eyre peninsula wap meri plan - landscape boards sa · 2015. 12. 21. · eyre peninsula wap meri...

13
Eyre Peninsula WAP MERI Plan Natural Resources Eyre Peninsula Ben Smith Monitoring, Evaluation & Reporting Officer Dr Greg Kerr Landscape Ecologist

Upload: others

Post on 18-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • Eyre Peninsula WAP

    MERI Plan

    Natural Resources

    Eyre Peninsula

    Ben Smith – Monitoring, Evaluation & Reporting Officer

    Dr Greg Kerr – Landscape Ecologist

  • WAP MERI Plan

    • DEWNR responsible for

    monitoring

    • MERI Plan currently being

    reviewed by DEWNR

    • Will be released following

    Minister’s approval of the WAP

    Natural Resources

    Eyre Peninsula

  • In or Out of the WAP?

    • MERI Plan will be a separate to the WAP

    • It is a living document

    • Allows us to update the MERI Plan as required

    Natural Resources

    Eyre Peninsula

  • Monitoring Network

    • Salinity and water level monitoring across all

    freshwater lenses in both Musgrave and Southern

    Basins PWA

    Natural Resources

    Eyre Peninsula

  • Natural Resources

    Eyre Peninsula

    Musgrave

    Southern Basins

  • Telemetered Wells

    • Installation of additional telemetered wells in Uley

    Wanilla and Lincoln South lenses

    • Data available in real time on Water Connect

    Natural Resources

    Eyre Peninsula

  • Lincoln North

    • Identified as a data gap

    • New monitoring

    network to be

    established

    Natural Resources

    Eyre Peninsula

  • GDE Monitoring

    Key Monitoring Objectives

    1. Identify the priority groundwater dependent

    ecosystems (GDE’s)

    Wetlands

    Phreatophytes

    2. Quantify the baseline GDE condition

    3. Identify the cause of any observed change in

    condition

    Natural Resources

    Eyre Peninsula

  • Assessing Wetland

    Condition

    • Assessing vegetation

    condition within zones along

    a ground- water gradient

    Natural Resources

    Eyre Peninsula

  • Assessing

    Bushland Condition

    • Using the protocols

    developed by the Nature

    Conservation Society of

    South Australia

    • 10 condition indicators

    • Specific condition

    indicators for each of the

    vegetation communities

    on Eyre Peninsula

    Natural Resources

    Eyre Peninsula

  • Assessing Ground

    Water Dependent

    Tree ConditionRiver Red Gum

    • Using Souter et al. 2009

    • developed to assess the

    status and monitor the effect

    of management on water

    stressed river red gum

    • assesses current condition

    and the direction of travel

    along a decline/recovery

    trajectoryNatural Resources

    Eyre Peninsula

  • Citizen Science

    • Citizen science enlists the public in collecting data.

    • A Citizen Scientist is a volunteer who collects

    and/or processes data as part of a scientific

    enquiry.

    • Monitoring of tree condition presents an excellent

    opportunity to involve the community in data

    collection

    Natural Resources

    Eyre Peninsula

  • Thankyou

    Natural Resources

    Eyre Peninsula