2
• Proposed 2016 Paving Plan
• Questions?
• Snow Mobilization
• Snowzilla Slideshow
• Questions?
Agenda
3
NOVA District Proposed 2016 Paving Plan
4
Overview
• VDOT Asphalt Pavement Conditions
• NOVA District Proposed 2016 Paving Schedules
• Secondary Corrective Maintenance
• NOVA District Additional Proposed 2016 Paving Schedules
• Primary and Secondary Roads Preventive Maintenance
Estimates
• Primary and Secondary Roads Preventive Maintenance Lane
Miles
• VDOT Online Road Work Request Form
• Questions
5
For asphalt pavements, VDOT calculates two different condition indices from the distress information that is collected, and then combines them into a single condition value.
•Load-Related Distress Rating (LDR) is calculated from load-related distresses, such as fatigue cracking in the wheel path (VDOT, 2006). •The Non-Load Related Distress rating (NDR) is calculated from non-load-related distresses, such as construction deficiencies, bleeding, etc. (VDOT, 2006).
The Critical Condition Index (CCI) is then calculated as the lower of the NDR and LDR. The CCI values range from 1 to 100 and the roads are given an overall rating using the ranges shown in Table 1.
VDOT Pavement Conditions Scale
VDOT Pavement Conditions Scale
6
Table 1. Pavement Condition Definitions (VDOT, 2006)
Index Scale (CCI) Pavement Condition Likelihood of Corrective Action
90 and Above Excellent Very Unlikely
70-89 Good Unlikely
60-69 Fair Possibly
50-59 Poor Likely
49 and Below Very Poor Very Likely
NOVA District Proposed 2016 Paving Schedules
# Schedule ID Location/System Total Tons
Asphalt Total Lane Miles Tons of Latex
SY (Slurry Surface
Treatment)
Preventive Maintenance
1 SS-9A-16 Districtwide Slurry Seal - 36.7 - 298,430
2 SS-9B-16 Districtwide Slurry Seal - 61.5 - 579,920
3 LM-9B-16 Districtwide Primary Latex 7,752 40.4 4,872 -
4 LM-9C-16 Districtwide Secondary Latex - 45.6 4,361 -
5 LM-9D-16 Fairfax Primary Latex - 34.3 4,489 -
Total 7,752 218.5 13,722 878,350
Interstate (Corrective Maintenance)
6 PM-9I-16 Fairfax Interstate Paving 34,421 23.4 - -
Total 34,421 23.4 - -
Primary (Corrective Maintenance)
7 PM-9A-16 Arlington Primary Paving 7,764 9.3 - -
8 PM-9F-16 Fairfax Primary Paving 47,325 37.9 - -
9 PM-9L-16 Loudoun Primary Paving 47,259 38.3
10 PM-9P-16 Prince William Primary Paving 1,156 1.4 - -
Total 103,504 86.9 - -
7
Secondary Corrective MaintenanceLocation Total Tons Lane Miles Tons of Latex Slurry Surface
Treatment
11 PM-9Y-16 Districtwide Secondary Paving 23,440 37.6 - -
12 PM-9B-16 Fairfax Secondary Paving 35,767 36.2 - -
13 PM-9C-16 Fairfax Secondary Paving 57,740 38.4 - -
14 PM-9D-16 Fairfax Secondary Paving 38,737 34.9 - -
15 PM-9E-16 Fairfax Secondary Paving 61,960 67.9 - -
16 PM-9G-16 Fairfax Secondary Paving 18,993 17.5 - -
17 PM-9H-16 Fairfax Secondary Paving 57,005 56.2 - -
18 PM-9J-16 Fairfax Secondary Paving 32,637 41.3 - -
19 PM-9W-16 Prince William Secondary Paving 42,063 40.1 - -
20 PM-9X-16 Prince William Secondary Paving 40,104 39.3 - -
21 PM-9Z-16 Prince William Secondary Paving 36,465 35.6 - -
22 PM-9N-16 Loudoun Secondary Paving 41,320 50.0 - -
23 PM-9O-16 Loudoun Secondary Paving 33,087 27.8 - -
Total 519,318 522.8 - -
Grand Total 664,995 851.6 13,722 878,350
8
Primary and Secondary Roads Paving Maintenance Estimates
Estimated $98,842,6449
10
Primary and Secondary Roads Paving Maintenance Estimates
Primary and Secondary Roads Paving Maintenance Lane Miles
Lane Miles: 851.611
12
Primary and Secondary Roads Paving Maintenance Lane Miles
VDOT Online Work Request
13
my.vdot.virginia.gov
Filling potholes; drainage culvert cleaning and repair; guardrail repair; signs and traffic signals; animal, tree, and debris removal from roadway; and shoulder repair.
14
Questions about the 2016 Paving Program?
15
Snow Removal and Snowzilla Slideshow
16
VDOT in Northern Virginia
Fairfax, Prince William, Loudoun, and Arlington counties(Arlington maintains own secondary roads)
Total lane miles: 13,016 (4,800 lane miles Fairfax County)
Interstate: 726 lane miles(Includes Express Lanes)
Primary: 1,729 lane miles
Secondary: 10,561 lane miles(318 miles gravel roads)(16,000 neighborhood streets)
24 commuter lots
18
VDOT Roads – Northern Virginia
Crews work interstates, major roads and main roads in subdivisions concurrently.
Interstates 66/95/395/495 made passable, then bare pavement
High-volume routes (1, 7, 28, 50, etc.) made passable, then bare pavement
Subdivisions(Main roads) made passable, then remaining streets and cul-de-sacs.
Additional priorities:•Shoulders•Moving snow where there is no storage (I-95/395 HOV, construction areas)•12,000 park-and-ride spaces along I-95, I-66
19
Subdivisions are divided into 650 snow maps (350 in Fairfax)Updated annually to ensure all state-maintained roads are included.
How subdivisions are assigned and plowed
• Plows staged in subdivisions when 2”+ forecasted• Plowing begins with 2” of snow on the ground• Main thoroughfares are priority and plowed repeatedly in storm• Crews then work streets, cul-de-sacs
Drivers:• Assigned up to five maps each• Report back after at least one pass on each road
One of 650 snow maps assigned to plow drivers. Hot spots are identified by superintendents and added annually.
Neighborhood Snow Maps
21
Subdivisions and low-volume roads
• Goal: Reach the most residents as quickly as possible• One pass for a typical storm; major storms require multiple
passes and heavy equipment• Hills, curves, intersections sanded for traction• Driveways, sidewalks, trails, hydrants: drivers asked to be
mindful but blocking is often an unintended consequence.
What does “passable” mean?
An 8- to 10-foot path cleared for emergency vehicle access, and drivable with extreme caution. The road remains snow-packed and rutted. The path will not be curb-to-curb or bare pavement.
22
Completing Subdivisions
• Monitors: VDOT staff drive routes for quality control
• Maps are considered complete when a driver reports to area headquarters and monitors have spot-checked
• Once subdivisions are passable,the call center logs inquiries for the field to revisit
• AVL Plow tracking site can help verify that passes were made;
provides data for inquiries
23
So what did it look like?
25
26
28
30
32
35
37
39
40
42
45
46
47
50
51
52
53
So what happens next?
54
Post-Storm ActivitiesPotholes•Crews have filled 10,000+ potholes since Jan. 1•Using “Pothole Killers” as well as traditional methods•Report locations at www.virginiadot.org or 800-FOR-ROAD
55
THANK YOU!