Faculty Senate
John F. Carney IIINovember 18, 2010
2010 Incoming Freshmen Class
![Page 2: Faculty Senate](https://reader035.vdocuments.us/reader035/viewer/2022070503/56816393550346895dd48a75/html5/thumbnails/2.jpg)
Upcoming Events Open House at the Residence, Dec. 14
9:00 a.m. – 11:00 a.m.1:00 p.m. – 3:00 p.m.
State of the University, Jan. 19, 2011noonLeach Theatre
![Page 3: Faculty Senate](https://reader035.vdocuments.us/reader035/viewer/2022070503/56816393550346895dd48a75/html5/thumbnails/3.jpg)
Upcoming Events
Special Board of Curators’ Meeting on Nov. 22 to consider bonding projects for University of Missouri System
![Page 4: Faculty Senate](https://reader035.vdocuments.us/reader035/viewer/2022070503/56816393550346895dd48a75/html5/thumbnails/4.jpg)
Schrenk HallBiological Sciences, Chemical and Biological Engineering, and Chemistry
Built in 1938 and 1973
141,854 GSF
Schrenk Hall is in terrible condition.
![Page 5: Faculty Senate](https://reader035.vdocuments.us/reader035/viewer/2022070503/56816393550346895dd48a75/html5/thumbnails/5.jpg)
Construction Project Opportunity205,354 Gross Square Feet
New Construction
$22 MChemical and Biological Engineering
• 63,500 GSF
Rehabilitation
$29 MSchrenk Hall East
• 58,960 GSFSchrenk Hall West
• 82,894 GSF
![Page 6: Faculty Senate](https://reader035.vdocuments.us/reader035/viewer/2022070503/56816393550346895dd48a75/html5/thumbnails/6.jpg)
$51M project
$43M in bonds
$8M must be raised from private sources for new building
Construction Project Opportunity205,354 Gross Square Feet
![Page 7: Faculty Senate](https://reader035.vdocuments.us/reader035/viewer/2022070503/56816393550346895dd48a75/html5/thumbnails/7.jpg)
Existing ProposedChemical and Biological Engr. 20,285 48,358
Chemistry 54,548 60,548
Biological Sciences 10,575 15,575
Support Spaces* 10,413 37,433Total 95,821 161,914
*classrooms, prep rooms, storage, etc.
Net Assignable Square Footage
![Page 8: Faculty Senate](https://reader035.vdocuments.us/reader035/viewer/2022070503/56816393550346895dd48a75/html5/thumbnails/8.jpg)
Chemical and Biological EngineeringProposed Site
![Page 9: Faculty Senate](https://reader035.vdocuments.us/reader035/viewer/2022070503/56816393550346895dd48a75/html5/thumbnails/9.jpg)