UTTAR PRADESH
HEALTH SYSTEMS DEVELOPMENT PROJECT (WORLD BANK AIDED)
(DEPARTMENT OF MEDICAL HEALTH AND FAMILY WELFARE)
FACILITY SURVEY (BUILDING AND EQUIPMENT)
DISTRICT-MAHOBA FACILITY-COMBINED HOSPITAL
ARCHITECTS STUDIO ARCHITECT PANKAJ MISRA
B.ARCH.(ROORKEE) A.I.I.A, M.C.O.A LUCKNOW- 1/14F, VISHWAS KHAND-1, GOMTINAGAR.226010
DIAL-0522-309727, 308158,98.98aG8829 (MOBILE) NEW GELHI-D-3/3482,VASANT KUNJ.110070 DIAL-01 1-6136175, 9B1 1052132 (MOBILE)
E-MAIL-pankajarchosatyam.net. in
(FOR RESTRICTED CIRCULATION ONLY)
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
1.0 ABOUT MIAHOBA - THE DISTRICT HEADQUARTERS: (i) Distance from State Capital 250KMS.
(ii) Highway Lucknow-Chhatarpur Road
(iii) Latitude 25* 18'N
(iv) Longitude 79* 53' E
(v) Climate Hot and Dry
(vi) Maximum Temperature 45*C
(vii) Minimum Temperature 10*C
(viii) Average Rainfall 900 mm.
(ix) Railway Station Important Station of CR 2.0 LOCATION AND ACCESSIBILITY OF THE FACILITY. (I) Distance from District Headquarter In heart of the town
(ii) Road Lucknow – Chhatarpur Road
(iii) Rail Connection Yes
(iv) Nearest Railway Station Mahoba
(v) Nearest Bus Station 1 Km away from DH
(vi) Mode of transport of patients Cycles, Foot & Ownvechile
(viii) Catchment Population 500000
Architects Studio
Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
2.1 HEALTH SERYJCES AVAILABLE:
i) Gynacological care
ii) X-Ray
iii) O.P.D
iv) Pathology
2.1.1 STAFF AND BED STRENGTH:
(i) Doctors 3 No.
(ii) Nurses 1 Nos.
(iii) Administration Nil
(iv) Others 60 Nos.
(v) Beds 88 Nos.
2.1.2 PATIENTS LOAD:
(i) Out Door 100 to 120
(ii) Indoor 02 to 4 cases 2.1.3 LANDSCAPING:
(i) Good Landscaping at site
2.1.4 PLINTH LEVELS:
i) Residential 600MM above the Road Level ii) Non Residential 450MM above the Road Level
Architects Studio
Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
2.1.5 COMPOUND WALL: (i) Location: Compound wall with one entry gate has been provided on the front side (ii) Length: 1657 m
(iii) Height: 2.44 m
(iv) Condition: OK 2.1.6 PROPOSAL: (A) New Construction
Length: Nil Height: Nil
(B) Repairs
Length: Nil Height: Nil
(C) Snocem Painting
Length: 1657 m Height: 2.44 m
(D) Dismantling
Length: Nil Height: Nil
(The above Provision has been made in the APPENDIX-3) 2.1.7 ENTRY GATES: NO. SIZE CONDITION 1 5.0 m Need Replacement 2.1.7 PROPOSAL: (A) New Gate NO. SIZE 1 5.0 m
(B) Repair NO. SIZE (C) ENAMEL PAINT NO. SIZE (The above provision has been made in APPENDIX-4)
Architects Studio Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
2.1.8 INTERNAL ROADS: EXISTING CONDITIONS:
SL.NO. TYPE LENGTH WIDTH CONDITION
1 METALLIC NIL NIL NIL
2 BRICK ON EDGE 150 4.5 BAD
PROPOSAL
2.1.9 INTERNAL ROADS:
(A) New Road
SL.NO. TYPE LENGTH WIDTH
1 METALLIC 15 4.5
2 BRICK ON EDGE 50 3.0
(The above provision has been made in APPENDIX-5) 3.0 EXISTING WATER SUPPLY
A) PIPED WATER SUPPLY:
(i) Owner:DH
(ii) Components (i) Tube Well- Working (ii) Pumping Plant Working (iii) O.H Tank - Working (iv) Distribution System of
External Pipelines) Working (v) Internal Pipe Lines Working
(vi) Chlorinator Not provided
(iii) Status of Supply: Adequate round the clock water supply
Architects Studio Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
B) INDIA MARK II HAND PUMP:
NO. LOCATION CONDITION 1 INSIDE OK
3.1 PROPOSAL FOR WATER SUPPLY:
A) NEW PIPED WATER SUPPLY CONSISTING THE FOLLOWING COMPONENTS:
(a) Tube Well -Not Required
(b) Pumping Plant-Not required
(c) Distribution System of Pipe Lines (External) -Not
Required
(d) Internal Pipelines System-Not required
(e) Chlorinator- 1 Nos.
(f) Polyethylene Tanks-required
(g) Inter Connection with Existing pipe lines - Not Required
(h) Testing and reparing of existing pipelines – Not
required
(i) Repairs of existing India Mark II Hand Pump – Not
required
3.2 EXISTING ELECTRICAL SYSTEM
(i) Power Connection Three Phase
(ii) Wiring Residential- Need Replacement
(iii) Wiring Non Residential- Need Replacement
(iv) Switches and Fixtures-Need Replacement (v) Main Panel Board- OK
(viii) Duration of Supply in hours: for 8-10 Hours
Architects Studio Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
(ix) Supply available in Residential and Non Residential -NA
(x) Augmentation KW/KVA as per following calculations - Not Required (xi) Capacity of the Existing Transformer - NA
SN UNIT SCALE OF REQUIREMENTS TOTAL REQUIREMENTS
1 DH 1210 SQ.MT. @ 40 W/SQ.MT. 48.40 KW
2 TYPE ONE 16 UNITS @1KW 16 KW
3 TYPE TWO 12 UNITS @2KW 24 KW
4 TYPE III 6 UNITS @3KW 18 KW
5 TYPE IV 1 UNITS @5KW 5 KW
RESIDENCES
6 TUBEWELL LS 2 KW
4 EXTERNAL LS 3 KW
LIGHTING
TOTAL 116.4 KW
By taking diversity factor 50% 58.2KW
By taking power factor 0.8 72.75KVA
3.3 PROPOSAL FOR ELECTRICAL SYSTEM.
(i)Wiring -Replace (Some Where)
(ii)Switches & Fixtures -Replace (Some Where)
(iii)Sub Main Wiring -OK
Architects Studio Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
(iv)Main Panel Boards -OK
(v)Augmentation of Power- 58.2 KW/73 KVA
(The Provision of Internal Wiring, Switches Fixtures has been made in the APPENDIX-IC and the Provision for augmentation of Power has been made in APPENDIX- 6) 3.4 GENERATOR CAPACITY:
No. Capacity Room 1 10KVA Proper Room
(The Cost of Repairs / providing the Generator Room has been dealt in the separate docket of Equipments) 3.5 SEWERAGE SYSTEM: (i)Present Status Components Condition (a) Septic Tanks OK (b) Proper Sewerage OK System 3.6 PROPOSAL:
It is proposed to clean and repair the existing septic tanks and soak pits provision for which has been made in the APPENDIX -2
3.7 INTERNAL PLUMBING:
The Sanitary Fixtures and accessories are ok/require repairs and/or replacement provision for which has been made as per Task Sheets in APPENDIX 1 B
4.0 RAIN WATER DRAINAGE.
(i) No Problem.
(The provision has been made in APPENDIX-2)
Architects Studio Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP
FACILITY SURVEY (WORLD BANK AIDED)
COMBINED HOSPITAL DISTRICT MAHOBA
5.0 FACILITY BUILDINGS:
The residential and non-residential building Have been built in one campus/two separate campus on an area of………… Respectively The plinth area and the year of construction of the various building blocks Are listed in the following table:
(A) NON RESIDENTIAL
S.NO. BUILDING BLOCK PLINTH AREA
(SQM.) YEAR OF CONSTRUCTION
REMARKS
1 .BLOCK
DH Block 1210.00
(B) RESIDENTIAL:
S.NO. BUILDING BLOCK_
PLINTH AREA (SQM.)
YEAR OF CONSTRUCTION
REMARKS
1 TYPE I 35.00 16 UNITS
2 TYPE II 70.00 12 UNITS
3 4
TYPE III 110.00 6 UNITS
4 TYPE IV 165.00 1 UNITS
6.0 REPAIR/ RENOVATION OF BUILDINGS:
It has been done as per task sheets and the BOQ has been Provided in APPENDIX 1 (a)
7 .0 RATES:
(i) CIVIL WORK:
The CPWD rates circulated by the Chief Engineer have been taken as a base of working out the cost INDEX for the year 19999 in respects of the items of civil works.
Architects Studio
Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
(ii) ELECTRICAL WORK:
The rates circulated by the Chief Engineer U.P.P.W.D. circulated in the year 1988 have been adopted and a cost INDEX of 50% has been applied to work out the cost at 1999 price level.
(iii) The cost of non schedule items have been taken on the present market rates.
(iv) The cost of new additions and alterations in the existing
Building areas to bring them to norms has been calculated On the plinth area rates of the U.P.P.W.C. in absence of
(i) Safe bearing capacity of soil.
(ii) Detailed Architectural & Structural designs. Similarly the costing of new water supply system has been adopted on lump sum based our experience of forty years in the field.
7.0 FURNITURE & EQUIPMENTS:
These have been dealt in a separate docket.
8.0 STATUS OF STAFF:
This has been dealt in a separate docket.
9.0 AMBULANCE. Existing Conditions 3 Working 10.0 MANNER OF COSTING
The cost of repair/renovation of all the sub-head of works Have been arranged in the following sequence building block Wise.
(I) Building works APPENDIX -1(a) (II) Internal Plumbing APPENDIX -1(b)
Architects Studio
Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
(III) Internal electrification APPENDIX -1(c)
(IV) External water supply, sewerage & Drainage APPENDIX - 2
(v) Compound wall APPENDIX - 3 (VI) Entry gate APPENDIX - 4 (VII) Internal roads APPENDIX - 5 (VIII) External electrification APPENDIX - 6 (IX) Generator Room APPENDIX - 7
(X) Additions/alterations to make The existing building fully functional APPENDIX- 8
(XI) Relieving congestion APPENDIX- 9 (XII) Provision for petty repairs which
Are not measurable such as uprooting Weeds and other vegetations from walls, Rooftops, sunsheads, etc. Cleaning of Spots on floors and windows panes, general Cleanup of the premises and grassing and Plantation for landscaping. APPENDIX – 10
11.0 Over all assessment of the working of the facility.
POOR
Architects Studio Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
DISTRICT: MAHOBA
FACILITY: COMBINED HOSPITAL
ABSTRACT OF COST
SN ITEMS OF WORK COST IN Rs.
1 Appendix —1 (a) BoQ for Building Works
716089.00
2 Appendix - 1 (b) BoQ for Internal Plumbing
46413.00
3 Appendix —1 (c) BoQ for Internal Electrification
9677.00
4 Appendix — (2) BoQ for External Water Supply Sewerage and Drainage
41597.00
5 Appendix — (3) BoQ for Compound Wall
187002.00
6 Appendix — (4) BoQ for Entry Gates
18320.00
7 Appendix — (5) BoQ for Internal Roads
89100.00
8 Appendix — (6) BoQ for External Electrification
171100.00
9 Appendix — (7) BoQ for Providin , Generator Room
00.00
10 Appendix — (8) BoQ for Additions and Alterations for bringing the facility to Norms
39675000.00
11 Appendix — (9) Provision for Relieving Congestion
00.00
12 Appendix — (10) Provision for Petty Repairs which are not measurable
150000.00
13 TOTAL 41104298.00
Architects Studio Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
U T T A R P R A D E S H HEALTH SYSTEMS DEVELOPMENT PROJECT
(WORLD BANK AIDED)
(DEPARTMENT OF MEDICAL HEALTH AND FAMILY WELFARE)
FACILITY SURVEY (BUILDING AND EQUIPMEN7)
DISTRICT-MAHOBA FACILITY-COMMUNITY HEALTH CENTRE- CHARKHARI
ARCHITECTS STUDIO
ARCHITECT PANKAJ MISRA B Arch (Roorkee) A.I.I.A, M.C.O.A
LUCKNOW-1/14-F, VISHWAS KHAND-1, GOMTINAGAR.226010 DIAL-0522-309727,308158,9&
-iE0.' 8829 (MOBILE) NEW DELHI-D-
3/3482,VASANT KUNJ.110070 DIAL-01 1-61361
75, 961 1052132 (MOBILE)
E-MAIL-pankaiarch(a)satvam.net.in -
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
1.0 ABOUT MAHOBA - THE DISTRICT HEADQUARTERS:
(i)Distance from State Capita! 250KMS (ii)Highway Lucknow-Chhatarpur Road (iii)Latitude 25* 18'N (iv)Longitude 79" 53' E (v)Climate Hot and Dry (vi)Maximum Temperature 45*C (vii)Minimum Temperature 10*C (viii)Average Rainfall 900 mm. (ix)Railway Station Important Station of CR
2.0 LOCATION AND ACCESSIBILITY OF THE FACILITY:
(I)Distance from District Headquarter 27Kms (ii)Road Mahoba- Chakrata Road (iii)Rail Connection No (iv)Nearest Railway Station Mahoba (v)Nearest Bus Station 1 Km away from DH (vi)Mode of transport of patients Cycles, Foot & Ownvechile (viii)Catchment Population About 100000
2.1 HEALTH SERVICES AVAILABLE:
(I)O.T Block (ii) X-Ray
2.1.1 STAFF AND BED STRENGTH:
(I)Doctors 1No. (ii)Nurses 2No. (iii)Adminiatration Nil (iv)Others 27No. (v)Beds 30No.
2.1.2 PATIENTS LOAD:
(i)Out Door 100 to 120 (ii)Indoor 02-04 cases
2.1.3 LANDSCAPING: (i) No Landscaping at site 2.1.4 PLINTH LEVELS:
(i)Residential 600Mli% above the Road Level (ii)Non 1Residential 450MM above the Road Level
Architects Studio
Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
2.1.5 COMPOUND WALL
( i ) Locat ion Compound wal l wi th two ent ry gate has been provided on the f ront s ide
( i i ) Length : 360m ( i i i ) Height : 1.5 m ( iv) Condi t ion: OK 2.1.5 PROPOSAL
(The above Provision has been made in the APPENDIX-3) 2.1.7 ENTRY GATES: No. SIZE CONDITION 2 4 .0m Need Replacement 2.1.7 PROPOSAL:
(A) New Gate NO. SIZE
2 4.0m (B) Repair
NO. SIZE
(C) ENAMEL PAINT NO. SIZE
(The above provision has been made in APPENDIX-4) Architects Studio
Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
(A) New Construction
Length: Nil
Height: Nil
(B) Repairs
Length: 46 m
Height: 1.5 m
(C) Snocem Painting
Length: 360 m
Height: 1.5 m
(D) Dismantling
Length: Nil
Height: Nil
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
2.1.8 INTERNAL ROADS EXISTING CONDITIONS
SL. NO TYPE LENGTH WIDTH CONDITION
1 BRICK ON EDGE NOT SATISFACTORY
PROPOSAL 2.1.9 INTERNAL ROADS (a) New Road
SL. NO TYPE LENGTH WIDTH
1 BRICK ON EDGE 50 4.0
2 BRICK ON EDGE 50 2.0
(The above provision has been made in APPENDIX 5)
3.0 EXISTING WATER SUPPLY: A) PIPED WATER SUPPLY: (i) Owner: CHC (ii) Components i)Tube Well - Working ii)Pumping Plant - Working iii)O.H.Tank - Working iv)Distribution System of External Pipelines) Working (v)Internal Pipe Lines - Working (vi) Chlorinator - Not provided
(iii)Status of Supply: Adequate round the clock water supply
B) INDIA MARK II HAND PUMP: NO. LOCATION CONDITION Nil
3.1 PROPOSAL FOR WATER SUPPLY:
(A) NEW PIPED WATER SUPPLY CONSISTING OF THE FOLLOWING COMPONENTS:
(a) Tube Well -Not Required (b) Pumping Pant--Not required (c) Distribution System of Pipe Lines {External) -Not Required (d)Internal Pipelines System-Not required (e)Chlorinator- 1 Nos. (f)Polyethylene Tanks-Required (g)Inter Connection with Existing Pipe Line=Not Required Architects Studio
Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
(h)Testing and Repairing of Existing Pipelines -Not
Required (i)Repair of Existing India Mark II Hand Pump-Not required
3.2 EXISTING ELECTRICAL SYSTEM: (i)Power Connection Single Phase (ii)Wiring Residential – Exposed on wooden strips (iii) Wiring Non Residential – Exposed on wooden strips (iv)Switches and fixtures- Need Replacement (v)MCBs-NA (vi)Main Panel board - OK (viii)Duration of Supply in hours: for 8-10 hours (ix)Supply available in residential & non residential -NA (x)Augmentation KW/-KVA as per following calculations – Not required (xi)Capacity of the existing Transformer –NA
SN UNIT SCALE OF REQ!REVE".7S TOTAL REQUIREMENTS
1 OT + X - RAY 695 SQ.MT @ 30 W/SQ.MT 27.80 KW
2 TYPE III 2 UNITS @ 3 KW 6 KW
3 TUBEWELL LS 2 KW
4 EXTERNAL LIGHTING
LS 2 KW
TOTAL 37.8 KW
I By taking diversity factor 50% 18.9 KW
By taking diversity factor 0.8 23.63 KW
3.3 PROPOSAL FOR ELECTRICAL SYSTEM:
(i)Wiring -Replace (Some Where) (ii)Switches & Fixtures -Replace (Some Where)
(iii)Sub Main Wiring –OK (iv)Main Panel Boards -OK
(v)Augmentation of Power -19 KW/24 KVA (The Provision of internal wiring, Switches Fixtures has been made in the APPENDIX-1C and the Provision for augmentation of Power has been made in APPENDIX- 6) 3.4 GENERATOR CAPACITY NO. CAPACITY ROOM NIL (The Cost of Repairs/providing the Generator Room has been dealt
, in the separate docket of Equipments)
Architects Studio
Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
3.5 SEWERAGE SYSTEM: (i) Present Status Components Condition (a) Septic Tanks OK (b) Proper Sewerage System OK 3.6 PROPOSAL:
It is proposed to clean and repair the existing septic tanks and soak pits provision for which has been made in the appendix -2
3.7 INTERNAL PLUMBING: The sanitary fixtures and accessories are ok/require repairs and/or replacement provision for which has been made as per Task Sheets in APPENDIX 18
4.0 RAIN WATER DRAINAGE (i) Problem (The provision has been made in Appendix -2) 5.0 FACILITY BUILDINGS:
The residential and non-residential building Have been built in one campus/two separate campus on an area ………………………….of Respectively The plinth area and the year of construction of the various building blocks Are listed in the following table:
(A) NON RESIDENTIAL: -
S.NO. BUILDING BLOCK
PLINTH AREA (SQM.)
YEAR OF CONSTRUCTION
REMARKS
1 O.T BLOCK 140.00
2 X- RAY 55.00
(B) RESIDENTIAL:
S.NO. BUILDING BLOCK
PLINTH AREA (SQM.)
YEAR OF CONSTRUCTION
REMARKS
1 TYPE III 125.00 2 UNITS
Architects Studio Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
6.0 REPAIR / RENOVATION OF BUILDINGS:
It has been done as per task sheets and the BOQ has been Provided in APPENDIX 1 (a)
7.0 RATES: (i)CIVIL WORK:
The CPWD rates circulated by the Chief Engineer have been taken as a base of working out the cost INDEX for the year 19999 in respects of the items of civil works.
(ii)ELECTRICAL WORK:
The rates circulated by the Chief Engineer U.P.P.W.D. circulated in the year 1988 have been adopted and a cost INDEX of 50% has been applied to work out the cost at 1999 price level.
(iii)The cost of non schedule items have been taken on the present market rates.
(iv)The cost of new additions and alterations in the existing Building areas to bring them to norms has been calculated On the plinth area rates of the U.P.P.W.D. in absence of (i)Safe bearing capacity of soil.
(ii)Detailed Architectural & Structural designs. Similarly the costing of new water supply system has been adopted on lump sum based our experience of forty years in the field.
7.0 FURNITURE & EQUIPMENTS:
These have been dealt in a separate docket. 8.0 STATUS OF STAFF:
This has been dealt in a separate docket. 9.0 AMBULANCE: Existing Conditions NIL
Architects Studio Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED) COMBINED HOSPITAL DISTRICT MAHOBA
10.0 MANNER OF COSTING:
The cost of repair/renovation of all the sub – head of works have been
arranged in the following sequence building block wise.
(i) Building works APPENDIX – 1(a) (ii) Internal Plumbing APPENDIX – 1(b) (iii) Internal electrification APPENDIX – 1(c) (iv) External water supply, sewerage & Drainage APPENDIX - 2
(v) Compound wall APPENDIX - 3 (VI) Entry gate APPENDIX - 4 (VII) Internal roads APPENDIX - 5 (VIII) External electrification APPENDIX - 6 (IX) Generator Room APPENDIX - 7
(X) Additions/alterations to make The existing building fully functional
APPENDIX- 8 (XI) Relieving congestion APPENDIX- 9 (XII) Provision for petty repairs which
Are not measurable such as uprooting Weeds and other vegetations from walls, Rooftops, sunsheads, etc. Cleaning of Spots on floors and windows panes, general Cleanup of the premises and grassing and Plantation for landscaping_ APPENDIX - 10
11.0 Over all assessment of the working of the facility.
POOR
Architects Studio Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
UPHSDP (WORLD BANK AIDED) FACILITY SURVEY
DISTRICT : MAHOBA FACILITY : C.H.C CHARKHARI
ABSTRACT OF COST
SN ITEMS OF WORK COST IN Rs.
1 Appendix - 1 (a) 112714.00
BoQ for Building Works
2 Appendix - 1 (b) 13411.00
BoQ for Internal Plumbing
3 Appendix - 1 (c) 1566.00
BoQ for Internal Electrification
4 Appendix - (2) 40147.00
BoQ for External Water Supply Sewerage and Drainage
5 Appendix - (3) 143121.00
BoQ for Compound Wall
6 Appendix - (4) 20340.00
BoQ for Entry Gates
7 Appendix -(5) 41427.00
BoQ for Internal Roads
8 Appendix - (6) 72403.00
BoQ for External Electrification
9 Appendix - (7) 00.00
BoQ for Providing Generator Room
10 Appendix - (8) 7740000.00
BoQ for Additions and Alterations for bringing the facility to Norms
11 Appendix - (9) 00.00
Provision for Relieving Congestion
12 Appendix - (10) 00.00
Provision for Petty Repairs which are not measurable
13 TOTAL 8185129.00
Architects Studio
Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
U T T A R P R A D E S H HEALTH SYSTEMS DEVELOPMENT PROJECT
(WORLD BANK AIDED)
(DEPARTMENT OF MEDICAL HEALTH AND FAMILY WELFARE)
FACILITY SURVEY (BUILDING AND EQUIPMEN7)
DISTRICT-MAHOBA FACILITY-COMMUNITY HEALTH CENTRE- CHARKHARI
ARCHITECTS STUDIO
ARCHITECT PANKAJ MISRA B Arch (Roorkee) A.I.I.A, M.C.O.A
LUCKNOW-1/14-F, VISHWAS KHAND-1, GOMTINAGAR.226010 DIAL-0522-309727,308158,9&
-iE0.' 8829 (MOBILE) NEW DELHI-D-
3/3482,VASANT KUNJ.110070 DIAL-01 1-61361
75, 961 1052132 (MOBILE)
E-MAIL-pankaiarch(a)satvam.net.in -
Distance from State Capital Highway Latitude Longitude Climate Maximum Temperature Minimum Temperature Average Rainfall Railway Station
250KMS. Lucknow-Chhatarpur Road 25* 18'N 79* 53' E Hot and Dry 45*C 10*C 900 mm. Important Station of CR
U P H S D P FACILITY SURVEY
(WORLD BANK AIDED)
PRIMARY HEALTH CENTRE JAITPUR DISTRICT MAHOBA
1.0 ABOUT MAHOBA – THE DISTRICT HEADQUARTERS:
Architects Studio
Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
2.0 LOCATION AND ACCESSIBILITY OF THE FACILITY:
Distance from District Headquarter Road Rail Connection Nearest Railway Station Nearest Bus Station Mode of transport of patients Catchment Population
50 Kms Mahoba-Jaitpur Road Yes Mahoba. 1 Km away Cycles, Foot & Ownvechile 111222
Doctors Nurses Administration O t h e r s Beds
2 No. Nil 4 No. 41 No.
4 No.
2.1.2 PATIENTS LOAD:
Out Door 100 to 150 Indoor Nil
2.1.3 LANDSCAPING: (i) No Landscaping at site
2.1.4 PLINTH LEVELS:
(i) Residential 450MM above the Road Level
(ii) Non Residential 300MM above the Road Level
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED)
PRIMARY HEALTH CENTRE JAITPUR DISTRICT MAHOBA
2.1.5 COMPOUND WALL:
(i) Location: Compound wall and entry gate do not exist
(ii) Length: 260 m
(iii) Height: 1.5 m (iv) Condition: OK
2.1.6 PROPOSAL:
(A) New Construction
(13) Repairs
(C) Snocem Painting
(D) Dismantling
Length: 260
Height: 1.5
Length: Nil Height: Nil
Length: Nil Height: Nil
Length: Nil Height: Nil
(The above Provision has been made in the APPENDIX-3)
2.1.7 ENTRY GATES:
NO. SIZE
CONDITION Nil
2.1.7 PROPOSAL.
(A)1 New Gate
NO. SIZE
1 3m
(B) Repair
NO. SIZE
(C)ENAMEL PAINT
NO.
(The above provision has been made in APPENDIX-4)
Architects Studio Lucknow-0522 309727,308158,9838058M (Mobile)
New Delhi-011 6136175,9811052132 (Mobile) [email protected]
SIZE
Architects Studio Lucknow-0522 309727.308158.9838058829 (Mobile) New Delhi -011 6136175, 9811052132 (Mobile)
E- mail – [email protected]
U P H S D P FACILITY SURVEY
(WORLD BANK AIDED)
PRIMARY HEALTH CENTRE JAITPUR DISTRICT MAHOBA 2.1.8 INTERNAL ROADS:
EXISTING CONDITIONS:
SL.NO. TYPE LENGTH WIDTH CONDITION
1 METALLIC Nil Nil Nil
2 BRICK ON EDGE Nil Nil Nil
PROPOSAL
2.1.9 INTERNAL ROADS:
(A) New Road
SL.NO. TYPE LENGTH WIDTH
1 METALLIC 20 3.0
2 BRICK ON EDGE 40 2.0
(The above provision has been made in APPENDIX-5)
3.0 EXISTING WATER SUPPLY:
A) PIPED WATER SUPPLY:
(i) Owner: Rural water supply
(ii) Components
(i) Tube Well- NA
(ii) Pumping Plant NA
(iii) O.H.Tank- NA
(iv) Distribution System of
External Pipelines) NA
(v) Internal Pipe Lines NA (vi) Chlorinator NA
(iii) Status of Supply: Adequate round the clock water
supply
B INDIA MARK If HAND PUMP:
NO. LOCATION CONDITION
2 Inside OK
3.1PROPOSAL FOR WATER SUPPLY.-
(A) NEW PIPED WATER SUPPLY CONSISTING OF
THE FOLLOWING COMPONENTS:
a)Tube Well –Not Required
b)Pumping Plant--Not required
c)Distribution System of Pipe Lines (External) –Not Required
d)Internal Pipelines System-Not required
e)Chlorinator- Not Required
(f)Polyethylene Tanks-required (g)Inter Connection with Existing Pipe Lines- Not required
U P H S D P FACILITY SURVEY (WORLD BANK AIDED)
PRIMARY HEALTH CENTRE JAITPUR DISTRICT MAHOBA
(h) Testing and Repairing of Existing Pipelines-Not Required
(i) Repairs of Existing India Mark 11 Hand Pump-Not required
3.2 EXISTING ELECTRICAL SYSTEM:
i)Power Connection Single Phase ii)Wiring Residential-Exposed on wooden strips.
i i i )Wiring Non Residential- Exposed on wooden strips. ( i v )Switches and Fixtures-Need Replacement N O MCBs -NA (vii) Main Panel Board- OK (viii) Duration of Supply in hours: for 8-10 Hours ( X ) Supply available in Residential and Non Residential -
NA (x) Augmentation KW/KVA as per following calculations-
Not Required 0 ) Capacity of the Existing Transformer.-NA
SN UNIT SCALE OF REQUIREMENTS TOTAL REQUIREMENTS 1 PHC + MORTUARY 345 SQ.MT. @ 40 W/SQ.MT. 10.35 KW 2 TYPE ONE 4 UNITS @ 1 KW 4 KW 4 TYPE TWO 2 UNITS @ 2 KW 4 KW 5 EXTERNAL
LIGHTING LS 1 KW
TOTAL 19.35 KW
By taking diversity factor 50%
9.67 KW
By taking power factor 0.8 12.09 KVA
3.3 PROPOSAL FOR ELECTRICAL SYSTEM:
(i) Wiring –Replace (Some Where) (ii) Switches & Fixtures –Replace (Some
Where) (iii) Sub Main Wiring -OK (iv) Main Panel Boards -OK (v) Augmentation of Power –10 KW/12 KVA
(7he Provision of Internal Wiring, Switches Fixtures has been made in the APPENDIX-1c and the Provision for augmentation of Power has been made in APPENDIX- 6)
3.4 GENERATOR CAPACITY:
No. Capacity Room 1 . 5 KVA Proper Room
(The Cost of Repairs/providing the Generator Room has been dealt in the separate docket of Equipments)
Architects Studio Lucknow-0522 309727,308158,98380588M (Mobile)
New Delhi-011 6136175,9811052132 (Mobile) [email protected]
U P H S D P FACILITY SURVEY
(WORLD BANK AIDED)
PRIMARY HEALTH CENTRE JAITPUR DISTRICT MAHOBA
3.5 SEWERAGE SYSTEM:
(i) Present Status
Components Condition
(a) Septic Tanks Need Repair &
Cleaning
(b) Proper Sewerage System
3.6 PROPOSAL:
3.7 INTERNAL PLUMBING:
4.0 RAIN WATER DRAINAGE:
It is proposed to clean and repair the existing
septic tanks and soak pits provision for
which has been made in the APPENDIX –2
The Sanitary Fixtures and accessories are
ok/require repairs and/or replacement
provision for which has been made as per Task Sheets in APPENDIX I B
(i) Problem.
(The provision has been made in APPENDIX-2)
5.0 FACILITY BUILDINGS.-
The residential and non-residential building
Have been built in one campus/two separate
campus on an area of ____________
Respectively .The plinth area and the year of
construction of the various building blocks Are
listed in the following table:
(A) NON RESIDENTIAL: -
S.NO. BUILDING BLOCK PLINTH AREA
(SQM.)
YEAR OF
CONSTRUCTION
REMARKS
PHC 230.00
2 MORTUARY 115.00
(B) RESIDENTIAL.-
S.NO. BUILDING BLOCK PLINTH AREA
(SQM)
YEAR OF CONSTRUCTION
REMARKS
I TYPE I 40.00 4 UNITS
2 TYPE 11 75.00 2 UNITS
Architects Studio
Lucknow-05= 309727,308158,9838068829 (Mobile) New Delhi-011 6136175,9811052132 (Mobile)
E-Maii-panka,iarr,[email protected]
i)Building works APPEENDIX – 1 (a)
U P H S D P FACILITY SURVEY
( W O R L D B A N K A I D E D ) PRIMARY HEALTH CENTRE JAITPUR DISTRICT MAHOBA
6.0 REPAIR/ RENOVATION OF BUILDINGS:- It has been done as per task sheets and the BOQ has been Provided in APPENDIX 1(a)
7.0 RATES.- (1) CIVIL WORK:-
The CPWD rates circulated by the Chief Engineer have been taken as a base of working out the cost INDEX for the year 19999 in respects of the items of civil works.
(ii) ELECTRICAL WORK:-
The rates circulated by the Chief Engineer U.P.P.W.D. circulated in the year 1988 have been adopted and a cost INDEX of 50% has been applied to work out the cost at 1999 price level.
(iii) The cost of non schedule items have been taken on the present market rates.
(iv) The cost of new additions and alterations in the existing Building areas to bring them to norms has been calculated On the plinth area rates of the U.P.P.W.D. in absence of- (i) Safe bearing capacity of soil. (ii) Detailed Architectural & Structural designs. Similarly the costing of new water supply system has been adopted on lump sum based our experience of forty years in the field.
7.0 FURNITURE & EQUIPMENTS.-
These have been dealt in a separate docket.
8.0 STATUS OF STAFF.- This has been dealt in a separate docket.
9.0 AMBULANCE. Existing Conditions 1 Working
10.0 MANNER OF COSTING:-
The cost of repair/renovation of all the sub-head of works Have been arranged in the following sequence building block Wise.
Architects Studio Lucknow-0522 309727,308158,9838058829 (Mobile)
New Delhi-011 6135175,9811052132 (Mobile) E-Mail-pan"[email protected]
UPHSDP FACILITY SURVEY
(WORLD BANK AIDED)
PRIMARY HEALTH CENTRE JAITPUR DISTRICT MAHOBA
Internal Plumbing Internal electrification External water supply, & D r a i n a g e Compound wall Entry gate I n t e r n a l r o a d s External electrification Generator Room
APPENDIX –1 (b) APPENDIX –1(c) sewerage
APPENDIX - 2 APPENDIX – 3 APPENDIX – 4 APPENDIX – 5 APPENDIX – 6 APPENDIX – 7
Additions/alterations to make The existing building fully functional
APPENDIX- 8 Relieving congestion APPENDIX- 9 Provision for petty repairs which Are not measurable such as uprooting Weeds and other vegetations from walls, Rooftops, sunsheads, etc. Cleaning of Spots on floors and windows panes, general Cleanup of the premises and grassing and Plantation for landscaping. APPENDIX – 10
11.,0 Over all assessment of the working of the facility.
POOR
Architects Studio Lucknow-0522 309727,308158,983805B829 (Mobile)
N e w D e l h i - 0 1 1 6 1 3 6 1 7 5 , 9 8 1 1 0 5 2 1 3 2 ( M o b i l e ) [email protected]
UPHSDP (FACILITY SURVEY) DISTRICT : MAHOBA
FACILITY : B.P.H.C. JAITPUR APPENDIX – 6
EXTERNAL ELECTRIFICATION
S.N ITEM UPPWD QUANTITY UNIT RATE AMOUNT
DSRNO.
1 Provision for augmentation of power NSH Kw/kva 1450.00• From
NIL
(This item shall be executed by the UPSEB hence this cost shall not form
part of the BID DOCUMENTS)
2 Supplying and laying of aluminum Meters NIL PVC insulated armoured, cable 1100 - volt
grade. The cable shall be fixed on MS clamps of suitable size or as directed by engineer incharge complete in all respects.
NIL
Add 50 % for the market variation. NIL 3 Supply and erection of factory fabricated
and wired metal clad dust and vermin proof floor mounting panel TPN switch board complete with the following HRC type heavy duty TPN fuse switches with fuses and instrument chamber etc. complete in all respects, The
instrument chamber shall be separate and shall comprise of flush type ammeter, voltmeter, instrument, fuse, current transformers etc. The board shall have suitable capacity electrolytic aluminum bus bars as per IS : 8623 with detachable side covers and shall be suitable for extensions
Nos. NIL
The ob includes the grouting of the board as j
per the direction of the engineer incharge. All the outgoing switches of 100 AMP and above will be provided with ammeter, current transformers and selector switches etc. and instrument fuses. The switch board shall Incoming
Out going:
Add 50 % for market variation.
Total Amount of Schedule & Non Schedule Items NIL