Facilities Development and Operations
Dashboard/Metrics Report
California State University, East Bay
July 1, 2014 to June 30, 2015
1
Facilities Development & Operations
Who We Are:
July 1, 2015
2
Administration & Finance
Associate Vice PresidentFacilities
Development & Operations
Business Operations
BudgetBudget
Administrative Services
Administrative Services
StoreroomStoreroom
Facilities Management
MaintenanceMaintenance
Building EngineersBuilding
Engineers
ElectricalElectrical
PlumbingPlumbing
CarpentersCarpenters
LocksmithsLocksmiths
PaintingPainting
Auto ShopAuto Shop
Grounds/CustodialGrounds/Custodial
Lawn MowingLawn Mowing
IrrigationIrrigation
Sports FieldsSports Fields
PlantingPlanting
CleaningCleaning
Pest ControlPest Control
Green Waste Removal
Green Waste Removal
Logistics ServicesLogistics Services
Moving Services / Event Set-up
Moving Services / Event Set-up
Work Control/Contracts
Work Control/Contracts
Planning Design & Construction
Construction AdministrationConstruction
Administration
Campus PlanningCampus Planning
Building Code Compliance
Building Code Compliance
Space Management
Space Management
Energy Management
Waste / RecyclingWaste /
Recycling
UtilitiesUtilities
SustainabilitySustainability
Facilities Development & Operations
Who We Are:
July 1, 2015
3
Staffing
Staffing Type # of Staff
Engineers 9Plumbers 4Electricians 2Carpenters 3Painters 2Facilities Workers 5Maintenance Mechanic 1Auto Mechanic 1Locksmiths 2Project Supervisor 1Custodians 47Grounds Workers 19Laborers 3Administrative & Technical Staff 19Students 2Management 7Grand Total 127
* Staffing quantities include the following departments: Facilities Management, Business Operations, and Planning, Design, & Construction, and Energy Management
0
20
40
60
80
100
120
140
Staffing by Fiscal Year
FY 10/11 FY 11/12 FY 12/13 FY 13/14 FY 14/15
* Does not include temporary project employees
Facilities Development & Operations
Who We Are:
July 1, 2015
4
Engineers7% Plumbers
3%
Electricians2%
Carpenters2%
Painters2%
Facilities Workers4%
Maintenance Mechanic1%
Auto Mechanic1%
Locksmiths2%
Project Supervisor1%
Custodians37%
Grounds Workers15%
Laborers2% Administrative & Technical
Staff15%
Students2% Management
6%
Facilities Development & Operations
Why are we here?
July 1, 2015
5
• Executive Order 757 charges the president with providing appropriate resources to meet the requirements of proper operations and maintenance of the physical plant. Current campus policy is that large departments such as Facilities Development & Operations, with a staff of over 100, have an administrative unit in place that provides leadership, administration compliance and fiscal oversight services for the department
• Executive Order 847 provides definitions for operations & maintenance, deferred maintenance, capital renewal, and reporting/auditing requirements to assure efficient & effective use of available maintenance funding supporting each appropriate campus.
• Executive Order 987 requires the CSU to manage utilities to achieve specific reduction targets by 2020.
• Assembly Bill 75 requires the CSU to achieve specific solid waste diversion targets by 2020.
• Assembly Bill 32 requires the CSU to manage utilities to achieve specific reduction targets by 2020.
• Assembly Bill 758 provide additional maintenance related compliance requirements.
• Assembly Bill 1103 provide additional maintenance related compliance requirements.
• Title 5 provide additional maintenance related compliance requirements.
• Education Code 66606 grants the CSU full power and responsibility in the construction and development of its capital program.
• Health & Safety Code 18934.5 requires the CSU to follow the California Building Code. Also, the CSU is required to coordinate its building official authority with the State Fire Marshal and the Department of State Architect.
Facilities Development & Operations
How we operate:
July 1, 2015
6
Life Cycle
Functionali
ty
Facilities Development & Operations
What We Spent On Operations:
July 1, 2015
7
$4.38$5.16
$0.00$1.00$2.00$3.00$4.00$5.00$6.00
CSUEB CSU
Cost/sq ft
OPERATIONS STATISTICS
Salaries $6,139,000
Materials / Equipment $1,312,000
Contracts / Services $532,000
Deferred Maintenance / Projects $500,000
Total $8,483,000
Salaries72.4%
Materials / Equipment
15.5%
Contracts / Services
6.3%Deferred
Maintenance / Projects5.9%
Facilities Development & Operations
What We Spent On Utilities:
July 1, 2015
8
UTILITY STATISTICS
Natural Gas $409,000
Water $612,000
Electricity $1,749,000
Sewage $202,000
Recycling $148,000
Solid Waste $42,000
Loan Re‐Payment $792,000
Total $3,954,000
ELECTRIC44.2%
NATURAL GAS
10.3%
WATER15.5%
SEWAGE5.1%
SOLID WASTE1.1% RECYCLE
3.7%
LOAN RE-PAYMENT20.0%
Facilities Development & Operations
How Much We Spent On Utilities:
July 1, 2015
9
$-
$50,000.00
$100,000.00
$150,000.00
$200,000.00
$250,000.00
$300,000.00
July 2014 August2014
September2014
October2014
November2014
December2014
January2015
February2015
March 2015 April 2015 May 2015 June 2015
ELECTRIC kWh Cost NATURAL GAS Therms Cost WATER Cost SEWAGE Cost SOLID WASTE Cost RECYCLE Cost
Facilities Development & Operations
How Much We Use On Utilities:
July 1, 2015
10
July 2014 August 2014 September2014
October2014
November2014
December2014
January2015
February2015
March 2015 April 2015 May 2015 June 2015
ELECTRIC kWh NATURAL GAS Therms Water gal Sewage gal
Facilities Development & Operations
How Much We Spent On Utilities By Fiscal Year:
July 1, 2015
11
$0.00
$1,000,000.00
$2,000,000.00
$3,000,000.00
$4,000,000.00
FY 2011 - 2012 FY 2012 - 2013 FY 2013 - 2014 FY 2014 - 2015
Facilities Development & Operations
What We Spent On Projects:
July 1, 2015
12
* Warren Hall Demo/Replacement building is $52,000,000
Click the picture to see the New Replacement Building project summary.
Summary Budget Number of Projects
Active $ 67,700,000 49
Completed $ 6,035,755 36
Grand Total 85
Active58%
Completed42%
Facilities Development & Operations
University Building Information:
July 1, 2015
Hayward Campus
95%
Concord Campus5%
Gross Sq. Ft.
13
0
10
20
30
40
50
HaywardCampus
Concord Campus
Average Age of Buildings per Campus
Campus Number of Students, Faculty, & Staff
Number of Buildings Gross Sq. Ft. Average Age
of Building
Hayward Campus
16,260
55 1,732,929 32
Concord Campus 5 89,363 22
Grand Total 60 1,822,292 37
Facilities Development & Operations
University Building Information:
July 1, 2015
14
Building Age Overview
Building Age # of Buildings Gross Sq. Ft.
0 ‐ 5 2 55,448
6 ‐ 20 31 508,674
21 ‐ 40 11 231,953
41 + 16 1,026,217
Total 60 1,822,292
Facilities Development & Operations
University Building Information:
July 1, 2015
15
Building Age 0 – 5
Building Age 6 – 20
# of Buildings Building Sq Ft. Year Built Age
1 Recreation & Wellness Center 54,548 2010 5
1 Food Kiosk (Einstein's Bagels) 900 2010 5
# of Buildings Building Sq Ft. Year Built Age
1 Student Service Administration 100,467 2009 6
1 University Union (New) 30,150 2009 6
2 Housing (Phase 3) 126,566 2008 7
1 Dining Commons 20,488 2008 7
1 Valley Business & Technology 67,872 2007 8
4 Housing (Phase 2) 102,970 2007 8
20 Modular's (20 Buildings) 24,110 1996 19
1 Book Store 36,051 1996 19
Facilities Development & Operations
University Building Information:
July 1, 2015
16
Building Age 21 – 40
# of Buildings Building Sq Ft. Year Built Age
1 Academic Services (Concord) 15,370 1992 23
1 Library (Concord) 36,821 1992 23
1 Contra Costa Hall (Concord) 22,411 1992 23
1 Student Union (Concord) 7,192 1992 23
1 Facilities Operations (Concord) 7,569 1992 23
6 Housing (Phase 1) (6) 142,590 1987 28
Facilities Development & Operations
University Building Information:
July 1, 2015
17
Building Age 41 +# of Buildings Building Sq Ft. Year Built Age
1 Student Health Center 23,900 1974 41
1 Robinson Hall 15,500 1971 44
1 Theatre 45,000 1971 44
1 Library 229,220 1971 44
1 Science Annex 1,720 1970 45
1 Fine Arts / Patio Foundry 9,150 1970 45
1 Plant Operations 3,600 1969 46
1 Meiklejohn Hall 111,662 1968 47
1 Field House 9,895 1966 49
1 Physical Education 116,000 1966 49
1 University Union (Old) 42,300 1966 49
1 Music 82,455 1965 50
1 Corporation Yard 18,910 1964 51
1 Science 203,600 1963 52
1 Art & Education 106,947 1963 52
1 Boiler Plant 6,358 1963 52
Facilities Development & Operations
Work flow of a Work Order:
July 1, 2015
18
Facilities Development & Operations
Work Orders:
July 1, 2015
19
FISCAL YEAR 14/15 STATISTICSSummary
Completed Work Orders
Unscheduled Maintenance 7504
Scheduled Maintenance 2745
Grand Total 10,249
Concord4.0%
Hayward96.0%
Completed Work Orders - By Campus
Auto Mechanic4%
Carpentry22%
Custodial5%
Electrical18%
Engineering11%
Grounds3%
Laborer11%
Locksmith8%
Painter3% Plumber
14%
Project0%
Contracts and Administrative
1%
Completed Work Orders by Shop
Facilities Development & Operations
Work Orders:
July 1, 2015
20
FISCAL YEAR 14/15WORK ORDER STATISTICS ‐ BY SHOP
SummaryNumber of Work Orders Generated
Completed Work Orders
Open Work Orders
Completion Rate
Engineering 1210 1095 115 90%
Plumbers 1521 1453 68 96%
Electricians 2051 1861 190 91%
Carpenters 2293 2211 82 96%
Painters 343 301 42 88%
Locksmiths 801 794 7 99%
Facilities Workers 4 4 0 100%
Custodians 610 487 123 80%
Grounds 371 354 17 95%
Laborers 1146 1121 25 98%
Auto Shop 440 430 10 98%
Projects 35 16 19 46%Contracts and Administrative 322 126 196 39%
Grand Total 11143 10249 894 92%
Completed92%
Open8%
Open vs. Closed
Facilities Development & Operations
Work Orders Completion Rate:
July 1, 2015
21
0%
20%
40%
60%
80%
100%
FY 09/10 FY 10/11 FY 11/12 FY 12/13 FY 13/14 FY 14/15
Results by Year
Facilities Development & Operations
Work Order Fiscal Year Comparisons:
July 1, 2015
22
0%
20%
40%
60%
80%
100%
FY 09/10 FY 10/11 FY 11/12 FY 12/13 FY 13/14 FY 14/15
Scheduled Maintenance % Completed
0%
20%
40%
60%
80%
100%
FY 09/10 FY 10/11 FY 11/12 FY 12/13 FY 13/14 FY 14/15
UnScheduled Maintenance % Completed
Facilities Development & Operations
Average Days to Respond to UnScheduled Work Orders
July 1, 2015
23
* Average Response (Days) is the average number of days from receipt of work order until someone shows up to address the issue.
0.00
5.00
10.00
15.00
20.00
25.00
July 2014 August2014
September2014
October2014
November2014
December2014
January2015
February2015
March 2015 April 2015 May 2015 June 2015
By Month
Facilities Development & Operations
Average Hours to Complete UnScheduled Work Orders
July 1, 2015
24
* Average hours is average number of hours it took to correct the issue once someone showed up to address the issue.
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
July 2014 August2014
September2014
October2014
November2014
December2014
January2015
February2015
March2015
April 2015 May 2015 June 2015
By Month
Facilities Development & Operations
Work Order Completion By Building:
July 1, 2015
25
Building# of Work Orders
# of Work Orders
Completed
% of Work Orders
CompletedAgora Stage 18 18 100%Art & Education 666 610 92%Athletic Fields 61 56 92%Boiler Plant 25 24 96%Bookstore 141 122 87%Concord ‐ Academic Services 83 75 90%Concord ‐ Art Lab 4 4 100%Concord ‐ Contra Costa Hall 43 37 86%Concord ‐ Facilities Operations 23 19 83%Concord ‐ Library 138 117 85%Concord ‐ Pump House 4 4 100%Concord ‐ Student Union 46 37 80%Concord Grounds/Exterior 7 6 86%Concord Non‐Bldg Specific 128 108 84%Corporation Yard 98 83 85%Dining Commons 161 148 92%Eisten's Bagels 28 23 82%Facilities Management 79 66 84%Field House 31 29 94%Hayward Grounds/Exterior 301 272 90%Hayward Non‐Building Specific 755 714 95%Health Center 182 168 92%Housing 22 19 86%Housing ‐ Calaveras 210 198 94%Housing ‐ Coloma 255 245 96%Housing ‐ Diablo 255 245 96%Housing ‐ El Dorado Hall 36 31 86%
Building
# of Work Orders Created
# of Work Orders
Completed
% of Work Orders
CompletedHousing ‐ Juniper 434 407 94%Housing ‐ Lassen Hall 102 98 96%Housing ‐Mariposa 33 31 94%Housing ‐ Sequoia 477 454 95%Housing ‐ Shasta 293 278 95%Housing ‐ Sierra 264 247 94%Housing ‐ Sonora 296 286 97%Housing ‐ Tamalpais 421 386 92%Library 947 866 91%Meiklejohn 364 327 90%Music & Business 293 260 89%Parking Lots 109 104 95%Physical Education 357 316 89%Pioneer Amphitheater 2 2 100%Recreation & Wellness 166 150 90%Robinson Hall 98 90 92%Science 1036 950 92%Storage Area 4 4 100%Student Administration 532 501 94%Theater 119 108 91%Trailer 254 234 92%University Union (New) 152 137 90%University Union (Old) 183 160 87%Valley Business & Technology 387 357 92%Warren Hall 1 1 100%Welcome Center 19 17 89%Grand Total 11143 10249 92%
Facilities Development & Operations
Annual Work Order Customer Satisfaction Survey
July 1, 2015
26
Response Legend
Outstanding 1
Exceeds Expectations 2
Meets Expectations 3
Needs Improvement 4
Unsatisfactory 5
Response Rate
Work Orders Completed 7629
Number of Responses 425
Response Rate % 5.6%
0
1
2
3
4
5
The techniciancleaned up thework site when
completed
The technicianwas courteous
and professionalwhile completing
the work
The work wascompleted to my
satisfaction
The work wascompleted withina timely manner
Facilities Development & Operations
Annual FD&O Employee Satisfaction Survey
July 1, 2015
27
0%
20%
40%
60%
80%
Strongly Agree Somewhat Agree Neither agree NorDisagree
Somewhat Disagree Strongly Disagree
Present Satisfaction workign at CSU East Bay?
2012 Result 2013 Result 2014 Result
0%10%20%30%40%50%
Strongly Agree Somewhat Agree Neither agree NorDisagree
Somewhat Disagree Strongly Disagree
My department understands and addresses my needs?
2012 Result 2013 Result 2014 Result
Facilities Development & Operations
Annual FD&O Employee Satisfaction Survey
July 1, 2015
28
0%20%40%60%80%
Strongly Agree Somewhat Agree Neither agree NorDisagree
Somewhat Disagree Strongly Disagree
My communication with my manager is appropriate and answers my questions?
2012 Result 2013 Result 2014 result
0%
20%
40%
60%
80%
Strongly Agree Somewhat Agree Neither agree NorDisagree
Somewhat Disagree Strongly Disagree
I would recommend working at CSU East Bay?
2012 Result 2013 Result 2014 Result
Facilities Development & Operations
Annual FD&O Employee Satisfaction Survey
July 1, 2015
29
0%10%20%30%40%50%60%
Strongly Agree Somewhat Agree Neither agree NorDisagree
Somewhat Disagree Strongly Disagree
Our department provides customers timely services and follow up?
2012 Result 2013 Result 2014 Result
Census 2012 Result 64 participantsCensus 2013 Result 35 participantsCensus 2014 Result 67 participants
Facilities Development & Operations
Below are the services FD&O provides and details identified in the ‘Planning For Distinction’ Report
July 1, 2015
30
• Oversee Department Programs and Provide Administrative Support Services
• Maintain, Repair, Operate, and Clean Buildings• Maintain, Repair, Improve, and Clean Grounds• Manage Utility Services• Perform and Manage New Construction and Renovations• Review and Enforce Code and Regulatory Compliance Related to
Buildings and Grounds
Facilities Development & Operations
Facilities Development & Operations Contact Information
July 1, 2015
31
Robert AndrewsDirector, Facilities Management
(510) [email protected]
Alvaro De SousaDirector, Business Operations
(510) [email protected]
Keat SawDirector, Planning, Design, & Construction
(510) [email protected]
Jim ZavagnoAssociate Vice President
(510) [email protected]
David MillerManager, Trades(510) 885-4771
Christopher NakamuraManager, Grounds / Custodial
(510) [email protected]
25800 Carlos Bee Boulevard Hayward, California 94542Main Office (510) 885-4444
Fax (510) 885-4708
http://www20.csueastbay.edu/af/departments/facilities/index.html
Loralyn PerryManager, Energy Management
(510) [email protected]