– Anthony Boyd, Warehouse Supervisor 12 years
9 Williams Visit - School Sites
• Inglewood High School
• Morningside High School
• Monroe Middle School
• Parent Elementary
• Centinela Elementary
• Warren Lane Elementary
• Hudnall Elementary
• Crozier Middle School
• Woodworth Elementary
Inglewood High School• Extreme Deficiencies Findings: 23
• Corrected Extreme Deficiencies: 20
• Pending Extreme Deficiencies: 3– Room/Area near B1: Breezeway under const. Monday 1/19
– Room/Area Grounds: (Spring/Summer) exterior paint /plaster /finish/breezeways
– Room/Area D2 AVID Room: lighting covers – special order 1/28
– Room/Area School Wide: damaged grounds/fields/asphalt/drainage
– Room/Area M202: floor tile missing – Tuesday 1/20
Morningside High School
• Extreme Deficiencies Findings: 10
• Corrected Extreme Deficiencies: 8
• Pending Extreme Deficiencies: 2– Room/Area Classroom T6: floor sagging (portable)
Spring/Summer
– Room/Area I3: exit door blocked by security gate
Monroe Middle School
• Extreme Deficiencies Findings: 5
• Corrected Extreme Deficiencies: 3
• Pending Extreme Deficiencies: 2– Room/Area Kitchen/MPR: Stage/Storage Area (2) – 1/27
• Open wall severe damage, several studs damaged missing, floor damaged/cracked, ceiling tiles damaged/stained/missing, plaster/paint damaged
– Room/Area Classroom A3: cracks, deterioration, eroded soil
Plan of Action• Restrooms Deep Cleaned
• Locker rooms Deep Cleaned– Painting/Floor polishing/wax being scheduled
• Restrooms Painted
• Exterminating Company Monthly/On Call
• Custodians assigned to designated restrooms
• Roof repair/replacement quotes in process
• Custodian training best practices being scheduled in partnership with ASCIP
Moving Forward• Hiring of additional Maintenance Workers
• LAWA - $44m
• Surplus sale of Park Property - $600k
• Rotation of Contractors Pool - Area of Expertise
• Supervisory Positions Pending
• Measure GG – Reinvest to “FIX” our schools
Equity and Modernization Issues
• Improve security, access points and perimeter of school by installing/replacing fencing, develop better site drainage ading retaining walls.
• Improve parking and instructional facilities by relocating the Maintenance - Grounds, Operations, Transporation Department.
• Remove/replace pipes on roofs.• Modernize and improve size and functionality of multipurpose
room.