER

PROTECTIVE RELAY: NUMBER DENOTES IEEE DEVICE FUNCTION

CT: NUMBERS DENOTE CT WINDING RATIO AND CT QUANTITY

DRAW-OUT ELEMENT

GENERATOR

LEFT: FVNR STARTER: X DENOTES NEMA SIZE DP DENOTES DEFINITE PURPOSE CONTACTORRIGHT: FVR STARTER

LEFT: RESISTORRIGHT: LINE REACTOR: #% DENOTES IMPEDANCE

CAPACITOR

SHUNT TRIP

SURGE PROTECTIVE DEVICE

LIGHTNING ARRESTOR

KIRK-KEY INTERLOCK

LEFT: VFD WITH LINE REACTORMIDDLE: VFD WITH HARMONIC FILTERRIGHT: VFD WITH LINE REACTOR AND FVNR BYPASS X DENOTES NEMA SIZE

VFD WITH RVSS BYPASS

PA

EXXDBXX

X

#

R

T

FX

#

DUCTBANK TAG: X DENOTES DUCTBANK ID

SOLENOID VALVE

CONTROL POWER TRANSFORMER

500kW480V,3Ø,4W

K

GFCT: NUMBERS DENOTE GFCT WINDING RATIO AND GFCT QUANTITY

MOTOR CIRCUIT PROTECTOR

LEFT: RVSS STARTERRIGHT: RVSS STARTER WITH FVNR BYPASS

RVAT STARTER: X DENOTES NEMA SIZE #% DENOTES TAP SETTING

CONTACTOR-STYLE ATS ORMTS WITH OFF POSITION

CONTACTOR-STYLE ATS OR MTS

CONTACTOR-STYLE ATS OR MTS,SERVICE-ENTRANCE RATED

LEFT: PANELBOARDRIGHT: COMBINATION POWER UNIT X DENOTES PANEL ID

MOTOR PROTECTION RELAY

TEMPERATURESWITCHES/

THERMOSTATS

PRESSURESWITCHES

LEVELSWITCHES

FLOWSWITCHES

NOTC NOTO NCTO NCTC

NOTATION LEGEND: NO/NC: NORMALLY OPEN/CLOSED RO/RC: RISE-TO-OPEN/CLOSE FO/FC: FALL-TO-OPEN/CLOSE TO/TC: TIME-OPEN/CLOSE

CONTACTS: TEXT DENOTES COIL ID

SWITCHES: TEXT DENOTES TAG NUMBER

X

LIMITSWITCHES

TORQUESWITCH

MSH CF

TE

CABLE TRAY TAG: X DENOTES CABLE TRAY ID Y DENOTES SCHEDULE REFERENCE

XY

LOCATED AT PANEL: X DENOTES PANEL ID: L DENOTES LOCAL CONTROL STATION 1 DENOTES EXISTING DAY TANK CONTROL PANEL 2 DENOTES SODIUM BISULFITE TANK FILL PANEL (FP-395-0-1) 3 DENOTES CENTRAL CONTROL AND METER PANEL 4 DENOTES CARBON REGENERATION SYSTEM CONTROL PANEL 5 DENOTES CARBON TRANSFER CONTROL PANEL

DISCONNECT SWITCH

100A3P

100A

100A

52

1200AN.C.E.O.BATT.

X#

X#

X#

#

X

X

TS

TS

TS TS

TS TS

TS TS

TS TSTS

GPTT

G

ETM

MPR

XXYYY

X

CPT 480/120VAC

XFMRkVA480-120/208V

3P/4WDRY TRANS

30A3P

30A3P

800AF800AP800ATLSIGZCTR

N.C.

800AF800AP800ATLSIGZCTR

N.C.

ETU

800AF800AP800ATLSIG

600:5(3)

ST

6PULSEVFD

ACTIVEFILTER

AMCP

100

RVSS

IC

OC

AMCP

100

1

OC

18PULSEVFD

RVSS

OC

AMCP

ICPST

IC

100

AFAT

100100

L

S1 S2

ATS480V, 800A3Ø 4W 4P65kAOPEN TRANSITION

L

S1 S2

ATS480V, 800A3Ø 4W 4P65kAOPEN TRANSITION

S1 S2

L

ATS480V, 800AF/800AT3Ø 4W 4P65kAOPEN TRANSITION

S1 S2

L

ATS480V, 800AF/800AT3Ø 4W 4P65kAOPEN TRANSITION

START STOP

E-STOP

STOP

L.O.START STOP

AOH

P-XXX-XXX

3 ADDENDUM 1 11/16 MPV

3

Page 4: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

D. WEBER

Z. ZDROJEWSKI

E-2

ELECTRICALGENERAL NOTES AND ABBREVIATIONS

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

AE ANALYSIS ELEMENT

AHU AIR HANDLING UNIT

AIC AMPERE INTERRUPTING CAPACITY

AIT ANALYSIS INDICATING TRANSMITTER

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AF AMPERE FRAME

AT AMPERE TRIP

ATS AUTOMATIC TRANSFER SWITCH

BC BYPASS CONTACTOR

BKR BREAKER

(L/V)CP (LOCAL/VENDOR) CONTROL PANEL

CPT CONTROL POWER TRANSFORMER

CT CURRENT TRANSFORMER

DB DUCTBANK

DSW DISCONNECT SWITCH

DVP DOMINION VIRGINIA POWER

ECB ENCLOSED CIRCUIT BREAKER

EHH ELECTRIC HAND HOLE

EMH ELECTRIC MANHOLE

EO ELECTRICALLY OPERATED

ETM ELAPSED TIME METER

ETU ELECTRONIC TRIP UNIT

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FS FLOW SWITCH

FSL FLOW SWITCH LOW

FVNR FULL VOLTAGE NON-REVERSING

FVR FULL VOLTAGE REVERSING

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GFCT GROUND FAULT CURRENT TRANSFORMER

GNG GO-NO GO

GND GROUND

HOA HAND-OFF-AUTO

HPU HYDRAULIC POWER UNIT

IC INPUT CONTACTOR

IEEE INSTITUTE OF ELECTRICAL AND ELECTRONICS

ENGINEERS

ISO INTERNATIONAL ORGANIZATION FOR

STANDARDIZATION

JB JUNCTION BOX

LCS LOCAL CONTROL STATION

LP LIGHTING PANEL

LS LEVEL SWITCH

LSL LEVEL SWITCH LOW

LSLL LEVEL SWITCH LOW-LOW

LSH LEVEL SWITCH HIGH

LSHH LEVEL SWITCH HIGH-HIGH

LT LEVEL TRANSMITTER

MFR MULTI-FUNCTION RELAY

MH MANHOLE

MOD MOTOR OPERATED DAMPER

MOG MOTOR OPERATED GATE

MOL MOTOR OPERATED LOUVER

MOV MOTOR OPERATED VALVE

MPR MOTOR PROTECTION RELAY

MTD MOUNTED

MTS MANUAL TRANSFER SWITCH

MWTS MOTOR WINDING TEMPERATURE SWITCH

NC NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSN

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NO NORMALLY OPEN

NTS NOT TO SCALE

OC OUTPUT CONTACTOR

OL OVERLOAD

PB PULLBOX

PC PHOTOCELL

PCC POINT OF COMMON COUPLING

PE PRESSURE ELEMENT

PIT PRESSURE INDICATING TRANSMITTER

PLC PROGRAMMABLE LOGIC CONTROLLER

PP POWER PANEL

PST PHASE SHIFTING TRANSFORMER

PT POTENTIAL TRANSFORMER

PTT PUSH TO TEST

RCS REMOTE CONTROL STATION

RECP RECEPTACLE

RIO REMOTE I/O

RM ROOM

RTD RESISTANCE THERMAL DEVICE

RTU REMOTE TELEMETRY UNIT

RVAT REDUCED VOLTAGE AUTO TRANSFORMER

RVSS REDUCED VOLTAGE SOLID STATE

SA SUPPLY AIR

S.E. SERVICE ENTRANCE

SP. C. SPARE CONDUIT

SPD SURGE PROTECTIVE DEVICE

SST STAINLESS STEEL

TB TEST BLOCK

TC TIMED CLOSE

TO TIMED OPEN

TSH TWISTED SHIELDED

TX TRANSFORMER

TYP TYPICAL

UPS UNINTERRUPTIBLE POWER SUPPLY

VFD VARIABLE FREQUENCY DRIVE

WPCR WEATHER PROOF CORROSION RESISTANT

WT WALK THROUGH

XFMR TRANSFORMER

NOTES:1. UNLESS SPECIFICALLY NOTED OTHERWISE, ALL

UNDERGROUND CONCRETE ENCASED ELECTRICALCONDUITS SHALL BE PER STANDARD DETAIL1611801.

2. THE INSTALLATION OF ALL CONCRETE ENCASEDELECTRICAL CONDUITS SHALL COMPLY WITH ACI318, SECTION 6.3. CONTRACTOR SHALL SUPPLYEXPANSION JOINT FITTINGS AS REQUIRED FORTHERMAL EXPANSION AND DEFLECTION.

3. BOND ALL NEW CONCRETE ENCASED GROUNDCONDUCTORS TO EXISTING GROUNDCONDUCTORS IN ALL MANHOLES, PULL BOXES,CABLE TRAYS, AND SIMILAR LOCATIONS WHEREAPPLICABLE.

4. UNLESS OTHERWISE SPECIFIED OR NOTED, ALLWALL MOUNTED ELECTRICAL PANELS,ENCLOSURES, AND SIMILAR EQUIPMENT SHALL BEMOUNTED 6'-6" (MAX) FROM THE TOP OF THEPANEL TO FINISHED FLOOR OR GRADE.

5. UNLESS OTHERWISE NOTED, ALL LIGHTINGSWITCHES, CONTROL SWITCHES, AND SIMILAREQUIPMENT SHALL BE MOUNTED WITH THEIRCENTERLINE APPROXIMATELY 4'-0" ABOVEFINISHED FLOOR, SLAB, OR GRADE.THERMOSTATS SHALL BE MOUNTED 4'-4" ABOVEFINISHED FLOOR.

6. A SEPARATE EQUIPMENT GROUNDINGCONDUCTOR SHALL BE PROVIDED FOR EACHCIRCUIT (SEPARATE CONDUCTOR IN THECONDUIT). THE CONDUCTOR SHALL BETERMINATED AT THE PROPER DEVICE, TERMINAL,OR LUG AT THE POWER SOURCE (MCC GROUNDBUS, PANELBOARD GROUND BUS, ETC.). GROUNDCONDUCTOR SIZE SHALL BE PER THE LATESTEDITION OF THE NEC.

7. UNLESS SPECIFICALLY NOTED OTHERWISE,EXISTING PAVEMENT SHALL BE SAW CUT ANDREMOVED TO ALLOW FOR THE INSTALLATION OFNEW ELECTRICAL DUCTBANKS. AFTERINSTALLATION, REPLACE PAVEMENT WITH NEWTO MATCH ORIGINAL CONDITIONS.

8. LIGHTNING PROTECTION SHALL BE PROVIDEDFOR THE STRUCTURES INDICATED ON THEDRAWINGS AND IN ACCORDANCE WITH SECTION16670.

9. CONDUIT HOMERUNS ARE NOT SHOWN ONDRAWINGS. CONTRACTOR SHALL REFER TOCONDUIT AND WIRE SCHEDULE, RISERDIAGRAMS, SINGLE LINE DIAGRAMS, AND OTHERDRAWINGS FOR CONDUIT AND WIREREQUIREMENTS.

10. ALL ELECTRICAL COMPONENTS, SYSTEMS, ANDNON-BUILDING STRUCTURES SHALL BE DESIGNEDIN ACCORDANCE WITH THE REQUIREMENTS OFSPECIFICATION 01611 - ANCHORAGE ANDBRACING.

11. CONTRACTOR SHALL PROVIDE SPECIAL SEISMICCERTIFICATION (SSC) FROM MANUFACTURER OFEQUIPMENT FOR ALL SYSTEMS DEEMEDESSENTIAL BY SPECIFICATION 01611. SPECIALSEISMIC CERTIFICATION SHALL BE INCOMPLIANCE WITH THE CURRENT EDITION OFASCE 7.

FIXTURE TYPE

LAMP/FIXTUREWATTAGE

DESCRIPTION MFR ANDMODEL

EW1 70/10 WALL MOUNTED, EMERGENCY FIXTURE,120-277 VAC WITH 6 OR 12 VDC NICKELCADMIUM BATTERY, GRAY CORROSIONAND IMPACT RESISTANT MOLDEDFIBERGLASS HOUSING, TIME DELAYSHUTOFF, SURGE AND BROWN-OUTPROTECTION, AND LOW VOLTAGE BATTERYCUT-OFF. BATTERY SHALL BE SUITABLEFOR 90 MINUTES (INCLUDING ALL REMOTEHEADS AS SHOWN ON DRAWINGS). TWO5W LED HEADS WET LOCATION LISTED.

HOLOPHANEDESOTO M90X,PHILIPS RHYNOSERIES, ORLITHONIA INDXSERIES.

XW1 1.5W WALL-MOUNTED, RED LED EXIT SIGN,120-277VAC, BLACK FACEPLATE, DIE CASTALUMINUM HOUSING, SINGLE/DOUBLEFACE AS INDICATED ON THE DRAWINGS,NICKEL CADMIUM BATTERY WITHSELF-DIAGNOSTICS, BROWNOUT ANDSURGE PROTECTED, DAMP LOCATIONLISTED.

HOLOPHANEMAGELLAN MEXSERIES,LITHONIA LESERIES, ORDUALLITESEMPRASERIES.

LW1 72W (MAX) WALL-MOUNTED, 120-277VAC, LED LIGHTFIXTURE, COLOR TEMPERATURE OF 5000K,PRISMATIC BOROSILICATE GLASS LENS,20 LEDS, IESNA TYPE III MEDIUMDISTRIBUTION, BLACK DIE-CASTALUMINUM HOUSING, 1000MA DRIVER,6500 LUMEN MINIMUM, AND WETLOCATION LISTED.

HOLOPHANEW4G LED,HUBBELL LEDPGM3 SERIES,OR GE EWS1SERIES.

LW2 72W (MAX) WALL-MOUNTED, 120-277VAC, LED LIGHTFIXTURE, COLOR TEMPERATURE OF 5000K,PRISMATIC BOROSILICATE GLASS LENS,20 LEDS, IESNA TYPE III MEDIUMDISTRIBUTION, BLACK DIE-CASTALUMINUM HOUSING, 1000MA DRIVER,7000 LUMEN MINIMUM, INTEGRALBATTERY BACKUP WITH 90 MINUTESILLUMINATION TIME, AND WET LOCATIONLISTED.

HOLOPHANEW4G LED,HUBBELL LEDPGM3 SERIES,OR GE EWS1SERIES.

LW2a SAME AS LW2 WITH INTEGRALPHOTOCELL.

LL1 74W (MAX) POLE-MOUNTED, 120-277VAC, LED LIGHTFIXTURE, COLOR TEMPERATURE OF 5000K,PRISMATIC BOROSILICATE GLASS LENS,IESNA TYPE 5 HIGH ANGLE DISTRIBUTION,CORROSION-RESISTANT GRAY CASTALUMINUM HOUSING, 8000 LUMENMINIMUM, AND WET LOCATION LISTED.

HOLOPHANEPETROLUXPLED2 SERIES,CROUSE-HINDSPMV SERIES,OR GE H2SERIES.

ROUND, BASE MOUNTED, TAPERED, 10FT.ANODIZED ALUMINUM POLE. POLE SHALLINCLUDE A LOCKING SWIVEL JOINT ORTELESCOPING ACTION THAT ALLOWS THEPOLE AND FIXTURE TO BE LOWERED TO ANACCESSIBLE HEIGHT FOR LADDER-FREEMAINTENANCE.

Page 5: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

D. WEBER

Z. ZDROJEWSKI

E-3

ELECTRICALEXISTING PLANT ONE-LINE DIAGRAM

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

R R

R

(SS-13)1500kVA34.5kV-480/277V

3P/4WDVP AJ47

(SS-13)1500kVA34.5kV-480/277V

3P/4WDVP AJ36

313/SPSB 3431 2

3 4

AJ27

1 2

3 4

AJ38

R R

(SS-3)

3750kVA34.5kV-480/277V

3P/4WDVP BJ05

(SS-3)3750kVA34.5kV-480/277V

3P/4WDVP BJ0501

313/SPSB 3431 2

3 4

BJ33

1 2

3 4

BJ45

(SS-18)300kVA34.5kV-480/277V

3P/4WDVP AJ15

313/SPSB 3431 2

3 4

BJ40

1 2

3 4

BJ30

(SS-14)

5000kVA34.5kV-480/277V

3P/4WDVP CK28

313/SPSB 3431 2

3 4

CK27

1 2

3 4

CK2701

(SS-10)750kVA34.5kV-480/277V

3P/4WDVP AK43

(SS-10)750kVA34.5kV-480/277V

3P/4WDVP AK4301

(SS-1)2000kVA34.5kV-480/277V

3P/4WDVP AK94

(SS-1)2000kVA34.5kV-480/277V

3P/4WDVP AK83

(SS-4)750kVA34.5kV-480/277V

3P/4WDVP BJ06

(SS-4)750kVA34.5kV-480/277V

3P/4WDVP BJ0601

(SS-2)2500kVA34.5kV-480/277V

3P/4WDVP BJ13

(SS-12)1500kVA34.5kV-480/277V

3P/4WDVP BJ50

(SS-12)1500kVA34.5kV-480/277V

3P/4WDVP BJ5001

(SS-6)2500kVA34.5kV-480/277V

3P/4WDVP BJ62

(SS-15)

1000kVA34.5kV-480/277V

3P/4WDVP CK19

(SS-11)2500kVA34.5kV-480/277V

3P/4WDVP CK18

DC-13

DC-3

MTS-18

MTS-14 DC-15 MTS-11

34.5kV, 3ɸ, 4W, 60HZOCCOQUON SUBSTATION FEEDER No.343(3)1000MCM - 34.5Kv

HAYFIELD SUBSTATION FEEDER No.313(3)1000MCM - 34.5Kv

DVP RECLOSER, TYPICAL.

313R157 343R58

313R129 343R11

DVP 35kV SERVICESWITCHES WITHMETERING

DVPTRANSFORMER,TYPICAL

DC-10 DC-1

DC-19

DVP OFFSITE EQUIPMENT

(SS-2)2500kVA34.5kV-480/277V

3P/4WDVP BJ40

DC-4 DC-2

(SS-18)300kVA34.5kV-480/277V

3P/4WDVP AJ16

DC-12 DC-6

(SS-6)2500kVA34.5kV-480/277V

3P/4WDVP BJ6201

(SS-14)5000kVA34.5kV-480/277V

3P/4WDVP CK2801

(SS-15)1000kVA34.5kV-480/277V

3P/4WDVP CK1901

(SS-11)2500kVA34.5kV-480/277V

3P/4WDVP CK1801

313T343RLS

(SS-20)

2000kVA34.5kV-480/277V

3P/4WDVP DL21

313/SPSB 3431 2

3 4

DK23

1 2

3 4

DK2301

(SS-16)1500kVA34.5kV-480/277V

3P/4WDVP CK19

DC-20 DC-16

(SS-20)2000kVA34.5kV-480/277V

3P/4WDVP DL12

(SS-16)1500kVA34.5kV-480/277V

3P/4WDVP CK1901

313/SPSB 3431 2

3 4

DJ9600

1 2

3 4

DJ9601

(SS-7)

1500kVA34.5kV-480/277V

3P/4WDVP CJ1400

(SS-8)

1500kVA34.5kV-480/277V

3P/4WDVP DK73

DC-7 DC-8

(SS-7)1500kVA34.5kV-480/277V

3P/4WDVP CJ1401

(SS-8)1500kVA34.5kV-480/277V

3P/4WDVP DK7301

(SS-9)

2000kVA34.5kV-480/277V

3P/4WDVP DJ19

DC-9

(SS-9)2000kVA34.5kV-480/277V

3P/4WDVP DJ1901

(SS-17)1500kVA34.5kV-480/277V

3P/4WDVP EJ5400

DC-17

(SS-17)1500kVA34.5kV-480/277V

3P/4WDVP EJ5401

G-0915-1 G-0915-2 G-0915-3 G-0915-4 G-0915-5

52

1200AN.C.E.O.BATT.

52

1200AN.C.E.O.BATT.

52

1200AN.C.E.O.BATT.

52

1200AN.C.E.O.BATT.

52

1200AN.C.E.O.BATT.

TRANSFORMER GSU12MVA4160V-34.5kV

3P/4WOIL FILLED SUBSTATION

R 313RGSU

(FUTURE)

CIRCUIT 313/STANDBYPOWER SYSTEM BUS (SPSB)

DVP INCOMING SERVICES

2000kW4160V,3Ø,4W

2000kW4160V,3Ø,4W

2000kW4160V,3Ø,4W

2000kW4160V,3Ø,4W

2000kW4160V,3Ø,4W

150A

52 1200A 52 1200A 52 1200A 52 1200A

Page 6: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

D. WEBER

Z. ZDROJEWSKI

E-4

ELECTRICALNEW PLANT ONE-LINE DIAGRAM

R R

R

(SS-13)1500kVA34.5kV-480/277V

3P/4WDVP AJ47

(SS-13)1500kVA34.5kV-480/277V

3P/4WDVP AJ36

313/SPSB 3431 2

3 4

AJ27

1 2

3 4

AJ38

R R

(SS-3)

3750kVA34.5kV-480/277V

3P/4WDVP BJ05

(SS-3)3750kVA34.5kV-480/277V

3P/4WDVP BJ0501

313/SPSB 3431 2

3 4

BJ33

1 2

3 4

BJ45

(SS-18)300kVA34.5kV-480/277V

3P/4WDVP AJ15

313/SPSB 3431 2

3 4

BJ40

1 2

3 4

BJ30

(SS-14)

5000kVA34.5kV-480/277V

3P/4WDVP CK28

313/SPSB 3431 2

3 4

CK27

1 2

3 4

CK2701

(SS-10)750kVA34.5kV-480/277V

3P/4WDVP AK43

(SS-10)750kVA34.5kV-480/277V

3P/4WDVP AK4301

(SS-1)2000kVA34.5kV-480/277V

3P/4WDVP AK94

(SS-1)2000kVA34.5kV-480/277V

3P/4WDVP AK83

(SS-4)750kVA34.5kV-480/277V

3P/4WDVP BJ06

(SS-4)750kVA34.5kV-480/277V

3P/4WDVP BJ0601

(SS-2)2500kVA34.5kV-480/277V

3P/4WDVP BJ13

(SS-12)1500kVA34.5kV-480/277V

3P/4WDVP BJ50

(SS-12)1500kVA34.5kV-480/277V

3P/4WDVP BJ5001

(SS-6)2500kVA34.5kV-480/277V

3P/4WDVP BJ62

(SS-15)

1000kVA34.5kV-480/277V

3P/4WDVP CK19

(SS-11)2500kVA34.5kV-480/277V

3P/4WDVP CK18

DC-13

DC-3

MTS-18

MTS-14 DC-15 MTS-11

DVP INCOMING SERVICES34.5kV, 3ɸ, 4W, 60HZ

OCCOQUON SUBSTATION FEEDER No.343(3)1000MCM - 34.5Kv

HAYFIELD SUBSTATION FEEDER No.313(3)1000MCM - 34.5Kv

DVP RECLOSER, TYPICAL.

313R157 343R58

313R129 343R11

DVP 35kV SERVICESWITCHES WITHMETERING

DVPTRANSFORMER,TYPICAL

DC-10 DC-1

DC-19

DVP OFFSITE EQUIPMENT

(SS-2)2500kVA34.5kV-480/277V

3P/4WDVP BJ40

DC-4 DC-2

(SS-18)300kVA34.5kV-480/277V

3P/4WDVP AJ16

DC-12 DC-6

(SS-6)2500kVA34.5kV-480/277V

3P/4WDVP BJ6201

(SS-14)5000kVA34.5kV-480/277V

3P/4WDVP CK2801

(SS-15)1000kVA34.5kV-480/277V

3P/4WDVP CK1901

(SS-11)2500kVA34.5kV-480/277V

3P/4WDVP CK1801

313T343RLS

(SS-20)2000kVA34.5kV-480/277V

3P/4WDVP DL21

313/SPSB 3431 2

3 4

DK23

1 2

3 4

DK2301

(SS-16)1500kVA34.5kV-480/277V

3P/4WDVP CK19

DC-20 DC-16

(SS-20)2000kVA34.5kV-480/277V

3P/4WDVP DL12

(SS-16)1500kVA34.5kV-480/277V

3P/4WDVP CK1901

313/SPSB 3431 2

3 4

DJ9600

1 2

3 4

DJ9601

(SS-7)

1500kVA34.5kV-480/277V

3P/4WDVP CJ1400

(SS-8)

1500kVA34.5kV-480/277V

3P/4WDVP DK73

DC-7 DC-8

(SS-7)1500kVA34.5kV-480/277V

3P/4WDVP CJ1401

(SS-8)1500kVA34.5kV-480/277V

3P/4WDVP DK7301

(SS-9)2000kVA34.5kV-480/277V

3P/4WDVP DJ19

DC-9

(SS-9)2000kVA34.5kV-480/277V

3P/4WDVP DJ1901

(SS-17)1500kVA34.5kV-480/277V

3P/4WDVP EJ5400

DC-17

(SS-17)1500kVA34.5kV-480/277V

3P/4WDVP EJ5401

G-0915-1 G-0915-2 G-0915-3 G-0915-4 G-0915-5

52

1200AN.C.E.O.BATT.

52

1200AN.C.E.O.BATT.

52

1200AN.C.E.O.BATT.

52

1200AN.C.E.O.BATT.

52

1200AN.C.E.O.BATT.

TRANSFORMER GSU12MVA4160V-34.5kV

3P/4WOIL FILLED SUBSTATION

R 313RGSU

(FUTURE)

CIRCUIT 313/STANDBY POWERSYSTEM BUS (SPSB)

NOTES:1. CONTRACTOR SHALL FURNISH AND INSTALL NEW

CONDUIT BETWEEN DJ9600 AND DVP-OWNEDTRANSFORMER EJ5400. DVP SHALL FURNISH ANDINSTALL CONDUCTORS.

2. CONTRACTOR SHALL FURNISH AND INSTALL NEWCONDUIT BETWEEN DJ9601 AND DVP-OWNEDTRANSFORMER EJ5401. DVP SHALL FURNISH ANDINSTALL CONDUCTORS.

3. DVP SHALL PROVIDE ADEQUATE CABLE TO ALLOWCONDUCTOR SPLICING INSIDE MANHOLES UNDERPHASE 2 CONSTRUCTION.

SEE NOTES 1AND 2

150A

2000kW4160V,3Ø,4W

2000kW4160V,3Ø,4W

2000kW4160V,3Ø,4W

2000kW4160V,3Ø,4W

2000kW4160V,3Ø,4W

52 1200A 52 1200A 52 1200A 52 1200A

MANHOLE EMH-9600,SEE NOTE 3

MANHOLE EMH-9601,SEE NOTE 3

P-DVP-002

P-DVP-000

P-DVP-003

P-DVP-001

Page 7: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

D. WEBER

Z. ZDROJEWSKI

E-5

ELECTRICALOVERALL SITE PLAN - EXISTING

OVERALL SITE PLAN - EXISTING1" = 60'-0"

PLANT NORTH

TRUE N

ORTH

OLD COLCHESTER ROAD

EXISTING GRAVELPARKING LOT

30

1"=60'-0"

60 0 60'

APWPUMPINGSTATION

(HH1)AWT

CHLORINATIONAND

DECHLORINATIONBUILDING (HH)

CLEARWATER DRIVEBUILDING AND GROUNDS

STORAGE BUILDING(U)

AWTMAINTENANCE

BUILDING(T)

MONOMEDIAFILTER

BUILDING(FF)

LOW

ER P

OTO

MAC

PARKW

AY

SODIUM BISULFITEBUILDING (PP)

CARBONREGENERATION

BUILDING(GG)

GRAVITY FILTERS EFFLUENTPUMP STATION (DD)

GRAVITY FILTERBUILDING (DD)

TERTIARYCLARIFIER

(CC)

TERTIARYCLARIFIER

(CC)

STANDBYGENERATORS

TRANSFORMERS

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

EQUALIZATIONBASIN 3(QQ3)

EQUALIZATIONBASIN 2(QQ2)

CHEMICAL FEED BUILDINGFERRIC AND POLYMER (S2)

INCLINE MIXINGBUILDING (IM)

OUTFALLSTRUCTURE (TT2)

76" X 48"OUTFALL

Page 8: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

NOTES:1. CONTRACTOR SHALL DEMOLISH AND REMOVE

EXISTING DUCTBANK IN ITS ENTIRETY BETWEENCABINET EJ9600 AND TRANSFORMER EJ5400, ANDSHALL DEMOLISH AND REMOVE EXISTINGDUCTBANK IN ITS ENTIRETY BETWEEN CABINETEJ9601 AND TRANSFORMER EJ5401.

2. DEMOLISH AND REMOVE EXISTING DUCTBANKS,AS NEEDED, TO ALLOW THE EXCAVATION FOR THENEW TEMPORARY BISULFITE FACILITY (PP1).

3. DISCONNECT CONDUCTORS POWERING THEEXISTING SODIUM BISULFITE FACILITY (PP) INTHE ELECTRICAL DISTRIBUTION CENTER DC-7.DEMOLISH AND REMOVE EXISTING DUCTBANK TOEXISTING SODIUM BISULFITE FACILITY (PP) ASNEEDED. COORDINATE WITH DEMOLITION WORKSHOWN ON DRAWING C-3.

4. CONTRACTOR SHALL FIELD VERIFY THE LOCATIONOF THE REMAINING EXISTING DUCTBANK ANDDIRECT-BURIED CONDUITS LOCATED IN THEVICINITY OF EXISTING 76" X 48" PIPES.DEMOLISH AND REMOVE EXISTING DUCTBANKAND CONDUITS, AS NEEDED, TO FACILITATEINSTALLATION OF THE NEW 60" OUTFALL PIPELINEIN ADDITION TO STRUCTURES TT1 AND TT2.

5. RELOCATE WIFI ANTENNA AND RADIO FROM WESTWALL OF FACILITY PP TO NEAREST LIGHT POLE.PROVIDE POWER FROM DC-7 PANELBOARD USING2" PVC BURIED CONDUIT WITH 2#12, #12GND.EXTEND FIBER OPTIC CABLE FROM CHEMICALTRENCH TO THE NEW RADIO LOCATION IN 2" PVCDIRECT-BURIED CONDUIT.

D. WEBER

Z. ZDROJEWSKI

E-6

ELECTRICALOVERALL SITE PLAN - DEMOLITION

OVERALL SITE PLAN - DEMOLITION1" = 60'-0"

PLANT NORTH

TRUE N

ORTH

30

1"=60'-0"

60 0 60'

OLD COLCHESTER ROAD

EXISTING GRAVELPARKING LOT

APWPUMPINGSTATION

(HH1)

CLEARWATER DRIVEBUILDING AND GROUNDS

STORAGE BUILDING(U)

AWTMAINTENANCE

BUILDING(T)

MONOMEDIAFILTER

BUILDING(FF)

LOW

ER P

OTO

MAC

PARKW

AY

CARBONREGENERATION

BUILDING(GG)

GRAVITY FILTERBUILDING (DD)

TERTIARYCLARIFIER

(CC)

TERTIARYCLARIFIER

(CC)

STANDBYGENERATORS

TRANSFORMERS

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

SEE NOTE 1

EQUALIZATIONBASIN 3(QQ3)

EQUALIZATIONBASIN 2(QQ2)

CHEMICAL FEED BUILDINGFERRIC AND POLYMER (S2)

SEE NOTE 2

DC-7, SEE NOTE 3

GRAVITY FILTERS EFFLUENTPUMP STATION (DD)

INCLINE MIXINGBUILDING (IM)

SODIUM BISULFITEBUILDING (PP), SEE NOTE 5

AWTCHLORINATION

ANDDECHLORINATION

BUILDING (HH)

OUTFALLSTRUCTURE (TT2)

76" X 48"OUTFALL

SEE NOTE 4

3 ADDENDUM 1 11/16 MPV

3

Page 9: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

D. WEBER

Z. ZDROJEWSKI

E-7

ELECTRICALOVERALL SITE PLAN - NEW

OVERALL SITE PLAN - NEW1" = 60'-0"

PLANT NORTH

TRUE N

ORTH

30

1"=60'-0"

60 0 60'

LOW

ER P

OTO

MAC

PARKW

AY

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

MONOMEDIAFILTER

BUILDING(FF)

EQUALIZATIONBASIN 3(QQ3)

EQUALIZATIONBASIN 2(QQ2)

CARBON REGENERATIONBUILDING (GG), SEE E-GG-1

TERTIARYCLARIFIER

(CC)

AWTMAINTENANCE

BUILDING(T)

CHEMICAL FEED BUILDINGFERRIC AND POLYMER (S2)

TERTIARYCLARIFIER

(CC)

STANDBYGENERATORS

LOWER POTOMAC PARKWAY

CLEARWATER DRIVE

CLE

ARW

ATE

R D

RIV

E

BUILDING AND GROUNDSSTORAGE BUILDING

(U)

CONTRACTORSTORAGE ANDSTAGING AREA

EFFLUENTCHAMBER (TT),SEE E-TT-1

TEMPORARYCHEMICAL BUILDING(PP1), SEE E-PP1-1

INTERMEDIATESTRUCTURE (TT1)

SEE E-8 FORPARTIAL PLAN

SEE E-8 FORPARTIAL PLAN

SEE E-9 FORPARTIAL PLAN

OLD COLCHESTER ROAD

EXISTING GRAVELPARKING LOT

APWPUMPINGSTATION

(HH1)

EHH-1

EHH-2 EHH-3

GRAVITY FILTERBUILDING (DD)

GRAVITY FILTERS EFFLUENTPUMP STATION (DD)

INCLINE MIXINGBUILDING (IM)

DBB1

DBA1

OUTFALLSTRUCTURE (TT2),SEE E-TT2-1

DBJ1

EHH-5

EHH-4

AWT CHLORINATION ANDDECHLORINATION BUILDING(HH), SEE E-HH-1

76" X 48"OUTFALL

SEE E-9 FORPARTIAL PLAN

3

3 ADDENDUM 1 11/16 MPV

Page 10: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

NOTES:1. CONTRACTOR SHALL TERMINATE DUCTBANK

5-FEET FROM EQUIPMENT PAD. FINALCONNECTION TO EQUIPMENT PAD SHALL BEINSTALLED BY UTILITY COMPANY.

2. CONTRACTOR SHALL FURNISH AND INSTALL8'x8'x8' MEDIUM VOLTAGE MANHOLES.

3. INSTALLATION OF MEDIUM VOLTAGECONDUCTORS AND CABLE TERMINATIONS SHALLBE COMPLETED BY UTILITY COMPANY.

4. CONTRACTOR PROVIDED WORK ON SERVICEENTRANCE SHALL COMPLY WITH DOMINIONVIRGINIA POWER COMPANY REQUIREMENTS.

D. WEBER

Z. ZDROJEWSKI

E-8

ELECTRICALPARTIAL SITE PLANS

PARTIAL SITE PLAN1" = 20'-0"

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

PARTIAL SITE PLAN1" = 20'-0"

PLANT NORTH

TRUE N

ORTH

CLEARWATER DRIVE

CLE

ARW

ATE

R D

RIV

E

PLANT NORTH

TRUE N

ORTH

SEE TOP RIGHT MATCHLINEFOR CONTINUATION

SEE BOTTOM LEFT MATCHLINEFOR CONTINUATION

UV DISINFECTIONFACILITIES

INSTALLED UNDERPHASE-2

AUXILIARY CHEMICALSTORAGE FACILITYINSTALLED UNDERPHASE-2

TRANSFORMEREJ5400 (SS-17)

TRANSFORMEREJ5401 (SS-17)

TRANSFORMERCJ1400 (SS-7)

TRANSFORMERCJ1401 (SS-7)

EMH-9600, SEE NOTE 2

EMH-9601, SEE NOTE 2

VFI SWITCHDJ9600

VFI SWITCHDJ9601

10 20'020

1"=20'-0"

DC-7

SEE NOTE 1

SEE NOTE 1

SEE NOTE 1

UV DISINFECTIONFACILITIES INSTALLEDUNDER PHASE-2

E-10DB-DVP

DBC1

DBD1

DBE1

DBF1

DBF1

DBE1

DBF1

DBE1

DBF1

DBE1

1611802

1611802

SEE NOTE 3

SEE NOTE 3

Page 11: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

NOTES:1. CONTRACTOR SHALL CONNECT EXPOSED SODIUM

BISULFITE PIPING HEAT TRACE CONTROLLER TOEXISTING OUTDOOR RECEPTACLE. RECEPTACLE ISMOUNTED DIRECTLY ABOVE EXPOSED PIPING.

2. CONTRACTOR SHALL FURNISH AND INSTALLEXPOSED CONDUITS ALONG HANDRAIL FROM AWTCHLORINATION BUILDING TO END OF HANDRAIL.SEE DRAWING E-TT-2 FOR CONDUIT AND WIRESCHEDULES.

3. CONTRACTOR SHALL FURNISH AND INSTALLDIRECT-BURIED CONDUITS ALONG EFFLUENTCHAMBER PERIMETER FROM END OF HANDRAIL TOEFFLUENT CHAMBER (TT) JUNCTION BOXES. SEEDRAWINGS E-TT-1 AND E-TT-2.

4. REFERENCE C-YP-11 FOR SODIUM BISULFITE HEATTRACING INSTALLATION LOCATIONS.

5. NOT ALL PIPING IS SHOWN ON THIS DRAWINGFOR CLARITY. REFERENCE C-YP DRAWINGS FORSITE PIPING.

D. WEBER

Z. ZDROJEWSKI

E-9

ELECTRICALPARTIAL SITE PLANS

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

PARTIAL SITE PLAN1" = 20'-0"

PLANT NORTH

TRUE N

ORTH

LOWER POTOMAC PARKWAY

MONOMEDIAFILTER

BUILDING(FF)

BUILDING AND GROUNDSSTORAGE BUILDING (U)

10 20'020

1"=20'-0"

TEMPORARY SODIUMBISULFITE FACILITY(PP1), SEE E-PP1-1

WASTE OILRECEIVINGSTATION

RELOCATION OF WASTE OILRECEIVING STATIONDUCTBANK

DUCTBANK FORRELOCATION OFLIGHTING FEEDERS

DUCTBANK FORRELOCATION OFLIGHTING FEEDERS

AWT CHLORINATION ANDDECHLORINATION BUILDING

(HH), SEE E-HH-1

DBH1

DBI1

DBG1

DBI1

SITE LIGHTINGPOLE

SITE LIGHTINGHANDHOLE

1611810

1611810

EXISTING WASTE OILRECEIVING STATIONDISCONNECT

EXPOSED SODIUMBISULFITE PIPING,SEE NOTE 1

PARTIAL SITE PLAN1" = 20'-0"

DIRECT-BURIEDCONDUITS, SEE NOTE 3

END OFHANDRAIL

EXPOSED CONDUITSALONG HANDRAIL,SEE NOTE 2

EFFLUENT CHAMBER(TT), SEE E-TT-1

APWPUMPINGSTATION

(HH1)

EHH-3

AWTCHLORINATION

ANDDECHLORINATIONBUILDING (HH),

SEE E-HH-1

DBK1

DBL1

DBA1

DBM1

PLANT NORTH

TRUE N

ORTH

WASTE OILRECEIVING STATIONCONTROL PANEL

SODIUMBISULFITE PIPING,SEE NOTE 4

3 ADDENDUM 1 11/16 MPV

SEE PARTIAL SITEPLAN, THIS DRAWING

PLANT NORTH

TRUE N

ORTH

3

PARTIAL SITE PLAN - CHEMICAL TRUCK SPILL CONTAINMENT SUMP3/8" = 1'-0"

DBH1

PRECASTCONC VAULT

MANHOLE COVERAND FRAME

3

SUMP PUMPSBSP-395-2-2(BELOW)

SUMP PUMP CONTROLPANEL (FP-395-4-1)

LSHLSL

6. POWER MUST BE MAINTAINED TO GUARD SHACKAT ALL TIMES. PROVIDE TEMPORARY POWER ASREQUIRED TO MAINTAIN THE OPERATION OFTHE SHACK AND GATE. FEEDERS TO THE GUARDSHACK ARE ONE (1) 480V, 3Ø, 20A CIRCUIT ANDONE (1) 240V, 1Ø, 40A CIRCUIT POWER FROMTHE BUILDING HH ELECTRICAL ROOM.

3

NOTE 6

3

Page 12: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

NOTES:1. COORDINATE WITH ENGINEER DURING

CONSTRUCTION FOR STUB UP LOCATIONS OFSPARE CONDUITS.

D. WEBER

Z. ZDROJEWSKI

E-10

ELECTRICALDUCTBANK DETAILS AND DUCTBANK SCHEDULE

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

DVP DUCTBANK DETAILNTS

E-8DB-DVP

21 14"

6 516" 6 5

16"

8 58"

12 5 8"

6 5 16

"

21 14"

6"

6 516" 6 5

16"

8 58"

12 5 8"

6 5 16

"

CONDUIT NO. SIZE FROM TO CONDUCTORS REMARKSP-DVP-000 6" DJ9600 EJ5400 INSTALLED BY DVPP-DVP-001 6" DJ9600 EJ5400 INSTALLED BY DVPP-DVP-002 6" DJ9601 EJ5401 INSTALLED BY DVPP-DVP-003 6" DJ9601 EJ5401 INSTALLED BY DVPP-DVP-004 6" EHH-4 EHH-5 EMPTY W/ PULLSTRING

P-DVP-005 NOT USEDP-DVP-006 NOT USED

DBE1

DBF1

6"6"6"

DUCTBANK NUMBER CONDUIT SIZE FROM TO

DB-A1 P-TT-012 1" JB-TT-1 JB-TT2-1

I-TT-004 2" JB-TT-2 JB-TT2-1

2 SPARES 1" SEE NOTE 1

DB -B1 P-TT-012 1" JB-TT-1 JB-TT2-1

I-TT-004 2" JB-TT-2 JB-TT2-1

2 SPARES 1" SEE NOTE 1

DB -C1 P-DVP-000 6" DJ9600 EJ5400

P-DVP-001 6" DJ9600 EJ5400

DB -D1 P-DVP-002 6" DJ9601 EJ5401

P-DVP-003 6" DJ9601 EJ5401

DB -E1 P-DVP-000 6" DJ9600 EJ5400

P-DVP-001 6" DJ9600 EJ5400

DB -F1 P-DVP-002 6" DJ9601 EJ5401

P-DVP-003 6" DJ9601 EJ5401

DB -G1 P-PP1-022 2" WASTE OIL RECEIVING STATION DSW WASTE OIL RECEIVING STATION CP

P-PP1-028 2" WASTE OIL RECEIVING STATION DSW WASTE OIL RECEIVING STATION CP

DB -H1 P-PP1-000 4" MCC-22 MAIN PP1-BLDG ECB

C-PP1-005 1" FP-460-HH-1 CJB-PP1-1

I-PP1-004 2" FP-460-HH-1 CJB-PP1-1

P-PP1-025 4" MCC-22 MAIN PP1-BLDG ECB

C-PP1-008 1" SODIUM BISULFITE DAYTANK CP CJB-PP1-1

2 SPARES 1" SEE NOTE 1

DB -I1 P-PP1-023 1" SITE LTG POLE SITE LTG HANDHOLE

1 SPARE 1" SEE NOTE 1

DB -J1 P-DVP-004 6" EHH-4 EHH-5

DB -K1 P-TT-007 3/4" JB-TT-1 FUTURE DO CONTROLLER

P-TT-012 1" JB-TT-1 JB-TT2-1

2 SPARES 1" SEE NOTE 1

DB-L1 I-TT-000 1" JB-TT-2 FUTURE DO CONTROLLER

I-TT-004 2" JB-TT-2 JB-TT2-1

2 SPARES 2" SEE NOTE 1

DB-M1 P-TT-007 3/4" JB-TT-1 FUTURE DO CONTROLLER

I-TT-000 1" JB-TT-2 FUTURE DO CONTROLLER

5 SPARES 1"

3 SPARES 2"

Page 13: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

CARBON METERINGSCREW NO.2

SPENT CARBONTANK NO.2

CARBON METERINGSCREW NO.1

MAKE-UP CARBON TRANSFERPUMP SYSTEM 7-B

CARBON METERINGSCREW NO.1

SPENT CARBON TRANSFERPUMP SYSTEM 5-A SPENT CARBON TRANSFER

PUMP SYSTEM 5-B

MAKE-UP CARBONSTORAGE TANK NO.2

MAKE-UP CARBONSTORAGE TANK NO.1

DUPLEX SUMPPUMP GG-9

SPENT CARBONTANK NO.1

CARBON METERINGSCREW NO.2

CARBON METERINGSCREW NO.1

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV3 ADDENDUM 1 11/16 MPV

BOTTOM POWER PLAN1/4" = 1'-0"

D. WEBER

N. SIEBACH

E-GG-1

CARBON REGENERATION BUILDING (GG)ELECTRICAL

BOTTOM POWER PLAN

PLANT NORTH

TRUE N

ORTH

Page 14: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

DUPLEX CONDENSATERETURN

CHEMICAL TANK

ACTIVATED CARBONSLURRY PUMP NO.2A

FEEDER WATERSYSTEM

STEAM BOILERNO.2

BOILER NO.2CONTROL PANEL

CARBON TRANSFERCONTROL PANEL

ACTIVATED CARBONSLURRY PUMP NO.1A

FEEDER WATERSYSTEM

WATER HEATER

COMBUSTION AIRBLOWER NO.2

CHEMICAL TANK

COMBUSTION AIRBLOWER NO.1

BLOWER AIRINTAKE

BOILER NO.1CONTROL PANEL

FURNACE NO.1 FURNACE NO.2

CENTRAL SHAFTCOOLING FAN

CENTRAL SHAFTCOOLING FAN

AIR WASHBLOWER NO.2

AIR WASHBLOWER NO.1

LP-19A

ATS

WATER CONTAINERSWATER CONTAINERS

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV3 ADDENDUM 1 11/16 MPV

LOWER INTERMEDIATE DEMOLITION PLAN1/4" = 1'-0"

D. WEBER

N. SIEBACH

E-GG-2

CARBON REGENERATION BUILDING (GG)ELECTRICAL

LOWER INTERMEDIATE DEMOLITION PLAN

PLANT NORTH

TRUE N

ORTH

MCC-19

Page 15: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

DUPLEX CONDENSATERETURN

CHEMICAL TANK

ACTIVATED CARBONSLURRY PUMP NO.2A

FEEDER WATERSYSTEM

STEAM BOILERNO.2

BOILER NO.2CONTROL PANEL

CARBON TRANSFERCONTROL PANEL

ACTIVATED CARBONSLURRY PUMP NO.1A

FEEDER WATERSYSTEM

WATER HEATER

COMBUSTION AIRBLOWER NO.2

CHEMICAL TANK

COMBUSTION AIRBLOWER NO.1

BLOWER AIRINTAKE

BOILER NO.1CONTROL PANEL

FURNACE NO.1 FURNACE NO.2

CENTRAL SHAFTCOOLING FAN

CENTRAL SHAFTCOOLING FAN

MCC-19

AIR WASHBLOWER NO.2

AIR WASHBLOWER NO.1

LP-19A

ATS

WATER CONTAINERSWATER CONTAINERS

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV3 ADDENDUM 1 11/16 MPV3 ADDENDUM 1 11/16 MPV

LOWER INTERMEDIATE POWER PLAN1/4" = 1'-0"

D. WEBER

N. SIEBACH

E-GG-3

CARBON REGENERATION BUILDING (GG)ELECTRICAL

LOWER INTERMEDIATE POWER PLAN

PLANT NORTH

TRUE N

ORTH

Page 16: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

HEATING BOILER

DUPLEX BOILERFEED PUMPS

FURNACE NO.2

INSTRUMENT AIRCOMPRESSOR

EXHAUST FAN NO. 7

DUPLEX BOILER FEEDPUMP CONTROL PANEL

SCRUBBER No. 2

AIR DRYER

FURNACE NO.1

INSTRUMENT AIRCOMPRESSOR

SCRUBBER No. 1

EXHAUST FANNo. 6

SUPPLY FANNO.1

SUPPLY FAN No.2

HEATING BOILERCONTROL PANEL

3 ADDENDUM 1 11/16 MPV

UPPER INTERMEDIATE POWER PLAN1/4" = 1'-0"

D. WEBER

N. SIEBACH

E-GG-4

CARBON REGENERATION BUILDING (GG)ELECTRICAL

UPPER INTERMEDIATE POWER PLAN

PLANT NORTH

TRUE N

ORTH

Page 17: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

INDUCED DRAFTFAN NO.2

SUPPLY FANNO.3

CARBON DEWATERINGSCREW NO.2

FURNACE NO.2

TRANSFORMER

LIGHTINGPANEL LP19B

INDUCED DRAFTFAN NO.2

INDUCED DRAFTFAN NO.1

FURNACE NO.1

CARBON DEWATERINGSCREW NO.1

ACTIVATED CARBONSTORAGE TANK NO.1

ACTIVATED CARBONSTORAGE TANK NO.2

EXHAUST FANNO.4 (ON ROOF)

EXHAUST FANNO.5 (ON ROOF)

EXHAUST FANNO. 2 (ON ROOF)

EXHAUST FANNO.1 (ON ROOF)

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV3 ADDENDUM 1 11/16 MPV

TOP POWER PLAN1/4" = 1'-0"

D. WEBER

N. SIEBACH

E-GG-5

CARBON REGENERATION BUILDING (GG)ELECTRICAL

TOP POWER PLAN

PLANT NORTH

TRUE N

ORTH

Page 18: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

MCC-19A 480V, 800A, 3Ø, 3W, 65kA

EXHAUSTFAN NO. 2EF-FF-2

EXHAUSTFAN NO. 2EF-FF-2

EXHAUSTFAN NO. 2EF-FF-2

EXHAUSTFAN NO. 4EF-FF-4

INSTRUMENTPWR PANEL

FEEDER

INSTTRANSFORMER

FEEDER

5kVA INSTRPWR XFMR

CRS-1

INSTPWR PNL

FURNACEDRIVE No1

COMBUSTIONAIR BLOWER

No1

AFTERBURNERTURBO

BLOWER No1

AIRCOMPRESSOR

DUPLEX CONDRET

PUMP No1

DUPLXPUMPCONT

INSTRUMENTAIR

COMPRESSOR

AIRCOMPCONT

CARBONDEWATERINGPUMP SCREW

No1

INDUCEDDRAFT FAN

No1

FUEL OILPUMP

FEEDER

BOILERCONTROL

PANEL FEEDERNo1

BOILRCONTPNL

SPACE SPACE SPACE SPACE CENTERSHAFT

COOLING FANNo1

MAKEUP CARBONPANEL XFER

PUMP No1 - SYST7A

SPACESPACE

LIGHTINGPNL.

LP-19E ATS

L

S1 S2

LIGHTING PNL.LP-13B

ACTIVATEDCARBON

SLURRY PUMPNo2A

INSTRUMENT AIRCOMPRESSOR

AIRCOMPCONT

LIGHTINGPNL.

LP-19A ATS

MEDIATRANSFER

PUMP No.1(5A)P7414

MEDIATRANSFER

PUMP No.1(5A)P7415

FEEDEREF-10

FEEDEREF-4

SUPPLY FANSF-3

SUMP PUMPGG-9

SUPPLYFAN No.2

SPARE SPARE SPACEACTIVATEDCARBON

SLURRY PUMPNo1A

FLUSHWATER

PUMP FF-1

CARBONMAKEUPMETERSCREW

SPENTCARBONMAKEUPSCREW

SPACE INSTRUMENT AIRCOMPRESSOR

AIRCOMPCONT

SPARE SUPPLY FANSF-1

480V, 800A, 3Ø, 3W, 65kA

BRIDGE CRANEFEEDER

FLUSH WATERPUMP FF-2

TANK DRAINPUMP FF-4

CRANECONTPNL

6KVA480-120/208Y

3P,4W

AIR WASHBLOWER NO. 1

B731

AIR WASHBLOWER NO. 2

B732

MAIN TIE MAIN ACTIVATEDCARBON

SLURRY PUMP1B

ACTIVATEDCARBON SLURRY

PUMP 2B

SPENT CARBONXFER PUMP

No1- SYST 5B

SPENTCARBON XFERPUMP No2 -

SYST 5B

MAKEUPCARBON XFERPUMP-SYST 7B

CARBONDEWATERINGSCREW No2

SPENTCARBON

METER SCREWNo2

CARBONMAKEUPMETER

SCREW No2

LP 19C XFMRFEEDER

LP-19D XFMRFEEDER

LP-19E XFMRFEEDER 'B'

DUPLEX SUMPPUMP GG-9

DUPLXPUMPCONT

DUPLEX FUELOIL PUMPS

DUPLXPUMPCONT

BOILRCONTPNL

SPARE BOILERCONTROL

PANEL

INSTRUMENTTRANSFORMERFEEDER PANEL

IPP-FF

SPARE

3 ADDENDUM 1 11/16 MPV

D. WEBER

N. SIEBACH

E-GG-6

CARBON REGENERATION BUILDING (GG)ELECTRICAL

MCC-19 DEMOLITION

MCC-19 DEMOLITIONSINGLE LINE DIAGRAM

1511 15 15 15 7.5 3 3 3 3 1 3 3

1 3 3 1 1 1 1 1 1 7.5 1 7.5 15 15 15

250 250 15 15 15 15 15 15 15 15 1 1 3 3 3 3

AMCP15

1

AMCP15

1

AMCP40

2

AMCP40

2

AFAT

10015

AFAT

10015

AMCP30

2

AMCP30

2

AFAT

10030

AFAT

10030

AMCP30

2

AMCP30

2

AMCP20

1

AFAT

10030

AMCP20

1

AMCP20

1

AFAT

10015

AMCP

7

1

AFAT

10015

AMCP15

1

AMCP15

1

AMCP

7

1

AMCP

7

1

AFAT

10015

AFAT

10015

AMCP

7

1

AMCP

7

1

AMCP

7

1

AMCP

7

1

AFAT

10030

AFAT

10030

AMCP

7

1

AFAT

10060

AFAT

10030

AFAT

10060

L

S1 S2 30kVA480-120/208V

3P/4W

AFAT

10080

AMCP40

2

AMCP40

2

AMCP40

2

AFAT

10015

AMCP

400

5

AF

AT

AFAT

AFAT

AMCP

400

5

AMCP40

2

AMCP40

2

AFAT

10040

AFAT

10015

AMCP40

2

AMCP40

2

AMCP40

2

AMCP40

2

AMCP40

2

AMCP40

2

AMCP

7

1

AMCP

7

1

AFAT

10015

AFAT

10015

AFAT

10015

AFAT

10030

AFAT

10015

AFAT

10030

AFAT

10030

30kVA480-120/208V

3P/4W

30kVA480-120/208V

3P/4W

Page 19: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

FEEDEREF-5

FEEDEREF-8

FEEDEREF-9

LP-19A XFMRFEEDER 'B'

SUMP PUMPFF-3

AFTERBURNERTURBO

BLOWERNo.2

SPARE SPACE FEEDEREF-1

BOILRCONTPNL

BOILERCONTROL

PANEL

SPACE SPACE

SPARE

CONDENSATERETURNDUMP

WATERHEATER

WATERHTR

A/C UNITNo2

A/CNo2

TO LP-19A

FEEDEREF-3

FEEDPMPSCONTPNL

BOILER FEEDPUMPS

CONTROL

CENTERSHAFT

COOLING FANNo2

INDUCEDDRAFT FAN

No2

INSTRUMENTAIR COMP

No2

AIRCOMPCONT

FEEDEREF-2

SPACE FURNACEDRIVE NO.2

COMBUSTIONAIR BLOWER

NO.2

SPACE

INSTPWR PNL

INSTTRANSFORMER

FEEDER

INSTRUMENTPWR PANEL

FEEDER

5kVA INSTRPWR XFMR

CRS-1

EXHAUST FANNo3

EE-FF-3

EXHAUST FANNo4

EE-FF-4

EXHAUST FANNo1

EE-FF-1

SPACE SPACE SPACE

3 ADDENDUM 1 11/16 MPV

D. WEBER

N. SIEBACH

E-GG-7

CARBON REGENERATION BUILDING (GG)ELECTRICAL

MCC-19 DEMOLITION

MCC-19 DEMOLITIONSINGLE LINE DIAGRAM

1 15 15 7.5 1 15 15 1 1 1 15 1 1 1

1 1 1

AFAT

10030

AFAT

10030

AMCP40

2

AMCP40

2

AFAT

10030

AFAT

10020

AMCP

7

1

AMCP40

2

AMCP40

2

AFAT

10020

AMCP

7

1

AMCP

7

1

AFAT

10020

AFAT

10020

AMCP

7

1

AFAT

10015

AMCP40

2

AMCP

7

1

AFAT

10020

AFAT

10015

AMCP

7

1

AMCP

7

1

AFAT

10030

AMCP

7

1

AFAT

10015

AFAT

10015

AFAT

10015

AFAT

10015

AFAT

10015

AMCP

7

1

AMCP

7

1

AMCP

7

1

Page 20: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

N.0.

POWERMONITOR

FROM

AFAT

12001000

AF

AT

1200

1000

5C

7B

7A

5B

5A

K

KK

7C

6B

SPD

250kASPD

250kA

POWERMONITOR

FROM

P- P-

EXHAUSTFAN NO.2EF-FF-2

EXHAUSTFAN NO.4EF-FF-4

FEEDEREF-10

FEEDEREF-4

SUPPLY FANSF-3

SUMP PUMPGG-9

SUPPLY FANSF-1

SUMP PUMPFF-3

AIR WASHBLOWER NO.1

B731

AMCP

400

5

2501

AMCP15

1

1

AMCP15

1

1

AMCP15

1

1

AMCP15

1

AMCP15

1

AMCP15

1

11

1

AMCP15

1

1

AMCP15

1

AFAT

10020

AFAT

10020

4A3D2B 2A2C

1D1C

3C 3B

CP

AIR WASHBLOWER NO.2

B732

AMCP

400

5

250

8A

FLUSH WATERPUMP FF-2

AMCP50

2

15

9B

TANK DRAINPUMP FF-4

AMCP50

2

15

9C

SUMP PUMPFF-3

AMCP15

1

1

10A

EXHAUSTFAN NO.1EE-FF-1

AMCP15

1

1

10B

EXHAUSTFAN NO.3EE-FF-3

AMCP15

1

1

10C

EXHAUSTFAN NO.5EE-FF-5

AMCP15

1

1

10D

FEEDEREF-3

AMCP15

1

1

AFAT

10020

1E

FEEDEREF-2

AMCP15

1

1

AFAT

10020

1F

FEEDEREF-5

AMCP15

1

1

AFAT

10020

11F

FEEDEREF-8

AMCP15

1

1

AFAT

10020

11E

FEEDEREF-9

AMCP15

1

1

AFAT

10020

11D

FEEDEREF-1

AMCP15

1

1

AFAT

10020

11C1G 1H 11H 11GAFAT

10030

AFAT

10020

AFAT

10020

AFAT

10020

kW kW

WATERHEATER

CP

SUMP PUMPCONTROL

PANEL

AC UNITNO.2

CRANECONTROL

PANEL

30kVA480-120/208V

3P/4WDRY TRANS

LP-19B

AFAT

10060

1AAFAT

10060

A

TO LP-19AATS 30kVA

480-120/208V

3P/4WDRY TRANS

LP-19C

AFAT

10020

11B

30kVA480-120/208V

3P/4WDRY TRANS

LP-19D

AFAT

10020

11A

480VAC, 3Ø, 3W, 1000A, 65kA, TIN-PLATED COPPER BUS

SPARE

AMCP15

1

2DA

MCP15

1

10E

SPARE

20A INSTPANELNO.2

6kVA3P, 4WIPP-FF

AFAT

10020

1B

9A

20A INSTPANELNO.1

3A

1IAFAT

10060

C

TO LP-19EATS

AFAT

10060

D

TO LP-19EATS

11IAFAT

10060

B

TO LP-19AATS

11J

AMCP15

1

10F

SPARESPARE

AMCP15

1

2E

SPARE

2G

AFAT

100100

AFAT

150150

1J 1K 1LAFAT

10020

11KAFAT

225200

11L

NOTES:1. EXISTING MCC-19A SHALL BE DEMOLISHED.

LOADS WHICH WERE PREVIOUSLY SUPPLIED FROMEXISTING MCC-19A SHALL BE SUPPLIED FROMNEW MCC-19.

2. CONTRACTOR SHALL INTERCEPT AND UTILIZEEXISTING POWER AND CONTROL WIRING FEEDINGTHE EQUIPMENT SHOWN FROM EXISTING MCC-19AAND RECONNECT TO NEW MCC-19.

3. EXISTING CONDITIONS PERTAINING TO MCC-19AARE SHOWN AS ACCURATELY AS POSSIBLE BASEDUPON AVAILABLE RECORD DRAWINGS. PRIOR TOMODIFYING OR REMOVING ANY EXISTINGEQUIPMENT, THE CONTRACTOR SHALL FIELDVERIFY THE EXISTING CONDITIONS AND NOTIFYTHE ENGINEER OF POTENTIAL CONFLICTS WITHTHE WORK SHOWN HERE.

SEE NOTE 2, TYP.

3 ADDENDUM 1 11/16 MPV

D. WEBER

N. SIEBACH

E-GG-8

CARBON REGENERATION BUILDING (GG)ELECTRICAL

MCC-19 SINGLE LINE DIAGRAM

MCC-19SINGLE LINE DIAGRAM

AFAT

12001000

MCC-19 ENCLOSURE

TO BUILDINGAND

GROUNDSSTORAGE

BUILDING (U)

TO AWTMAINTENANCEBUILDING (U)

P-

P-

TO BUILDING(RR)

P-

TOGUARDSHACK

P-

AFAT

100100

AFAT

150150

2F

SPARE

6A

Page 21: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

NOTES:1. ONLY NEW & MODIFIED CONNECTIONS TO PLC ARE

SHOWN.

D. WEBER

N. SIEBACH

E-GG-9

CARBON REGENERATION BUILDING (GG)ELECTRICAL

MCC-19 ELEVATION AND RISER DIAGRAMS

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

SECTION 6SECTION 5 SECTION 7

5A

POWERMONITOR

5B

5C

SPD

MAIN

7A

POWERMONITOR

7B

7C

SPD

MAIN

6B

TIE

6A

TRANSFERCONTROLS

SECTION 8 SECTION 9SECTION 3 SECTION 4

ELEVATION (NTS)

SECTION 1 SECTION 11

4A 8A

3A

3B

3C

3D1K 1L

1I 1J

1G 1H

1E 1F

1C 1D

1A 1B

9A

9B

11K 11L

11I 11J

11G 11H

11E 11F

11C 11D

11A 11B

SECTION 2

2D

2E

2A

2B

2C

9C

INSTPANEL

INSTPANEL

SECTION 10

10D

10E

10F

10A

10B

10C

PLCPARTIAL CONTROL ONE-LINE DIAGRAM

PLC

MCC-70-1A

SEE NOTE 1

C-C-

I-I-

3 ADDENDUM 1 11/16 MPV

30kVA480-120/208V

3P/4WDRY TRANS

L

S1 S2

ATS

LP-19E

D

30kVA480-120/208V

3P/4WDRY TRANS

L

S1 S2

ATS

LP-19A

B CA

LP-19A AND LP-19ESINGLE LINE DIAGRAM

2F 2G

Page 22: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

1

2

3

4

5

6

8

7

9

11

10

12

13

14

15

16

17

18

19

20

22

21

23

24

25

26

27

28

29

31

33

32

34

35

30

36

37

38

39

40

41

43

42

44

46

45

47

48

49

50

51

52

53

54

55

57

56

58

59

60

61

62

63

64

66

68

67

69

70

65

71

72

73

74

75

76

78

77

79

81

80

82

83

84

85

86

87

88

89

90

92

91

93

94

95

96

97

98

99

101

103

102

104

105

100

AIR WASH BLOWER NO.1CONTROL SCHEMATIC

L1

L2

L3

M480VAC

M8 OL

CPT 480/120VAC

3

H AO

XOO

OOXL

START

M8

L

STOP

3

BLOWER NO.2 BLOWER NO.1

TO BLOWER NO.2

PILOT

3

CR50

FAIL FROMBLOWER NO.2

BEARING TEMP WINDING TEMP

TD10

OLM8

RUN

MOTORFAIL TIMER

M8CR13

PTT

R

TD10

CR13

CR15 ALARM

TOANNUNCIATOR

CR15

TO MPX

CR15

TO BLOWERNO.2

CR15

TO MPX

CR13

TO CENTRAL CONTROLAND METER PANEL

CR13

AIR WASH BLOWER NO.2CONTROL SCHEMATIC

L1

L2

L3

M480VAC

M43 OL

CPT 480/120VAC

3

H AO

XOO

OOXL

START

M43

L

STOP

3

BLOWER NO.1 BLOWER NO.2

TO BLOWER NO.1

PILOT

3

CR15

FAIL FROMBLOWER NO.1

BEARING TEMP WINDING TEMP

TD45

OLM43

RUN

MOTORFAIL TIMER

M43CR48

PTT

R

TD45

CR48

CR50 ALARM

CR50

TO MPX

CR50

TO BLOWERNO.1

CR50

TO MPX

CR48

TO CENTRAL CONTROLAND METER PANEL

CR48

SUPPLY FANS SF-1 AND SF-3CONTROL SCHEMATIC

L1

L2

L3

M480VAC

M29 OL

CPT 480/120VAC

H AO

XOO

OOXL

START

M29

L

STOP

PILOT

4

OLM29

TD30 0-5 SEC

SET @ 3 SEC

TD30

M29

CR32

TOANNUNCIATOR

CR32

RUN

MOTORFAIL TIMER

ALARM

SPARE

CR32

SPARE

M29

D. WEBER

Z. ZDROJEWSKI

E-GG-10

CARBON REGENERATION BUILDING (GG)ELECTRICAL

CONTROL SCHEMATICS3 ADDENDUM 1 11/16 MPV

TOANNUNCIATOR

FLUSH WATER PUMP FF-2CONTROL SCHEMATIC

L1

L2

L3

M480VAC

M63 OL

CPT 480/120VAC

L

H AO

XOO

OOX

5

STOP

5

START

M63

TD64

OLM63

TD64 0-5 SEC

SET @ 3 SEC

MOTORFAIL TIMER

RUNM63

CR67

PTT

R

TD64

CR67

CR69 ALARM

TO MPX

CR67

TO MPX

CR69

TO CARBONTRANSFER

CONTROL PANEL

CR69

TO CARBONTRANSFER

CONTROL PANEL

CR67

TANK DRAIN PUMP FF-4CONTROL SCHEMATIC

L1

L2

L3

M480VAC

M80 OL

CPT 480/120VAC

L

H AO

XOO

OOX

5

STOP

5

START

M80

TD81

OLM80

TD81 MOTOR

FAIL TIMER

FS

RUNM80

CR84

PTT

R

TD81

CR84

CR86 ALARM

TO MPX

CR84

TO MPX

CR86

TO CARBONTRANSFER

CONTROL PANEL

TO CARBONTRANSFER

CONTROL PANEL

CR84 CR86

Page 23: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

D. WEBER

Z. ZDROJEWSKI

E-GG-11

CARBON REGENERATION BUILDING (GG)ELECTRICAL

CONDUIT AND WIRE SCHEDULES3 ADDENDUM 1 11/16 MPV

CONDUIT NO. SIZE FROM TO CONDUCTORS REMARKSP-GG-000 NOT USEDP-GG-001 NOT USEDP-GG-002 NOT USEDP-GG-003 NOT USEDP-GG-004 NOT USEDP-GG-005 NOT USEDP-GG-006 NOT USEDP-GG-007 NOT USEDP-GG-008 NOT USEDP-GG-009 NOT USEDP-GG-010 NOT USEDP-GG-011 NOT USEDP-GG-012 NOT USEDP-GG-013 NOT USEDP-GG-014 NOT USEDP-GG-015 NOT USEDP-GG-016 NOT USEDP-GG-017 NOT USEDP-GG-018 NOT USEDP-GG-019 NOT USEDP-GG-020 NOT USEDP-GG-021 NOT USEDP-GG-022 NOT USEDP-GG-023 NOT USEDP-GG-024 NOT USEDP-GG-025 NOT USEDP-GG-026 NOT USEDP-GG-027 NOT USEDP-GG-028 NOT USEDP-GG-029 NOT USEDP-GG-030 NOT USEDP-GG-031 NOT USEDP-GG-032 NOT USEDP-GG-033 NOT USEDP-GG-034 NOT USEDP-GG-035 NOT USEDP-GG-036 NOT USEDP-GG-037 NOT USEDP-GG-038 NOT USEDP-GG-039 NOT USEDP-GG-040 NOT USEDP-GG-041 NOT USEDP-GG-042 NOT USEDP-GG-043 NOT USEDP-GG-044 NOT USEDP-GG-045 NOT USEDP-GG-046 NOT USEDP-GG-047 NOT USEDP-GG-048 NOT USEDP-GG-049 NOT USEDP-GG-050 NOT USEDP-GG-051 NOT USEDP-GG-052 NOT USEDP-GG-053 NOT USEDP-GG-054 NOT USEDP-GG-055 NOT USEDP-GG-056 NOT USEDP-GG-057 NOT USEDP-GG-058 NOT USEDP-GG-059 NOT USEDP-GG-060 NOT USEDP-GG-061 NOT USEDP-GG-062 NOT USEDP-GG-063 NOT USEDP-GG-064 NOT USEDP-GG-065 NOT USEDP-GG-066 NOT USEDP-GG-067 NOT USEDP-GG-068 NOT USEDP-GG-069 NOT USEDP-GG-070 NOT USEDP-GG-071 NOT USEDP-GG-072 NOT USEDP-GG-073 NOT USEDP-GG-074 NOT USEDP-GG-075 NOT USEDP-GG-076 NOT USEDP-GG-077 NOT USEDP-GG-078 NOT USEDP-GG-079 NOT USED

CONDUIT NO. SIZE FROM TO CONDUCTORS REMARKSC-GG-000 NOT USEDC-GG-001 NOT USEDC-GG-002 NOT USEDC-GG-003 NOT USEDC-GG-004 NOT USEDC-GG-005 NOT USEDC-GG-006 NOT USEDC-GG-007 NOT USEDC-GG-008 NOT USEDC-GG-009 NOT USEDC-GG-010 NOT USEDC-GG-011 NOT USEDC-GG-012 NOT USEDC-GG-013 NOT USEDC-GG-014 NOT USEDC-GG-015 NOT USEDC-GG-016 NOT USEDC-GG-017 NOT USEDC-GG-018 NOT USEDC-GG-019 NOT USEDC-GG-020 NOT USEDC-GG-021 NOT USEDC-GG-022 NOT USEDC-GG-023 NOT USEDC-GG-024 NOT USEDC-GG-025 NOT USEDC-GG-026 NOT USEDC-GG-027 NOT USEDC-GG-028 NOT USEDC-GG-029 NOT USEDC-GG-030 NOT USEDC-GG-031 NOT USEDC-GG-032 NOT USEDC-GG-033 NOT USEDC-GG-034 NOT USEDC-GG-035 NOT USED

CONDUIT NO. SIZE FROM TO CONDUCTORS REMARKSI-GG-000 NOT USEDI-GG-001 NOT USEDI-GG-002 NOT USEDI-GG-003 NOT USEDI-GG-004 NOT USEDI-GG-005 NOT USEDI-GG-006 NOT USEDI-GG-007 NOT USEDI-GG-008 NOT USEDI-GG-009 NOT USEDI-GG-010 NOT USEDI-GG-011 NOT USEDI-GG-012 NOT USEDI-GG-013 NOT USEDI-GG-014 NOT USEDI-GG-015 NOT USEDI-GG-016 NOT USEDI-GG-017 NOT USEDI-GG-018 NOT USEDI-GG-019 NOT USEDI-GG-020 NOT USEDI-GG-021 NOT USEDI-GG-022 NOT USEDI-GG-023 NOT USEDI-GG-024 NOT USEDI-GG-025 NOT USEDI-GG-026 NOT USEDI-GG-027 NOT USEDI-GG-028 NOT USEDI-GG-029 NOT USEDI-GG-030 NOT USEDI-GG-031 NOT USEDI-GG-032 NOT USEDI-GG-033 NOT USEDI-GG-034 NOT USEDI-GG-035 NOT USED

Page 24: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

N

PLANT NORTH

LOUVER L-1(ABOVE)

LW1LP-1/1a

LW1LP-1/1a

LW1LP-1/1a

LW1LP-1/1a

LW1LP-1/1a

LW1LP-1/1a

LW1LP-1/1a

EMERGENCY SHOWER/EYEWASH, TYP

CAUSTIC VENTSCRUBBER AREA

SODIUM BISULFITEBULK TANK NO.1

SODIUM BISULFITEBULK TANK NO.2

EUH-2 DSW

EUH-2

BISULFITE TRANSFERPUMP NO.1 (SBTP-395-1-1)

BISULFITE TRANSFERPUMP NO.2 (SBTP-395-2-1)

XW1LP-1/1

XW1LP-1/1

EUH-1

EUH-1 DSW

SODIUM BISULFITE TANK FILL CABINET

LP-1/2

LP-1/2

LP-1/2

LP-1/1a

LP-1/1a

3

3

EW1LP-1/3

EW1LP-1/3

FRP ACCESS LADDER, TYP

LW2aLP-1/4

LW1LP-1/1a

FS395-2-2

MOUNTING RACK,TYP, SEE NOTE 11

FS395-1-2

INSTANTWATER HEATER

TEMPORARY SODIUMBISULFITE TANKFILL CONTROL PANEL(FP-395-0-1)

ESB SUPPLY HEAT TRACENO.1, NO.2, AND NO.3

LP-1/2

GFCI

GFCI

GFCI

GFCI

LW2aLP-1/4

E

HEAT TRACE FORFSL-395-1-2 PIPING

FIREEXTINGUISHER, TYP

BISULFITE TRANSFERPUMP PANEL NO.1(FP-395-1-1)

BISULFITE TRANSFERPUMP PANEL NO.2(FP-395-2-1)

LP-1 PANEL

CJB-PP1-1WATER HEATERECB

MAIN PP1-BLDGECB

TX-LP-1 ECB

TX-LP-1

LSH395-1-3

LE395-2-1

LIT395-2-1

LE395-1-1

LIT395-1-1

LW2aLP-1/4

LW2aLP-1/4

LW2aLP-1/4

SUMP PUMP (BELOW)

LP-1/27

WIRE TROUGH,SEE NOTE 6

LP-1/3EW1

DISCONNECT RATED RECEPTACLEFOR SUMP PUMP

LSL395-1-3

SUMP PUMP CONTROLPANEL (FP-395-3-1)

, TYP.1611806

HEAT TRACE CONTROLLERS,TYP,SEE DETAIL ON E-PP1-2

MOUNTING RACK,TYP, SEE NOTE 11

CP-2 (ALARM-ONLYPANEL)

CP-1

EF-1

GROUND ROD, TYPGROUND RODWITH TESTWELL, TYP

#4/0 BARE COPPERGROUND CONDUCTOR, TYP, SEE NOTE 5

, TYP.1617001

CONNECT TO STRUCTURAL REBAR, TYP

1 1

LIGHTNING PROTECTION SYSTEMDOWNLEAD CONDUCTOR AS REQUIRED,TYP, SEE NOTE 7

BOND 1" CWLINE TOGROUND GRID

1" CITYWATER LINE

LEGEND:

NON-PERMANENT PROCESSAREA

1

NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

MOUNT LUMINAIRE TYPE "LW1" 11'-0"AFF.

MOUNT LUMINAIRE TYPE "XW1" 6" ABOVEDOOR FRAME.

MOUNT LUMINAIRE TYPE "EW1" 11'-0"AFF.

MOUNT LUMINAIRE TYPE "LW2a" 9'-0"ABOVE GRADE. WHERE FIXTURES ARESHOWN ABOVE DOOR FRAMES, MOUNTLUMINAIRE TYPE "LW2a" 6" ABOVE DOORFRAME.

GROUND RING CONDUCTOR SHALL BE#4/0 BARE COPPER WIRE 30" MINIMUMBELOW FINISHED GRADE. ALL GROUNDCONDUCTORS TO EQUIPMENT ORSTRUCTURAL STEEL SHALL BE BARECOPPER WIRE.

CONTRACTOR SHALL FURNISH ANDINSTALL 8" X 8" HINGED MINIMUM NEMA3R WIRE TROUGH 6" BELOW ENCLOSEDCIRCUIT BREAKERS. REFERENCE E-PP1-2.

CONTRACTOR SHALL FURNISH ANDINSTALL LIGHTNING PROTECTIONSYSTEM FOR THIS STRUCTURE INACCORDANCE WITH SPECIFICATIONSECTION 16670.

3'-0" ABOVE FINISHED FLOOR IS WITHINTHE LIQUID CONTAINMENT AREA.CONDUITS SHALL NOT PENETRATE OR BEATTACHED TO FLOORS OR WALLS INSIDEOF LIQUID CONTAINMENT AREA WITHOUTSPECIFIC ENGINEER APPROVAL. CONDUITSHALL BE INSTALLED ON PLYWOODWALLS WHERE POSSIBLE. CONDUITINSTALLED TO CEILING SUPPORTS MAYIMPACT FUTURE TANK MAINTENANCE.ALL DEVICES AND EQUIPMENT SHOWNATTACHED TO THE WALLS SHALL BEATTACHED TO THE PLYWOOD WALLABOVE THE CONTAINMENT AREA UNLESSINDICATED OTHERWISE.

CONDUIT WITHIN THE TEMPORARYCHEMICAL BUILDING SHALL BE SCHEDULE80 PVC. ASSOCIATED CONDUIT BOXES,STRAPS, SUPPORTS, AND SIMILAR SHALLBE PVC OR FRP. CONDUIT OUTSIDE OFTHE TEMPORARY CHEMICAL BUILDINGSHALL BE RGS AND ALL BOXES ANDFITTINGS SHALL BE NEMA 3R OR NEMA 4PER SPECIFICATION 16111.

SODIUM BISULFITE IS A NON-FLAMMABLESOLUTION THAT IS NOT IDENTIFIED AS AHAZARD IN NFPA 820, ANNEX D. THETEMPORARY CHEMICAL BUILDING SHALLBE RATED AS UNCLASSIFIED AS DEFINEDIN ARTICLE 500 OF THE NATIONALELECTRIC CODE. ELECTRICAL METHODSAND MATERIALS SHALL REFLECT THISCLASSIFICATION.

CONTRACTOR SHALL MOUNT PANELS AMINIMUM OF 48" ABOVE PLATFORM TOALLOW ACCESS.

Lic. No.26535

GERALD J.RATASKY

HTLAEWNOM

MC

P

AINI

GR

IVFO

ROFESSIONAL EN

GI

NEER

O

DESIGNED BY:

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

DATE:

HAZEN NO.:

CONTRACT NO.:

DRAWINGNUMBER:

PROJECTENGINEER:

DRAWN BY:

CHECKED BY:

1

REV ISSUED FOR DATE BY

HAZEN AND SAWYER4035 RIDGE TOP ROAD,

FAIRFAX, VA. 22030CERTIFICATE OF AUTHORITY: 2771

FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKSAND ENVIRONMENTAL SERVICES

NOMAN M. COLE, JR.POLLUTION CONTROL PLANT

DISINFECTION FACILITIES - PHASE I

M. VANHORNE

0 1/2" 1"

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTIONJ. CARROLL

OCTOBER 2016

32241-004

C:\

Use

rs\z

zdro

jew

ski\

Doc

umen

ts\3

2241

-004

-PP1

-ELE

C_z

zdro

jew

ski.r

vt

11/4

/201

6 11

:58:

51 A

M

E-PP1-1

Z. ZDROJEWSKI

D. WEBERTEMPORARY CHEMICAL BUILDING (PP1)

ELECTRICALTOP POWER AND LIGHTING PLAN

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV3 ADDENDUM 1 11/16 MPV

3

3

3

3

3

3

Page 25: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

NOTES:1. TO PROVIDE POWER TO TEMPORARY CHEMICAL

BUILDING (PP1), CONTRACTOR SHALL FURNISHAND INSTALL WESTINGHOUSE TYPE W CIRCUITBREAKER IN EXISTING MCC-22, SECTION A,LOCATED IN EXISTING AWT CHLORINATIONFACILITY (HH). REFERENCE DRAWING E-HH-1 FORMCC-22 LOCATION.

2. CONTRACTOR SHALL SPLICE CONDUCTORS IN THEWIREWAY IN A NEAT AND WORKMANLIKE MANNER.CONTRACTOR SHALL USE INSULATED,MULTI-CONDUCTOR CONNECTORS ASMANUFACTURED BY POLARIS, OR EQUAL.

3. COORDINATE LOCATION OF ELECTRICAL JUNCTIONBOX WITH HEAT TRACE INSTALLER.

D. WEBER

Z. ZDROJEWSKI

E-PP1-2

TEMPORARY CHEMICAL BUILDING (PP1)ELECTRICAL

SINGLE LINE DIAGRAM AND RISER DIAGRAMS

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

480V, 3Ø FROM MCC-22 INEXISTING AWT CHLORINATION

FACILITY (HH)

NEMA 3R MAINPP1-BLDG ECB

NEMA 3R 8"X8" (MINIMUM) WIREWAY,SEE NOTE 2

NEMA 3RTX-LP-1 ECB

TX-LP-145KVA480-120/208V

3Ø, 4WDRY-TYPE

NEMA 3R WATERHEATER ECB

INSTANTWATERHEATER

TEMPORARY CHEMICAL BUILDINGSINGLE LINE DIAGRAM

TEMPORARY CHEMICAL BUILDINGRISER DIAGRAM

CJB-PP1-1

C-PP1-000

SODIUMBISULFITE ROOM

EYEWASH/SHOWER

C-PP1-001

FS

SODIUM BISULFITEFILL STATION

EYEWASH/SHOWER

TEMPORARY SODIUM BISULFITETANK FILL PANEL

(FP-395-0-1)

I-PP1-001

I-PP1-005C-PP1-006

I-PP1-006C-PP1-007

C-PP1-011

LSH

SODIUM BISULFITESTORAGE AREA

SUMP

I-PP1-003

SODIUM BISULFITETEMP STORAGE

TANK NO.1

SODIUM BISULFITETEMP STORAGE

TANK NO.2

BISULFITE TRANSFERPUMP PANEL NO.1

(FP-395-1-1)

C-PP1-003 C-PP1-004

P-PP1-000

P-PP1-001

P-PP1-002

P-PP1-004

P-PP1-005 P-PP1-006

P-PP1-003

AWT CHLORINATION FACILITY (HH)

REMOTE I/O PANELFP-460-HH-1

C-PP1-005 I-PP1-004

LE LE

FS

LIT LIT

LP-1

AFAT

10070

AFAT

225200

AFAT

250250

TRANSFER PUMPS NO.1 AND NO.2RISER DIAGRAMS

FROM LP-1

BISULFITETRANSFER PUMPPANEL NO.1(FP-395-1-1)

1

P-PP1-008

P-PP1-007

TRANSFER PUMPNO.1

(SBTP-395-1-1)

FROM LP-1

1

P-PP1-010

P-PP1-009

TRANSFER PUMPNO.2

(SBTP-395-2-1)

MCC-22SINGLE LINE DIAGRAM

AFAT

250250

EXISTING MCC-22SECTION A, SEE NOTE 1

TO TEMPORARY CHEMICALBUILDING (PP1)

P-PP1-000

I-PP1-008

AMCP

7

1

AMCP

7

1 BISULFITETRANSFER PUMPPANEL NO.2(FP-395-2-1)

SODIUM BISULFITEDAYTANK CONTROL PANEL

C-PP1-008

P-PP1-025

P-PP1-025

EXHAUST FAN EF-1RISER DIAGRAM

FROM LP-1

P-PP1-029

P-PP1-030

L-1

P-PP1-031

EF-1

BISULFITE TRANSFERPUMP PANEL NO.2

(FP-395-2-1)

C-PP1-002

FROM LP-1

P-PP1-019

EUH-1

60A3P

FROM LP-1

P-PP1-020

EUH-2

60A3P

UNIT HEATERSRISER DIAGRAMS

HEAT TRACE CONNECTION DETAILNOT TO SCALE

FROM LP-1, SEEPANEL SCHEDULE

30A

HEAT TRACECONTROLLER

JUNCTIONBOX

HEAT TRACE INSTALLEDPER MANUFACTURER'SRECOMMENDATION

END CAP, TYP

POWER CONNECTIONBOX, SEE NOTE 3, TYP

LOCKABLE SNAPSWITCH

3/4" CONDUIT (SCHEDULE 40 PVC,WHERE INSTALLED IN PIPE TRENCH)

WIRE SIZE PER PANELSCHEDULE

CIRCUIT SUPPLIED THROUGHGROUND FAULT EQUIPMENTPROTECTOR

CONTROLLER, ONEPER CIRCUIT

LOCATED DISCONNECTADJACENT TOCONTROLLER

SUMP PUMPCONTROL PANEL

(FP-395-3-1)

LSL

C-PP1-010

SUMP PUMP CONTROL PANELSRISER DIAGRAM

SUMP PUMPCONTROL PANEL(FP-395-3-1)

FROM LP-1

P-PP1-032

DISCONNECT RATED RECEPTACLE

M

P-PP1-033

P-PP1-034

SUMP PUMP(SBSP-395-1-2)

C-PP1-012 C-PP1-013

WASTE OIL RECEIVING STATIONRISER DIAGRAM

WASTE OILRECEIVING STATION

CONTROL PANEL

30A3P

P-PP1-022P-PP1-028

WASTE OILRECEIVING STATIONDISCONNECTEXISTING CONTROL

CONDUIT

EXISTING POWER CONDUIT

AMCP

7

1

3 ADDENDUM 1 11/16 MPV

3

CP-1CP-2

C-PP1-014

C-PP1-015

3

SUMP PUMPCONTROL PANEL(FP-395-4-1)

FROM LP-1

P-PP1-035

DISCONNECT RATED RECEPTACLE

M

P-PP1-036

P-PP1-037

SUMP PUMP(SBSP-395-2-2)

AMCP

7

1

C-PP1-017

LSH

SODIUM BISULFITESTORAGE AREA

SUMP

SUMP PUMPCONTROL PANEL

(FP-395-4-1)

LSL

C-PP1-016

3

Page 26: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

D. WEBER

Z. ZDROJEWSKI

E-PP1-3

TEMPORARY CHEMICAL BUILDING (PP1)ELECTRICAL

CONTROL SCHEMATICS AND PANEL SCHEDULE

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

1

2

3

4

5

6

8

7

9

11

10

12

13

14

15

16

17

18

19

20

22

21

23

24

25

26

27

28

29

31

33

32

34

35

30

36

37

38

39

40

41

43

42

44

46

45

47

48

49

50

1

45

SODIUM BISULFITE TRANSFER PUMP NO.1 & NO.2CONTROL SCHEMATIC

L1

L2

L3

M208VAC

M8 OL

CPT 208/120VAC

M8

R

OL

OL

Y

RUN

FAIL

208/120 VOLTS LP-1 TYPE: NEMA 3R3 PHASE, 4 WIRE MAIN BREAKER MOUNT: SURFACE

150A 3P

MODS DESCRIPTION WIRE TRIP POLE No.VOLT-AMPERES VOLT-AMPERES

No. POLE TRIP WIRE DESCRIPTION MODSA B C A B C

- CHEM BLDG - INDOOR LTG SEE NOTE 1 20 1 1 730 720 2 1 20 SEE NOTE 1 CHEM BLDG - RECEPTACLES -- CHEM BLDG - EMERGENCY LTG SEE NOTE 1 20 1 3 60 450 4 1 20 SEE NOTE 1 CHEM BLDG - OUTDOOR LTG -

- SEE RISER 205 420 420 6

3 20 SEE RISER -TRANSFER PUMP NO. 1 3 7 420 420 8 TRANSFER PUMP NO. 29 420 420 10

- FS-395-2-2 P-PP1-017 20 1 11 250 300 12 1 20 P-PP1-011 SB TANK FILL CONTROL PANEL -- FS-395-1-2 P-PP1-018 20 1 13 250 100 14 1 20 P-PP1-012 LIT-395-1-1 -

GFEP SB HEAT TRACE NO.1 P-PP1-014 20 1 15 1,800 100 16 1 20 P-PP1-013 LIT-395-2-1 -GFEP SB HEAT TRACE NO.2 P-PP1-015 20 1 17 1,800 500 18 1 20 P-PP1-021 FSL-395-1-2 HEAT TRACE GFEPGFEP SB HEAT TRACE NO.3 P-PP1-026 20 1 19 1,800 4,167 20

3 40 SEE RISER EUH-2 -- EUH-1 SEE RISER 40 3

21 4,167 4,167 2223 4,167 4,167 2425 4,167 320 26 1 20 SEE RISER EF-1 -

- SUMP PUMP CP ( FP-395-3-1) SEE RISER 20 1 27 500 300 28 1 20 P-PP1-024 TANK FILL CABINET -- SUMP PUMP CP ( FP-395-4-1) SEE RISER 20 1 29 500 - 30 1 20 SPARE -- SPARE 20 1 31 - - 32 1 20 SPARE -- SPARE 20 1 33 - - 34 1 20 SPARE -- SPARE 20 1 35 - - 36 1 20 SPARE -- SPARE 20 1 37 - - 38 1 20 SPARE -- SPARE 20 1 39 - - 40 1 20 SPARE -- SPARE 20 1 41 - - 42 1 20 SPARE -

TOTAL 7,367 6,947 7,137 5,727 5,437 5,387 TOTALPHASE TOTAL TOTAL LOAD (VA)

13,094 12,384 12,524 38,002TOTAL LOAD (A)

105GFCI - GROUND FAULT CIRCUIT INTERRUPTER (5mA)

LOD - LOCK-ON DEVICE 22K AICLFD - LOCK-OFF DEVICE 100kA SPDGFEP - GROUND FAULT EQUIPMENT PROTECTOR (30mA)

WAOO

DT LOW LEVEL

1

DT HIGH LEVEL

1

NOTES:1. UNLESS OTHERWISE NOTED, ALL LIGHTING AND

RECEPTACLE WIRE SHALL BE 2#12, #12GND IN3/4" CONDUIT.

2. LINE VOLTAGE THERMOSTAT PROVIDED PERVENTILATION SCHEDULE ON SHEET H-PP1-2.

CONTROLPOWER ON

JOG

120VAC, 1Ø

M27 OL

M

DISCONNECT RATEDRECEPTACLE

STOP

L.O.

START

M27LSL-395-1-3

M27

R

OL

RUN

LSH-395-1-3

CR30

RESET CR30

Y

HIGH LEVELALARM

HIGH LEVEL ALARM TOSB TANK FILL CONTROL

PANEL (FP-395-0-1)

CR30

SUMP PUMP CONTROL PANEL (FP-395-3-1)CONTROL SCHEMATIC

IN SERVICE

2

W CONTROLPOWER ON

OL

Y FAIL

3 ADDENDUM 1 11/16 MPV

3

3

120VAC, 1Ø

M44 OL

M

DISCONNECT RATEDRECEPTACLE

STOP

L.O.

START

M44LSL-395-2-3

M44

R

OL

RUN

LSH-395-2-3

CR47

RESET CR47

Y

HIGH LEVELALARM

HIGH LEVEL ALARM TOSB TANK FILL CONTROL

PANEL (FP-395-0-1)

CR47

W CONTROLPOWER ON

OL

Y FAIL

51

SUMP PUMP CONTROL PANEL (FP-395-4-1)CONTROL SCHEMATIC

52

53

54

3

Page 27: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

D. WEBER

Z. ZDROJEWSKI

E-PP1-4

TEMPORARY CHEMICAL BUILDING (PP1)ELECTRICAL

CONDUIT AND WIRE SCHEDULES

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

CONDUIT NO. SIZE FROM TO CONDUCTORS REMARKSP-PP1-000 4" MCC-22 MAIN PP1-BLDG ECB 3#250KCMIL, #4GND

P-PP1-001 3" MAIN PP1-BLDG ECB PP1-BLDG WIREWAY 3#250KCMIL, #4GND

P-PP1-002 2" PP1-BLDG WIREWAY TX-LP-1 ECB 3#4, #4GND

P-PP1-003 3" PP1-BLDG WIREWAY WATER HEATER ECB 3#4/0, #4GND

P-PP1-004 2" TX-LP-1 ECB TX-LP-1 3#4, #8GND

P-PP1-005 2" TX-LP-1 LP-1 4#1/0, #6GND

P-PP1-006 2" WATER HEATER ECB INSTANT WATER HEATER 3#4/0, #6GND

P-PP1-007 3/4" LP-1 BISULFITE TRANSFER PUMP PANEL NO.1 3#12, #12GND

P-PP1-008 3/4" BISULFITE TRANSFER PUMP PANEL NO.1 TRANSFER PUMP NO.1 3#12, #12GND

P-PP1-009 3/4" LP-1 BISULFITE TRANSFER PUMP PANEL NO.2 3#12, #12GND

P-PP1-010 3/4" BISULFITE TRANSFER PUMP PANEL NO.2 TRANSFER PUMP NO.2 3#12, #12GND

P-PP1-011 3/4" LP-1 SB TANK FILL PANEL (FP-395-0-1) 2#12, #12GND

P-PP1-012 3/4" LP-1 LIT-395-1-1 2#12, #12GND

P-PP1-013 3/4" LP-1 LIT-395-2-1 2#12, #12GND

P-PP1-014 3/4" LP-1 SB HEAT TRACE NO.1 2#10, #12GND

P-PP1-015 3/4" LP-1 SB HEAT TRACE NO.2 2#10, #12GND

P-PP1-016 NOT USEDP-PP1-017 3/4" LP-1 FS-395-2-2 2#12, #12GND

P-PP1-018 3/4" LP-1 FS-395-1-2 2#12, #12GND

P-PP1-019 1" LP-1 EUH-1 3#8, #10GND VIA DISCONNECTP-PP1-020 1" LP-1 EUH-2 3#8, #10GND VIA DISCONNECTP-PP1-021 3/4" LP-1 FSL-395-1-2 PIPING HEAT TRACE 2#10, #12GND

P-PP1-022 2" WASTE OIL RECEIVING STATION DSW WASTE OIL RECEIVING STATION CP 3#10, 2#12, 4#14, 3#12GND

P-PP1-023 1" SITE LTG POLE SITE LTG HANDHOLE 4#10, #12GND

P-PP1-024 3/4" LP-1 SODIUM BISULFITE TANK FILL CABINET 2#12, #12GND FOR RECEPTACLE, LTG, ETC.

P-PP1-025 4" MCC-22 MAIN PP1-BLDG ECB EMPTY W/ PULLSTRING SPAREP-PP1-026 3/4" LP-1 SB HEAT TRACE NO.3 2#10, #12GND

P-PP1-027 NOT USEDP-PP1-028 2" WASTE OIL RECEIVING STATION DSW WASTE OIL RECEIVING STATION CP EMPTY W/ PULLSTRING SPAREP-PP1-029 3/4" LP-1 VENTILATION CONTROL PANEL CP-1 2#12, #12GND

P-PP1-030 3/4" VENTILATION CONTROL PANEL CP-1 L-1 2#12, #12GND

P-PP1-031 3/4" VENTILATION CONTROL PANEL CP-1 EF-1 2#12, #12GND

P-PP1-032 3/4" LP-1 SP CONTROL PANEL (FP-395-3-1) 2#12, #12GND

P-PP1-033 3/4" SP CONTROL PANEL (FP-395-3-1) DISCONNECT RATED RECEPTACLE 2#12, #12GND

P-PP1-034 3/4" DISCONNECT RATED RECEPTACLE SUMP PUMP (SBSP-395-1-2) 2#12, #12GND

P-PP1-035 3/4" LP-1 SP CONTROL PANEL (FP-395-4-1) 2#12, #12GND

P-PP1-036 3/4" SP CONTROL PANEL (FP-395-4-1) DISCONNECT RATED RECEPTACLE 2#12, #12GND

P-PP1-037 3/4" DISCONNECT RATED RECEPTACLE SUMP PUMP (SBSP-395-2-2) 2#12, #12GND

P-PP1-038 NOT USEDP-PP1-039 NOT USEDP-PP1-040 NOT USEDP-PP1-041 NOT USEDP-PP1-042 NOT USEDP-PP1-043 NOT USEDP-PP1-044 NOT USEDP-PP1-045 NOT USEDP-PP1-046 NOT USEDP-PP1-047 NOT USEDP-PP1-048 NOT USEDP-PP1-049 NOT USEDP-PP1-050 NOT USEDP-PP1-051 NOT USEDP-PP1-052 NOT USEDP-PP1-053 NOT USEDP-PP1-054 NOT USEDP-PP1-055 NOT USEDP-PP1-056 NOT USEDP-PP1-057 NOT USEDP-PP1-058 NOT USEDP-PP1-059 NOT USEDP-PP1-060 NOT USEDP-PP1-061 NOT USEDP-PP1-062 NOT USEDP-PP1-063 NOT USEDP-PP1-064 NOT USEDP-PP1-065 NOT USEDP-PP1-066 NOT USEDP-PP1-067 NOT USEDP-PP1-068 NOT USEDP-PP1-069 NOT USEDP-PP1-070 NOT USEDP-PP1-071 NOT USEDP-PP1-072 NOT USEDP-PP1-073 NOT USEDP-PP1-074 NOT USEDP-PP1-075 NOT USEDP-PP1-076 NOT USEDP-PP1-077 NOT USEDP-PP1-078 NOT USEDP-PP1-079 NOT USED

CONDUIT NO. SIZE FROM TO CONDUCTORS REMARKSC-PP1-000 3/4" CJB-PP1-1 FS-395-2-2 2#14, #14GND

C-PP1-001 3/4" CJB-PP1-1 FS-395-1-2 2#14, #14GND

C-PP1-002 3/4" CJB-PP1-1 TEMP SODIUM BISULFITE TANK FILL PANEL 6#14, #14GND

C-PP1-003 1" CJB-PP1-1 BISULFITE TRANSFER PUMP PANEL NO.1 12#14, #14GND

C-PP1-004 1" CJB-PP1-1 BISULFITE TRANSFER PUMP PANEL NO.2 12#14, #14GND

C-PP1-005 1" FP-460-HH-1 CJB-PP1-1 14#14, #14GND

C-PP1-006 3/4" TEMP SODIUM BISULFITE TANK FILL PANEL LIT-395-1-1 8#14, #14GND

C-PP1-007 3/4" TEMP SODIUM BISULFITE TANK FILL PANEL LIT-395-2-1 8#14, #14GND

C-PP1-008 1" SODIUM BISULFITE DAYTANK CP CJB-PP1-1 28#14, #14GND

C-PP1-009 NOT USEDC-PP1-010 3/4" TEMP SODIUM BISULFITE TANK FILL PANEL SP CONTROL PANEL (FP-395-3-1) 6#14, #14GND

C-PP1-011 3/4" SP CONTROL PANEL (FP-395-3-1) LSH-395-1-3 6#14, #14GND

C-PP1-012 3/4" TEMP SODIUM BISULFITE TANK FILL PANEL BISULFITE TRANSFER PUMP PANEL NO.1 4#14, #14GND

C-PP1-013 3/4" TEMP SODIUM BISULFITE TANK FILL PANEL BISULFITE TRANSFER PUMP PANEL NO.2 4#14, #14GND

C-PP1-014 3/4" VENTILATION CONTROL PANEL CP-1 CP-2 8#14, #14GND

C-PP1-015 3/4" VENTILATION CONTROL PANEL CP-1 EF-1 6#14, #14GND FLOW SWITCH AND ALARMC-PP1-016 3/4" TEMP SODIUM BISULFITE TANK FILL PANEL SP CONTROL PANEL (FP-395-4-1) 6#14, #14GND

C-PP1-017 3/4" SP CONTROL PANEL (FP-395-4-1) LSH-395-2-3 6#14, #14GND

C-PP1-018 NOT USEDC-PP1-019 NOT USEDC-PP1-020 NOT USEDC-PP1-021 NOT USEDC-PP1-022 NOT USEDC-PP1-023 NOT USEDC-PP1-024 NOT USEDC-PP1-025 NOT USEDC-PP1-026 NOT USEDC-PP1-027 NOT USEDC-PP1-028 NOT USEDC-PP1-029 NOT USEDC-PP1-030 NOT USED

CONDUIT NO. SIZE FROM TO CONDUCTORS REMARKSI-PP1-000 NOT USEDI-PP1-001 3/4" LIT-395-1-1 LE-395-1-1 CABLE BY MANUF.I-PP1-002 NOT USEDI-PP1-003 3/4" LIT-395-2-1 LE-395-2-1 CABLE BY MANUF.I-PP1-004 2" FP-460-HH-1 CJB-PP1-1 6(2/C#16TSH), #14GND

I-PP1-005 1" TEMP SODIUM BISULFITE TANK FILL PANEL LIT-395-1-1 2(2/C#16TSH), #14GND

I-PP1-006 1" TEMP SODIUM BISULFITE TANK FILL PANEL LIT-395-2-1 2(2/C#16TSH), #14GND

I-PP1-007 NOT USEDI-PP1-008 1" CJB-PP1-1 TEMP SODIUM BISULFITE TANK FILL PANEL 4(2/C#16TSH), #14GND

I-PP1-009 NOT USEDI-PP1-010 NOT USEDI-PP1-011 NOT USEDI-PP1-012 NOT USEDI-PP1-013 NOT USEDI-PP1-014 NOT USEDI-PP1-015 NOT USEDI-PP1-016 NOT USEDI-PP1-017 NOT USEDI-PP1-018 NOT USEDI-PP1-019 NOT USEDI-PP1-020 NOT USEDI-PP1-021 NOT USEDI-PP1-022 NOT USEDI-PP1-023 NOT USEDI-PP1-024 NOT USEDI-PP1-025 NOT USEDI-PP1-026 NOT USEDI-PP1-027 NOT USEDI-PP1-028 NOT USEDI-PP1-029 NOT USEDI-PP1-030 NOT USED

3 ADDENDUM 1 11/16 MPV

3

3

Page 28: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

NOTES:GROUND RING CONDUCTOR SHALL BE #4/0 BARECOPPER WIRE 30" MINIMUM BELOW FINISHEDGRADE. ALL GROUND CONDUCTORS TO EQUIPMENTOR STRUCTURAL STEEL SHALL BE BARE COPPERWIRE.

MOUNT FIXTURE TYPE "LW2" 8'-0" AFF.

CONTRACTOR SHALL FURNISH AND INSTALLDIRECT-BURIED CONDUITS FROM JB-TT-1 ANDFROM JB-TT-2 TO THE HANDRAIL OUTSIDE THEAWT CHLORINATION BUILDING (HH). SEEDRAWING E-9 FOR SITE PLAN CONDUIT ROUTINGAND DRAWING E-TT-2 FOR CONDUIT AND WIRESCHEDULE.

A GROUND ROD TRIAD AT THIS STURCTURE SHALLBE PROVIDED WITH RODS SEPARATED BY 10 FEET.BOND DUCTBANK AND ALL OTHER EQUIPMENT ASREQUIRED AT THIS STRUCTURE TO THE GROUNDROD TRIAD.

CONTRACTOR SHALL STUB OUT AND CAPCONDUITS FROM DUCTBANK DB-M1 SIX (6) FEETFROM HANDHOLE EHH-3.

EFFLUENT CHAMBER STRUCTURE (TT) ISIDENTIFIED AS HAVING AN NEC, ARTICLE 500RATING OF UNCLASSIFIED PER TABLE 5.2, LINE 25OF NFPA 820. ELECTRICAL MATERIALS ANDMETHODS SHALL REFLECT THIS CLASSIFICATION.

1.

2.

3.

4.

5.

6.

E-TT-1

B____

E-TT-1

A____

TO UV

UP(FUTURE) DO CONTROLLER

LW2 LW2

LL1

GFCIWPCR

JB-TT-1

SEE NOTE 3

DUCTBANK TO FUTUREDISINFECTION FACILITIES (HH2),SEE NOTE 5

DB

A1

EHH-3DB

K1

LL1

JB-TT-2

DB

L1

, TYP.1650005

DB

M1

(FUTURE) DO CONTROLLER

E(FUTURE) RAIL MOUNTEDDO PROBE

JB-TT-2

(FUTURE) DO CONTROLLER

E

(FUTURE) RAIL MOUNTEDDO PROBE

GROUND ROD, TYP, SEE NOTE 4

#4/0 BARE COPPERGROUND CONDUCTOR, TYP,SEE NOTE 1

BOND TO STRUCTURAL REBAR, TYP

BOND TODUCTBANK, TYP

Lic. No.26535

GERALD J.RATASKY

HTLAEWNOM

MC

P

AINI

GR

IVFO

ROFESSIONAL EN

GI

NEER

O

DESIGNED BY:

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

DATE:

HAZEN NO.:

CONTRACT NO.:

DRAWINGNUMBER:

PROJECTENGINEER:

DRAWN BY:

CHECKED BY:

1

REV ISSUED FOR DATE BY

HAZEN AND SAWYER4035 RIDGE TOP ROAD,

FAIRFAX, VA. 22030CERTIFICATE OF AUTHORITY: 2771

FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKSAND ENVIRONMENTAL SERVICES

NOMAN M. COLE, JR.POLLUTION CONTROL PLANT

DISINFECTION FACILITIES - PHASE I

M. VANHORNE

0 1/2" 1"

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTIONJ. CARROLL

OCTOBER 2016

32241-004

C:\

Use

rs\z

zdro

jew

ski\

Doc

umen

ts\3

2241

-004

-TT-

ELEC

_zzd

roje

wsk

i.rvt

11/4

/201

6 12

:03:

40 P

M

E-TT-1

Z. ZDROJEWSKI

D. WEBEREFFLUENT CHAMBER (TT)

ELECTRICALTOP POWER AND LIGHTING PLAN

1/4" = 1'-0"TOP POWER AND LIGHTING PLAN

SECTION 1/4" = 1'-0" E-TT-1

BSECTION 1/4" = 1'-0" E-TT-1

A

N

PLAN

T N

ORTH

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

Page 29: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

D. WEBER

Z. ZDROJEWSKI

E-TT-2

EFFLUENT CHAMBER (TT)ELECTRICAL

RISER DIAGRAM AND CONDUIT ANDWIRE SCHEDULES

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

EFFLUENT CHAMBER AND OUTFALL STRUCTURERISER DIAGRAMS

FROM LP-22B INCHLORINATION FACILITY (HH),

REFERENCE E-HH-1

P-TT-002

JB-TT-1

EFFLUENT (TT)RECEPTACLES

EFFLUENT (TT)LIGHTING

P-TT-007

I-TT-000

CONDUIT NO. SIZE FROM TO CONDUCTORS REMARKSP-TT-000 NOT USEDP-TT-001 NOT USEDP-TT-002 2" LP-22B JB-TT-1 2#6, 2#8, 4#10, #12GND SEE NOTE 1P-TT-003 NOT USEDP-TT-004 3/4" JB-TT-1 EFFLUENT (TT) RECEPTACLES 2#10, #12GND

P-TT-005 3/4" JB-TT-1 EFFLUENT (TT) LIGHTING 2#10, #12GND

P-TT-006 NOT USEDP-TT-007 3/4" JB-TT-1 FUTURE DO CONTROLLER EMPTY W/ PULLSTRING STUB UP AND CAP IN DB-M1P-TT-008 3/4" FUTURE DO CONTROLLER FUTURE DO PROBE EMPTY W/ PULLSTRING

P-TT-009 NOT USEDP-TT-010 3/4" JB-TT2-1 OUTFALL (TT2) LIGHTING 2#6, #12GND

P-TT-011 3/4" JB-TT2-1 EXISTING OUTFALL (TT2) CAMERA 2#8, #12GND

P-TT-012 1" JB-TT-1 JB-TT2-1 2#6, 2#8, #12GND

P-TT-013 NOT USEDP-TT-014 NOT USEDP-TT-015 NOT USED

CONDUIT NO. SIZE FROM TO CONDUCTORS REMARKSI-TT-000 1" JB-TT-2 FUTURE DO CONTROLLER EMPTY W/ PULLSTRING STUB UP AND CAP IN DB-M1I-TT-001 2" FIBER PATCH PANEL JB-TT-2 6PR MM FIBER OUTFALL (TT) CAMERA

I-TT-002 1" FIBER PATCH PANEL JB-TT-2 EMPTY W/ PULLSTRING SPAREI-TT-003 1" FUTURE DO CONTROLLER FUTURE DO PROBE EMPTY W/ PULLSTRING

I-TT-004 2" JB-TT-2 JB-TT2-1 6PR MM FIBER OUTFALL (TT) CAMERA

I-TT-005 2" JB-TT2-1 OUTFALL (TT) CAMERA 6PR MM FIBERI-TT-006 2" SCADA TERMINAL FIBER PATCH PANEL 6PR MM FIBERI-TT-007 NOT USEDI-TT-008 NOT USEDI-TT-009 NOT USEDI-TT-010 NOT USED

JB-TT-2

NOTES:1. TWO (2) #6 AND TWO (2) #8 CONDUCTORS SHALL

SUPPLY POWER TO OUTFALL STRUCTURE (TT2),AND FOUR (4) #10 CONDUCTORS SHALL SUPPLYPOWER TO EFFLUENT CHAMBER (TT).

FROM SCADA TERMINAL INCHLORINATION FACILITY (HH)

I-TT-001I-TT-002

P-TT-005

P-TT-004P-TT-012

JB-TT2-1

EXISTINGOUTFALL (TT2)

CAMERA

OUTFALL (TT2)LIGHTING

P-TT-011P-TT-010

FUTURE DOCONTROLLER

FUTURE DOPROBE

I-TT-003

FUTURE DOCONTROLLER

FUTURE DOPROBE

P-TT-008

I-TT-004

JB-TT2-1

EXISTINGOUTFALL (TT2)

CAMERA

I-TT-005

FIBER PATCHPANEL (IN CHLORINATION

FACILITY (HH)

I-TT-006

Page 30: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

JB-TT2-1

EHH-1

LL1

, TYP.1650005

, TYP.1611804

EHH-5

SEE NOTE 4, TYP

GROUND ROD, TYP,SEE NOTE 3

#4/0 BARE COPPER GROUND CONDUCTOR, TYPSEE NOTE 1

BOND TO STRUCTURAL REBAR, TYP

DB

B1

DB

B1

EXSITING POLEMOUNTED CAMERALOCATION

EXISTING SPOT LIGHT LOCATION

BOND TODUCTBANK, TYP

DB

J1

NOTES:GROUND RING CONDUCTOR SHALL BE #4/0 BARECOPPER WIRE 30" MINIMUM BELOW FINISHEDGRADE. ALL GROUND CONDUCTORS TOEQUIPMENT OR STRUCTURAL STEEL SHALL BEBARE COPPER WIRE.

CONTRACTOR SHALL RECONNECT ANY LIGHTS &SECURITY EQUIPMENT IN THE AREA. REFERENCEDRAWING E-HH-1 FOR LP-22B CIRCUITDESIGNATIONS.

A GROUND ROD TRIAD AT THIS STRUCTURE SHALLBE PROVIDED WITH RODS SEPARATED BY 10 FEET.BOND DUCTBANK AND ALL OTHER EQUIPMENT ASREQUIRED AT THIS STRUCTURE TO THE GROUNDROD TRIAD. BOND THE TRIAD TO THE EXISTINGGROUND GRID.

DUCTBANKS B1 AND J1 SHALL BE UNIFORMLYSLOPED TOWARDS THE HANDHOLES TO AVOIDFLOODING INSIDE HANDHOLES.

OUTFALL STRUCTURE (TT2) IS IDENTIFIED ASHAVING AN NEC, ARTICLE 500 RATING OFUNCLASSIFIED PER TABLE 5.2, LINE 25 OF NFPA820. ELECTRICAL MATERIALS AND METHODSSHALL REFLECT THIS CLASSIFICATION.

1.

2.

3.

4.

5.

Lic. No.26535

GERALD J.RATASKY

HTLAEWNOM

MC

P

AINI

GR

IVFO

ROFESSIONAL EN

GI

NEER

O

DESIGNED BY:

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

DATE:

HAZEN NO.:

CONTRACT NO.:

DRAWINGNUMBER:

PROJECTENGINEER:

DRAWN BY:

CHECKED BY:

1

REV ISSUED FOR DATE BY

HAZEN AND SAWYER4035 RIDGE TOP ROAD,

FAIRFAX, VA. 22030CERTIFICATE OF AUTHORITY: 2771

FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKSAND ENVIRONMENTAL SERVICES

NOMAN M. COLE, JR.POLLUTION CONTROL PLANT

DISINFECTION FACILITIES - PHASE I

M. VANHORNE

0 1/2" 1"

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTIONJ. CARROLL

OCTOBER 2016

32241-004

C:\

Use

rs\z

zdro

jew

ski\

Doc

umen

ts\3

2241

-004

-TT2

-ELE

C_z

zdro

jew

ski.r

vt

11/4

/201

6 12

:04:

37 P

M

E-TT2-1

Z. ZDROJEWSKI

D. WEBEROUTFALL (TT2)

ELECTRICALTOP POWER AND LIGHTING PLAN

3/8" = 1'-0"TOP POWER AND LIGHTING PLAN

N

PLAN

T NO

RTH

1 PERMIT SUBMITTAL 10/16 MPV2 GMB DEVELOPMENT SUBMITTAL 10/16 MPV

Page 31: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

PLAN

T N

ORTH

D. WEBER

Z. ZDROJEWSKI

E-HH-1

AWT CHLORINATION FACILITY (HH)ELECTRICAL

TOP POWER PLAN

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

TOP POWER PLAN3/16" = 1'-0"

MCC-22, SEE NOTE 1

A CB D E F G H K L M

N

P

Q

CHLORINATORROOM

LP-22B, SEENOTES 2 AND 3 LP-22A

DESK WITH SECURITY MONITORAND SCADA TERMINAL

CONTROLROOM

TRANSFORMERS

VFD VFD

FP-460-HH-1

NOTES:1. TO PROVIDE POWER TO TEMPORARY CHEMICAL

BUILDING (PP1), CONTRACTOR SHALL FURNISHAND INSTALL NEW WESTINGHOUSE TYPE WCIRCUIT BREAKER IN MCC-22, SECTION A.REFERENCE DRAWING E-PP1-2 FOR SINGLE LINEDIAGRAM.

2. FOR EFFLUENT CHAMBER (TT), CONTRACTORSHALL UTILIZE SPARE CIRCUIT NO.55 IN LP-22BFOR LIGHTING, AND SHALL UTILIZE SPARECIRCUIT NO.65 IN LP-22B FOR RECEPTACLES.REFERENCE DRAWING E-TT-2 FOR CONDUIT ANDWIRE SCHEDULE.

3. FOR OUTFALL STRUCTURE (TT2), CONTRACTORSHALL FURNISH AND INSTALL NEW CONDUIT ANDWIRE FOR CIRCUIT NO.28 (OUTFALL CAMERA) ANDFOR CIRCUIT NO.50 (OUTFALL LIGHTING).REFERENCE DRAWING E-TT-2 FOR CONDUIT ANDWIRE SCHEDULE.

4. CONDUITS SHALL NOT PENETRATE OR BEATTACHED TO FLOORS OR WALLS INSIDE OFLIQUID CONTAINMENT AREA WITHOUT SPECIFICENGINEER APPROVAL.

5. THIS BUILDING SHALL BE A NON-PERMANENTPROCESS AREA. REFERENCE SPECIFICATION16111.

6. THE CONTROL ROOM, LAB ROOM, AND PLC ROOMIN CHLORINATION FACILITY (HH) ARENON-PROCESS RELATED AREAS WITHOUT ANIDENTIFIED EXPLOSIVE RISK. AREA SHALL BERATED AS UNCLASSIFIED AS DEFINED IN ARTICLE500 OF THE NATIONAL ELECTRIC CODE.ELECTRICAL MATERIALS AND METHODS SHALLREFLECT THIS CLASSIFICATION.

PUMPINGROOM

ANALYZERROOM

DBH1

EXPOSED CONDUITS TOHANDRAIL, SEE E-9 FORCONDUIT ROUTING

SODIUM BISULFITEDAYTANK CONTROL PANEL

CONTAINMENT AREA,SEE NOTE 4

PLC ROOM

FIBER PATCH PANEL

Page 32: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

J. WALSH

M. SWINSKY

D-14

MISCELLANEOUS STANDARD DETAILS

SHEET 14

Page 33: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

J. WALSH

M. SWINSKY

D-15

MISCELLANEOUS STANDARD DETAILS

SHEET 15

Page 34: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

J. WALSH

M. SWINSKY

D-16

MISCELLANEOUS STANDARD DETAILS

SHEET 16

Page 35: FAIRFAX COUNTY, VIRGINIA DEPARTMENT OF PUBLIC WORKS … · 4 denotes carbon regeneration system control panel 5 denotes carbon transfer control panel disconnect switch 100a 3p 100a

FOR GMP DEVELOPMENTONLY NOT FORCONSTRUCTION

IF THIS BAR DOES NOTMEASURE 1" THEN DRAWINGIS NOT TO FULL SCALE

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECTENGINEER:

HAZEN AND SAWYER4035 RIDGE TOP ROAD, SUITE 400

FAIRFAX, VIRGINIA 22030CERTIFICATE OF AUTHORITY: 2771REV ISSUED FOR DATE BY

0 1"1/2"

32241-004

1CONTRACT NO.:

HAZEN NO.:

DATE: OCTOBER 2016

DRAWINGNUMBER:

M. VANHORNE FAIRFAX COUNTY, VIRGINIADEPARTMENT OF PUBLIC WORKS AND

ENVIRONMENTAL SERVICESNOMAN M. COLE, JR.

POLLUTION CONTROL PLANTDISINFECTION FACILITIES - PHASE I

J. CARROLL

1 PERMIT SUBMITTAL 10/16 MPV2 GMP DEVELOPMENT SUBMITTAL 10/16 MPV

J. WALSH

M. SWINSKY

D-17

MISCELLANEOUS STANDARD DETAILS