Failford Road to Tritton Road Upgrading the Pacific Highway CONCEPT DESIGN FEBRUARY 2006 A new carriageway would be constructed adjacent to the existing southern carriageway on the eastern side (the existing southbound carriageway would become the new northbound lanes). The preferred project is 3.3km long. The concept design is on display until Friday 17 March 2006. TO TAREE TO NABIAC Failford Cemetery Tritton Road B u l l o c k y W a y F a i l f o r d R o a d P o s s u m B r u s h R o a d S e r v i c e R o a d 1km 0.5 0 N OrthoView aerial photography (2001), cadastral and topographic data under licence to RTA by Department of Lands LEGEND Existing property boundaries Water courses Property acquisition boundary Stage 2 Embankment Cutting Proposed upgrade Existing highway Local roads Stage 2: Existing Bullocky Way intersection would close. Stage 1: New northbound entry ramp to provide access to the Pacific Highway. Stage 1: Existing cross median access would be removed. Stage 1: Existing northbound carriageway would become a two-way service road providing safer access for local residents. Stage 1: Existing southbound carriageway would become new northbound carriageway. Stage 1: New grade- separated interchange at Failford Road. Some property acquisition and clearing of medium value vegetation would be required. Stage 1: New carriageway. Some property acquisition and clearing of medium value vegetation would be required. P a c i f i c H i g h w a y Stage 1: Existing intersection would close and cross median access would be removed. Stage 2: Two-way overbridge and new alignment of Bullocky Way. This would provide east-west access across the Pacific Highway. Some property acquisition and clearing of medium value vegetation would be required. Stage 1: Left-in, left-out access. Property acquisition boundary. CONCEPT DESIGN DETAIL OF STAGE 2 DETAIL OF STAGE 1

Upload: others

Post on 16-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Failford Road to Tritton RoadUpgrading the Pacific Highway

    CONCEPT DESIGN

    FEBRUARY 2006

    A new carriageway would be constructed adjacent to the existing southern carriageway on the eastern side (the existing southbound carriageway would become the new northbound lanes).

    The preferred project is 3.3km long. The concept design is on display until Friday 17 March 2006.

    TO TAREE

    TO NABIAC

    FailfordCemetery

    Tri

    tto

    n R

    oad

    BullockyWay

    Failford

    Road

    PossumBrush Road

    Serv

    ice

    Roa

    d

    1km0.50

    N

    OrthoView aerial photography (2001), cadastral and topographicdata under licence to RTA by Department of Lands

    LEGENDExisting propertyboundariesWater coursesProperty acquisitionboundaryStage 2

    Embankment

    Cutting

    Proposed upgrade

    Existing highway

    Local roads

    Stage 2: Existing BullockyWay intersection would close.

    Stage 1: New northboundentry ramp to provide access

    to the Pacific Highway.

    Stage 1: Existingcross median

    access would beremoved.

    Stage 1: Existing northbound carriagewaywould become a two-way service road

    providing safer access for local residents.

    Stage 1: Existing southboundcarriageway would become

    new northbound carriageway.

    Stage 1: New grade-separated interchange

    at Failford Road.Some property acquisitionand clearing of mediumvalue vegetation would

    be required.

    Stage 1: New carriageway.Some property acquisitionand clearing of mediumvalue vegetation would

    be required.

    Pacif

    ic

    High

    way

    Stage 1: Existing intersectionwould close and cross median

    access would be removed.

    Stage 2: Two-way overbridgeand new alignment of

    Bullocky Way. This wouldprovide east-west access

    across the Pacific Highway.Some property acquisition and

    clearing of medium valuevegetation would be required.

    Stage 1: Left-in,left-out access.

    Propertyacquisitionboundary.

    CONCEPT DESIGN

    DETAIL OF STAGE 2

    DETAIL OF STAGE 1

  • TO TAREE

    TO NABIAC

    Bullocky W

    ay

    Pac

    ific

    Hig

    hway

    Bullocky Way

    Tw

    o-w

    aySe

    rvic

    eR

    oad

    Stage 2: Bullocky Wayoverbridge.

    To Possum Brush Road andnorthbound highway entry ramp.

    Stage 1: Existing cross medianaccess would be closed. Bullocky

    Way would be left-in, left-out.Stage 2: Intersection will close.

    Stage 2:Roundaboutsuitable forB-Doubles.

    Stage 1: Property acquisitionwould be required for newsouthbound carriageway.

    Stage 1: Existing southboundcarriageway would become new

    northbound carriageway.

    To FailfordRoad.

    Stage 2: Propertyacquisition required for newalignment of Bullocky Way.

    Stage 2:Roundaboutsuitable forB-Doubles.

    N

    1km0.50

    300m0 100 200

    OrthoView aerial photography (2001), cadastral and topographicdata under licence to RTA by Department of Lands

    LEGENDExisting propertyboundariesWater coursesProperty acquisitionboundaryStage 2

    Embankment

    Cutting

    Proposed upgrade

    Existing highway

    Local roads

    The existing highway intersections at Possum Brush Road and Tritton Road would close in Stage 1, and Bullocky Way would become left-in, left-out. Bullocky Way intersection would close in Stage 2.

    A grade-separated interchange at Failford Road would provide access to Forster, Tuncurry and Halliday’s Point.

    TO TAREE

    TO NABIAC

    Failford Road

    FailfordCemetery

    Pacific Highw

    ay

    Stage 1:Two-way service road.

    Stage 1: Overbridge wouldprovide safer access for local traffic.

    Stage 1: Roundaboutsuitable for B-Doubles.

    Stage 1:Southboundexit ramp.

    Stage 1:Northboundexit ramp.

    Stage 1:Southboundentry ramp.

    Stage 1: Roundaboutsuitable for B-Doubles.

    Stage 1: Some property acquisition andclearing of vegetation would be requiredto provide new southbound carriageway.

    N

    OrthoView aerial photography (2001), cadastral and topographicdata under licence to RTA by Department of Lands

    LEGENDExisting propertyboundariesWater coursesProperty acquisitionboundaryStage 2

    Embankment

    Cutting

    Proposed upgrade

    Existing highway

    Local roads

    300m0 100 200

    DETAIL OF STAGE 2 PROPOSED OVERBRIDGE

    Failford Road to Tritton RoadUpgrading the Pacific Highway

    CONCEPT DESIGN

    FEBRUARY 2006

    DETAIL OF STAGE 1 PROPOSED INTERCHANGE

    TYPICAL CROSS SECTION

    SELECTION OF CONCEPT DESIGN

    REFINE DESIGN

    PROJECT APPROVAL

    2-WA

    Y C

    OM

    MU

    NIT

    Y IN

    VOLV

    EMEN

    T

    DISPLAY REFINED DESIGN AND ENVIRONMENTAL ASSESSMENT

    WE ARE HERE

    PREPAREENVIRONMENTAL

    ASSESSMENT

    For more information contact the RTA’s project manager: Greg Baird RTA Pacific Highway Office C/ Hunter Regional Office Locked bag 30 Newcastle NSW 2300

    T 02 4924 0242 F 02 4924 0291

    [email protected]

    To send submissions contact: Ms Faye Hargreaves Herons Creek to Stills Road Project team Reply paid 598 Lane Cove NSW 1595

    [email protected]

    www.rta.nsw.gov.au/pacific (click on Failford Road to Tritton Road)

    1800 232 290 (toll free) Project information line

    RTA/Pub.06.016

    All information in correspondence is collected for the sole purpose of assisting in the assessment of this proposal. Submissions will not be responded to individually. All information received, including names and addresses of respondents, may be published in subsequent assessment documents unless clear indication is given in the correspondence that all or part of that information is not to be published.

    Stay involvedThe RTA will continue to consult with landowners and the community about the concept design. There are many aspects of the design that will need local community input, including access arrangements, reducing impact on the immediate environment, drainage infrastructure, noise management and others.

    Your submission on the concept design should be sent to the address shown in the contact information box. All community issues for the concept design will be considered during the assessment studies.

    Detailed report availableThe Failford Road to Tritton Road Concept Design Report explains how the concept design was developed, the major planning constraints and the potential impacts of the project. The report is available on the project website or by telephoning the project information line (see contact details). This report can be viewed at the staffed displays.

    Staffed displaysProject staff will be available to discuss the concept design in more detail at:

    Nabiac Old Bank Centre, Nabiac Street, Nabiac Tuesday 21 February 2006, 1pm - 4.30pm.

    Forster RTA Motor Registry, Forster Village Shopping Centre, Breese Parade, Forster Wednesday 22 February 2006, 9am - 12 noon.

    Taree RTA Motor Registry, 7 Macquarie Street, Taree Wednesday 22 February 2006, 1pm - 4.30pm.

    What happens next?The project team will consider community submissions to refine the concept design. A review of environmental factors will then be undertaken to assess ecological and social impacts. The refined design will be displayed for community comment, prior to consideration for project approval.