PSO I Guidelines

FACILITIES STRATEGIC PLANNINGDESIGN, PROJECT STRATEGY + INNOVATION

FEBRUARY 2017

Page 2: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

MISSION STATEMENTThe NYP‐PSO Guideline is a comprehensive resource for the planning and design of Physician Practice Offices around the region. By drawing from a wide range of resources and experiences the mission is to create environments of well‐being for our patients, family and staff by establishing a coherent set of guides that support real estate decisions, architectural design and documentation and furnishings specification. Programming criteria are based upon best practices and regulatory guidelines. Material and Finishes selections are based upon mid‐priced options from the NYP Interior Guidelines and comply with applicable codes and regulations. 

PROJECT GOALS• Create a universal and scalable approach to the programming and design of  physician practice offices that is highly functional, durable and aesthetically 

appropriate with a focus on NYP branding and the propagation of consistent interiors • Enhanced patient and staff safety through the implementation of best ergonomic practices.• Balance the need to respect strongly‐held individual preferences by consistently applying institutional standards• Building an efficient design process by specifying proven products, with the potential of shortening project schedules.• Greater project budget control by anticipating costs related to interior projects

REGULATORY AND CODE COMPLIANCE• Local and state building codes• Life Safety and NFPA• FGI standards for Outpatient Facilities, including Planning, Design Construction and Commissioning• IESNA RP 29 – Lighting for Hospitals and Healthcare Facilities• All applicable to the program usage

GUIDELINES ORGANIZATION• Space Program Guide• Floor Plans• Design Principals• Materials and Finishes• Furniture• Details – Hardware, Millwork and Art

DESIGN PRINCIPALS | Physician Services Organization

2

Page 3: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

SPACE PROGRAM | By practice size and room type

3

Page 4: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

SPACE PROGRAM | By practice size and room type

4

Page 5: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

March 2016 5

STANDARDS | Exam Rooms

Page 6: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

RCP

STANDARDS | Exam Rooms

6

Page 7: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

STANDARDS | Exam Rooms

7

Page 8: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

DESIGN PRINCIPALS | By room type

8

Page 9: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

PLANNINGHIPPA – accommodation for Patient Privacy• Privacy panels to provide visual and acoustical privacySeating considerations• Planning to maximize sightlines between the guest seating and the front desk• TV sightlines to be considered• Provide wheelchair storage as per program requirementsSignage• Branding and signage to be coordinated with NYP Marketing and locations coordinated on the planAmenities• Water cooler (with refillable bottle option) or Quench unit• Umbrella sleeves dispenser• Accessible USB and power outlets at table height in seating area• Artwork to be installed to support the NYP‐PSO brand

BUILT‐IN MILLWORKDesks, counters and storage • Quartz(engineered stone) desks, transaction tops and  counters• Resin dividers between workstations for privacy • ADA height desk function• Solid surface exterior construction with plastic laminate interior. Upper cabinet to be plastic 

laminate, pedestals to be metal furniture• Appropriate access panels, grommets, and wire management aids to accommodate data and power• Provide adequate storage and counters for equipment and supplies, including the Athena 

printer/copier

FINISHES• Street entry ‐ porcelain tile floors, entry door construction to be coordinated with landlord• Off building lobby – vinyl floor tile, entry door to be MH frame with Marshfield Durable Door with 

sidelight • Appropriate walk off mats

FURNITURE• Tandem seating, avoiding back to back seating when possible• Provisions for bariatric and hip chair seating, wheel chairs, strollers based on program

DESIGN PRINCIPALS | Reception + Checkout

9

Page 10: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

PLANNING• Corridor layout should support wayfinding and efficient use of space • Medical assistants can be located in the corridors, if the location allows for private telephone discussions between 

staff and patients/families. Smaller practice office may required a separate enclosed area for the medical assistant(s)• Centrally located hand wash sinks must be placed in corridors with trash containers located nearby

BUILT‐IN MILLWORK• Corian countertops with integral back and sidesplash at all sink locations with integral stainless steel sink• Corian countertops with plastic laminate storage at medical assistant locations, metal furniture storage below

FINISHES• Paint color deployment should support wayfinding, one wall to be white with an opportunity to utilize an accent 

color on the opposing wall

FURNITURE• Task chairs located in corridors to have glide in lieu of casters

WALL PROTECTION• 2” stainless steel, full height corner guards• Wall bumper or rub rail may be required by a particular groups practice with heavy cart traffic in the corridors

ACCESSORIES• Wall mounted chart holder outside of each exam room

ARTWORK• Art a key element of design intended to aid in comforting both patients and families through positive distraction. In 

circulation areas it is be installed in locations to support wayfinding.

DESIGN PRINCIPALS | Corridors + Medical Assistants

10

Page 11: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

DESIGN PRINCIPALS | Exam Rooms

PLANNING• Functional exam room with accommodation for primary care or practice 

specialties • Hand wash sink visible to patient located at room entry• Organized device locations on the wall• Proper wall blocking for all wall hung elements (including the wall phone)• Cubicle curtain at door for patient privacy

BUILT‐IN MILLWORK• Millwork with moisture resistant substrates and Corian counters and back and 

side splash.• Integral stainless steel sink• Accessible storage, with a preference for tower cabinet in lieu of or in addition 

to upper cabinets• Work table or wall hung computer station with writing shelf

FINISHES• One painted accent wall

FURNITURE• Two guest chairs, one with arms and one armless

WALL PROTECTION• 2” stainless steel, full height corner guards• 8” plastic rub rail to protect paint on all walls

ARTWORK • Art a key element of design intended to aid in comforting both patients and 

families through positive distraction. In exam rooms it is to be located directly in patient sightlines.

11

Page 12: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

DESIGN PRINCIPALS | Consult RoomsPLANNING• Designed as a typical doctor’s office with an option as a small conference room layout

FINISHES• One painted accent wall

FURNITURE• Doctor’s office – plastic laminate desk and work surface, metal storage• Conference layout – Corian top table

DESIGN PRINCIPALS | Doctor’s  or Medical Assistant WorkroomPLANNING• Rooms should support a quiet work environment for multiple staff position• In smaller rooms, acoustic panels that separate desks should be utilized

BUILT‐IN MILLWORK• Corian countertops with plastic laminate storage above• Metal furniture storage below• Forbo tack board above counter

12

Page 13: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

DESIGN PRINCIPALS | Business OfficePLANNINGSize and fit‐out is dependent on practice size, options:• Desk and storage units ‐ wood plastic laminate work surfaces and metal storage• Furniture system – wood plastic laminate, metal storage and acoustical panels

13

Page 14: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

DESIGN PRINCIPALS | Visitor and Staff Toilets, Janitor’s closetVisitor toilets• Full height porcelain tile walls• Porcelain  tile floor• Baby changing shelf if appropriate to program• Stainless steel dispensers• Electric hand dryer• Vanity light and ceiling downlight• Acoustic tile ceiling• Porcelain wall hung sink• Rescue door hardware

Staff toilets• Full height porcelain tile wet wall• Remaining walls semi‐gloss paint with porcelain tile base• Porcelain  tile floor• Stainless steel dispensers• Dyson V electric hand dryer (large practice offices)• Vanity light and ceiling downlight• Acoustic tile ceiling• Porcelain wall hung sink

Janitor’s closet• Porcelain tile walls to 48”• Porcelain  tile floor

14

Page 15: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

DESIGN PRINCIPALS | Pantries and Staff LoungePLANNING• To accommodate refrigerator (full or half height depending on practice size), microwave, Quench and coffee maker• Table and chairs • Staff “Z” metal lockers (if a locker room is not provided in the plan). 

BUILT‐IN MILLWORK• Millwork with moisture resistant substrates and Corian counters and back and side splash.• Integral stainless steel sink

FINISHES• Paint color deployment ‐ one wall to be white with an opportunity to utilize an accent color on the opposing wall

DESIGN PRINCIPALS | Clean Supply/Soiled Holding/Laboratory ServicesPLANNING• CLEAN ‐ Separate room for clean and sterile supplies with positive air pressure• SOILED HOLDING ‐ Separate room for the collection, storage and disposal of soiled materials with negative air 

pressure• SOILED UTILITY ‐ Sinks required as per program, practices that wash instruments required to have 3 sinks in soiled 

room, hand wash, rim sink and instrument washing sink• LAB – lab testing/work areas requires a separate room with hand wash sink

BUILT‐IN MILLWORK (as per program)• Millwork with moisture resistant substrates and Corian counters and back and side splash• Metal storage below counter, plastic laminate above

WALL PROTECTION• Plastic sheet wall protection to be provided in soiled rooms and labs• 2” stainless steel corner guards

SHELVING• Metal wire shelving as per program

15

Page 16: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

MATERIALS AND FINISHES| By room type

16

Page 17: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

17

MATERIALS AND FINISHES | General

PRODUCT MANUF. CODE DESCRIPTION COLORP1 Wall paint Natura Ben. Moore OC‐29 Eggshell Floral WhiteP2 Accent paint corridors, staff rooms Natura Ben. Moore HC‐45 Eggshell Shaker BeigeP3 Accent paint exam room, consult rooms Natura Ben. Moore CW‐635 Eggshell Nelson BlueP4 Doors + Frames, misc. trim Natura Ben. Moore 1474 Semi‐gloss Cape MayB1 Vinyl wall base 4" Cove Johnsonite 55 TP wall base Silver GreyV1 Floor ‐ reception, staff rms Natural Creations LVT ‐ Aria Armstrong TP776 18" square Grey Beige

V2 Floor ‐ corridors Centiva LVT ‐ Sigma Tarkett CSG0747 18” square PhantomV3 Floor tile exam and support rooms Vinyl tile Cortina Grande Johnsonite CG404 16" square PumiceV4 Procedure room floor Melodia sheet Johnsonite 610 Sheet Berber

Acoustical ceiling tile Ultima Armstrong 1910 2x2 square edge WhiteACT grid Exposed T grid Armstrong Prelude XL 15/16 WhiteReception + corridors 6" x 4' linear light with lens HE Williams LL6‐L34 Flush frame 3500KArt light Wall washer Elliptipar  S222 Trim mount 3500KGeneral lighting 2x2 Luminaire Cree CR22 ‐ 3500K

D1 Entry doors Wood Veneer Algoma RA18741 White Slice OakCorner and end guards Stainless steel Pawling CG‐51 2" leg 304‐4 satinRub rail Plastic wall protection Pawling CR‐60/55 6" beveled edge Silver Grey Windows ‐ upper floors Roller shades, fascia or pocket Mecho 5/system 5% weave EggshellWindows ‐1st Flr./sun conditions Roller shades, fascia or pocket Mecho 5/system 1% weave Beige

V2D1 P1

P4

P3P2 V3 V4

B1

V1

Page 18: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

18

MATERIALS AND FINISHES | Reception + Checkout

PRODUCT MANUF. CODE/STYLE DESCRIPTION COLORQ1 Desk work surface/transaction Silestone Cosentino 2cm. Blanco Norte

Q2 Desk exterior and base Eco  Cosentino 2cm. Iron Ore

Desk interior and base Melamine on MR MDF Various ‐ ‐ WhiteTackboard above work surface Bulletin board Forbo 2162

V1 Floor ‐ reception, staff rms Natural Creations LVT ‐ Aria Armstrong TP776 18" square Grey BeigeCT3 Floor reception street entrance Casalgrande Padana Prospec Basaltina 12” x 24” StromboliG1 HIPPA dividers at check out Resin panels, 1/2", eased edges 3Form ‐ Varia Eco SE Sandstone finish Silken Bridal

Seating Task chair Steelcase Amia Black frame Navy vinylSeating Reception ‐ tandem Gunlocke Molti Champagne frame Sonora arm capSeating Reception ‐ HIP chair Arcadia Haven Champagne frame Sonora arm cap

Q1 Q2 G1 V1 CT3

Page 19: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

MATERIALS AND FINISHES | Exam Room

PRODUCT MANUF. CODE DESCRIPTION COLORPL1 Millwork cabinets, exterior PLAM and Edge band Wilsonart 38 ‐ Brazilwood

Substrate Premium MR MDF Various ‐ ‐ ‐

Millwork cabinets, interior Melamine Various ‐ ‐ WhiteC1 Countertop Corian w/4" cove splash Corian Linen marine plywood LinenPL1 Welch‐Allen board PLAM and Edge band Wilsonart 38 ‐ BrazilwoodP1 Wall paint Natura Ben. Moore OC‐29 Eggshell Floral WhiteP3 Accent paint Natura Ben. Moore CW‐635 Eggshell Nelson BlueS1 Large integral handwash sink Overflow, grid drain Karran E‐505 shop installed  SSTS2 Small integral handwash sink Overflow, grid drain Karran E‐303 shop installed  SST

Faucet Wrist blade T&S B2866 ‐ ChromeUnder cabinet lights Varies Various ‐ ‐ warm white

CC Cubicle Curtain Curtain with mesh top C‐S, Inc. NYP Spec. Maharam Semaphore SolaceRub rail Plastic wall protection Pawling CR‐60/55 6" beveled edge Silver GreyExam stool With back Sky Mid‐height Siliform espresso Stinson Shantung SH15 Accessories Soap Provon NXTAccessories Glove box Bowman GP‐073 clearAccessories Purell Purell FMX‐12 w/shield

C1 PL1

S1/S2

CCP1 P3

19

Page 20: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

20

MATERIALS AND FINISHES | Holding rooms,  Storage, Med rooms + Labs, Soiled Utility

C1 PL1

PRODUCT MANUF. CODE DESCRIPTION COLORPL1 Millwork cabinets, exterior PLAM and Edge band Wilsonart 38 ‐ Brazilwood

Substrate Premium MR MDF Various ‐ ‐ ‐

Millwork cabinets, interior Melamine Various ‐ ‐ WhiteC1 Countertop Corian w/4" cove splash Corian Linen marine plywood Linen

Shelving By clinical team/bio‐medFloor Tile Vinyl tile Tarkett CG405 16" square Cinder whiteWall Paint Natura Ben. Moore OC‐29 Eggshell Floral White

SOILED UTILITYWall Plastic sheet to 48"AFF Pawling  WC‐30/55 plastic moldings Silver GreyFaucet NYP plumbing guidelines T&S B2866 ‐ ChromeLarge integral handwash sink Overflow, grid drain Karran E‐505 shop installed  SSTSmall integral handwash sink Overflow, grid drain Karran E‐303 shop installed  SSTRim sink for utility rooms NYP plumbing guidelines ‐ ‐ ‐ ‐

Instrument sink for utility rms NYP plumbing guidelines ‐ ‐ ‐ ‐

CT1 Floor  Casalgrande porcelain tile  Prospec Granito1 8"x8" porcelain Arkansas

CT1

Page 21: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

21

MATERIALS AND FINISHES | Staff Lounge and pantry

PRODUCT MANUF. CODE DESCRIPTION COLORPL1 Millwork cabinets, exterior PLAM and Edge band Wilsonart 38 ‐ Brazilwood

Substrate Premium MR MDF Various ‐ ‐ ‐

Millwork cabinets, interior Melamine Various ‐ ‐ WhiteC1 Countertop Corian w/4" cove splash Corian Linen marine plywood Linen

Large integral handwash sink Overflow, grid drain Karran E‐505 shop installed  SSTSmall integral handwash sink Overflow, grid drain Karran E‐303 shop installed  SSTFaucet Wrist blade T&S B2866 ‐ ChromeRub rail Pro‐Tek Pawling CR‐60/55 6" beveled edge Silver Grey

L1 Lockers Z locker ‐ Traditional Metal ASI 9509 combo lock Almond #03Waste/Recycling dual receptacle Dimension based on layout Rubbermaid 1901994 front step SSTTable Dimension based on layout Steelcase Universal Polished chrome Corian LinenChairs  Loon chair Keilhauer 1713 plastic seat/back #12 Steel blueMicrowave Hospital grade Sharp R‐21LVF ‐ ‐

Refrigerator Energy star Various ‐ ‐ ‐

Water dispenser Countertop Quench 755 ‐ ‐

Wall paint Natura Ben. Moore OC‐29 Eggshell Floral WhiteAccent paint corridors Natura Ben. Moore HC‐45 Eggshell Shaker BeigeVinyl wall base 4" Cove Johnsonite 55 TP wall base Silver Grey

C1 PL1

L1

Page 22: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

22

MATERIALS AND FINISHES | Staff Office, Business Office, Consult rooms

PRODUCT MANUF. CODE DESCRIPTION COLORP1 Wall paint Natura Ben. Moore OC‐29 Eggshell Floral WhiteP2 Accent paint corridors Natura Ben. Moore HC‐45 Eggshell Shaker BeigeB1 Vinyl wall base 4" Cove Johnsonite 55 TP wall base Silver Grey

Systems furniture Panels, PLAM surfaces, storage Steelcase Nat. Cherry   Champagne Metal Bocci panelsDesk and return Work surface, storage Steelcase Nat. Cherry   Champagne Metal Bocci tack boardSeating Task chair Steelcase Amia Black frame Navy vinylSeating  Guest chair Source Intl. Font  Serif TBD

P1 B4P2

Page 23: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

MATERIALS AND FINISHES | Patient Restroom

PRODUCT MANUF. CODE DESCRIPTION COLORChanging table If program requirement ASI 9013 Roval stainless

CT1 Floor  Casalgrande porcelain tile  Prospec Balsatina 12"x12" PantelleriaCT2 Wall Casalgrande porcelain tile  Prospec Architecture 6"x24" Warm gray, matt

Grout Mapei epoxy #107 Iron 1/8”

MATERIALS AND FINISHES | Staff RestroomPRODUCT MANUF. CODE DESCRIPTION COLOR

P1 Wall Paint Natura Ben. Moore OC‐29 Eggshell Floral WhiteCT1 Floor  Casalgrande porcelain tile  Prospec Balsatina 12"x12" PantelleriaCT2 Wet wall only Casalgrande porcelain tile  Prospec Architecture 6"x24" Warm gray, matt

Grout Mapei epoxy #107 Iron 1/8”

CT2CT1/B4 P1

23

Page 24: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

24

MATERIALS AND FINISHES | Blood Draw, Triage, Procedure rooms

PRODUCT MANUF. CODE DESCRIPTION COLORPL1 Millwork cabinets, exterior PLAM and Edge band Wilsonart 38 ‐ Brazilwood

Substrate Premium MR MDF Various ‐ ‐ ‐Millwork cabinets, interior Melamine Various ‐ ‐ White

C1 Countertop Corian w/4" cove splash Corian Linen marine plywood LinenLarge integral hand wash sink Overflow, grid drain Karran E‐505 shop installed  SST

V4 Procedure room floor Integral sheet Aria Tarkett 652 Sheet Windy CitySmall integral hand wash sink Overflow, grid drain Karran E‐303 shop installed  SSTFaucet Wrist blade T&S B2866 ‐ ChromeUnder cabinet lights Varies Various ‐ ‐ warm whitePull‐out trash 36Qt container and hardware Haefele 502.56.510 Fixed door front Silver frameCorridor chart holder Chart holder Peter Pepper 4111H plain front white + aluminumRub rail Plastic wall protection Pawling CR‐60 6" beveled edge ShorelineProcedure integral sheet floor Welded seem sheet floor Tarkett 652 Ara  Windy CityExam stool With back Sky Mid‐height Siliform espresso Stinson Shantung SH15 Exam table Upholstery Ritter ‐ ‐ Dusty Blue

CC Cubicle Curtain Curtain with mesh top C‐S, Inc. NYP Spec. Maharam Semaphore SolacePhlebotomy chair By clinical team/bio‐medEquipment By clinical team/bio‐med

C1 PL1 CCV4

Page 25: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

Non‐clinical Equipment| By room type

25

Page 26: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

Non‐clinical Equipment| By room type

Type Model #/Finish

Reception Visitor Toilet

Medical Assistant

Exam or Proceedure 

Room

Consult Room Staff Toilet Corridor Staff Pantry Blood 

DrawerClean Supply

Soiled Holding

C‐Fold paper towel ASI ‐ 20210 SST, Roval Collection * * * * * *Toilet Paper Dispenser ASI 20030, SST, Roval Collection, twin roll * * *Soap Dispenser Provon NXT * * * * *Glove Box Bowman, GP‐073, clear plastic, 3‐Box * * *Purell Dispenser FMX‐12 w/shield * * * * * *Changing table (PEDS/OBGYN) ASI 9013 Recessed, SST, Roval Collection *Mirror  ASI20650, 24" x 30" Roval Collection * *Mirror  ASI20650, 18" x 24" Roval Collection *Coat Hook ASI 7345 Robe Hook * * *Grab Bars ASI Snap Flange series, 3700 Series *Integral trash or soiled gown container in cabinet

Haefele 502.56.500 or 510 single or double container * * *

Free standing trash container Rubbermaid Slim‐Jim, SST, End Step Trash/Recycling container, 1902000, one Black and one Blue liner 1902011 * * * *

Trash Container Rubbermaid Slim Jim, gray plastic, 1883604, 18 gal., front step * * *

Trash Container Magnuson Valuta series, 14 gal., Dk Antracite* * *

Microwave Sharp R‐21LVF *Refrigerator, counter height Uline ADA24R, or equal, energy star *Refrigerator, full height Summit FF1511, or equal , energy star *Quench water dispenser 755 Counter top or 720 floor model * *Slant top or soffit top Lockers on platform base

ASI Plastic Traditional Plus, color Blue #9509, combination lock ready *

Coat hangers ‐ closed loop Magnuson, MG‐17L *Chart Holder, HIPPA

Peter Pepper, 4111H, white/alum. *Cubicle Curtain

Construction Specialties, Maharam Semaphore, Solace

*

26

Page 27: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

FURNITURE| By room type

27

Page 28: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

28

RECEPTION: Drum table, Kwalu, PVC Faux wood/Corian top

FURNITURE | Reception and General Seating

RECEPTION: Gunlocke  Molti ‐ Tandem Seating metal frame, plastic arm cap, connecting Corian connector tables. Upholster backs and seat Designtex Leap, option for solid accent chairs on 20% of seats Designtex Leap

Color Birch 3600‐102 

Stinson TessutoMaurano TES29

Stinson CassidyDenim CAS17

Page 29: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

29

TASK and CONFERENCE CHAIR: Office Master Affirm AF418, fully ergonomic

STAFF LOUNGE: Keilhauer Loon, arm and armless available

EXAM ROOM CHAIRS: Source International Font Serif. Standard and bariatric, arm and armless available

FURNITURE | Reception and General Seating

EXAM ROOM STOOL: Keilhauer Sky Stool

Stinson CassidyDenim CAS17

Office MasterVinyl color 3V50 Cats

#12 Steel Blue plastic seat and back

Arc Com Task ForceChroma

Seat – Siliform AquamarineBack – Stinson Shantung SH04 Steel

Page 30: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

30

BUSINESS OFFICE: Steelcase AnswerWood laminate and fabric wrapped panels

CHART HOLDERS: Peter Pepper HIPPA  wall mount

FURNITURE | Administrative and Miscellaneous Items

WORKROOM/STAFF LOUNGE TABLE: Steelcase Universal plastic laminate top

WALL CLOCKS: Peter Pepper

DOCTOR AND ADMINISTRATOR'S OFFICE: Steelcase UniversalWood laminate and fabric wrapped panels

Page 31: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

DETAILS | Millwork, Hardware, Art + Signage

31

Page 32: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

32

Continuous cabinet pull

Millwork• AWI Premium Grade• MR or FR MDF substrate as required• 3mm PVC edging on all exposed edges• 4” kick base• GWB Soffit or slant tops required• Continuous pulls or recessed pull required in 

niches where wire pull would damage the side wall

• Soft close drawer glides• Corian work surfaces in all wet areas/patient 

areas• PLAM option for work surfaces w/3mm edge in 

non‐wet areas

PLAM with 3mm edging

DETAILS| Millwork

Extended door in lieu of wire pulls

Continuous pull

Coved join

Side splash termination

Coved sink and splash joins

Page 33: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

33

DETAILS| Hardware

COAT HOOK – BEHIND THE DOORDESIGN GOAL – using a low profile hook avoid accidents when entering a roomHansgrohe ‐Axor Bouroullec Double Hookhttp://www.hansgrohe‐usa.com/articledetail‐axor‐bouroullec‐axor‐bouroullec‐double‐hook‐42601000.html

MILLWORK UNDER CABINET TRASH RECEPTACLEDESIGN GOAL – to be used with a full height door panel, avoids the need for a millwork frame around trash containers, pull out doorHafele  Pull out trash bins. 502.56.XXX. http://www.hafele.com/us/external/mountinginstructions/Kesse_Pull‐Out_Waste_Bin_Brochure_502.56.XXX.pdf

MILLWORK UNDER CABINET TRASH CHUTEDESIGN GOAL – use w/reduced height door panelArch Hardware R‐45https://archhardware.net/shop‐by‐category/trash‐rings‐chutes/chute‐square‐rectangle‐no‐lid/trash‐chute.html

MILLWORK EXAM ROOM DESK END LEGDoug Mockett, TLRF2/W‐26D, dual rectangular leg, satin chrome,https://www.mockett.com/tlrf2‐w‐26d.html

CABINET LOCK OPTIONCompX Timberline, Cabinet Latch for use in upper and lower cabinetshttp://compx.com/images/compxtimberline_aug2014.pdfRef. Project: CUMC Area E, Adult ED

Page 34: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

34

DETAILS| Hardware

WORK SURFACE BRACKET – SURFACE MOUNTHafele, Speed Brace, size and finish to coordinate with work surface. 287.74.707http://www.hafele.com/us/en/external/blaetterkataloge/TCH_FC_2013/index.html?startpage=11.64

CABINET SHELF SUPPORTSHafele  282.24.718 Load bearing capacity 165 lbs.

Marshfield Durable Doors  ‐ high impact plastic door face and bonded edge band• Window stops to be factory finished paint or wood, not field painted.• Kick/mop installed as per room layout requirements• Coordinate with hollow metal doors for support room and closet locations• Contact: Judy Landwehr,  715 486 2265

CABINET PULL OPTIONSDoug Mocket DP Series Tab Pull, various lengths  http://www.mockett.com/dp3b.html

Hafele Continuous Cabinet Pull 126.27.036 or 126.27.936 in lieu of wire pullshttps://www.hafele.com/us/en/product/12627936/12627936/

Page 35: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

35

DETAILS| Hardware

WIRE MANAGEMENT UNDER WORK SURFACEDoug Mockett Wire Manager WM2 ‐ 1 http://www.mockett.com/grommets‐wire‐management/wire‐managers/wm2.htmlPanduit ABMT Hook and Loophttp://www.panduit.com/

WIRE MANAGEMENT UNDER WORK SURFACEDoug Mockett Adjustable Height Grommet Liner, EDP Series. Coordinate grommet cap color and type with IT and user group.http://www.mockett.com/edpad1.html

KARRAN HANDWASHING SINKS EDGE SERIES• Non‐traditional method of installation, contractor MUST follow manufacturer’s instructions• Grid strainer and overflow ordered separately• All sink sizes to meet FGI guidelines requirements• Contact: Mark Webster 410‐975 0128

E – 505, 17 – 7/8” x 16‐7/8” x 5‐1/2” E – 303, 17 – ½” x 14‐3/8” x 5‐3/4”

Page 36: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

36

DETAILS| Art, Branding and Signage

ARTWORK/coordinated with NYP Facilities Design, Project Strategy and Innovation• Art is integral to vision of NYP Consistent Interiors• The goal is to  amass a collection of art that is aesthetically appealing, valuable, and stimulates well‐being and a sense of community. It includes a 

wide range of options from commissioned art, to graphic prints • Fine art framing installed with security hardware

Poster exam rooms• Prints corridors and waiting

BRANDING/coordinated with NYP Marketing• NYP is developing a branding package for PSO offices, working with landlord and municipalities, the expectation is that the PSO locations will 

incorporate exterior and way finding signage 

SIGNAGE/coordinated with NYP Marketing• NYP has developed an interior signage package with the graphics consultant, Poulin + Morris. This sign package is to be deployed in all PSO office. It 

includes mandatory signage, directories, wayfinding, as well as patient services signs used for business communications.

Page 37: FACILITIES STRATEGIC PLANNING DESIGN, PROJECT … Documents/PSO Interior... · PSO IGuidelines FACILITIES STRATEGIC PLANNING DESIGN, PROJECT STRATEGY + INNOVATION ... • Appropriate

March 2016 37

PSO I Interior Design Guidelines