FACTORY CLEARANCE • Case study of tenant & landlord requiring removal of redundant equipment and return of building to original shell.

Upload: neil-woodall

Post on 13-Feb-2017

82 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: FACTORY CLEARANCE Power Point Show

FACTORY CLEARANCE

• Case study of tenant & landlord requiring removal of redundant equipment and return of building to original shell.

Page 2: FACTORY CLEARANCE Power Point Show

Works completed by Mason Metals Ltd

Established 1960

Page 3: FACTORY CLEARANCE Power Point Show

Numerous machines, work benches, racking and shelving, tool stores etc

Page 4: FACTORY CLEARANCE Power Point Show

Provision of labour and equipment

Page 5: FACTORY CLEARANCE Power Point Show

Flat bed, hiab, curtain side vehicles, Ro Ro hook lift recycling bins

Page 6: FACTORY CLEARANCE Power Point Show

Bins & tooling all provided in smooth efficient, controlled and safe project

Page 7: FACTORY CLEARANCE Power Point Show

Light & Heavy machinery extracted

Page 8: FACTORY CLEARANCE Power Point Show

Job completed – all materials reclaimed or recycled

Page 9: FACTORY CLEARANCE Power Point Show

Customer Acknowledgement“We are delighted with the work done. Excellent job – would recommend Mason’s without hesitation”.

Catherine Stark Owner Electro Arc

“The lads who cleared the unit were very efficient and perfectly mannered. The work went through without a hitch and finished ahead of schedule.”

Bev Sproson Site Manager Electro Arc