  • Dear clients and colleagues,

    On the first of May in 2008, we sharpened our pencils and began working on a project

    that has shaped our office - the Bao’an International Airport in Shenzhen.

    Prior to the Bao’an International Airport, Knippers Helbig specialized in the structural

    engineering of building framing and specialty façade systems. It was on that day 10

    years ago that we began to also provide façade consultation, design, and engineering

    services for curtain walls, conventional, and special glazing systems.

    We look back on 10 years of challenging projects and thank everybody involved for

    the fruitful collaborations during those years. Our services have grown to encompass

    early concept design to construction administration for unitized curtain walls, custom

    façade systems, double-skin façades as well as parametrically designed building

    envelopes, including a wide range of material systems such as aluminum, steel,

    timber, structural glazing, textiles, cable walls and many more.

    We look forward to many more years of intriguing projects together.

    Thorsten Helbig

    Partner

    Content

    BAO’ANINTERNATIONALAIRPORT 06

    LIGHTRAIL STATION 08

    GLASSELLSCHOOL OF ART 10

    TRON REALM, CHEVROLETDIGITAL CHALLENGE 12

    TRUMPF SMARTFACTORY 14

    HARVARD SCIENCE ANDENGINEERING COMPLEX 16

    ONE OCEAN PAVILIONWORLD EXPO 2012 18

    ACADEMY MUSEUMOF MOTION PICTURES 20

    MUSEUM OF FINE ARTSHOUSTON - NANCY AND RICHKINDER BUILDING 22

    FRANKLIN AND MARSHALLCOLLEGE - WINTER VISUALARTS CENTER 24

    NEW TORONTOCOURTHOUSE 26

    EUROPAPLATZ BF4 28

    NATIONAL VETERANSRESOURCE CENTER 30

    FOM 32

    WHARF PARCEL6+7 34

    BERGGRUEN INSTITUTE 36

    INSTITUTE FOR ADVANCEDSTUDY - RUBENSTEIN COMMONS 38

    ADIDAS HALFTIME 40

    2008 - 201810 Years Advanced Façade Engineering

    Stuttgart | New York | Berlin

    Boris Peter

    Partner

  • BAO’ANINTERNATIONALAIRPORT

    SHENZHEN, CHINA

    MASSIMILIANOFUKSAS ARCHITECTSBIAD

    Project

    _ Client: Shenzhen Airport

    Company Ltd.

    _ Completed in 2013

    _ 300.000 m2 double-layer

    façade and roof construction

    _ Spans of up to 80 m

    _ 85.000 individual façade

    panels realized by 6 different façade

    contractors

    Scope

    _ Façade Engineering

    _ Structural Engineering

    _ Parametric Design

    7©leonardornotti.com ©Knippers Helbig

  • LIGHTRAIL STATION

    THE HAGUE, NETHERLANDS

    ZWARTS & JANSMAARCHITECTS

    Project

    _ Client: BAM Infra NL / ProRail

    _ Completed in 2016

    _ 1.600 m2 steel gridshell with

    doubly curved steel members

    _ Single-curved glass; heat-bent glass

    Scope

    _ Façade Engineering

    _ Structural Engineering

    _ Parametric Design

    9©Bart van Hoek ©ProRail

  • GLASSELLSCHOOL OF ART

    HOUSTON, TX, USA

    STEVEN HOLL ARCHITECTSKENDALL/HEATON ASSOCIATES

    Project

    _ Client: Museum of Fine Arts Houston

    _ Completed in 2018

    _ 7.900 m2 façade made of precast

    concrete elements, translucent

    glazing units and operable windows

    _ Skylights, custom vestibules

    _ Large punched windows with unit

    sizes up to 6.00 m x 6.00 m

    _ Joints and connection details with

    minimum dimensions

    Scope

    _ Façade Engineering

    11©Richard Barnes ©Knippers Helbig

  • TRON REALM, CHEVROLETDIGITAL CHALLENGE

    SHANGHAI, CHINA

    GRIMSHAWARCHITECTS

    Project

    _ Client: confidential

    _ Completed in 2016

    _ Exterior doubly-curved textile

    façade screen

    _ Glass façade with structural glass fins

    _ Bent aluminum façade cladding

    Scope

    _ Façade Engineering

    _ Structural Engineering

    13©Walt Disney Imagineering ©Knippers Helbig

  • TRUMPF SMARTFACTORY

    CHICAGO, IL, USA

    BARKOW LEIBINGERARCHITECTS

    Project

    _ Client: TRUMPF GmbH + Co. KG

    _ Completed in 2017

    _ Structure and façade demonstrate

    wide spectrum of possibilities of the

    utilization of steel

    _ Vertical double-T large façade

    mullions made of weathering steel

    Scope

    _ Façade Engineering

    _ Structural Engineering

    15

  • HARVARD SCIENCE ANDENGINEERING COMPLEX

    BOSTON, MA, USA

    BEHNISCHARCHITEKTEN

    Project

    _ Client: Harvard University

    Allston Development Group

    _ To be completed in 2020

    _ 50.000 m2 gross floor area

    _ Façade strategy balances user

    comfort, maximized views and

    solar exposure

    _ External shading screen made of

    hydroformed stainless steel panels

    with parametrically optimized

    geometry

    _ Highly efficient and

    sustainable façade design

    Scope

    _ Façade Engineering

    17©Behnisch Architekten ©Behnisch Architekten

  • ONE OCEAN PAVILIONWORLD EXPO 2012

    YEOSU, SOUTH KOREA

    SOMAARCHITECTURE

    Project

    _ Client: The Organizing Committee for

    EXPO 2012 Yeosu - KR

    _ Completed in 2012

    _ 3.200 m2 kinetic façade

    _ More than 100 individual Glass Fiber

    Reinforced Polymer louvers

    _ Actuators at top and bottom allow for

    asymmetrical bending

    Scope

    _ Façade Engineering

    _ Kinematic Design

    19©soma ©soma

  • ACADEMY MUSEUMOF MOTION PICTURES

    LOS ANGELES, CA, USA

    RENZO PIANO BUILDINGWORKSHOP GENSLER

    Project

    _ Client: Academy of Motion

    Picture Arts and Sciences

    _ To be completed in 2019

    _ 2.180 m2 façade area

    _ Free spanning lightweight shell

    structure with approx. 45 m span

    _ Spherical dome comprised of an

    extremely slender steel construction

    with shingled glass envelope

    _ design and engineering of various

    suspended stairs, steel-glass bridges

    including seismic design

    Scope

    _ Façade Engineering

    _ Structural Engineering

    21©Renzo Piano Building Workshop/©A.M.P.A.S./Image from L’Autre Image ©Knippers Helbig

  • MUSEUM OF FINE ARTS HOUSTON - NANCY AND RICH KINDER BUILDING

    HOUSTON, TX, USA

    STEVEN HOLL ARCHITECTSKENDALL/HEATON ASSOCIATES

    Project

    _ Client: The Museum of Fine Arts,

    Houston

    _ To be completed in 2019

    _ 9.150 m2 façade area

    _ Façade strategy focuses on daylight

    control and reduction of solar heat

    gain

    _ Exterior “Cool Jacket”:

    a ventilated rain screen consisting

    of approx. 1.150 gravity bent

    translucent glass tubes

    Scope

    _ Façade Engineering

    23©Steven Holl Architects ©Knippers Helbig

  • FRANKLIN AND MARSHALLCOLLEGE – WINTER VISUAL ARTS CENTER

    LANCASTER, PA, USA

    STEVEN HOLLARCHITECTS

    Project

    _ Client: Franklin & Marshall College

    _ To be completed in 2019

    _ 1.600 m2 façade area

    _ Double layer façade comprised of

    glass channels and translucent

    insulation

    _ Maximization of transparency

    through frameless glass on

    ground level

    Scope

    _ Façade Engineering

    25©Steven Holl Architects ©Knippers Helbig

  • NEW TORONTOCOURTHOUSE

    TORONTO, ONT, CANADA

    RENZO PIANO BUILDINGWORKSHOPNORR

    Project

    _ Client: Infrastructure Ontario

    _ To be completed in 2022

    _ 16.200 m2 façade area

    _ 20 m high twin cable supported

    Atrium façade

    _ Blast-resistant building envelope

    _ Main tower façade features

    shadow boxes with hydroformed

    metal steel panels

    Scope

    _ Façade Engineering

    27©Renzo Piano Building Workshop ©Knippers Helbig

  • EUROPAPLATZ BF4

    BERLIN, GERMANY

    ALLMANN SATTLERWAPPNERARCHITEKTEN

    Project

    _ Client: CA Immo

    Deutschland GmbH

    _ 1st prize in competition, 2007

    _ Unitized double skin façade with

    gradually varying depth of exterior

    surface

    _ Slender glazing yields lightweight and

    transparent character

    _ Ventilated cavity serves as a

    buffer for increased sound insulation,

    protects motorized solar blinds and

    allows for natural ventilation

    Scope

    _ Façade Engineering

    29©Knippers Helbig©Allmann Sattler Wappner Architekten

  • NATIONAL VETERANSRESOURCE CENTER

    SYRACUSE, NY, USA

    SHoP ARCHITECTS

    Project

    _ Client: Syracuse University

    _ To be completed in 2019

    _ 4.500 m2 façade area

    _ Exterior shading fins are distributed

    and geometrically optimized in

    dependence to heat gain control,

    maximization of daylight access,

    views from inside

    _ Transparent double-storey façade

    on ground level

    Scope

    _ Façade Engineering

    31©SHoP Architects ©Knippers Helbig

  • FOM

    BERLIN, GERMANY

    J. MAYER H. ARCHITECTS

    Project

    _ Client: BildungsCentrum der

    Wirtschaft GmbH

    _ To be completed in 2019

    _ Monolithic external walls primarily

    consist of C8/9 class ultra-lightweight

    concrete

    _ Deep box type windows correspond

    to the linear thermal gradient within

    the adjacent 65 cm insulating

    concrete. The layout of interior triple

    insulated and exterior monolithic SSG

    glazing allows a highly transparent

    and elegant appearance and enables

    natural ventilation in combination

    with excellent sound protection

    _ Double layer façade correlates to the

    small-scale temperature gradient

    within the insulating concrete

    Scope

    _ Façade Engineering

    _ Structural Engineering

    33©J. Mayer H. Architects ©Knippers Helbig

  • WHARF PARCEL6+7

    WASHINGTON DC, USA

    SHoP ARCHITECTSWDG

    Project

    _ Client: PN Hoffman and

    Madison Marquette

    _ To be completed in 2021

    _ 23.200 m2 façade area

    _ Main building volume is enclosed by

    a staggered and shingled unitized

    façade system

    _ Oculus: Soffit cladding of multiple

    hundred individually folded aluminum

    panels

    Scope

    _ Façade Engineering

    35©SHoP Architects ©Knippers Helbig

  • BERGGRUEN INSTITUTE

    LOS ANGELES, CA, USA

    HERZOG & DE MEURONGENSLER

    Project

    _ Client Rep: Paratus Group

    _ Completion date: 2022

    _ Spherical Dome with doubly-curved

    glass and seismic movement joint

    _ Lightweight steel shell structure

    _ Timber curtain walls glass stripe of

    spherically curved insulated glass

    units

    Scope

    _ Façade Engineering

    _ Structural Engineering

    37©Herzog & de Meuron ©Knippers Helbig

  • INSTITUTE FOR ADVANCED STUDY – RUBENSTEIN COMMONS

    PRINCETON, NJ, USA

    STEVEN HOLLARCHITECTS

    Project

    _ Client: Institute for Advanced Study

    _ To be completed in 2019

    _ 1.250 m2 façade area

    _ Prismatic glass above 7˝ scatters

    white light into the color spectrum

    creating spectacular light effects

    _ Planar and single curved clerestory

    glazing wood windows integrated into

    steel framed façade

    Scope

    _ Façade Engineering

    39©Steven Holl Architects ©Steven Holl Architects

  • ADIDAS HALFTIME

    HERZOGENAURACH, GERMANY

    COBE

    Project

    _ Client: adidas Pension Trust e.V.

    _ Completed in 2018

    _ Transparent large span vertical

    façades

    _ Skylights with optimized daylighting

    strategy

    Scope

    _ Structural Engineering

    _ Façade Engineering

    41

  • Our Credo

    “We do projects of any scale and complexity in Europe, North America and all parts

    of the world as long as there are interesting aspects to solve.

    We love to work in multidisciplinary teams, with architects, clients and the industry.

    We believe that realizing amazing projects requires enthusiasm and personal

    involvement of key personnel from the first concept sketch through all design and

    construction phases until completion.”

    43

    Florian Scheible and Roman Schieber

    are leading the façade group at Knippers Helbig.

    ©Knippers Helbig

  • Knippers Helbig Advanced Engineering is an internationally consulting engineering

    practice with a multidisciplinary team of civil and structural engineers, architects

    and façade engineers. We offer a comprehensive range of services for structural

    engineering, façade design and geometric consulting for architecturally challenging

    building and bridge projects.

    The office was founded in 2001 by Jan Knippers and Thorsten Helbig. Jan Knippers

    retired from the company as a partner at the end of 2017. The two owners Thorsten

    Helbig and Boris Peter are leading the engineering offices in Stuttgart, New York

    and Berlin.

    45

    more to come

  • Knippers Helbig GmbH

    Tübinger Str. 12-16

    70178 Stuttgart

    Deutschland

    T +49 711 248 39 36 0

    E [email protected]

    Knippers Helbig Inc.

    75 Broad Street

    New York, NY 10004

    USA

    T +1 212 313 9618

    E [email protected]

    Knippers Helbig Berlin

    Zehdenicker Straße 21

    10119 Berlin

    Deutschland

    T + 49 30 577 000 95 0

    E [email protected]

    knippershelbig.com