KELLY DOWN CONSULTANTS Pty Ltd A.C.N. OOB 152 207 " Mall: PO Box 573, St Leonards N.S.W., 1590, AUSTRALIA Tel; 61-2-9901-3422 Fax: 61-2-990V3635 Level 1 51 Chandos Street, St Leonards N.S.W., 20E5, AUSTRALIA FACSIMILE HEADER TO: ATTN: CC: FAX No: FROM: Mineral Resources Tasmania Carol Bacon Kourosh Mehin 0394125156 Ahmad Nadji; DNRE Victoria 0394125152 URGENT ROUTINE CONFIDENTIAL 03 6233 8338 No. of Pages Incl. this p a g e Colin Stuart Date: ?~ /a - ?9 Ref: Globex B1 SUBJECT BARRAMUNDI 1 DAILY REPORT MESSAGE: Regards, CA6 •i Colin Stuart Project Manager IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CONTACT THIS OFFICE IMMEDIATELY AT THE FOLLOWING TELEPHONE NUMBER 61-2-901-3422 AND ASK FOR AUTHORISED BY CHARGE TO: Incorporated In South Australia SO/IO 'd 3S9SI066 Z 19 'ON Xtfd NHOQ AH3JI S HOZO 03:80 (1H1 66-100-AO

Upload: duongdang

Post on 10-Mar-2018

214 views

Category:

Documents


1 download

TRANSCRIPT

KELLY DOWN CONSULTANTS Pty Ltd A.C.N. OOB 152 207 "

Mall: PO Box 573, St Leonards N.S.W., 1590, AUSTRALIA

Tel; 61-2-9901-3422 Fax: 61-2-990V3635

Level 1 51 Chandos Street, St Leonards

N.S.W., 20E5, AUSTRALIA

FACSIMILE HEADER

TO: ATTN: C C : FAX No: FROM:

Mineral Resources Tasmania Carol Bacon Kourosh Mehin 0394125156 Ahmad Nadji; DNRE Victoria 0394125152

URGENT ROUTINE

CONFIDENTIAL

03 6233 8338 No. of Pages Incl. this page

Colin Stuart Date: ?~ /a - ?9 Ref: Globex B1

SUBJECT BARRAMUNDI 1 DAILY REPORT

MESSAGE:

Regards,

CA6 •i

Colin Stuart Project Manager

IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CONTACT THIS OFFICE IMMEDIATELY AT THE FOLLOWING TELEPHONE NUMBER 61-2-901-3422 AND ASK FOR

AUTHORISED BY C H A R G E TO:

Incorporated In South Australia

S O / I O 'd 3 S 9 S I 0 6 6 Z 19 'ON Xtfd NHOQ A H 3 J I S H O Z O 0 3 : 8 0 (1H1 6 6 - 1 0 0 - A O

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL:

PERMIT:

RIG:

DEPTH 2400 Hr»:

TVD:

24 HR PROGRESS:

HOLE SIZE;

SURVEYS:

BARRAMUNDI-1

T/Z7P

SEDCO 702

DATE:

REPORT 9

D.F.S.

G-Ocl-99

17

13

J

J LAST CASING:

1 WD(MSL):["

STATUS @ 2400 Kn:

FORMATION:

| Pulling anchors

• RT' SEABED/MSL: 102.5

SHOE l.O.T.:£

MAASP:[]

MUD PROPERTIES ADDrrrves SOLIDS CONTROL FORMATION DATA

DtNSITffSG) Ipm uf ho DEPTH

VISCOSITY(Sncs) DESILTER NAJ TRIP GAS (K.)

pH DESANOER N/U CONN. GAS (%)

PV/YP(cp/lb/100M) MU0 CLEANER N/U B'GRD GAS (!4)

GELS 10/10 CENTRIFUGE N'U PORE PRESS (SG) WL API(cc/30min) 1 2 3 ECO(SG) WLHTHP(cc/30min) SHAKERS Thulo Thule Thule LITHOLOGY

CAKE(inm) SCREENS 52x52 84x64 120x105 DRILLS / BOPS

SOUOS % PUMPS 1 2 3 LAST BOP DRILL 1-Ocl

SANO% TYPE OitwBll A-170O Oilweli A-1700 Oihwll A-1700 LAST FIRE DRILL 9Q Can

CHLORIDES(mg/l) STROKE (in) 1Z" 12- \Z LAST MOB DRILL K C L % LINER(in) 6' 6" 6' LAST ABN. RIG DRILL v-UCl

MBT(IWbbl) SPM LAST BOP TEST Zf-Sop

TEMP "C LPM BOP TEST DUE 11-Oct

HOL£vOL(m3/bbl) AV.DP(mWn) HRS C U M

SURFVOl(m3M)l) AV-0C(m/mln) 1, MOVE RIG 66.5

LOSSES(m3/bb!/rir) SPPikPaVpai) 2. RUN ANCHORS 15.75

MUD Co SCR @ 40 3. DRILLING 69

MUD TYPE SCR® 50 4, TRIP 35 BIT DATA WEATHER / RIG RESPONSE 5. WIPERTRIP 4.25

aiT No. WINDSPEED(kls) 20-25 6. SURVEY 5.2G

SIZE(mm/in) DIRECTION!') 50 7. CIRC./COND 16,75

TYPE TEMPERATURE('C) 14-17 B. HANDLE BHA 5,5

IADCCODE BAR.PRESSURE|kPo) 1017 9. CASE/CEMENT 6.75

SERIAL No, BAR, RISE/FALL(kPa) Falling 10. WELLHEAD

NOZ2LES(32ln) VISIBILITY(NM) 12 11.BOPS 25.75

DEPTH IN(m) WEATHER STATE Moderate 12. LOT 0.75

OEPTH OUT (m) SWELL/PER/DIR(m/socT) 240/1.5 /4 13. CORING

DRILLED (mcDnVdly) WAVES / PER / DlRMsec/') 50/.9/2 14, LOGGING 16

HOURS (cum/diy) HEAVE N/A 15, REAM/WASH 8,75

GRADE PITCH(') .2/4 16. FISH/STUCK

AVGE ROP (m/hr) ROLL(') .3/4 17. LOSS CIRC

W08 (ml) ANCHOR TENSION-MIN(MT) N/A 18, KICK CONTROL

MM ANCHOR TENSION-MAX(MT) N/A 19, SIDETRACK

JETVEL[m/soc) RISER TENSION(MT) N/A 20. OTHER 6,5 7,75

HHP® BIT VARIABLE DECK LOAD(MT) 1S3G 21. REP. SURF

BHA No. BHA WEIGHT | STRING WT 22, WELL TEST

BHAPrafllt; 23. WO WEATHER 24, WAIT • OTHER

DOWHHOLE TOOLS SERIAL No, ROT/REAM HRS DRILLING DATA 25. A8DN./SUSPEND 13 54,5

DRILLING JAR DRAG - UP (ml) 26. RIG SERVICE 1.5

DRILLING JAR DRAG-DOWN (ml) 27, SUP/CUT LINE 1.5

SHOCK SUB TORQUE-On 8oHom (M|/lb3) 28. PULL ANCHORS 4.5 4,5

PDM TORQUE-Off Bottom (kfl/lbs) 29. FLOWCHECK 0.25

MOMEL TOTAL (HRS) 24 367

5 0 / 3 0 "d 9 8 9 8 1 0 6 6 a 19 'ON Wd NflOa A11HX ? H 0 Z 0 0 9 : 8 0 n H i 6 6 - X 0 0 - Z 0

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL: |BARRAMUNDI-1

PERMIT: fT/27P

RIG;|SEDCO702

DATE:

REPORT *

D.F.S.

6-Oc(-S9

17 13

FROM TO HOURS

0:00 4:15 4.25 Continue to cut 20' and 30" cO5lnu,-00:os attempt lo pull-unBucasaful (170klbs overpuil), continue to cut @ 01:45 attempt unsucossful @220 klbs. ffl 03:30 attempt unauceaaful @ 3S0 klba overpuil.

4:15 5:oo 0.75 Pull cutting assy. To surface. 5:00 11:30 6,5 Cutting assy. At surface. One blade broken. Pin Bushings In Baker casing cullor brokon ond / or worn.

Mechanic prsparo and fabricate now pin bushings on latha. Also remove broken pin retainer while walling for replacement casing cottar.

11:30 13:15 1,75 Pick up and make up replacement casing cutler, test same,, 13:15 14:45 1.50 Run In with casing cutting assy.( latch on lo well head, over pull 20 klbs). 14:45 1«i30 3.7S Cut casing @ 17:30 attempt to pull unsucessful with 160klbs, 18:30 19:00 0.50 Pulled free at 120klbs overpuil. Pull PGB to surface. 19.00 19:15 0.25 ROV survoy of well area, 19:is 0:00 4.75 Pull anchors, anchor *t 6 complotod ® 22:00 hra

anchor # 2 finished @ 21:50 hrs. Pacific Shogun rigged up for low @ 21:50hrs, Start anchor it 3 ffi 22:39 hrs.

While handling anchors, unlatch MOST tool, break and lay out casing cullor.

Pick up 18 3/4 casing running tool, latch onlo slump, pick UD and lay out same.

20-25 50

14-17 1017

Hold pro lour safety meetings. Falling

Z4.00 240M.5/4 OPERATIONS TO 0600 HRS: Contlnuo (0 pull anchors. Last anchor 50 / .9 / 2

N/A

PROGRAMME NEXT 24 HRS: N/A

BULK GEL(SX) BARITE(sx) CEMENT(sx) N/A POT WATER(mt) DIESEL FUEL(lt HELI FUEL(ll)

Rlg/PC/ PS 840 2649 2351 879/40/0 189/125/135 301 /408/44.1 PERSONNEL ON RIG TRANSPORTATIO 1836 COSTS

OPERATOR NAME LOCATION DAILY MUO

DRILLING CONT. 3S WORKBOAT Shogun fl9 CUMULATIVE MUD 5107,230.25

SERVICE COMPS 11 WORKBOAT Challenger no DAILY WELL

OTHER 15 STANDBY BOAT CUMULATIVE WELL

CATERING HELICOPTER 1 trip TOTAL 73 HELICOPTER

SUPERVISOR(S) Wolly Westman Lon Kronstal OIM J.J. Dlbon

3 0 / 8 0 'd 5 8 9 8 1 0 6 6 Z 19 'ON m NMOd 'S 1 1 0 2 0 1 5 : 8 0 n H i 6 6 - I 0 O - Z . 0

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL:

PERMIT:

RIG:

BARRAMUNDI-1

T/27P SEDCO 702

DATE:

REPORT U

D.F.S.

[_ 7-Ocl-99

r~nr-

DEPTH 2400 Hra:

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVEYS:

1

1

3 LAST CASING: [_

] WD(M8L);[

STATUS @ 2400 Hn:

FORMATION: L

2 ] RT-SEABED/MSL:| 108.5 ~|

SHOELO.T.:|

MAASP;|

MUD PROPERTIES SOLIDS FORMATION DATA DENSITY(SG) Ipm •if hi« DEPTH VISCOSITY(Socs) DESILTER N/U TRIP GAS (%)

PH DESAN0ER N/U CONN. GAS (%) PV/YP(cp/lb/100ft2) MUD CLEANER N/U B'GRD GAS (%) GELS 10/10 CENTRIFUGE N/U PORE PRESS (SG)

WLAPI(cc/30min) 1 2 3 ECD(SG) WLH'rHP(ec/30mln) SHAKERS Thulo Thulo Thule LITHOLOGY CAKCfmm) SCREENS 52x52 84x84 120x105 DRILLS / BOPS

SOLIDS % PUMPS 1 2 3 LAST BOP DRILL 1-Ocl SAND % TYPE Ollwell A-1700 Oilwell A-1700 Oikoll A-1700 LAST FIRE DRILL 28-Sep CHLORIDES(mg/1) STROKEfln) 121 12- 12" LAST MOB DRILL 26-Sep KCL% LINERpn) 6' 5" 6' LASTA8N. RIG DRILL 6-Ocl MBTCb/bbl) SPM LAST BOP TEST 27-Sep TEMP 'C LPM BOP TEST DUE 11-Ocl IIOLEVOL(m3/bbl) AV-DP(m/min) HRS CUM SURFVOI.(m3/bb!) AV-OCfm/mln) 1. MOVE RIG G6.5 LOSSES(m3/bbl/lir) SPP(kPa/psl) 2. RUN ANCHORS 15.75

MUD Co SCR ©40 3. DRILLING 89 MUD TYPE SCR @ SO 4. TRIP 35

B(T DATA WEATHER /RIG RESPONSE 5, WIPER TRIP 4,25 BIT No. WIND SPEED(kts) 20-25 6, SURVEY 5.25 Sl2fc'(rnm*t) DIRECTION! V 50 7, CIRCJCOND 16.75 TYPE TEMPERATURG('C) 14-17 8. HANDLE BHA 5.5 IADCCODE BAR. PRESSURE(kPa) 1017 9. CASE/CEMENT 6.75 SERIAL No. BAR. RISE / FALL(kPa) Falling 10, WELLHEAD NOZ2XES(321n) VISIBILITY(NM) 12 11. BOPS 2C.75 DEPTH IN (m) WEATHER STATE Moderate 12. LOT 0.75 DEPTH OUT (m) SWELL/PER/DIR(m/sec/') 240/1.5 /4 13. CORING DRILLED (m cum/dlv) WAVES / PER / DIR(m/£9C/') 50/9/2 14. LOGGING 16 HOURS (cum/dly) HEAVE N/A 15, REAM/WASH 8.75

GRADE PITCHC) .2/4 16. FISH/STUCK

AVGG ROP (m/tu) ROLL(') 3/4 17. LOSS CIRC

WOD (ml) ANCHOR TENSION-MIN(MT) N/A 18. KICK CONTROL RPM ANCHOR TENSION-MAX(MT) N/A 19. SIDETRACK JETVEL(m/soc) RISER TENSION(MT) N'A 20. OTHER 7.75 HHP® BIT VARIABLE DECKLOADtMT) 1B36 21. REP. SURF

B H A No. BHA WEIGHT | STRING WT 22. WELL TEST

BHAPronie: 23. WO WEATHER 24. WAIT-OTHER

DOWNHOLE TOOLS SERIAL No. ROT/REAM HRS DRILLING DATA 25.ABDN./SUSPEND 54.5

DRILLING JAR DRAG-UP (ml) 26. RIG SERVICE 1.5 DRILLING JAR DRAG-DOWN (ml) 27, SLIP/CUT LINE 1.5 SHOCK SUB TORQUE-On Boltom (kft/lbs) 28, PULL ANCHORS 2.5 7

POM TORQUE-Ofl Bottom (kfWbs) 29. FLOWCHECK 0.25

MONEL TOTAL (HRS) 2,5 369,5

S O / W "d S E 9 S I 0 6 6 Z 19 'ON Wi NflOd A H 3 ) I $ 1 I 0 Z 0 I S : 8 0 HHX 6 6 - 1 0 0 - A O

WELL: | GJARKAMU

PERMIT: |T/27P RIG;|SEDCO 70

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL: | GJARKAMU

PERMIT: |T/27P RIG;|SEDCO 70

NDI-1 | DATE: | 7.0cl99

| REPORT* | 10 2 | D.F.S. | 14

FROM TO HOURS

0:00 2:30 2,50 Contlnuo to pull anchors, 00:40 anchor ft 3 finished. 01:20 Pacific Challenger has lew bridle connected. 01:38 Commence anchor # 7 02:30 Anchor 8 7 racked, RIG RELEASED TO CULTUS,

2.S0 OPERATIONS TO 0600 HRS;

PROGRAMME NEXT 24 HRS:

BULK GEL(sx) BARITE(sx) CEMENT(sx) N/A POT WATER(mt) DIESEL FUEL(lt HELI FUEL(ll)

Rlg/PC/ PS B40 2849 2351 879/40/0 188/125/133 301 /406/441

PERSONNEL ON RIG TRANSPORTATION COSTS OPERATOR NAME LOCATION DAILY MUD DRILLING CONT, WORKBOAT Shogun rig CUMULATIVE MUO £187,230,25 SERVICE COMPS WORKBOAT Challrjngor rig DAILY WELL OTHER STANDBY BOAT CUMULATIVE WELL

CATERING HELICOPTER TOTAL HELICOPTER

SUPERVISOR(S) Welly Westman Len Kronslal OIM J.J. Dibon

5 0 / 9 0 'd 5 8 9 8 1 0 6 6 Z 19 'ON X v J NflOQ KHSk ? 1 I 0 Z 0 2 9 : 8 0 f l H l 6 6 - 1 0 0 - A O

O S - O C T - 9 9 WED 1 1 : 0 9 O Z O I L & K E L L Y DOWN FAX NO. 61 2 9 9 0 1 3 6 3 5

KELLY DOWN CONSULTANTS Pty Ltd A.C.N, 008 152 207 '

P. 0 1 / 0 3

Mall: PO Box 573, St Leonards N.S.W., 1590, AUSTRALIA

Level 1 51 Chandos Street, St Leonards

N.S.W., 2065, AUSTRALIA

Tel: 61-2-9901-3422 Fax: 61-2-9901-3635

FACSIMILE HEADER

TO: ATTN: C C : FAX No: FROM:

Cc SUBJECT

MESSAGE:

Mineral Resources Tasmania Carol Bacon Kourosh Mehin 0394125156 Ahmad Nadji; DNRE Victoria 0394125152

URGENT ROUTINE

CONFIDENTIAL

03 6233 8338 No. of Pages Incl. this page

Colin Stuart Date: ^ 4 , Ref: Globex Bl

BARRAMUNDI 1 DAILY REPORT

Regards,

Colin Stuart Project Manager

IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CONTACT THIS OFFICE IMMEDIATELY AT THE FOLLOWING TELEPHONE NUMBER 61-2-901-3422 AND ASK FOR

AUTHORISED BY C H A R G E TO:

0 6 - O C T - 9 9 WED 1 1 : 0 9 O Z O I L & K E L L Y DOWN F A X NO. 61 2 9 9 0 1 3 6 3 5 P, 0 2 / 0 3

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL:

PERMIT:

RIG;

8ARRAMUNDI-1

T/27P

SEDCO702 1

DATE:

REPORT*

D.F.S.

| 4-oJt~s"9~~|

r 15

11

DEPTH 2400 Hrs:

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVEYS:

STATUS @ 2400 Hrs:

FORMATION:

J LAST CASING: |

] WD(MSL):[2I

[ ] ~2 RT-SEABED/MSLif 10? S " |

SHOE LO,T . : [22Z I I ] MAASP:| ]

MUD PROPERTIES ADDITIVES SOLIDS CONTROL FORMATION DATA D:NSITY(SG> Barile (100) 150 Ipm uf hra DEPTH VISCOSITY(Sacs) CaCI 5sx DESILTER N/U TRIP GAS (%)

pi I DESANDER N/U CONN, GAS (%) PV/YP(cp/lb/100112) MUD CLEANER N/U B'GRD GAS (%) GELS 10/10 CENTRIFUGE N/U PORE PRESS (SG)

WLAPl(cc/30inln) 1 2 3 ECD (SG)

Wl. HTHP(cc/30min) SHAKERS Thula TIIUIB Thule LITHOLOGY CAKE(mm) SCREENS 52x52 04x84 120x105 DRILLS/BOPS

SOLIDS % PUMPS 1 2 3 LAST BOP DRILL 1-Oct

SAND % TYPE Oilw-ill A-1700 C M A-1700 Oilwell A-1700 LAST F IKE DRILL bop CHLORIDES(mg/l) STROKE(in) 12' 12" 12" LAST MOB DRILL 26-Sop K C L % LINER(in) G" 6" 6" LAST ABN. RIG DRILL 111 Q/in

MBT(IWbbl) S P M LAST BOP TEST "57 C ir. z/-5Ap

TEMP 'C LPM BOP TEST DUE 11-Oct

HOLGVOL(m3/bbl) AV-DP(m/min) HRS

SURF VOI (ma/bW) AV-DC(in/mIn) 1.MOVE RIG Cfi.5

LOBSES[rn3/bbl/lir) SPP(kPa/pol) 2. RUN ANCHORS 15.75 MUD Co SCR ©40 3. DRILLING 89

MUD TYPE SCR § SO 4. TRIP 35 BIT DATA WEATHER / RIG RESPONSE 5. WIPER TRIP 4.25

DIT No. WIND SPEED(kls) 15-20 6. SURVEY 5,25 SIZE(mm/in) DIRECTION!*) 230 7. ORC /COND 16.75

TYPE TEMPERATURE('C) 13-15 8. HANDLE DMA 5,5 lADCCODE BAR. PRESSURE(kPa) 1014 9, CASE/CEMENT 0.75

SERIAL No. BAR, RISE/FAU.fkPa) Rising 10. WELLHEAD

N022LES(32ln) VISlBILITY(NM) 12 11. OOPS S ?2,S

DEPTH IN (m) WEATHER STATE Modoralo V„ LOT 0.75

DEPTH OUT (in) SWELL / PER / DlRfm/sec/') 2.30/1/11 13. CORING

DRILLLO(mcunVdly) WAVES / PER / OlR(m/sec/°) 23Q/.6/2 14. LOGGING 10 HOURS (cum/dly) Make up MOST lool. .4/11 15. REAM/WASH 8.75 G R A D E PITCH'*) .3/3 16. FISH/STUCK

AVGE ROP (m/hr) ROLL(') .4/4 17, LOSS CIRC WOS (ml) ANCHOR TENSION MIN(MT) 210 18. KICK CONTROL

RPM ANCHOR TENSION-MAX(MT) 300 19. SIDETRACK

JET VEL (mteec) RISER TENSION(MT) N/A 20. OTHER 1.25

H H P ® BIT VARIABLE DECK LOAD(MT) 1929 21. REP. SURF

BHA No. BHA WEIGHT STRING WT ??, WFU. TEST BHA Pronie: 23. WO WEATHER

24, WAIT-OTHER DOWNHOLE TOOLS SERIAL No. ROT/REAM HRS DRILLING DATA 25. ABDN./SUSPEND 19 21.75 DRILLING JAR D R A G - U P (ml) 26, RIG SERVICE 1.5

PRIMING JAR D R A G - D O W N (ml) ?7, SUP/CUT LINE 1.5

SHOCK SUB TORQUE-OnBoltom(kfl/lbs) 28. PULL ANCHORS

POM TORQUE-OffBollom(ktl/lbs) 29, FLOWCHFCK 0 25

MONEL TOTAL (HRS) 24 319

0 6 - 0 C T - 9 9 WED 11 H O O Z O I L & K E L L Y DOWN P.

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL; [BARRAMUNDI-1 _ | DATE: |_ 4-6cl-99

PERMIT: |T/27P J REPORT # | J 5 RIG:|SEDCO702 | D.F.S. | 11

FROM TO HOURS

0:00 0:45 0,75 Circ. Bottoms up. No cement returns observed, Spot Hi vis pill from 947m lo 905m.

0:45 1:00 0.25 POOH from 947m to 905m. 1:00 1:45 0.75 M/U cmt. Hose. Hold JSA, mix and pump cmt plug 4 4 from 905m to845m.( 144 sx. Class G @ 15,8 ppg) 1:45 2:30 0.75 POOH from 905m to 745m. 2;30 3:00 0.50 Circ. Bottoms up.—Dumped 60 bbls contaminated mud, 3;00 3:30 0.50 Function BOPs and annulars, circ. Through choke and kill lines, 3:30 3:45 0,25 Pump slug, hold JSA on tripping. 3:45 6:45 3.00 POOH, lay out excess 5" drillplpe, (105 jls) 6:45 8:15 1.50 Move 3 stands of 8 1/4" DC From left lo right hand side of derrick & lay out 5 DC + jars. 8:15 9:15 1,00 M/U divertor & RIH on S" drillpipe lo 720m. 9:15 9:45 0.50 Wash down (1 pump @ 50 spm-'200 psi), tag top of cement at 890m, 9;45 10:45 1.00 Circ, Botloms up. —Dumped 170 bbl of contaminated mud, 10:45 11:30 0 75 Function BOPs and annulars, circ. Through choke and kill lines, bottoms up from BOPs. Hold cmt job JSA, 11:30 12:00 0,50 M/U cnl stand & cmt. Hose. 12:00 12:15 0.25 Pump cmt. Plug # 4 B from 890m lo 829m, 12:15 13:00 0.75 POOH to 650 m. 13.00 13:15 0,25 Circulate hole clean, 13:15 14:00 0.75 POOH to 211m. 14:00 14:45 0.75 Displace hole lo seawater, spot Hl-Vis pill from 211 m to 170m, 14:45 15:00 0.25 POOH from 21lmlo170m. 15:00 15:15 0.25 Pump cement plug # 5 from 170m to 121m. (114sx, Class G emt @ 15.8 ppg). 15:15 15:45 0.50 POOH from 170m to 112m. 15:45 16:30 0.75 Reverse circulate contents of drill string. 16:30 17:15 0.75 Function BOPs and annulars. 17:15 19:00 1.75 POOH with cement diverter, RlH and relreive flex Joint & wellhead wear bushings, 1900 20:30 1,50 Hold JSA, Rig up to pull marine riser & BOP. 20:30 21:00 0.50 Pull Divarter. 21:00 22:00 1.00 Pick up landing Joint, make up, and close inner barrel. 22:00 23:30 1.5 Unlatch connector. Pull BOP, remove choke and kill linos, hold JSA, remove Rucker lines. 23:30 24:00:00 0.5 Continue to pull BOP.

Held pre tour safety meetings.

24.00 OPERATI ONS TO OEOO HRS: Continue to pull OOP, lay out riser, rack back BOP.

Make up MOST tool.

PROGRAMME NEXT 24 HRS: Cut and retrclve wellhead and PGB, Pull anchors, release rig.

BULK GEL(sx) BARITE(sx) CEMENT(sx) DRlLLWATER(mt) POT WATER(mt) DIESEL FUEL(ll) HELI FUEL(lt) Rig/PC/ PS 840 2649 2351 896/40/0 194/135/140 32B/423/45B PERSONNEL ON RIG TRANSPORTATION COSTS OPERATOR 3 NAME LOCATION DAILY MUD DRILLING CONT. 35 WORKBOAT Shogun rig CUMULATIVE MUD $167,230.25 SERVICE COMPS 11 WORKBOAT Challenger rig DAILY WELL

OTHER 15 STANDBY BOAT CUMULATIVE WELL

CATERING 9 HELICOPTER 1 trip TOTAL 73 HELICOPTER

SUPERVISOR(S) Wally Weslman Lan Kronslal | OIM J.J, Diuon

Cl iveCalver To: [email protected] Cc: Carol Bacon Subject: RE: Barramundi 1

Hi Chris, I told Colin Stuart to send you drilling reports but there will only be one more because the well wil be P&A'd today. I have copied the previous reports and express-mailed them to you. Note that at the end of 3Q (30 Sept) Barramundi -1 had reached 1672m; there has been no other petroleum exploration activity in Tasmania this quarter. Regards Clive

Original Message From: [email protected] [SMTP:[email protected]] Sent: Tuesday, 5 October 1999 12:06 To: [email protected] Subject: Barramundi 1 Importance: High

Hi Clive,

Could you chase up for me the daily drilling reports for Barramundi 1 in T/27P? Please remind Globex that they are obliged to send them to us under the P(SL)A.

Our fax number is:

02 6249 9962

Thanks,

Chris Quinn Petroleum Technical Advice Group Australian Geological Survey Organisation Ph. (02) 6249 9241 Fax (02) 6249 9962 http://www.agso.gov.au

0 5 - O C T - 9 9 TUE 0 8 : 4 0 O Z O I L & K E L L Y DOWN FAX NO. 61 2 9 9 0 1 3 6 3 5 P, 0 1 / 0 3

KELLY DOWN CONSULTANTS Pty Ltd

Mail: PO Box 573, St Leonards N.S.W., 1590, AUSTRALIA

Level 1 61 Chandos Street, St Leonards

N.S.W., 2065, AUSTRALIA

Tel; 61-2-9901-3422 Fax:61-2-9901-3635

FACSIMILE HEADER

TO: Mineral Resources Tasmania URGENT ATTN: Carol Bacon Kourosh Mehin 0394125156 ROUTINE C C : Ahmad Nadji; DNRE Victoria 0394125152 CONFIDENTIAL

FAX No: 03 6233 8338 No. of Pages Incl. this page

FROM: Colin Stuart Date: - f / / o M < y • Ref: Globex Bl

SUBJECT BARRAMUNDI 1 DAILY REPORT

MESSAGE:

Regards,

Colin Stuart Project Manager

IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CONTACT THIS OFFICE IMMEDIATELY AT THE FOLLOWING TELEPHONE NUMBER 61-2-901-3422 AND ASK FOR

AUTHORISED BY C H A R G E TO:

0 5 - O C T - 9 9 TUE 0 8 : 4 0 O Z O I L & K E L L Y DOWN F A X NO, 61 2 9 9 0 1 3 6 3 5 P.

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL:

PERMIT;

RIG:

DEPTH 2400 Hrt:

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVEYS:

BARRAMUNDI-1

T/27P

SEDCO702

DATE:

REPORT P D.F.S.

| 4-Cci-99 ]

l 15 I I—i i—I

STATUS® 2400 Hf»:

FORMATION:

LAST CASING;

WD(MSL):[^ RT-SEABEO/MSL: 102.6

SHOE LOT.: Q

MAASP:fJ

MUD PROPERTIES 1 ADDITIVES SOLIDS CONTROL FORMATION DATA

DENSITY(SG) Bs/He (100) 1S0 Ipm ill hrs DEPTH

VISCOSITY(SHLS) CaCI 5SK OESILTER N/U TRIP GAS (%)

PH DESANDER N/U CONN. GAS(%)

PVAT'(r;p/lb/100ft2) MUO CLEANER N/U I3'GRDGAS(%)

GELS 10/10 CENTRIFUGE N/U PORE PRESS (SG)

WL API(cc/30min) 1 2 3 ECD(SG)

WL HTHP(cc/30miit) SHAKERS Thule Thule Thule LITHOLOGY

CAKE(mm) SCREENS 52x52 84x84 120x105 DRILLS; BOPS

SOLIDS % PUMPS 1 2 3 LAST BOP DRILL 1-Ocl

SAND % TYPE Oirwell A-1700 Oilwell A-1700 Oil«3ll A-1700 LAST FIRE DRILL 28-Sep

CHLORlDES(ing/l) STROKE(in) 12" 12" 12" 1 AST MOB DRILL 26-Sop

KCL",4 LINER(in) 6" 6" 6" LASTABN. RIG DRILL 28-Sep

MBT(IWbbl) SPM LAST BOP TEST ?7-Sap

TEMP 'C L P M BOP TEST DUE 11-Od

HOLEVOL(in3/bbl) AV-OP(mfmin) HRS 1 CUM

SURFVOL(m3/bbl) AV-DQin/mln) 1. MOVE RIG G6.5

LOSSLlS(m3/bbl/hr) SPP(kPa/p:i) 2. RUN ANCHORS 15.75

MUD Co SCR @ 40 3. DRILLING 89

MUD TYPE SCR @ 50 4. TRIP 35

BIT DATA WEATHER / RIG RESPONSE 5. WIPER TRIP 4.25

BIT No. WIN0SPEG0(I<I5) 15-20 8. SURVEY 5,?5

SIZE(inmfoi) OIRECTIONC) 230 7, C1RC./COND 16.75

TYPE TEMPFRATUREI'C) 13-15 8. HANDLE BHA 55

lAOCCODE BAR. PRESSURE^) 1014 9, CASE/CF.MENT 0.75

SERIAL No, BAR. RISE/FALL(kPa) Rising 10. WELLHEAD

NOiSTI FS(32frl) VISIBHJTY(NM) 12 11. BOPS 5 ??.5

DEPTH IN (m) WEATHER STATE Moderate 12. LOT 0.75

DEPTH OUT (ra) SWELL I PER / DlR(m/sBc/*) 230/1/11 13. CORING

DRILL ED (m cum/dly) WAVES / PER / DIR(m/scc/") 230/.6/2 14. LOGGING 16

HOURS (cumMly) Make up MOST tool. ,4/11 15. REAM/WASH 8.75

GRADE PITCH)') .3/3 16. PISH/STUCK

AVGE ROP (m/hr) ROLL( ' ) .4/4 17, LOSS CIRC

WOS (ml) ANCHOR TENSION-MIN(MT) 210 1B. KICK CONTROL

RPM ANCHOR TENSION-MAX(MT) 300 19, SIDETRACK

JETVEL(mfcec) RISER TENSION(MT) N/A 20. OTHER 1.2S

HHP® SIT VARIABLE DECK LOAD(MT) 1929 21. REP, SURf

BHA No. BHA WEIGHT STRING WT 22. WELL TEST

BHA Profile: 23. WO WEATHER

24, WAIT - OTHER

DOWNHOLE TOOLS SERIAL No. ROT/REAM HRS DRILLING DATA 25. ABDN./SUSPEND 19 21,75

DRILLING JAR DRAG-UP (ml) 26. RIG SERVICE 1.5

DRILLING JAR DRAC-DOWN(ml) 27. SLIP/CUT LINE 1,5

SHOCK SUB TORQUE-On Bollom (kfl/lbt.) 28. PULL ANCHORS

POM TORQUE-Off Bottom (kfl/lbs) 29, FLOWCHECK 0.25

MONEL TOTAL (HRS) 24 319

i - O C T - 9 9 TUE 0 8 : 4 1 OZOIL & K E L L Y DOWN F A X NO. 61 2 9 9 0 1 3 6 3 5

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL: [BARRAMUNDI-1 DATE: | _ 4 Ccl-09

PERMIT: |T/27P | REPORT # | 15

RIG:|SEDCO702 | D.F.S, | 11

FROM TO HOURS

0;00 0:45 0.75 Circ. Bottoms up. No cement returns observed. Spot Hi vis pill from 947m to 905m. 0:45 1;00 0.25 POOH from 947m lo 905m. 1:00 V.45 0.75 M/U cmt. Hose. Hold JSA, mix and pump cmt plug # 4 from 905m to 845m.{14 4 sx. Class G @ 15.0 ppg)

1;45 2:30 0.75 POOH from 905rn to 745m, 2:30 3:00 0,50 Circ Bottoms up.—Dumped 60 bbls contaminated mud. 3:00 3:30 0.50 Function BOPs and annulars, circ. Through choke and kill lines. 3:30 3:45 0.25 Pump slug, hold JSA on tripping. 3:45 6:45 3.00 POOH, lay out excess 5" drlllpipe, (105 jts) 6:45 8:15 1.50 Move 3 stands of B 1/4" DC from [eft to right hand side of derrick & lay out 5 DC + jars. 8:15 9:15 1.00 M/U dlvertor & RIH on 5" drillpipe lo 720m. 9:15 9:45 0.50 Wash down (1 pump @ 50 sprn-^OO psi), lag lop of cement at 890m. 0:45 10:45 1,00 Circ, Boiioms up. —Dumped 170 bbl of contaminated mud. 10:45 11:30 0.75 Function BOPs and annulars, circ. Through choke and kill lines, bottoms up from BOPs, Hold cmt job JSA. 11:30 12:00 0.50 M/U cnl stand & cmt, Hose. 12.00 12:15 0,25 Pump cmt. Plug # 4 B from 890m to 829m, 12;1S 13:00 0.75 POOH to 650 m. 13:00 13:15 0.25 Circulate hole clean. 13:15 14:00 0,75 POOH In 5i A m 14:00 14:45 0.75 Displace hole to seawatcr, spot HI-Vis pill from 211m lo 170m. 14:45 15:00 0.25 POOH from 211m to 170m

1 V * - ' ' 1 11 vIII *- 1 l l l l Iw 1 * V11 1 • 15:00 15:15 0,25 Pump cement plug # S from 170m to 121m, (114sx. Class G emtffi 15.8 ppg). 15:15 15:45 0.50 POOH from 170m to 112m, 15:45 16:30 0.75 Reverse circulate conlents of drill string, 16:30 17:15 0.75 Function BOPs and annulars. 17:15 19:00 1.75 POOH with cement diverter, RIH and retrelve flex Joint & wellhead wear bushings. 19:00 20:30 1.50 Hold JSA, Rig up to pull marine riser & BOP. 20:30 21:00 0,50 Pull Diverter, 21:00 22:00 1.00 Pick up landing joint, make up, and close Inner barrel. 22:00 23:30 1.5 Unlatch connector, Pull BOP, remove choke and kill lines, hold JSA, remove Rucker linos. 23:30 24:00:00 0,5 Continue to pull BOP.

Held pre tour safely meetings.

24.00 OPERATIONS TO 0600 HRS: Continue to pull BOP, lay out riser, rack back BOP.

Make up MOST tool.

PROGRAMME NEXT 24 HRS: Cut and retrelve wellhead and PGB. Pull anchors, release rig.

BULK GEl(sx) BARlTE(3x) CEMENT(SX) DRIl.LWATER(ml) POT WATER(mO DIESEL FUEL(U) HELI FU£L(lt) Rig/PC/ PS 840 2649 2351 896/40/0 194/135/140 328/423/458 PERSONNEL ON RIG TRANSPORTATION COSTS

OPERATOR 3 NAME LOCATION DAILY MUD

DRILLING CONT. 35 WORKBOAT Shogun rig CUMULATIVE MUD $167,230.25 SERVICE COMPS 11 WORKBOAT Challenger rig DAILY WELL OTHER 15 STANDBY BOAT CUMULATIVE WELL

CATERING 9 HELICOPTER 11rip TOTAL 73 HELICOPTER

SUPERVISOR(S) Wally Westman Len Kronslal OIM J.J. Dlbon

0 2 - O C T - 9 9 SAT 0 8 : 5 1 O Z O I L & K E L L Y DOWN FAX NO. 61 2 9 9 0 1 3 6 3 5

KELLY DOWN CONSULTANTS Pty Ltd

P, 0 1 / 0 6

A.C.N.O08 1S2 407

Mall: PO Box 573, St Leonards N.S.W.,1S90, AUSTRALIA

Laval 1 51 Chandos Street, St Leonards

N.S.W., 20E5, AUSTRALIA

Tel; 61-2-9901-5422 Fax: 61-2-9901-3635

FACSIMILE HEADER

SUBJECT

MESSAGE:

BARRAMUNDI 1 DAILY REPORT

TO: Mineral Resources Tasmania URGENT ATTN: Carol Bacon Kourosh Mehin 0394125156 ROUTINE C C : Ahmad Nadji; DNRE Victoria 0394125152 CONFIDENTIAL

FAX No: 03 6233 8338 No. of Pages incl. this page

FROM: Colin Stuart Date: Ref: Globex Bl

Regards,

Colin Stuart Project Manager

• 4

IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CONTACT THIS OFFICE IMMEDIATELY AT THE FOLLOWING TELEPHONE NUMBER 61-2-901-3422 AND ASK FOR

AUTHORISED BY C H A R G E TO:

0 2 - 0 C T - 9 9 SAT 0 8 : 5 1 O Z O I L & K E L L Y DOWN F A X NO, 61 2 9 9 0 1 3 6 3 5 P, 0 2 / 0 6

GLOBEX FAR EAST GEOLOGICAL REPORT

WELL: Barramundi 1 DATE ; 2nd October, 1999

REPORT NUMBER: 7 DAYS FROM SPUD: 8 6am OPS: Wiper Trip (RIH)

REPORT PERIOD: 00:00hrs.. 30/9 to 00:00 hrs, 1/10

MEASURED DEPTH: 2052m PROGRESS (MD): 380m FORMATION: Eastern View Coal Measures

G E N E R A L D A T A : BASIN: Bass Hasin

P1-R.MIT: T/27P

MUPI.1NE: -76.6m

RTioMSl . : 25.9m

HOI.P. SIZE:

36"

17'/="

12>//'

HOLET.D.:

147m

875m

CASING SIZE:

30"

13-3/8"

SHOli DEPTH:

147m

869.1m

FORMATION TOPS: AtWiscot Ss; 1080mMDRT, 1054.1mTVDSS (47m Hi)

Demons BlullTm: I090mMDRT, 1064.1mTVDSS (42m Hi)

EVC'M; 1324m MDRT, I298.tmTVDSS (12m Hi)

OPr: RATIONS: R111, precautionary wash and ream lo bottom from 1540m to 1672m. Work tight spot at 1640m. Drill ahcod from 1672m to 2052m.

6:00 Update: Conduct wipur trip prior to POOH for Logs.

DEPTH INTERVAL L1TIIOLOGY

1672-1715m

1715-1830m

(0-90%)SANDSTONE, unconsolidated, light grey to medium light grey, medium to coarse grained, trace very coarse grains, poorly to moderately sorted, elongate to sub-spherical, -sub-angular to sub-rounded, rare well rounded quartz, predominantly transparent grains, occasional frosted quartz, minor quartz overgrowths, rare pyrite aggregales, trace pyrite cement in part, trace sericitc mica, good inferred porosity. Fluorescence; 1672-I690m trace- 2% spotty, dim to occasionally moderately bright pale yellow fluorescence, very weak crush cut, as above, very faint, thin, dim pale yellow residual ring. (0-80%)SILTSTONFL, moderate to dark yellowish brown, rare pale yellowish brown to white, argillaceous to very argillaceous, very soft, dispersive, hygroturgid, amorphous, trace very fine carbonaceous specks. (0-70%)COAL, black, brownish black, dull, earthy in part, sub- bituminous, generally firm and friable, sub-blocky to blocky (poor clearing), some sub-fissile, minor bright vitrinitc with sub conchoidal fracture, grades to carbonaceous shale in part. (20-100%)SANPSTONE, clear to translucent, frosted, locally fine, medium to predominantly coarse, angular to subangUlar, poor sorting, rare cryptocrystalline orange brown dolomilic cement, locally abundant silty/kaolinitic matrix, trace nodular pyrite, common coarse fractured milky quartz, disaggregated, occasionally hard fine aggregates, generally good porosity. Fluorescence: 1810-1830m trace dull pale yellow patchy fluorescence, weak slow streaming crush cut, dim film residue.

(0-80%)SILTSTONE, light brown, dusky yellow brown, very argillaceous, .slightly arenaceous, trace carbonaceous/coaly laminae, microinicaceous, trace Iithic fragments, hygroturgid, soft to slightly dispersive, massive to amorphous.

(0-60%)COAL> black, bituminous, subconchoidal fracture in part, subvilreous lustre, brittle to hard, blocky.

P A G E : 1

0 2 - O C T - 9 9 SAT 0 8 : 5 1 O Z O I L & K E L L Y DOWN FAX NO. 61 2 9 9 0 1 3 6 3 5 P. 0 3 / 0 6

I830-I980m

19S0-2052iii

(0-100%)SANDSTONE, clear lo translucent, frosted, light grey, fine to medium, subangular lo subrounded, good sorting, weak siliceous cement in part, trace coarse milky quartz float, trace rock fragments, friable to disaggregated, fair porosity. Fluorescence: 1965-1975m. trace to 5% spotty, very dim, dull yellow fluorescence (in cemented sandstone), no direct cut, extremely faint (very weak) pale yellow crush cut, very faint thin dim pale yellow residual ring. (0-100%)SILTSTONE, brown grey, dusky yellow brown, moderately argillaceous, microinicaceous, trace carbonaceous specks, trace Iithic fragments, trace light grey arenaceous inclusions/Jam inac, soft to firm, massive to blocky. (0-60%)COAL, black, bituminous, slightly argillaceous in part, subvitreous lustre, subconchoidal fracture in part, brittle to hard, blocky to sub-fissile.

(10-60%)SIIA1-E, dark to dusky yellowish brown, brownish grey, firm lo very firm, non dispersive, sub-fissile to fissile, non calcareous, massive to occasionally finely laminated, microinicaceous, trace to rare (locally common) disseminated very fine carbonaceous material, some coaly streaks in part.

(0-40%)SANDSTONE, light grey to medium light grey, cemented, very tine lo fine grained, occasional medium grains, poorly to moderately sorted, elongate to sub-spherical, sub-angular to sub-rounded, hard to very hard, well cemented (siliceous cement), trace dolomitic cement, trace kaolin matrix, trace to rare carbonaceous fragments, trace pyrite, trace feldspar, tile, nil visible porosity. No shows.

(Trace-5%)DOLOMITE, dusky yellowish brown, cryptociystalline to microcrysialline, very hard, dense, brittle, slightly argillaceous, trace very fine carbonaceous specks, trace very fine pyrite, nil visible porosity, no show. C O A L , brownish black, black, dull, firm, sub-blocky to occasionally sub-fissile, earthy in part, friable, trace amber inclusions, grades to carbonaceous shale.

(0-80%)SILTSTONE, predominantly pale yellowish brown, some moderate yellowish brown, very finely arenaceous, very soft, dispersive, hygroturgid, non calcareous, trace carbonaceous specks, occasionally interlaminated with darker siltstone and shale.

GAS D A T A : Total Gas CI C2 C3 IC4 nC4 C5

(Units) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm)

1672-1790m 30(BG) 4612 45 I

1790-1830m 20(BG) 4480 27 1

1X30-1980m 25(BG) 4700 70 1

1980-2020m 19(BG) 4616 82 12 1

2020-2052m 33(BG) 6965 156 41 8 1

1679m 111 (Peak) 18250 205 1

1757m 173 (Peak) 30329 280 32 1

1800m 178 (Peak) 42700 381 48 1

1873m 106 (Peak) 18320 186 20 1

1887m l60(Peak) 34300 360 63 13

1905m 288(Peak) 51203 510 97 20

2002m 108(Pcak) 27571 431 103 7

2024m 264(Pcak) 55273 1014 243 46 10

P A G E ; 2

0 2 - O C T - 9 9 SAT 0 8 : 5 2 O Z O I L & K E L L Y DOWN FAX NO. 61 2 9 9 0 1 3 6 3 5 P, 0 4 / 0 6

S U R V E Y D A T A : M.Depth

(m) T.V.Depth

(m) Inclination

(deg) Azimuth

(deg) N/S (m)

E/W (m)

Vertical Section (m) S U R V E Y D A T A :

VI / * N/A

M U D DATA ' Weight

(SG) Funnel

Vise, (sec) Fluid Loss (cc, API)

Chlorides (mg/1)

p l l Remarks M U D DATA '

1.13 49 4.5 29000 9.0 KCI /PUPA Polymer

C O M M E N T S : A l l gas peaks associated with coals. 3% C 0 2 from 1885-19Q5m, 1928-1936m. 3-4% C 0 2 from 2019-2025m.

24 HOUR FORWARD P R O G R A M :

Drill to TD. Wiper trip. POOH. Condua wireline log program at TD.

G L O B E X G E O S T A F F : Wellsite Geologists - Greg Clota/Tony Kress

P A G E : 3

02-OCT-99 SAT 08:52 OZOIL & KELLY DOWN FAX NO, 61 2 99013635 P, 05/06

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL: [BARRAMUNDI-1 I DATE: | 1-Oct-99 ~] PERMIT; IT/27P | REPORT# | 12 | RIG: ISEDCO702 ) D.F.S. | 8 |

DEPTH 2400 Hrs:

TVD:

7i HR PROGRESS:

HOLE SIZE:

SURVEYS:

2052 | STATUS O 2100 Hra; iDrllllng 121/4" holo DEPTH 2400 Hrs:

TVD:

7i HR PROGRESS:

HOLE SIZE:

SURVEYS:

2052 | FORMATION: EaalemViflw Coal Measures (1324). DEPTH 2400 Hrs:

TVD:

7i HR PROGRESS:

HOLE SIZE:

SURVEYS:

380 ~| LAST CASING:[ 13 3/8

121/4 | WD(MSU:I 76.6

869 | SHOEL,O.T.:[ 14,3|

SEABED/MSL:| 102.5 | MAASP:L 734|

DEPTH 2400 Hrs:

TVD:

7i HR PROGRESS:

HOLE SIZE:

SURVEYS:

MUD PROPERTIES ADDITIVES SOLIDS CONTROL FORMATION DATA DENSITY(SG) 1,14 Baracldo 3 Ipm ul his DEPTH VISCOSITY(Secs) 49 Baraeor 7 DESILTER 1.8 24 TRIP GAS (%) pH 9 DexirldU45 DESANDER CONN, GAS (%) PWYP(cp/!b/100l[2) 19/30 EZ Mud DP 24 MUO CLEANER N/U B'GROGAS{%) 1798m-216u,2024m2S3u GELS 10/10 7/8 Pae-R14 CENTRIFUGE w PORE PRESS (SG) 9.1

WL API(co/30min) 4.5 KCL(4000) 3 1 2 3 ECO (SG) 9.63 WLHTHP(ce/30mln) 1S.2 XCD-Poly27 SHAKERS Thuls Thulo Thule LITHOLOGY shala/ slUI /coal CAKE(mm) 1/3 Pae-L 7 SCREENS 180x52 180X52 180x180 DRILLS /BOPS SOLIDS % 4,9 KOH S PUMPS 1 2 3 LAST BOP DRILL 1-Ocl SAND% 1.6 Sods Ash 2 TYPE OilwGll A-1700 Ollwoll A-1700 Ollwell A-1700 LAST FIRE DRILL 28-Ssp CIILORlDr;S(nig/1) 29000 STROK£(ln) 12" 12' 12" LAST MOD DRILL 26-Sep KCL% 1B LINER(ln) 6' 6' 6" LAST ABN. HIG DRILL ~^ 20-Sep MBT(IWbbl) 2,6 SPM 100 100 LAST BOP TEST 27-Sop TEW *C 52 LPM 3217 BOP TEST DUE 11-Ocl HOLE VOL(m3/bbl) 993 AV-DP(nVmln) 21,9 HAS CUM SURFVOL(m3/bbl) 1752 AV-DC(m/mln) 97.4 1, MOVE RIG C6.5 LOSSES(m3*bl/hr) 1148 SPP(kPa/psi) 1650 2, RUN ANCHORS 15.75 MUD Co Baroid SCR O 40 200 200 3, DRILLING 22.25 86.75 MUD TYPE KCUPHPA SCR a 50 275 275 4. TRIP 21,75

BIT DATA WEATHER / RIG RESPONSE 5. WIPER TRIP 2.5 OIT No. 4 WINDSPEED(kls) 10-15 6. SURVEY 4.5 SIZE(mnVin) 121/4 DIRECTION!0) 270 7. C1RC/COND 6,75 TYPE M34HVX TEMPERATUHE('C) 12 lo U 8. HANDLE BHA 5.25 IADCCODE BAR. PRESSUREflcPa) 1016 9. CASE/CEMENT 6.75 SERIAL No. JR3922 BAR, FtlSE / FALL(kPa) falling 10. WELLHEAD NOZZLES(32in) 8X14,1X16 VISIBILITY(NM) 12 11, BOPS 17 OEPTHIN(m) 1672 WEATHER STATE lino 12, LOT 0.7S DEPTH OUT (m) SWELL / PER / DIR(m/£8c/') 2EO/1/9 13. CORING DRILLED (mttim/dly) 380 WAVES/PER/DIRfrrVsec/*) 270/.3/2 14. LOGGING HOURS (euin/dly) 22.25 HEAVE(m) .4/9 15. REAM/WASH 1.75 8.5 GRADE PITCH(') ,2/3 16. FISH/STUCK AVGE ROP (m/hl) 16.S BOLLf) .2/4 17, LOSS CIRC WOB (ml) 10-15 ANCHOR TENSION-MIN(MT) 210 18. KICK CONTROL RPM 100O50 ANCHOR TENSION-MAX(MT) 295 19. SIDETRACK JET VEL (m/sec) 71 RISER TENSION(MT) 296 20. OTHER 1.25 HHP 0 BIT 260 VARIABLE DECK LOAD(MT) 1S26 21. REP. SURF

BHA No. 4 BHA WEIGHT 62,949 | STRING WT 300000 22. WELL TEST BHA Prolllo: 0lt,NBS,Pony,Slflh,MNi8l, Slab., 15X8 1/4" DC, Jars, 1 X 81/4" DC, X/0.15 X HWDP. 23. WO WEATHER BHA Prolllo:

24. WAIT-OTHER DOWNHOLE TOOLS SERIAL No. ROT/REAM HRS DRILLING DATA 25. ABDN./SU SPEND DRILLING JAR isas-ma 86.5 DRAG-UP (ml) 5 26. RIG SERVICE 1

DRILLING JAR DRAG • DOWN (ml) 5 27. SLIP/CUT UNE SHOCK SUB TOROUE-On Bottom (kMbs) SloU J 28. PULL ANCHORS PDM TORQUE-OI/BollomfWl/lbs) 2 M fl 20.

MONEL MSO 7000 7d 1 TOTAL (HRS) 24 247

0 2 - 0 C T - 9 9 SAT 0 8 : 5 3 O Z O I L & K E L L Y DOWN FAX NO, 61 2 9 9 0 1 3 6 3 5 P,

GLOBEX FAR EAST n A i i v DDII i thin D P D D D T

WELL:|BARRAMUNDM ] DATE: | 1-Oct-99

PERMIT: IT/27P | REPORT # | 12

RIG:[sEDCO70Z | D.F.S, | a

FROM TO HOURS

0:00 1:45 1.75 Precautionary wash and ream lo bollomfrom 1540m to 1672m, Work tight spol at 1640m, no lill on botloin

1:45 2:15 O.SO Foaihor now P D C bit In with light parameters.

2;15 0:00 21.75 Drill 12 W hole (rom 1672m lo 2052m.

Held pit drill.

Hold pro lour safoly meetings,

24.00 OPERATIONS TO 0600 HAS: Continue to drill 121/4" holo Irom 2052m, To 2100m, CIrculalo up sample.

Wiper (rip to 1650m. Circulate.

PROGRAMME N E X T 2 4 HRS: CIrculalo holo clean, drop survey, POOH, log.

BULK GEL(sx) BARITE(sx) CEMENT(sx) DRILLWATER(mt) POT WATER(ml) DIESEL FUEL/JO HELI FUEL(II)

Rig/PC/ P S 220 2869 1535 650/4O/0 176/150/140 367/430/284

PERSONNEL ON RIG TRANSPORTATION COSTS

OPERATOR 4 NAME LOCATION DAILY MUD $31,220.27

DRILLING CONT. 3S WORKBOAT Shogun To Geelong CUMULATIVE MUD $162,500.57

SERVICE COMPS ia WORKBOAT Challenger rig DAILY WELL

OTHER 15 STANDBY BOAT CUMULATIVE WELL

CATERING a HELICOPTER 0 trips

TOTAL 80 HELICOPTER

SUPERVISOR(S) Wally Weslman Lon Kronslal | OIM J . J . Dillon

0 3 - O C T - 9 9 SUN 0 9 : 2 0 O Z O I L & K E L L Y DOWN FAX NO. 61 2 9 9 0 1 3 6 3 5 P. 01

KELLY DOWN CONSULTANTS Pty Ltd A.CM. 008 15B 207 *

Mall: PO Box 573, St Leonards N.S.W,, 1590, AUSTRALIA

Level 1 51 Chandos Street, St Leonards

N.S.W., 2065, AUSTRALIA

Tel: 61-2-9901-3422 Fax: 61-2-9901-3635

FACSIMILE HEADER

TO: ATTN: C C : FAX No: FROM:

SUBJECT

Mineral Resources Tasmania Carol Bacon Kourosh Mehin 0394125156 Ahmad Nadji; PNRE Victoria 0394125152

URGENT ROUTINE

CONFIDENTIAL

03 6233 8338 No. of Pages incl. this page

Colin Stuart Date: 03/10/99 Ret: Globex Bl

BARRAMUNDI 1 Plug and Abandonment Approval

MESSAGE:

Dear Carol,

Globex Far East requests approval as per the PSLA, section 514 to abandon exploration well Barramundi-1,

The well will be abandoned with the setting of 5 class G cement plugs in the following order.

Sequence Depth m From

Plug 1 Plug 2 Plug 3 Plug 4 Plug 5

1900.0 1575.0 1354.0 905.0 160.0

Depth m To

1850.0 1525.0 1294.0 845.0 112.0

Note that plug number 3 will weight tested to 3k

Regards,

Colin Stuart Project Manager For and on Behalf of Globex Far East

IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CONTACT THIS OFFICE IMMEDIATELY AT THE FOLLOWING TELEPHONE NUMBER 61-2-901-3422 AND ASK FOR

AUTHORISED BY CHARGE TO:

Incorporated In South Australia

O l - O C T - 9 9 F R I 1 0 : 1 6 O Z 0 1 L & K E L L Y DOWN F A X NO, 61 2 9 9 0 1 3 6 3 5

KELLY DOWN CONSULTANTS Pty Ltd A.C.N.OOB 162 207 *

P. 0 1 / 0 4

Mall: PO Box 573, St Leonards N.S.W., 1590, AUSTRALIA

Level 1 51 Chandos Street, St Leonards

N.S.W., 2065, AUSTRALIA

Tel: 61-2-9901-3422 Fax: 61-2-9901-363S

FACSIMILE HEADER

MESSAGE:

SUBJECT BARRAMUNDI 1 DAILY REPORT

TO: Mineral Resources Tasmania URGENT ATTN: Carol Bacon Kourosh Mehin 0394125156 ROUTINE C C : Ahmad Nadji; DNRE Victoria 0394125152 CONFIDENTIAL

FAX No: 03 6233 8338 No. of Pages Incl. this page

FROM: Colin Stuart Date: Ref: Globex Bl

9

Regards,

Colin Stuart Project Manager

I 1 O C T i g g < p A w U W G

1

^ . •w \ r <

^ - ^ J - J sZg/? gbr<j?*A4 *<y<zs-s<2./y

IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CONTACT THIS OFFICE IMMEDIATELY AT THE FOLLOWING TELEPHONE NUMBER 61-2-901-3422 AND ASK FOR

AUTHORISED BY C H A R G E TO;

0 1 - 0 C T - 9 9 F R I 1 0 : 1 7 O Z 0 1 L & K E L L Y DOWN FAX NO. 61 2 9 9 0 1 3 6 3 5 P. 0 2 / 0 4

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL: | DARRAMUNDI-1 | DATE: | 3C-Sap-93 |

PERMIT: IT/27P | REPORT # T 11 |

RIG: ISEDCO702 | D.F.S. | 7 |

DEPTH 2400 Hrs;

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVETS:

| 1672 | STATUS O 2400 Hw: |Dr|lllng121M' hole DEPTH 2400 Hrs;

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVETS:

I 1672 | FORMATION:

RT

lEostOfT) Vlow Coil Measures (1324).

DEPTH 2400 Hrs;

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVETS:

I 32 | LASTCASING:| 13 3/8

I 1Z1/4 | WD(HSL):| 76.6 RT

I 869 1 SHOEL,O.T-:| 14.3|

SEABED/MSL:| 102.5 | MAASP:| 734|

DEPTH 2400 Hrs;

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVETS: |1672—miss run.

MUD PROPERTIES ADDITIVES SOLIDS CONTROL FORMATION DATA DENSITY(SG) 1,14 Baiaelds 1 Ipm ul his DEPTH VISCOSITY(Secs) 60 Baracor 1 DESILTER 2.04 10 I TRIP GAS (%)

pH 9 DetlildLT15 DESANDER CONN, GAS (%) PV/YP{cp/lb/100ll2) 17/29 EZ Mud DP 8 MUD CLEANER N/U B'GRD GAS (%) 16S0m-93u 1670m-97u GELS 10/10 7/8 Pac-R7 CENTRIFUGE N/U PORE PRESS (SG) 0.1 WLAPI(r,c/30mln) 4.4 KCL(4000) 1 1 2 3 ECD (SG) 9.64 WLHTHP(cc 0min) 14.2 XCD-PolyS SHAKERS Thule Thule Thule LITHOLOGY £51/coal /slisl CAKE(mm) 1/3 Barila(100)0 SCREENS 165x52 180x52 180x165 DRILLS/BOPS SOLIDS % S KOH 1 PUMPS 1 2 3 LAST BOP DRILL 28'Sop

SANO% ,7 Soda Ash 1 TYPE Ollwell A-1700 Ollwell A-1700 Oilwell A-1700 LAST FIRE DRILL 28-Sep CHLORIDESfmg/l) 27000 STROKE(ln) 12" 12' 12- LAST MOB DRILL 26-Sep KCL% 17 LlNER(ln) 6" 6' 6" LAST ABN, RIG DRILL MBT(lbybM) 4 SPM 85 85 85 LAST BOP TEST 27*Sop TEMP 'C SI LPM 4125 BOP TEST DUE 11-Oct HOLEVOL(m3rbbl) 824 AV-OP(m/mln) 21,9 HRS CUM SURFVOL(m3/bbl) 1799 AV-DC(m/mln) 97.4 1, MOVE RIG 66.5 LOSSES(m3/bbl/hr) 196 SPP(kPa/psl) 23S0 2. RUN ANCHORS 15.75 MUD Co Baroid SCR 0 40 170 170 3. DRILLING 7.7S 64.5 MUDTYPE KCUPHPA SCR 9 50 220 220 14. TRIP 12.25 21.75

BIT DATA WEATHER /RIG RESPONSE 5, WIPER TRIP 2.S BIT No. 3 4 WlNDSPEEDrjls] 15-20 6. SURVEY 0.75 4.5 SiZ£(mm/in) 121/4 121/4 DIRECTION(') 260 7.CIRC./COND O.S 8,75 TYPE S91HPX M34HVX TEMPERATURE('C) 13-15 8. HANOLE BHA 5.25 IADC CODE BAR, PHESSURE(kPa) 1018 0. CASE/CEMENT 6.7S SERIAL No, JRS018 JR3922 BAR. RISE /FALL(kPa) rising 10. WELLHEAD NOZZLES(32in) 7X16 8X14,1X16 VISIBIUTY(NM) 12 11, BOPS 17 DEPTH IN (ni) 875 1672 WEATHER STATE line 12. LOT 0.75 DEPTH OUT (m) 1672 SWELL / PER / DlflfnVsoe/') 260/1/11 13. CORING DRILLED (mcum/dly) 797 / 32 WAVES / PER / DIRfm/sBc/'} 260/.3/2 14, LOGGING HOURS (cunVdly) 37.25/21 HEAVE(m) ,4/11 1S.REAMWASH 2,75 C.7S

GRADE 7.B.RO.rjU.CT,Pfl PITCHf) .2/3 16. FISH/STUCK AVGE ROP (m/hr) 20.S ROLLf) ,4/4 17. LOSS CIRC WOB (ml) 2.5/5 ANCHOR TENSION-MIN(MT) 215 18, KICK CONTROL RPM 100 la 140 ANCHOR TENSION-MAX(MT) 300 19. SIDETRACK JET VEL (m/sec) 71 RISER TENSION(MT) 284 20. OTHER 1,25 HHP 0 BIT 258 VARIABLE DECK LOAD(MT) 1910 21, REP. SURF

BHA No. 4 BHA WEIGHT| 62,949 STRING WT 260000 22, WELL TEST BHA Profile: BII.NBS.Pony.Slab.Monel, Slab., ISX 8 1/4" DC, Jars, 1X81/4' DC, X/0,15X HWDP. 23. wo WEATHER BHA Profile:

24. WAIT' OTHER

DOWNHOLE TOOLS SERIAL No. ROT/REAM HRS DRILLING DATA 25. ABDN./SUSPEND DRILLING JAR 1588-1148 66,75 DRAG • UP (ml) 2 26, RIG SERVICE 1

DRILLING JAR DRAG-DOWN (ml) 3 27, SLIP/CUT LINE

SHOCK SUB TORQUE-On Bollom (kMbs) 3106 28. PULL ANCHORS

PDM TORQUE-OH Bollom (kll/lbs) 210 3 29. MONEL MSO7000 47.75 TOTAL (HRS) 24 223

0 1 - O C T - 9 9 F R I 1 0 : 1 7 O Z 0 1 L & K E L L Y DOWN F A X NO, 61 2 9 9 0 1 3 6 3 5 P. 0 3 / 0 4

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL; | BAR RAMUNDI-1 | DATE: (_ 30Sop-99 PERM)T:|T/27P I REPORT p | n

RIG:|SEDCO702 | D.F.S. | 7

FROM TO HOURS

0:00 7:45 7.75 Drill 121/4" hole Irom 1640m lo 1672m. Back ream each siand, and wipe down oach Eland drillod. 7:45 8:00 0,25 Drop survey bbl, and How check. 8:00 10:00 2 POOH Irom 1672m lo 13 3/8 casing shoe at 869m. 10;00 12:30 2.5 Back roam Irom 1298m to 869m--llltar cake and coal. 12:30 13:00 0.5 Circulate shakers cloan. (meanwhile service top drive). 13:00 14:00 1.00 Flow check, pump slug & POOH lo 371m, 14;00 72—miss r 0.50 Flow check prior lo pulling BHA through 80Ps. Recover survey—miss run.

72—miss r 16:30 2,00 Continue POOH. Rack back BHA, broak bit. 16:30 22;00 5.S0 Make up now bit, run BHA from derrick (t pick up 5 DC, pony, 2 stabs.), RIH to 1390m. 22:00 22:15 0.2S Roam tight spot at 1390m. 22:15 0:00 1,75 Conlinue lo RIH. To 1540m, 2.04 10

Held pre tour saloty meetings.

24.00 OPERATIONS TO 0600 HRS: Contlnuo to RIH, (wash and roam last 3 stands), Drill 12 1/4" hole Irom 1672m. To 1725m.

Drilling at 10-40m/hr.

PROGRAMME NEXT 24 HRS: Drill lo TD, wiper trip, log.

BULK GEL(sx) BARITE(SX) CEMENT(.qx) DRILLWATER(ml) POT WATER(ml) DIESEL FUEL(lt) HEU FUEL(II) Rig/PC/ PS 220 2863 1535 880/60/240 1B8/60/240 378/431/292 PERSONNEL ON RIG TRANSPORTATION COSTS OPERATOR 4 NAME LOCATION DAILY MUD $8,445.41 DRILLING CONT, 35 WORKBOAT Shogun From Gcolong CUMULATIVE MUD $131,272.30 SERVICE COMPS 18 WORKBOAT Challenqer no DAILY WELL AS3S08S9 OTHER 14 STANDBY BOAT CUMULATIVE WELL A$5,236,278

CATERING 66.75 HELICOPTER 2 trips 2 US$3,403,500 TOTAL 137.75 HELICOPTER 3

SUPERVISOR^) WsllyWeslman Lan Kronstal OIM Ronny Rlckard

0 1 - O C T - 9 9 F R I 1 0 : 1 8 O Z O I L & K E L L Y DOWN F A X NO. 61 2 9 9 0 1 3 6 3 5 P.

KELLY DOWN CONSULTANTS Pty Ltd A.C.N. 008 15Z207 '

Mall: PO Box 573, St Leonards N.S.W., 2065, AUSTRALIA

51, Chandos Street St Leonards

N.S.W., 2065, AUSTRALIA

Tel: 61 -2-9901-3422 Mobilo:(018) 446-440 Fax: 61 -2-9901-3635

FACSIMILE HEADER

TO: SEDCO 702 ATTN: Wally Westman. CC: Jim Slater /Tom Burgett/Carol Bacon (TMR)

FAX No: Q^452QQBQQ'ZlSSo=h No, of Pages 1 incl. this page FROM: Colin Stuart DATE: 1/10/99 Ref:

SUBJECT: Amendment to Drilling Programme

Well Name: Barramundi-1 Amendment No: 1 Amendment:

Wally,

Total Depth is now revised to 2100 m. Proceed to drill to this depth with the current BHA keeping the Sydney office informed of progress.

Regards

Prepared by

Signature: On behalf of Globex Far East

Approved by:

Signatui^riC1/2l^L^... IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CONTACT THIS OFFICE IMMEDIATELY AT THE FOLLOWING

TELEPHONE NUMBER 61-2-9901-3422 rQFFICEl

Incorporated In South Australia

3 0 - S E P - 9 9 THU 0 8 : 5 2 OZOIL & K E L L Y DOWN FAX NO. 61 2 9 9 0 1 3 6 3 5

KELLY DOWN CONSULTANTS Pty Ltd A.C.N. 008 152 207 '

P. 0 1 / 0 6

Mall; PO Box 573, St Leonards N.S.W., 1590, AUSTRALIA

Level 1 51 Chandos Street, St Leonards

N.S.W., 2065, AUSTRALIA

Tel: 61-2-9901-3422 Fax: 61-2-9901-3635

FACSIMILE HEADER

TO: Mineral Resources Tasmania URGENT ATTN: Carol Bacon Kourosh Mehin 0394125156 ROUTINE C C : Ahmad Nadji; DNRE Victoria 0394125152 CONFIDENTIAL

FAX No: 03 6233 8338 No. of Pages Incl. this page

FROM: Colin Stuart Date: 1 ^ Ref: Globex B1

SUBJECT BARRAMUND11 DAILY REPORT

MESSAGE:

Regards,

Colin Stuart Project Manager

^ S E P 1 9 9 9

i m . : L _

IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CONTACT THIS OFFICE IMMEDIATELY AT THE

FOLLOWING TELEPHONE NUMBER 61-2-901-3422 AND ASK FOR

AUTHORISED BY CHARGE TO:

Incorporated In South Australia

3 0 - S E P - 9 9 THU 0 8 : 5 3 OZOIL & K E L L Y DOWN FAX NO, 61 2 9 9 0 1 3 6 3 5 P, 0 2 / 0 6

W E L L ;

PERMIT: RIG;

GLOBEX FAR EAST DAILY DRILLING REPORT

FBARRAMUNDI-1 ] |T/27P

S E D C Q 702

DATE:

REPORT*

D.F.S.

I 29 9 . 9 9 _ |

10

DEPTH 24O0 Hrs:

TVO:

24 HR PROGRESS;

HOLE SIZE:

SURVEYS:

1640

1640

340

121(4

STATUS @ 2400 Hr»:

FORMATION:

UST CASING: | 13 3(6 ~1

WD (MSL): | ?6.6 "]

(Dfilllng 121/4" hole

Eastern View Cool Measures

869

RT • SEABED/MSL;[ 102.5

SHOEL.O.T. ; [

MAASP:

14.3

7-12

[1527m -1/2 den.

MUD PROPERTIES AUL/11 IVtb SOLIOS CONTROL FORMATION DATA

DENSITY(SG) 1.13 Bsrsode 2 Ipm ur hrs DEPTH

VISCOSITY(Secs) 50 Baracur5 DFSILTER 1,26 4 TRIP GAS (%)

pH 8.5 UCWlQ L1 DESANDER 2.04 17 CONN. G A S (%)

PV/YP(cp/lb/100fl2] 15/31 C7 KAuA HO 1R MUD CLEANER N/U B'GRD GAS {%) 159C/34u 1624/28u

G E L S 10/10 7/8 ruC - K i f CENTRIFUGE N(U PORE P R E S S (SG) 9

WLAPI{rx/30min) 4.6 1 2 3 ECO (SG) 9,63

WLHTHP{ErJ30inin) 15,2 vrn Dni.. ri*> AKAJ-rOly Lc SHAKERS Thule Thule Thule LITHOLOGY dyr.ltal

CAKE(mni) 1/3 S C R E E N S 52x52 84 i M 120x105 DRILLS / BOPS

SOLIDS % 4.4 PUMPS 1 2 3 LAST BOP DRILL 28-Sep

SAND% ,75 Soda Asfi 2 TYPE Q ' M I A-1700 Oito:IIA.1700 Oilwell A-1700 LAST TIRE DRH L 28-Sop C H L O R I D K M ) 26000 STROKE(in) 12" 12" 12" LAST MOR DRILL 2S'Sep KCL% 17 LlNCR(in) 6" 6r 6' LAST A B N . RIG DRILL 28-Sap MBT(lb'bbl) 4 SPM 85 85 80 LAST BOP TEST 27-Sap TEMP"C 51 LPM 412S BOP TFST DUE 11-Ocl HOLE VOL(m3(bbl) 813 AV-DP(m/min) 21.9 HRS CUM

SURF VOl.(m3/bbl) 1801 AV-DC(m/min) 97.4 1. MOVE RIG 66.5 LOSSES(rn3/l>bWir) 340 SPP(kPa/psl) 2350 2. RUN A N C H O R S 7U./0

MUD Co Baroid SCR @ 40 170 170 3. DRILLING 21 56.75

MUD TYPE K C U P H P A SCR ©50 220 220 4. TRIP 9.5 BfT DATA WEATHER /RIG RESPONSE S. WIPER TRIP 2.5

BIT No. 3 WIND SPEFD[kls) 15-20 6. SURVEY 0.5 3.75

SIZG(mm/in) 12 1/4 DIRECTION;") ?60 ?. CIRC./COND 2.5 8,25

TYPE 591HPX TEMPERATURE( 'C) 15-18 8. HANDLE BHA 5.25 IADC C O D E BAR, PRESSURE(kPa) 1015 9. C A S E / C C M C N T 6.75

SERIAL Mo, JR8018 BAR. RISE / FALL(kPa) rising 10, WFI..LHEAD

NO?7lES(32in) 7X16 VISIGILITY(NM) 12 11. BOPS 17

DEPTH IN (m) 875 WEATHER STATE overcssl 12, LOT 0,75

DEPTH OUT (m) SWELL / PER / DIR(m/sec/°) 290/1 / 9 13. C O R I N G

DRILLED (m curn/dly) 76S WAVES / PER / DIR(m/sec/") 260/3/4 14. LOGGING

HOURS (cum/dly) 37.25/21 HEAVE[m) ,4/9 15, REAM/WASH 4

G R A D E PITCHf) .3/3 16. FISH/STUCK

A V C E ROP (in/hr) 20,5 ROLI.C) .4/4 17. LOSS CIRC

WOB (ml) 2.5/5 ANCHOR TENSION-MIN(MT) 70 18, KICK C O N T R O L

R P M 100 to 140 ANCHOR TENSION-MAX(MT) 300 19. SIDETRACK

JF,TVEL(ni/sec) 71 RISER TENSION(MT) 290Wps 20. OTHER 1,25

HHPfgOir 258 VARIABLE DECK LOAD(MT) 1973 21. REP. S U R F

BHA No, 3 BHA WEIGHT 47,000 STRING WT 260000 22. WCl L TEST

BHA Proflto: Bit, bit aub. 8" monel, 1 X8 1/4" DC, 12 1/4" slab., 8X8 1/4" DC., J.ir, I X8 1/4" DC..XVO, 23. WO WEATHER

15 X HWDP. 24, W A I T - O T H E R

DOWNHOLE TOOLS SERIAL No. ROT/REAM HRS DRILLING DATA 25. ABDN. /SUSPEND

DRILLING JAR 1588-1148 56.25 DRAG -UP (ml) 0 26. RIG SERVICE 1

DRILLING JAR DRAG - DOWN (ml) 0 27. SLIP/CUT LINE

SHOCK SUP lOROUE-On Bollom (kll/lbs) 3toC 20. PULL A N C H O R S

P P M TORQUE-Off Bollom (kit/lbs) 2(o3 29.

MONSL M S O 7 0 0 0 37, ?5 TOTAL (HRS) 24 190

3 0 - S E P - 9 9 THU 0 8 : 5 3 O Z O I L & K E L L Y DOWN FAX NO. 61 2 9 9 0 1 3 6 3 5 P,

GLOBEX FAR EAST DAII Y DRILLING R E P O R T

WELL: [BARRAMUNDI-1 | DATE: | J9 9.99

PERMIT:IT/27P | REPORT # | 10

RIG:|SEDCO702 | D.F.S. | 6

FROM TO HOURS

0:00 1:30 1.50 Drill 121/4" hole from 1300m to 1333m. 1;30 2:00 0,50 Circulate up sample tor geologist. 2:00 8:00 6 Drill 12 1/4" hole from 1333m to 1433m, (bsckream and wipe each stand drilled.) 8:00 6:30 0.5 Circulate up sample for geologist. 0:30 14:00 5.50 Drill 121/4" hole from 1433m to 1527m. At a controlled rate of 30 metres / hr. max. 14.00 14:35 0.50 Circulate bottoms up to clean hole. 14:30 15:00 0.50 Drop Totco survey, rack back 1 std. DP. & recover survey.—1/2 dog. 15:00 16:15 1.25 Drill 12 1/4" hole from 1527m lo 1536m. 16:15 16:45 0,50 Circulate up sample for geologist. 16:45 18:15 1.50 Drill 12 1/4" hole from 1536m lo 1564m. 18:15 18:45 0.50 Circulate up sample tor geologist. 18:45 0:00 5.25 Drill 12 1/4" hole from 1564m to 1640m.

t

Held pre tour safety meetings.

24.00 OPERATIONS TO 0600 HRS: Continue to drill from 1640m, To 1672.

PROGRAMME NEXT 24 HRS: Drill loTD, wiper trip, log,

BULK ,GEL(sx) RARITE(sx) CEMENT(sx) DRILl.WATER(ml) POT WATER(ml) DIESEL FUEL(II)[ HELI FUEL(lt) Rio/PC/ PS 220 2869 1535 665/40/50 188/65/45 393/431/317 j

PERSONNEL ON RIG TRANSPORTATION COSTS OPERATOR 4 NAME LOCATION DAILY MUD $24,979.49 ORILLING CONT, 33 WORKBOAT Shogun From Geelong CUMULATIVE MUD S122.fl26.89 SERVICE COMPS 19 WORKBOAT Challenger rig DAILY WELL

OTHER 15 STANDBY BOAT CUMULATIVE WELL CATERING 9 HELICOPTER 2 IripG

TOTAL 80 HELICOPTER SUPERVISOR(S) Wally Westman Len Kronslal I OIM Ronny Rickard

3 0 - S E P - 9 9 THU 0 8 : 5 4 OZOIL & K E L L Y DOWN F A X NO. 61 2 9 9 0 1 3 6 3 5 P. 0 4 / 0 6

GLOBEX FAR EAST GEOLOGICAL REPORT

W E L L : Barramundi 1 DATE : 30l" September, 1999

REPORT NUMBER: 5 DAYS FROM SPUD: 6 6am OPS: Drill ahead,

REPORT PERIOD: 0O:O0hrs, 29/9 lo 00:00 hrs, 30/9

MEASURED DEPTH: 1640m PROGRESS (MD): 340m FORMATION: Eastern View Coal Measures

G E N E R A L D A T A : DASIN: lias$ Basin

PERMIT: T/27P

MUDLINE: -76.6m

RTloMSI.: 25.9m

HOLE SIZE: IIOUiT.D.: CASING SIZE: SHOE DEPTH:

36" 147m 30" 147m

17'/v" 875m 13-3/8" 869.1m

FORMATION TOPS: Addiscol Ss: lOSOmMDRT, 1054, lml'VUSS (47m Hi)

Demons BlufTFm: 1090mMDRT, I064.1mTVI)SS (42m Hi)

HVCM: 1324m MDRT, I298.1mTVDSS (I2m Hi)

OPERATIONS: Drill from 1300m to 1640m. Circulate up samples irom drill breaks at 1333m. 1433m, 1535m and 1564m.

6:00 Update: Drill ahead at 1672m, ROP decreased markedly nvcr last metre.

DEPTH I N T E R V A L I.ITHOI-OGY

1300-1324m

1324-1365iii

(90-I00%)CLAYSTONE, dusky brown, dusky yellowish brown, very soft, dispersive, hygroclastic to hygroturgid, silty, smooth, trace mica, trace carbonaceous specks, trace pyrite ("verniers' and occasional large aggregates), occasional fine quartz grains, rarely becoming soft to firm, blocky to sub-fissile. 2% greenish grey to dark greenish grey, soft to firm, trace glauconite, possibly turtaceous in part, otherwise as above. (Trace-5%)CARBONACEOUS SILTSTONE, brownish black, soft to firm, sub-fissile to fissile, non to occasionally very slightly calcareous, very carbonaceous to coaly, locally pyrilic (inclusions and 'veinlets'). (Trace-5%)SANDSTONE, loose quartz, medium to very coarse grained, poorly sorted , sub-angular to rounded, elongaLc to sub-spherical, locally with pyrite cement, as above, moderate inferred porosity, no show, (60-95%)CLAYSTONE, brownish grey, rare dusky brown, very soft, dispersive, hygroturgid, non calcareous, trace carbonaceous fragments, trace mica, occasional scattered medium quart/, grains, locally pyrilic, mottled/interspersed with dolomitic sillstone. (Trace-40%)DOU)MITIC SILTSTONE, pale to medium yellowish brown, very soft, dispersive, hygroturgid, moderately calcareous (dolomitic), very argillaceous, grades to silty dolomilic clayslone. Occasionally becomes soft to firm, argillaceous cryplocryslalline dolomite, sub-blocky, trace fossil material in part, rare lo minor (locally common) pelletal glauconite, lite, no visible porosity, no show (trace mineral fluorescence in pari). (Ti ,ace-20%)SANDSTONE, unconsolidated quartz grains, fine to medium, occasional coarse to very coarse grains, poorly sorted, angular to sub-rounded, elongate to sub-spherical, transparent quartz grains, trace mica (large flakes), moderate inferred porosity, no show.

(0-10%)COAI., black, brownish black, dull, sub-biluminous, firm, friable, occasionally moderately hard and blocky, occasionally fissile, lignitic, trace pyriie in part, grades to carbonaceous siltstonc/shale.

P A G E : 1

3 0 - S E P - 9 9 THU 0 8 : 5 4 O Z O I L & K E L L Y DOWN F A X NO. 61 2 9 9 0 1 3 6 3 5 P. 0 5 / 0 6

1365-1425m

1425-1540m

1540-1640m

(Trace-100%)SANDSTONE, clear to translucent, frosted, medium to predominanlly coarse to very coarse, angular lo subroiinded, poor sorting, trace pyrite cement, predominantly clean, trace nodular pyrite, trace carbonaceous fragments, common very coarse to granular milky quart/, grains, disaggregated, very good porosity, no fluorescence. (0-80%)CLAYSTONE, medium dark grey, dusky yellow brown, very silly, micromicaceous, trace Iithic fragments, occasionally light grey very fine arenaceous inclusions/laminae, trace carbonaceous fragments, hygroturgid, soft to dispersive, massive to amorphous. (0-20%)SILTSTONE, brown grey, brown black, very argillaceous, very carbonaceous, trace disseminated pyrile, soft to firm, massive. (0-10%)COAL, as above. (40-100%)SANDSTONE, clear to translucent, light brown, medium to very coarse, angular to subangular, poor to moderate sorting, trace dolomitic cement in part, common light brown argillaceous matrix, common very coarse fractured milky quartz, trace coaly fragments, trace nodular pyrite, disaggregated, good porosity, no fluorescence. (0-60%)SILTSTONE, brown grey to dusky yellow brown, very argillaceous, microinicaceous, trace carbonaceous fragments/microlaminae, slightly arenaceous, trace biotite, trace Iithic fragments, soft to slightly dispersive, massive to amorphous. (0-20%)COAL, black to brown black, slightly argillaceous, sub-bituminous, dull lustre, brittle, blocky lo sub-fissile, (30-I00%)SILTSTONE, predominanlly moderate to dark yellowish brown, with approximately 40% pale yellowish brown, argillaceous to very argillaceous, grades lo silty claystonc in part, very sofl, dispersive, non calcareous, locally with trace mica. Darker variety is more carbonaceous (common flecks and occasional thin coaly streaks). Thin lo medium laininaled in part (alternating light and dark laminae). (Trace- 100%)SANDSTONE, unconsolidated quartz grains, medium lo coarse grained, poorly sorted, sub-angular to sub-rounded, sub-elongate, occasional very coarse quartz grains, rare very fine crystalline pyrite cement in part (weak cement, friable), trace pyrite aggregates, trace reddish orange Fe sLaincd grains, moderate to good inferred porosity, no show. Minor cemented aggregates, very light grey, white, very fine to fine grained, silty in part, moderately sorted, angular to sub-angular, sub-elongate, firm to moderately hard, well cemented (sideritc cement in pari), trace feldspar, rare carbonaceous fragments, trace pyrite, non calcareous, nil to very poor visiuie porosity, no snow. ( Trace- 10%)CCME, black, brownish black, sub bituminous, firm, blocky, occasionally very firm, poorly cleated, locally grades to carbonaceous siltstone, occasionally interlaminaled wilh sillstone in part. Occasionally contains trace translucent orange amber (wilh spotty bright yellow fluorescence, instant blooming bright yellowish while cut),

Total Gas CI C2 C3 IC4 nC4 C5

(Units) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm)

1300-1335m 25(BG) 2499 45

1335-1351m 11 (BG) 1605 72

1351-1425m 2(BG) 332 8

1425-I540m 3(BG) 480 60

1540-1575m 6(BG) 540 13

1575-1640m 18(BG) 2084 42

1501m 7(Peak) 550 217

1596m 35(Peak) 2716 41

1625m 28(Peak) 3290 35

S U R V E Y D A T A : M . Depth

(m) T.V.Depth

(m) Inclination

(deg) Azimuth

(deg) N/S (m)

E/W (m)

Vertical Section (m)

P A G E : 2

3 0 - S E P - 9 9 THU 0 8 : 5 5 O Z O I L & K E L L Y DOWN FAX NO, 61 2 9 9 0 1 3 6 3 5 P. 0 6 / 0 6

1 S ? 7 i i l J £. f

M U D D A T A : Weight

(SG) Funnel

Vise, (sec) Fluid Loss (cc, API)

Chlorides (mg/1)

PI I Remarks M U D D A T A :

1.13 50 4.6 28000 8.5 KC1/PHPA Polymer

C O M M E N T S : Flow checked and circulated up samples from drilling breaks at 1333m, 1433m, 1535m and 1564m. No shows observed.

24 HOUR F O R W A R D P R O G R A M :

Drill ahead to proposed TD, circulating out drilling breaks. Wiper trip prior to logging.

GLOB1IX GEOSTAFF: Wellsite Geologists - Greg Clota/Tony Kress

P A G E : 3

2 9 - S E P - 9 9 WED 1 2 : 2 5 O Z O I L & K E L L Y DOWN FAX NO. 61 2 9 9 0 1 3 6 3 5

KELLY DOWN CONSULTANTS Pty Ltd A /+ U ?*\a (CI 1rV7

P. 0 1 / 0 3

7

A.C.N. OOB 152 207

Mall: PO Box 573, St Leonards N.S.W., 1590, AUSTRALIA

Levol 1 51 Chandos Street, St Leonards

N.S.W., 2065, AUSTRALIA

Tel: 61-2-9901-3422 Fax: 61-2-9901-3635

FACSIMILE HEADER

SUBJECT

MESSAGE:

TO: Mineral Resources Tasmania URGENT ATTN: Carol Bacon Kourosh Mehin 0394125156 ROUTINE C C : Ahmad Nadji; DNRE Victoria 0394125152 CONFIDENTIAL

FAX No: 03 6233 8338 No. of Pages inch this page

FROM: Colin Stuart Date: ^ f / s ^ A ^ r . Ref: Globex Bl

BARRAMUNDI 1 DAILY REPORT

Regards,

Colin Stuart Project Manager

2 n S E P 1 9 9 9 ^

r

.....i,.. i.

D.fi

IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CONTACT THIS OFFICE IMMEDIATELY AT THE FOLLOWING TELEPHONE NUMBER 61-2-901-3422 AND ASK FOR

AUTHORISED BY CHARGE TO:

2 9 - S E P - 9 9 WED 1 2 : 2 6 O Z O I L & K E L L Y DOWN FAX NO. 61 2 9 9 0 1 3 6 3 5 P, 0 2 / 0 3

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL; |8ARRAMUNDI-1 | DATE: | 23,9.99

PERMIT: (T/27P | REPORT # | 9

RIG;|SEDCO702 j D.F.S. | 5

FROM TO HOURS

0;00 0:30 0,50 Contlnuo RIH from 455m to 720m. 0:30 1:30 1.00 WBsh down f/ 728m to 843,5m, Tag plug Intermittently, pushing il down to the lop of the float collar.

1:30 4:00 2.5 Drill out plugs, float, shoe, cement from 843,5m to 875m. 4:00 4:15 0.25 Drill 12 1/4" hole from 875m to 870m.

4:15 5;30 1.25 Displace hole to mud & circ. Until mud weight oven.f 9ppg) 5:30 5:15 0.75 Pull back lo shoe, space out & close MPR, hang off, LOT.—EMW= = 14.38ppg (1.7 sg ) 6;15 11:15 5.00 Drill 12 1/4" hole from 878 lo 1002m, Ream each 6tand before connections.

11:15 12:00 0.75 Pull off bottom A condition mud due lo losses over shakers. 12:00 17:15 5.25 Drill 12 1/4" hole from 1002m to 1181m, 17:15 17:45 0.50 Circulate bottoms up. 17:45 10:15 0,50 Drop totco survey, rack 1 stand, recover survoy on slickline, 11/4 deg. 18:15 0:00 5.75 Drill 12 1/4" hole from 1131m. To 1300m,

Held pre tour safety meetings.

24.00 OPERATIONS TO 0600 HRS: Drill to 1333, circulate sample for geologist, continue to drill lo 1405m,

PROGRA PROGRA MME NEXT 24 HRS: Continue to drill, core if there are any zone of Interest.

BULK GELfsx) BAR/TEfsx) Cfc'MENTfsx) DRIlLWATER(ml) POT vVATER(mt) DIESEL FUEL(lt) HELI FUEL (It) Rig/PC/ PS 220 2869 1535 777/40/50 182/70/45 414/434/317 PERSONNEL ON RIG TRANSPORTATION COSTS OPERATOR 4 NAME LOCATION DAILY MUD $11,423.40 DRILLING CONT. 33 WORKBOAT Shogun From Geelong CUMULATIVE MUD $97,847,40 SERVICE COMPS 15 WORKBOAT Challenger rig DAILY WELL OTHER 15 STANDBY BOAT CUMULATIVE WELL

CATERING 9 HELICOPTER 1 trip TOTAL 76 HELICOPTER

SUPERVISOR'S) Wally Westman Len Kronslal | DIM Ronny Rickand

2 9 - S E P - 9 9 WED 1 2 : 2 6 0 Z 0 1 L & K E L L Y DOWN F A X NO. 61 2 9 9 0 1 3 6 3 5 P. 0 3 / 0 3

C O M M E N T S : Performed Leak Oil'at 878m -1.72SG EMW

24 HOUR F O R W A R D P R O G R A M :

Drill 12-1 AT hole.

G L O B l i X GEOSTAI 'F : Wellsite Geologists - Greg Clota/Tony Kress

(

I I

i

I • P A G l i : 3

2 8 - S E P - 9 9 TUE 0 8 : 4 6 0 Z 0 I L & K E L L Y DOWN FAX NO, 61 2 9 9 0 1 3 6 3 5 P, 0 1 / 0 3

KELLY DOWN CONSULTANTS Pty Ltd A.C.N, 008 152 207 *

h

Mall: PO Box 573, St Leonards N.S.W., 1590, AUSTRALIA

Tel: 61-2-9901-3422

Level 1 51 Chandos Street, St Leonards

N.S.W., 206S, AUSTRALIA

Fax:61-2-9901-3635

FACSIMILE HEADER

TO: ATTN: C C : FAX No: FROM:

SUBJECT

Mineral Resources Tasmania Carol Bacon Kourosh Mehin 0394125156 Ahmad Nadji; DNRE Victoria 0394125152 03 6233 8338 Colin Stuart

No. of Pages

Date: ^O^Mr

BARRAMUNDI 1 DAILY REPORT

URGENT ROUTINE

CONFIDENTIAL

Incl. this page

Ref: Globex B1

MESSAGE:

Regards,

Colin Stuart Project Manager

I 2 8 S E P 1 9 9 9 ^ \ - v M G

M

J

IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CONTACT THIS OFFICE IMMEDIATELY AT THE FOLLOWING TELEPHONE NUMBER 61-2-901-3422 AND ASK FOR

AUTHORISED BY C H A R G E TO;

Incorporated In South Australia

2 8 - S E P - 9 9 TUE 0 8 : 4 7 O Z O I L & K E L L Y DOWN FAX NO, 61 2 9 9 0 1 3 6 3 5 P,

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL! |BARRAMUND|-1 | DATE: | 27,9.93 |

PERMIT: IT/27P I REPORT (f I & I

RIG: ISEDCO702 | D.F.S. ( 4 |

DEPTH 2400 Hra:

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVEYS:

875 J STATUS 0 2400 HM: RIH wilh 121/4" BHA, DEPTH 2400 Hra:

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVEYS:

875 ~) FORMATION:

• RT-

DEPTH 2400 Hra:

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVEYS:

474 | USTCASING:| 13 3/8

121/4 | WD[HSL):[ 76.6

• RT-

869 | SHOEL-O.T.:| |

SEABED/MSL;| 102.5 ] MAASP:| |

DEPTH 2400 Hra:

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVEYS:

MUD PROPERTIES ADOITIVES SOLIDS CONTROL FORMATION DATA

DENSITY(SG) 1,08 Baracida S Ipm Ul hrs DEPTH

VISCOSITY(S6C5) 100+ Der|ridLT7G DESILTER TRIP GAS(%)

PH EZ Mild DP 22 DESANDEH CONN, GAS (%)

PV/rP(cp/lb/100tl2) 1/0 Pac-R 37 MUD CLEANER B'GRD GAS (%)

GELS 10/10 KCL (4000)5 CENTRIFUGE PORE PRESS (SG)

WL API(cc/30mln) XCDPoly35 1 2 3 ECO (SG)

WLHTHP(ec/30mln) Barita (100) 574 SHAKERS LITHOLOGY

CAKE(mm) 2 KOH5 SCREENS DRILLS /BOPS

SOLIDS % Soda Ash S PUMPS 1 2 3 LAST BOP DRILL

SAND % Na HCo3 6 TYPE Oilwoll A-1700 Ollwell A-1700 Ollwell A-1700 LAST FIRE DRILL 22-Sop

CHLOfllDES(mg/l) STROKE(ln) 12' 12" 12" LAST MOB DRILL 26'5tip

KCL% LINERfln) 6' 6" 6' LAST ABN. RIG DRILL 22-Sep

MBT(lb/bM) SPM LAST BOP TEST

TEMP SC LPM BOP TEST DUE

HOLEVOl(m3/bbl) AV-DP(nVmln) HRS CUM

SURFVOL(m3/bbl) AV-DC(nVmln) 1, MOVE RIG 06.5

LOSSES(fTi3/bbWir) SPP(kPa/psl) 2. RUN ANCHORS 15.75

MUD Co SCR 9 40 3, DRILLING 15.5 19.5 MUD TYPE SCR a SO 4. TRIP 1.S

BIT DATA J WEATHER/RIG RESPONSE 5. WIPER TRIP 2.5 2.5

BIT No, 3 i WINDSPEEO(kls) 15 6. SURVEY 2.25 2,75

SIZE(mm/in) 12 1/il | DIRECTION!1) 40 7, CIRC/COND 2.75 3.25

TYPE S91HPX TEMPERATURE('C) 12-14 8. HANDLE BHA £.25

(ADC CODE BAR. PR£SSURE(kPa) 1020 9. CASE/CEMENT $.75 SERIAL No. JR8018 BAR. RISE / FALL(kPa) [ailing 10. WELLHEAD

NOZZLES(32ln) 7X16 VISIBILITY(NM) 12 11. BOPS DEPTH IN (m) 875 WEATHER STATE FINE 12. LOT

DEPTH OUT (m) SWELL / PER / DIRtm/sec/") 270/1 /9 13, CORING

DRILLED (m cum/dly) WAVES / PER / DIRfm/soc/') 7S/.6/2 14. LOGGING HOURS (cum/dly) HEAVE(m) .3/9 15.REAMAVASH 1 1.5

GRADE PITCH(') .2/3 16. FISH/STUCK

AVGE ROP (rn/hr) ROLL(') .3/1 17, LOSS CIRC WOB (ml) ANCHOR TENSION-MIN(MT) 220 IB. KICK CONTROL

RPM ANCHOR TENSION-MAX(MT) 300 19. SIDETRACK JETVEL(m/soc) RISER TENSION(MT) 286klpS 20. OTHER 1,25 HHP 0 BIT VARIABLE DECK LOAD(MT) 2175 21, REP. SURF

BHA No, 3 BHA WEIGHT 47,000 | STRING WT 180000 22. WELL TEST BHA Profile: Bll, bll sub, 8' moral, 1 X 81/4- DC, 12 1/4" slab., 8X81/4' DC., Jar, 1 X 81/4" 0C.,X/0, 23. WO WEATHER BHA Profile:

15 X HWDP. 24. WAIT • OTHER

OOWNHOLE TOOLS SERIAL No. HOT/REAM HRS DRILLING DATA 25. ABDN./SUSPENO

DRILLING JAR 1588-1M8 19 DRAG - UP (ml) 2.5 26. RIG SERVICE 0.5

DRILLING JAR DRAG-DOWN (ml) 2.5 27, SLIP/CUT LINE

SHOCK SUB TORQUE-On Bottom (kWlbs) 3-10 28. PULL ANCHORS PDM TORQUE-OflBollamtkfHbis) 2 29.

MONEL MSO7000 TOTAL (HRS) 24 127

2 8 - S E P - 9 9 TUE 0 8 : 4 7 O Z O I L & K E L L Y DOWN FAX NO, 61 2 9 9 0 1 3 6 3 5 P.

GLOBEX FAR EAST n A i i v n c n I IMP D C D H D T

WELL:|BARRAMUNDI-1 I DATE: [ 27.9.99

PERMIT: [TO7P | REPORT # | 8

RIG:|SEDCO702 | D.F.S. [~ i

FROM TO HOURS

0:00 1:1S 1,25 Hold JSA wilh crew, M/up doublo ol riser to LMRP & Install guide lines.

1:15 1:45 0.50 Pross/ test choke and kill lines 250 / 5000 psi.

1:45 2;45 1 Run BOPs, (rig at 80' draft.) 2:45 3:15 0.5 Press/ tast ehoko and kill lines 250 / 5000 psi.

3:15 6:15 3,00 Pick up slip Jnt & landing Jt, Install Ruckers & choke and kill lines lo slip joint.

6:15 6:45 0.50 Press/ lest choke and kill lines 250 / 5000 psi.

D:45 7:15 0.50 Install storm loops on control lines.

7:15 7:45 0,50 Land out BOPs & latch connoctor to wellhead, test wilh 50k overpuil.

7:45 8:15 0.50 Bring rig to 85" draft/pressure test shear ram against csg to 1000 psi. 6:15 0:45 1.50 Open Inner barrel and Install diverter.

0:45 10:15 0.50 Lay out 500 Ion equipment & spider, pick up 350 (on equipment.

10:1S 11:00 0.7S M/U lest plug and RIH, 11:00 17:00 6.00 Pressure lest BOPs--Annulars to 250 / 3500, Rams 250 / 5000 psi on yellow pod. Function test BOPs on

Glue pod from mini panel In Sadeo olllco. 17:00 17:45 0.75 Porform depletion test on BOPs. (Accumulator lost).

17:45 18:15 0.50 POOH, L/oul lest lool. 18;1S 10:45 0,50 Service TDS and RBS.

18:45 19:15 0.50 Pressure lest csg. Aqalnst shoar rams (15 roin), pick up & make up Hang Oil lool and rack In derrick. 10:15 20:30 1.25 Hold JSA II layout 17 1/2" drilling assy. From derrick.

20:30 21:15 0.75 P/up Ilex Joint wear bushing & RlH. sol, POOH, lay out tool,

21:15 l 0:00 2.75 Hold JSA, make up 121/4" BHA and RIH. (455m).

Held pre tour safoly meetings.

24.00 OPERATIONS TO 0600 HRS: Contlnuo RIH. Tag plug al 728m, push plug to top of comont at 843.5m Hard cement © 863m.

Drill plugs, float collar, shoe (rack, shoe and 3m formation wilh soa waler, circ, Hole clean, displace lo mud.

LOT. PROGRAMME NEXT 24 HRS: Drill 12 1/4" hole,

BULK GEL(SX) BARITEfsx) CEMENT(sx) DRILLWATER(mt) POTWATER(ml) DIESEL FUEL(ll) HELI FUEL(lt)

Rig/PC/ PS 220 2959 153S 910/40/50 188/75/45 427/439/317

PERSONNEL ON RIG TRANSPORTATION COSTS

OPERATOR 4 NAME LOCATION DAILY MUD SS2.909.32

DRILLING CONT. 33 WORKBOAT Shogun To Geelong CUMULATIVE MUD $86,424.00

SERVICE COMPS 13 WORKBOAT Challenger rig DAILY WELL

OTHER 15 STANOBY BOAT CUMULATIVE WELL

CATERING 9 HELICOPTER 1 trip

TOTAL 74 HELICOPTER SUPERVISOR(S) Wally Wsstman Len Kronslal OIM Ronny Rickard

2 7 - S E P - 9 9 MON 0 9 : 3 8 O Z O i L & K E L L Y DOWN F A X NO. 61 2 9 9 0 1 3 6 3 5

KBLLY DOWN CONSULTANTS Pty Ltd A.C.N. 008 152 207 *

P. 0 1 / 0 7

Mall: PO Box 573, St Leonards N.S.W., 1590, AUSTRALIA

Lovol 1 51 Chandos Street, St Leonards

N.S.W., 2065, AUSTRALIA

Tel: 61-2-9901-3422 Fax: 61-2-9901-3635

FACSIMILE HEADER

SUBJECT BARRAMUNDI 1 DAILY REPORT

TO: Mineral Resources Tasmania URGENT ATTN: Carol Bacon Kourosh Mehin 0394125156 ROUTINE C C : Ahmad Nadji; DNRE Victoria 0394125152 CONFIDENTIAL

FAX No: 03 6233 8338 No. of Pages Incl. this page

FROM: Colin Stuart Date: Ref: Globex Bl

MESSAGE:

Regards,

Colin Stuart Project Manager I 2 7 $ E P 1 9 9 9 ^ ° ^ S

L

J

IF YOU DO NOT RECEIVE ALL PAGES. PLEASE CONTACT THIS OFFICE IMMEDIATELY AT THE FOLLOWING TELEPHONE NUMBER 61-2-901-3422 AND ASK FOR

AUTHORISED BY CHARGE TO:

Incorporated In South Australia

2 7 - S E P - 9 9 NON 0 9 : 3 8 O Z O I L & K E L L Y DOWN FAX NO. 61 2 9 9 0 1 3 6 3 5 P.

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL: | BARRAMUNDI-1 | DATE: | 26.9.9D |

PERMIT: IT/27P I REPORT * [ 7 '

RIG: ISEDCO702 I D.F.S. | 3 |

DEPTH 2400 Hra:

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVEYS:

I 875 | STATUS C 2400 Hra: POOH lo run casing DEPTH 2400 Hra:

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVEYS:

I 875 | FORMATION:

AT-

DEPTH 2400 Hra:

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVEYS:

| 474 | LAST CASING:| 30"

171/2 | WD(MSL):| 76.6 AT-

[ 147m | SHOELO.T.:[ |

SEABED7MSL:| 102,5 | MAASP:( |

DEPTH 2400 Hra:

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVEYS: [ 1' 9 488m. 21/2! al 748m. 1/4' al B7Sm.

MUD PROPERTIES ADDITIVES SOLIDS CONTROL FORMATION DATA

DENSITY(SG) 1.04 gsl30 Ipm ul hrs DEPTH

VISCOSITY(Socs) 100* DESILTER TRIP GAS (%)

PH DESANDER CONN. GAS (%) PV/YP(cp/lh/100II2) 1/0 MUD CLEANER B'GROGAS(%)

GELS 10/10 CENTRIFUGE PORE PRESS (SG) WL API(cc/30mln) 1 2 3 ECO(SG) WL HTHP(cc/30min) SHAKERS LITHOLOGY CAKE(mm) SCREENS DRILLS/BOPS SOLIDS % PUMPS 1 2 3 LAST BOP DRILL SAND% TYPE Ollwell A-1700 Ollwell A-1700 Ollwell A-1700 LAST FIRE DRILL 22-Sap CHLORlDES(mg/l) STROKE(in) 12' 12" 12' LAST MOB DRILL 26-Sep KCL% LINEfi(ln) 6' 6" 6' LAST ABN. RIG DRILL 22-Sep MBT(lb/bbl) SPM LAST BOP TEST TEMP SC LPM BOP TEST DUE HOLEVOL(m3/tibl) AV-DP(m/mln) HRS CUM SURF V0L(m3<bbl) AV-DC(m/rnln) 1. MOVE RIG GC.S LOSSES(m3*bi/hr) SPP(kPa/psl) 2. RUN ANCHORS 15.75 MUD Co | SCR 0 40 3, DRILLING 15.5 19.5 MUD TYPE SCR e SO 4. TRIP 1.5

BIT DATA WEATHER /RIG RESPONSE 5. WIPER TRIP 2.5 2,5 BIT No. 2 WIND SPEED(kts) 10 6, SURVEY 2.25 2.75 SIZe(mm/in) 17.S DIRECTIONC) 75 7. CIRC/COND 2,75 3.25 TYPE MSDSSHQC TEMPEflATURE('C) 12-16 8. HANDLE BHA 5.25 IADCCODE 1,1.5 BAR. PRESSURE(KPa) 1024 9. CASE/CEMENT 6.75 SERIAL No. LF9220 BAR, RISE/FALL(kPa) rising 10. WELLHEAD NOZZLES(32ln) 3x24 VISIBILITY(NM) 12 11. BOPS DEPTH IN (m) 147 WEATHER STATE FINE 12, LOT DEPTH OUT (m) 875 SWELL / PER / DIR(m/soc/<) 270/.S/1 13, CORING OniLLEDfrnoum/dly) 728 / 474 WAVES / PER / DIR(m/saC/') 7SV.3/1 14. LOGGING HOURS (cum/diy) 18.5/15.5 HEAVEfm) N/A 1S. REAM/WASH 1 1.5 GRADE 2.2.1n PITCH(') 0.2/3S8C 16, FISH/STUCK AVGE ROP (mfcr) 39.3 ROLL(') 0.2/3 5 K 17, LOSS CIRC WOB (ml) ANCHOR TENSION-MIN(MT) 250 18. KICK CONTROL RPM ANCHOH TeNSIOH-MAX(MT) 330 19. SIDETRACK JETVEL(rrVsec) RISER TENSION(MT) 20. OTHER 1.25 HHP O GIT VARIABLE DECK LOAD(MT) 1941 21. REP. SURF

BHA No. 2 BHA WEIGHT 52,000 | STRING WT 22. WELL TEST BHA Profile: Bit ,Floal sub, 2X91/2' D.C..17 1/2' SlablUzer, 1X91/2' D.C, X/0„ 7X81/4' D.C, 23. WO WEATHER BHA Profile:

Jar. 1 X 81/4' O.C., X/O., 15 X HWDP. 24.WAIT-OTHF.R DOWNHOLETOOLS SERIAL No. ROT/REAM HRS DRILLING DATA 25. ABDNySUSPEND DRILLING JAR 1588-1148 19 DRAG • UP (ml) 2.S 26. RIG SERVICE 0.5 DRILLING JAR DRAG-DOWN (ml) 2.5 27, SUP/CUT LINE

SHOCK sue TORQUE-On Bottom (klWbs) 3-10 28. PULL ANCHORS POM TORQUE-OII Bollom (kfl/lbs) 2 29.

TOTAL (HRS) 24 127 |

27-SEP-99 HON 09:39 OZOIL & KELLY DOWN FAX NO. 61 2 99013635 P. 03/07

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL:[BARRAMUNDM | DATE: | 26,0.00

PERMIT: [T/27P | REPORT» L 7

R|Q:|SEDCO702 | D-F-S. 1 3

FROM TO HOURS

0:00 2:00 2.00 POOH from 875m lo 105m, strap pipe on the way out.

2:00 2:30 0.50 Jel woll-hoad & PGB, observe wilh ROV,

2:30 3:30 1 Continue POOH, recover lotoo on the way oul—1/4 dog.

3:30 4:16 0.75 Rig up to run 13 3/8 casing.

4:15 4;30 0.25 Hold JHA & FVASS

4:30 10:30 6,00 Pick up shoo jt, check same & RIH wilh casing. ROV assist through wellhead, till every 5 Jolnts-lo 757m,

10:30 12:00 1,50 P/up hanger assy, m/up plug launcher & plugs, m/up lo 18 3/4" wollhoad.

12:00 13:00 1.00 Run 13 3/8 casing on 5" OP from dorrlck. (drift all to 2 3/4") land w/head w/30klbs. confirm latch w/50k o/pul|

13:00 13:30 0.50 Rig up surface lines, circ. 100 bbl sea walar, Contirm good returns w/ROV. Hold JSA. Press. Tost Una lo 3klbs,

13:30 16:00 2.50 Pump 38 bbl drlllwater, drop ball & pump 2 bbls, shear bollom plug with 1500 psi, Mix and pump 10C7 sx class G cml. a 12,8 ppg (1,54 sg) followed by 410 sx class G tail slurry© 15.9ppg (1,9sg) Drop dart and pump 12 bbl sea water-no Indication ol shear oul.

16.00 16:30 0.50 Displace with rig pumps.No Indication ol plug bumping on stks. Pump additional 60 stks.( 1/2 shoe track) No Indication of bumping plug,

16:30 17:45 1,25 Break out cement hose, (no back How) release R/lool, POOH & lay out R/Tool.

17:45 16:15 0.50 P/up cmt-head assy, break out & layout same.

18:15 19:00 0.7S Rig up to run BOPs. Hold JSA. 19:00 20:00 1,00 Make up double ol rlsor and rack back In derrick. 20:00 21:15 1.25 Hold JSA and move BOP across to beams & lower wilh std ol DP as backup. Move LMPR across,

21:15 0:00 2.7S Function tost BOPs on both blue and yellow pods Irom drill Moor. Function mini panol from Sodco olflce,

Hold pro tour safely meetings.

24.00 OPERATIONS TO 06DO HRS: Run BOP on rteor, nlpplo up choke and kill lines.

PROGRAMME NEXT 24 HRS: Land BOP, Pressure tesl BOP, drill out cement and shoo, LOT.

BULK GEL(sx) BARITE(sx) CEMENT(SX) DRILLWATER(ml) POT WATER(ml) DIESEL FUEL(lt) HELI PUEL(ll) RIG/Boat/Boat 220 3303 1535 809/40/50 194/80/45 437/446/317 PERSONNEL ON RIG TRANSPORTATION COSTS OPERATOR 4 NAME LOCATION DAILY MUD 773.1

DRILLING CONT. 33 WORKBOAT Shogun ng CUMULATIVE MUD 34197.58

SERVICE COMPS 15 WORKBOAT Challenger rig DAILY WELL OTHER 15 STANDBY BOAT CUMULATIVE WELL

CATERING 9 HELICOPTER 1 trip

TOTAL 76 HELICOPTER SUPERVISOR'S) Wally Weslman Len Kronslal | OIM RonnyRlckard \

2 7 - S E P - 9 9 HON 0 9 : 3 9 OZOIL & K E L L Y DOWN F A X NO, 61 2 9 9 0 1 3 6 3 5 P.

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL: |BARRAMUND|-1 _ J DATE: | 24.9.93 j PERMIT: IT/27P I REPORT # | 5 | RIG: |SEDCO702 | D.F.S. | 1 |

DEPTH 2400 Hrs:

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVEYS:

! 401 | STATUS 0 2400 Hit: DRILLING 17 1/2" HOLE O 401m. DEPTH 2400 Hrs:

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVEYS:

401 ] FORMATION:

• RT-

DEPTH 2400 Hrs:

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVEYS:

299 | LASTCASING:| 30"

171/2 1 WD(MSU;I 76.6

• RT-

I 147m | SHOEL,O.T,:| |

SEABED/MSL'.I 102,5 | MAASP:| |

DEPTH 2400 Hrs:

TVD:

24 HR PROGRESS:

HOLE SIZE:

SURVEYS: 1'0 143m. 1" 6 488m.

MUO PROPERTIES ADDITIVES SOLIDS CONTROL FORMATION DATA OENSITY(SG) 1,06 gol 250 SX Ipm Ul hrs DEPTH VISCOSITY(Secs) 100. causllc 2 DESILTER TRIP GAS (%)

PH soda ash 2 DESANDER CONN, GAS (%) PV/YP(cp/ILV100ll2) 1/0 Ilme16 MUD CLEANER B'GRD GAS (%) GELS 10/10 CaC110 CENTRIFUGE PORE PRESS (SG) WLAPI(cc/30mln) 1 2 3 ECD(SG)

WL HTHP(cc/30mln) SHAKERS LITHOLOGY CAKE(mm) SCREENS DRILLS/BOPS SOLIDS % PUMPS 1 2 3 LAST BOP DRILL SAND % TYPE Olfwell A-1700 Oitaell A-1700 Oifwall A-1700 LAST FIRE ORILL 22-St!p CHLORIDES(mrj/l) STROKEfJn) 12' 12' 12' LAST MOB DRILL 12-Sflp KCL% UNERfln) fi" 6' 6' LAST ABN. RIG DRILL 22-Sop MBT(ltybbl) SPM 100 100 100 LAST BOP TEST TEMP "C LPM 4800 BOP TEST DUE HOLE VOL(m3/tibl) AV-DP(m/mln) 12.1 HRS CUM SURFVOL(m3/bbl) AV-OC(nVmln) 39 1. MOVE RIG 6G.5 LOSSES(m3*bl/hf) SPP(kPa/psl) 1400 2. RUN ANCHORS 3.2S 15.75 MUO Co SCR 0 40 3. DRILLING 4 4 MUD TYPE SCR 9 50 4. TRIP 1.5 1.5

BIT DATA WEATHER / RIG RESPONSE 5. WIPER TRIP BIT No. 1 2 WINDSPEED(K1s) 10 6. SURVEY 0.5 0.5 SIZE(mnVln) 26" 17.5 DIRECTION)1) 250 7. CIRO/COND 0.5 0,5 TYPE DSJC MSDSSHOC TEMPERATURE('C) I0-D8C B, HANDLE BHA 5.25 5.25 IADCCODE 1,1,1 1,1.5 BAR. PRESSURE(kPa) 1017 9. CASE/CEMENT 6,75 6,75 SERIAL No. 66330 02-03-000003 BAR. RISE / FALL(kPa) rising 10, WELLHEAD NOZZLES(32ln) 3x24 3x24 VISIBILITYINM) 12 11. BOPS DEPTH IN (m) 102,5 147 J WEATHER STATE FINE 12. LOT DEPTH OUT (m) 147 SWELL / PER / DIRtm/socr1) 270/0.5/01 13. CORING DRILLED (m cum/dly) 45 254 ||wAVES/PER/DIR(in/secf) 250/.3/1 14, LOGGING HOURS (cum/dly) 0.5 3 HEAVEM N/A 15. REAM/WASH 0.5 0.5 GRADE 1-1-1 PITCH(') 0.2/ i sac 16. FISH/STUCK AVGE HOP (rrvhr) 90.0 64.6 ROLLf) 0,2/4 sec 17. LOSS CIRC WOB(ml) 0-5 0-5 ANCHOR TENSION-MIN(MT) 260 18, KICK CONTROL RPM 70 100 ANCHOR TENSION-MAX(MT) 340 19. SIDETRACK JETVEL(m/soc) 82 RISER TENSION(MT) 20. OTHER 1,25 1.25 HHP « BIT 406 VARIABLE DECK LOADIMT) 2202 21, REP, SURF

BHA No. 2 BHA WEIGHT 52,000 | STRING WT 190000 22, WELL TEST BHA Prollla : Bil .Floal SUb, 2X91/21 D.C.,171/2* SlabllHOr, 1X91/2" D,C„ X/0., 7 X 8 1/4' D.C. 23, WO WEATHER BHA Prollla :

Jar, 1 X 81/4' 0,C„ X/0,15 X HWDP. 24, WAIT-OTHER DOWNHOLE TOOLS SERIAL No, ROT/REAM HRS j DRILLING DATA 25,ABONySUSPEND DRILLING JAR 1SBB-1148 3,5 DRAG - UP (ml) 2.5 20. RIG SERVICE 0.5 0.5 DRILLING JAR DRAG-DOWN(ml) 2,5 27. SUP/CUT LINE SHOCK SUB TOHQUE-On Bollom (xll/lts) 3-10 28. PULL ANCHORS POM TORQUE-OK Bollom (Wl/lte) 2 29.

| TOTAL (HRS) 24 103

27-SEP-99 HON 09:40 OZOIL & KELLY DOWN FAX NO. 61 2 99013635 P. 05/07

GLOBEX FAR EAST DAILY DRILLING R t r O R T

WELL:|BARRAMUNDI-1 J ] DATE: | 24.0.99 PERMIT: IT/27P | REPORT * I 5

RIG:|SEDCO702 | D.F.S. | 1

FROM TO HOURS

0:00 2:00 2.00 Continue to pre-tenslon anchors, ail lo 350 kips. 2:00 3:15 1.25 Perform emergency winch-off drill. 3:15 4:00 0.75 Hold JHA / Shallow Gas Contingency Plan, - ROV perform Seabed Survey. 4;00 4:30 0.5 R.I.H., Tag Seabed 0 102.5m, Drill 36" hole from 102.5rr 4:30 4:45 0.25 Swoop Hole with 100 bbl HI-Vis. 4:4S S;15 0.50 Drop Tolco survey, POOH lo 120m and rocovor lotco. 5:15 5:30 0,25 Wash down 1/120m to 147m, spot 250 bbl gel on bottom. 5:30 5:45 0,25 POOH to 108m. S:45 6:15 0.50 ROV spot markers an either side of holo, 6:15 7:00 0.75 Continue POOH lo surface. 7:00 7:45 0.75 Rig up to run 30" easing. 7;45 11:30 3.7S Hold JHA / Pick up shoe Joint, test same, run casing, Make up stinger, pick up running tool, engage into

wellhead, land Into PGB and RIH, 11:30 12:00 0.50 Make up cementing line and hold JHA. 12:00 12:45 0.7S CIrculalo 50 bbl, and confirm returns wilh ROV. Pressure tesl surface linos to 2000 psi, 12:45 13:15 0.50 Mix and pump 600 sx class G cement ffi 1.9 sg and displace with 11.43 bbl soa walor, 13:15 14:15 1.00 Check no back flow, break olf surface lines, conlirm Bullsoye 3/4« to port. 14;1S 15:00 0.75 Release running tool, POH and lav out same. 15:00 16:00 1.00 Lay oul 30" cmt head assy, Mako up 13 3/8 cml head assy. 16:00 17:30 1.50 Hold JSA & lay oul 36" drilling assy. 17:30 19;30 2.00 Hold JSA & mako up 17 1/2" drilling assy. Slab Into wollhead observed by ROV to 118m 10:30 20:00 0.50 Sorvlce TDSI RBS. Held kick drill. 20:00 20:30 0.50 Wash down f/118m, lag cement at 143m with 10kibs. 20:30 21:00 0.50 Drill cement and shoo. 21:00 23:59 3.00 Drill 17 1/2" hole from 147m lo 401m,

W.O.B.«5-10Klbs, RPM-100-1SO, PUMPS-3x100 spm © 1400 psi.

Hold prelour safely meetings.

QUEST ENGINEER GAVE A PRESENTATION ON GLOBEX HSE AND ERP.

24.00 OPERATIONS TO 06 00 HRS: Drill lo 4S8m, survay--mls$run, drill to 486m, survey--19. Drill from 488m. To 570m.

PROGRAMME NEXT 24 HRS: Drill, wiper trip, rig up lo run casing.

BULK GEL(sx) BARIT6(sx) CEMENT(sx) DRILLWATER(ml) POT WATER(mt) DIESEL FUEL(lt; HELI FUEL(ll)

RIG/Doat/Boal 625/0/0 3533 3148 1061/40/400 164/90/260 338/451/457

PERSONNEL ON Rl( TRANSPORTATION COSTS OPERATOR 2 NAME LOCATION DAILY MUD 6970.78

DRILLING CONT. 33 WORKBOAT Shogun rig CUMULATIVE MUD 6970.78

SERVICE COMPS 8 WORKBOAT Challenner rig DAILY WELL

OTHER IS STANDBY BOAT CUMULATIVE WELL CATERING 9 HELICOPTER 1 (rips

TOTAL 67 HELICOPTER SUPERVISOR^) Wally Woslman Lon Kronstal | OIM Ronny Rlckard

2 7 - S E P - 9 9 HON 0 9 : 4 0 O Z O I L & K E L L Y DOWN F A X NO, 61 2 9 9 0 1 3 6 3 5 P,

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL: | B A R R A M U N D I - 1 — | DATE: I 25.0.09 ]

PERMIT: |T/27P I REPORT* | 6 )

RIG: [SEDCO702 I D.F.S. | 2 |

DEPTH 2400 Hra:

TVD;

24 HR P R O G R E S S :

HOLE SIZE:

SURVEYS:

875 | STATUS fl 2400 Hrs: [POOH lo run casing DEPTH 2400 Hra:

TVD;

24 HR P R O G R E S S :

HOLE SIZE:

SURVEYS:

1 875 | FORMATION:

9

RT-

I

DEPTH 2400 Hra:

TVD;

24 HR P R O G R E S S :

HOLE SIZE:

SURVEYS:

474 | LAST CASING:) 30"

171/2 | WO(MSL);| 76.6

9

RT-

L 147m J SHOE L.O.T.:| J

SEABE0/MSL:| 102.5 1 MAASP:| |

DEPTH 2400 Hra:

TVD;

24 HR P R O G R E S S :

HOLE SIZE:

SURVEYS: 1« O 488m. 2 1/2«al 748m. 1/4« 01875m,

MUD PROPERTIES ADDITIVES SOLIDS CONTROL FORMATION DATA DENSITY(SG) 1.04 gal 950 St Ipm ul hrs DEPTH

VISCOSITY[Sets) 100* causllc 7 DESILTER TRIP GAS (%)

pH soda ash 9 DESANDER CONN. GAS (%)

PV/YP(cp/lb/lOOII2) 1/0 Ilme15 MUD CLEANER 8'GRD GAS (%)

GELS 10/10 CENTRIFUGE PORE PRESS (SG)

WLAPI(cc/30mln) 1 2 3 ECD (SG) WLHTHP(«/30min) SHAKERS UTHOLOGY

CAKE(mm) SCREENS DRILLS /BOPS

SOUOS PUMPS 1 2 3 LAST BOP DRILL

SAND % TYPE Oilwall A-1700 Oilwall A-1700 Oilwall A-1700 LAST FIRE DRILL 22-Sep

CHLOR(DES(mg/1) STflOKEfjft) 12' 12' 12" LAST MOB DRILL 12-Sop K C L % LINER(in) 6" 6' 6" LAST ABN. RIG DRILL 22-Sop MOT(lti/bbl) SPM 100 100 100 LAST SOP TEST

T E M P "C LPM 4600 BOP TEST DUE

HOLEvOKma/bbl) AV-DP(nVmln) 12.1 HRS CUM SURF VOL(m3/bbl) AV-DC(m/mln) 39 1, MOVE RIG 66.5 LOSSES(rfi3/bbMir) SPPOtPa/ps)) 2250 2. RUN A N C H O R S 15,75 MUD Co SCR 9 40 3, DRILLING 15.5 19.5 MUD TYPE SCR « 50 4. TRIP 1,5

BIT DATA WEATHER / RIG RESPONSE 5, WIPER TRIP 2.5 2.5

BIT No. 2 WlNDSPEEDflds) 5 6. SURVEY 225 2,75 SIZE(mmfln) 17,5 DIRECTION!') 240 7.CIRC;COND 2.75 3,25

TYPE M S D S S H Q C TEMPERATURE('C) 13-I7C 8. HANDLE BHA 5.25 IADCCODE 1.1.5 BAR. PRESSURE(kPa) 1020 9. C A S E / C E M E N T 6.75

SERIAL No, LF0220 BAR, RISE/FALL(VPa) rising 10. WELLHEAD

NOZZLES(32ln) 3i24 VISIBILITY(NM) 12 11. BOPS DEPTH IN (m) 147 WEATHER STATE FINE 12, LOT OEPTH OUT (m) 875 SWELL/PER/DIR(m/S0(/) 260/0.5/01 13. CORING

DRILLED (m cum/dly) 728 / 474 WAVES / PER / DIR(rrVs8o/°) 240/.3/I 14. LOGGING

HOURS (cum/dly) 18.5/15.5 HEAVE(m) N/A 15. REAM/WASH 1 1,5

GRADE 1 PITCHO 0.2/3SOC 16. FISH/STUCK

AVGE ROP (m/hr) 39.3 I ROLL(') 0.2/3 sec 17. LOSS CIRC

WOf) (ml) 5-IS |ANCHORTENSION-MIN(MT) 260 18. KICK CONTROL

R P M 100/120 |ANCHOR TENSION-MAX(MT) 330 19. SIDETRACK

JETVEL(m/soc) 82 RISER TENSION(MT) 20. OTHER 1.25

HHP 0 BIT 406 VARIABLE DECK LOAD(MT) 2160 21, PEP. SURF

BHA No. 2 BKAWEIGHTj 52,000 STRING WT 215000 22. WELL TEST

BHA Prollla: Bit .Float sub, 2X91/2" O.C.,171/2" SlablUzer, 1X91/2' D.C, X/O, 7X81/4' D.C. 23. WO WEATHER BHA Prollla: Jar, 1X 81/4' O.C„ X/O, 15 X HWDP. 24. WAIT • OTHER

DOWNHOLE TOOLS SERIAL No. ROT/REAM HRS DRILLING DATA 25. ABDN. /SUSPEND

DRILLING JAR 1588-1148 19 DRAG-UP (ml) 2.5 26. RIG SERVICE 0.5

DRILLING JAR DRAG • DOWN (ml) 2.5 27, SUP/CUT LINE

SHOCK SUB TORQUE-On Bollom (Wi/ibs) 3-10 28. PULL ANCHORS

PDM TORQUE-OA Bottom (klHbs) 2 29. TOTAL (HRS) 24 127

2 7 - S E P - 9 9 NON 0 9 : 4 1 O Z O I L & K E L L Y DOWN FAX NO. 61 2 9 9 0 1 3 6 3 5 P. 0 7 / 0 7

GLOBEX FAR EAST nAii v nmi i INA REPORT L / M I L T u n i L u i n u n c r u n I

WELL: BARRAMUNDI-1 | D A T E : | 25.9.09

PERMIT:lT/27P I HEPOP1TII I 6

RIG;|SEDCO702 | D.F.S. | 2

FROM TO HOURS

0;00 0:45 0.7S Drill 17 1/2" holo Irom 401 mto 458m. 0:45 1:00 0.25 Sweep hole clB-an with 50 bbls ol HI-VIs, 1;00 1:30 0,5 Drop totco survey and recover on wireline- mlssrun.

1:30 2:00 0.5 Drill 17 1/2" hole from 458m lo 48Sm. 2:00 2:15 0.2S Circulate hole and spot 30 bbl hl-vls on boitom. 2:15 2:45 0,50 Drop |o|co survey and recover on wireline- 1 deg.

2:45 11;00 8.25 Drill 17 1/2" hole Irom 485m to 748m,

11:00 11:30 0,50 Circulate hole and spot 30 bbl hl-vls on bottom. 11:30 12,00 0.50 Drop totco survey and recover on wlrellno-21/2 dog.

12:00 18:00 6.00 Drill 17 1/2* hole from 748m to 875m, Pump 25 bbl sweeps mid siand and spot 25bbl on connections.

18:00 18:30 0.50 Pump 100 bbl hl-vls and sweep oul hole. 18:30 18:45 0,25 Drop tolco survey.

18:45 20:15 1.50 POOH. Wash and ream through tight spots at 792m, 804m, 820m,4 832m.

20:15 20:30 0.2S Rooovor survoy— mlssrun.

20:30 21:30 1,00 RIH-taklng weight at 820m.(l5klbs). 21:30 22:30 1.00 Wash and ream Irom 820m, tag TD O 875-no fill on bottom.

22:30 23:00 0.50 Pump 50 bbl hl-vls and sweep oul hole. 23:00 23:45 0.75 Displace holo to ool mud-pump 150% hole volume. 23:45 0:00 0.25 Drop tolco survey,

Held pre tour and weekly safety meetings,

24.00 OPERATIONS TO 0600 H R S : POOH to wellhoad. Flush around wellhead, observe with ROV. POOH.Recovar surveyW.

Rig to and run casing.

PROGRAMME NEXT 24 H R S : Finish running casing, cement, nipple up BOP,

BULK GEL(sx) BARITE(SX) CEMENT(sx) DRILL WATER(mt) POT WATER(ml) DIESEL FUELfjt; HELI FUEL(II)

RIG/Boat/Boat 250 3533 3148 886/40/400 170/85/255 321/450/455

PERSONNEL ON RIG TRANSPORTATION COSTS

OPERATOR 4 NAME LOCATION DAILY MUD 25225.2

DRILLING CONT. 33 WORKBOAT Shogun rig CUMULATIVE MUD 32195,98

SERVICE COMPS 12 WORKBOAT Chalionoor rig DAILY WELL

OTHER 15 STANDBY BOAT CUMULATIVE WELL

CATERING 9 HELICOPTER 1 trips

TOTAL 73 HELICOPTER

SUPERVISOR(S) Wally Wes man Len Kronstal | OIM Ronny Rlckard

2 4 - S E P - 9 9 F R I 1 0 : 5 1 O Z O I L & K E L L Y DOWN FAX NO. 61 2 9 9 0 1 3 6 3 5 P. 0 1 / 0 2

KELLY DOWN CONSUL TANTS Pty Ltd A.C.N, Ma 162 207 •»

Mall: PO Box 573, St Leonards N.S.W., 1590, AUSTRALIA

Level 1 51 Chandos Street, St Leonards

N.S.W., 2065, AUSTRALIA

Tel; 61-2-9901-3422 Fax: 61-2-9901-3635

FACSIMILE HEADER

SUBJECT

TO: Mineral Resources Tasmania URGENT ATTN: Carol Bacon ROUTINE C C : Ahmad Nadji; DNRE Victoria 0394125152 CONFIDENTIAL

FAX No: 03 6233 8338 No. of Pages incl. this page

FROM: Colin Stuart D a t e i & f - / ^ / * ? ^ Ref: Globex Bl

BARRAMUNDI 1 DAILY REPORT

MESSAGE:

C « 6

IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CONTACT THIS OFFICE IMMEDIATELY AT THE FOLLOWING TELEPHONE NUMBER 61-2-901-3422 AND ASK FOR

AUTHORISED BY C H A R G E TO:

2 4 - S E P - 9 9 F R I 1 0 : 5 1 O Z O I L & K E L L Y DOWN FAX NO, 61 2 9 9 0 1 3 6 3 5 P. 0 2 / 0 2

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL:|BARRAMUNDI-1 | DATE: PERMIT:|T/27P I REPORT ft

RlG:|SEDCO702 | D.F.S.

23.9,99

4

0

FROM TO HOURS

0:00 11:30 11.SO Under low to Barramundi #1. 11:30 0:00 12.50 Run Anchors

11;3S--eommonce payout on #7 anchor. 11:40 ~ anchor on bottom 12:30- Pacific Challenger disconnected from low jrldle, 13:16--SUrtM anchor 14:32--Pacillc Shogun disconnected Irom tow bridle. 14;50--*3 anchor eomploled, 1S:15-Slart K anchor, 16:54" #6 anchor complo'.ed. 15:35--Start #2 anchor, 17:20--eomploted. 17;50--Start #1 anchor, 20:43 --oamplatod, 18:05--Starl #5 anchor, 20:03-completed. 20:32-Slart #4 anchor, 22:00-- Completed. 20:01-Start #8 anchor, 22:58- Completed. 23:00--Commence Pre-tenslon on anchors 3 & 7 lo 350 kips, completed al 23:20, 23:22~Commonce Pre-lenslon on anchors 2 4 6, to 350 kips, winch blower on #2 anchor /ailed bofore reaching 350 kips, Abort lest on 2 & 6, go to anchors #1 & 5, while working on anchor winch #2.

HELD PRE-SPUD MEETING PREPARE GEL SWEEPS WHILE RUNNING ANCHORS.

OPERATIONS TO 0600 HRS: Continue to pro-lenslon anchors, Hold wlnch-oll drill. Lower ROV and chock sea floor. Sea lloor smooth and water calm. Hold pro Job sialicw gas safety mealing. Spud In at 04:00 HRS. Drill to section TD. Spol hi vis sweep. Wlpor trlp.Survey 1". POH lor casing.

PROGRAMME NEXT24 HRS; Run Casing, Cement.

BULK GEL(sx) BARITE(Sx) CEMENT(sx) DRIlLWATER(ml) POT WATER(mt) DIESEL FUELrJt; HELI FUELrJt)

RIG/Boat/Boal 150/850 3533 3789 916/3*5/400 170/100/270 361/455/462

PERSONNEL ON RIG TRANSPORTATION COSTS I OPERATOR 3 NAME LOCATION DAILY MUD

DRILLING CONT. 35 WORKBOAT Shogun runarchors CUMULATIVE MUD SERVICE COMPS 9 WORKBOAT Challonoer run archors DAILY WELL

OTHER 15 STANDBY BOAT CUMULATIVE WELL

CATERING 9 HELICOPTER 2 trips

TOTAL 71 HELICOPTER SUPERVISOR(S) Wally Westman Len Kronstal | OIM Ronny Hlckard

23-S.EP-99 THU 10:57 OZOIL & KELLY DOWN FAX NO. 61 2 99013635 P. 01/023

KELL Y DOWN CONSUL TANTS Pty Ltd A.C.N.OOB 1SZ207 *

Mall: PO Box 573, St Leonards N.S.W., 1590, AUSTRALIA

Level 1 51 Chandos Street, St Leonards

N.S.W., 2065, AUSTRALIA

Tel: 61-2-9901-3422 Fax: 61-2-9901-3635

FACSIMILE HEADER

TO: ATTN: C C : FAX No: FROM:

SUBJECT

Mineral Resources Tasmania Carol Bacon Ahmad Nadji; DNRE Victoria 0394125152

URGENT ROUTINE

CONFIDENTIAL

03 6233 8338 No. of Pages Incl. this page Colin Stuart Date: Zzloci{*{*r Ref: Globex Bl

BARRAMUNDI 1 DAILY REPORT

MESSAGE:

IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CONTA.CT THIS OFFICE IMMEDIATELY AT THE

FOLLOWING TELEPHONE NUMBER 61-2-901-3422 AND ASK FOR

AUTHORISED BY C H A R G E TO:

2 3 - S E P - 9 9 THU 1 0 : 5 7 O Z O I L & K E L L Y DOWN FAX NO, 61 2 9 9 0 1 3 6 3 5 P.

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL:|8ARRAMUNDI-1 | DATE: f 22.9.QB PERMIT:\V27P | REPORT # | 3

RIS:|SEDCO702 J D.F.S. | 0

FROM TO HOURS

0:00 23:59 24.00 Under low to Barramundi #1, While undor tow, test mud manllold, mud hoses, lower and upper l-BOP. Working an changing out upper annular element. Positional 24:00 hrs 22.9.99 Lat 39'37.1' S. Long 146°17.9'E. Average Spaed 2.37kts,(Tow) Distance travelled 128nm. Olstance to go 29nm. Prosonl speed 2,2 kls, Temp 14", Wind Spaed 10, Wind Direction 270'. Baromotor 1013.

Position al 06:00 hrs, 23.9,99 Lat 39*37.7' S Long 146' 00.0' E Spaed 2.00 kls. Olstance travelled 147 miles, distance lo go 10 miles. Tomp 14° Wind Speed 5 kts. Wind Direction 270" Barometer 1012 ETA O avorago speed 09:40hrs. 23/09

OPERATIONS TO 060O HRS: Tow to Barramundi,

PROGRAMME NEXT 24 HRS: Arrive at Barramundi Location, run anchors,

BULK GEL(sx) BARITE(sx) CEMENT(sx) DRILLWVTER(ml) POT WATER(ml) DIESEL FUELflfl HELI FUEL(ll)

RIG/B oat/Boat 650/850 3533 3789 1060/TI6S/400 170/105/285 357/474/479 PERSONNEL ON RIG TRANSPORTATION COSTS OPERATOR 3 NAME LOCATION DAILY MUO DRILLING CONT, 34 WORKBOAT Shogun Tow CUMULATIVE MUD

SERVICE COMPS 8 WORKBOAT Challenger Tow DAILY WELL

OTHER 16 STANDBY BOAT CUMULATIVE WELL

CATERING 9 HELICOPTER TOTAL 71 HELICOPTER

SUPERVISOR(S) Wally Westman Len Kronslal OIM Ronny Rlckard

22rSEP-99 WED 09:16 OZOIL & KELLY DOWN FAX NO, 61 2 99013635

KELLY DOWN CONSULTANTS Pty Ltd A.C.N. 008 152 207 *

Mall: PO Box 573, St Leonards N.S.W., 1590, AUSTRALIA

Level 1 51 Chandos Street, St Leonards

N.S.W., 2065, AUSTRALIA

Tel: 61-2-9901-3422 Fax: 61-2-9901-3635

P.

FACSIMILE HEADER

TO: Mineral Resources Tasmania URGENT ATTN: Carol Bacon ROUTINE C C : Ahmad Nadji; DNRE Victoria 0394125152 CONFIDENTIAL

FAX No: 03 6233 8338 No. of Pages incl, this page

FROM: Colin Stuart Date: X Z / e t J ^ Ref: Globex Bl

SUBJECT BARRAMUNDI 1 DAILY REPORT

MESSAGE:

IF YOU DO NOT RECEIVE ALL PAGES, PLEASE CONTACT THIS OFFICE IMMEDIATELY AT THE FOLLOWING TELEPHONE NUMBER 61-2-901-3422 AND ASK FOR

AUTHORISED BY C H A R G E TO:

Incorporated In South Australia

2 2 - S E P - 9 9 WED 0 9 : 1 6 O Z O I L & K E L L Y DOWN FAX NO. 61 2 9 9 0 1 3 6 3 5 P,

GLOBEX FAR EAST DAILY DRILLING REPORT

WELL:|8ARRAMUNDI-1 ~~| DATE:

PERM|T:|T/27P | REPORT #

RIG:|SEDCO702 | D.F.S.

21.9.99

2

0

FROM TO HOURS

O;0O 23:59 24.00 Under low lo Barramundi #1. While under tow, make up spud In BHA and lay out om pipe deck. DO malnlainence work on TDS and rig,

Position at 24:00 hrs 21.0.09 Lat 39*13.0' S. Long 147'16.0'E. Average Speed 2,47kn.(Tow) Dlslance travelled 74nm. Distance to go B3nm. Temp 12" Wind Direction 360* Barometer 1012

Position at 06:00 hrs, 22.9.99 Lat 39-2S.8' S Long 147" 02.8' E Speed 2,75 kts, Distance travelled 895 miles, distance to go 67.5 miles. Tomp 11° Wind Direction 03S" Barometer 1010 ETA ffi average speed 09:32hrs. 23/09

OPERATIONS TO 0600 HRS: Tow to Barramundi.

PROGRAMME NEXT 24 HRS:

BULK CEL(sx) BARITEfsx) CEMENT(Sx) DRlLLWATEfl(ml) POT WATER(ml) DIESEL FUEL(lt HELI FUEL(ll)

RIG/Boal/Boal 650/850 3533 3789 1069/365/400 182/110/290 372/498/498

PERSONNEL ON RIG TRANSPORTATION COSTS OPERATOR 3 NAME LOCATION DAILY MUD

DRILLING CONT. 34 WORKBOAT Shogun Tow CUMULATIVE MUD

SERVICE COMPS 10 WORKBOAT Challenger Tow DAILY WELL

OTHER 15 STANDBY BOAT CUMULATIVE WELL CATERING 9 HELICOPTER

TOTAL 71 HELICOPTER SUPERVISOR(S) Wally Woslman Len Kronslal OIM Ronny Rlckard

2 1 - S E P - 9 9 TUE 1 5 : 3 6 0 Z 0 1 L & K E L L Y DOWN FAX NO, 61 2 9 9 0 1 3 6 3 5

KELLY DOWN CONSULTANTS Pty Ltd A.C.N. OCa 152 207 *

P. 0 1 / 0 1

Mall: PO Box 673, St Leonards N.S.W., 1590, AUSTRALIA

Level 1 51 Chandos Strout, St Leonards

N.S.W., 2065, AUSTRALIA

Tel; 61-2-9901-3422 Fax: 61-2-9901-3635

FACSIMILE HEADER

TO: Mineral Resources Tasmania URGENT ATTN: Carol Bacon ROUTINE C C : Ahmad Nadji; DNRE Victoria 0394125152 CONFIDENTIAL

FAX No: 03 6233 8338 No. of Pages incl. this page

FROM: Colin Stuart Date: 21/09/99 Ref: Globex Bl

SUBJECT BARRAMUNDI 1 DAILY REPORT

MESSAGE:

Dear Carol,

Please be advised that the Sedco 702 was transferred from Esso operatorship to Globex at 1800 hrs on 20/09/99.

At 0800 hrs today the rig was in the following position:

Location:

Heading: Speed: ETA:

Regards,

<7

38 deg 44 min latitude 147 deg 47.4 min longitude 219 3.07 knots 23/09 at 0900 hrs.

Colin Stuart Project Manager