extra large garden shed - the gladiator
DESCRIPTION
Extra Large Garden Shed - The GladiatorTRANSCRIPT
ASGARD
'G
LADIATO
R'
PACK CON
TENTS
ITEMN
OPAR
TD
ESCRIPTIO
NQ
TY
123456
39867LH
REAR TO
P PNL
1150mm
*1130mm
111111
789
111
1011
12131
ASGAR
DG
LADIATO
RSELF ASSEM
BLY INSTR
UCTIO
NS
PLEASE NO
TE FOR
SAFETY REASO
NS TH
EASSEM
BLY OF TH
IS UN
IT REQ
UIR
ES TW
O P
EOP
LE.B
ASE IN
STRU
CTIO
NS
A FIRM, LEVEL ,FLAT SU
RFACE IS REQ
UIRED
AS A BASE FOR TH
IS UN
IT SU
CH AS CO
NCR
ETE OR FLAG
S.- M
INIM
UM
BA
SE M
EAS
UR
EMEN
T FO
R G
LAD
IATO
R IS 2
400
W*
26
35L
TOO
LS REQ
UIR
ED - PO
SI-DR
IV SCREWD
RIVER (PO
WER
DRIVER
RECOM
MEN
DED
) - 6m
m D
IA MASO
NRY D
RILL
- 13mm
SOCKET SPAN
NER
(FOR AN
CHO
R FIXIN
GS)
- A TUBE O
F ALL WEATH
ER SEALENT
SUITABLE FO
R STEEL AN
D CO
NCR
ETE.D
OO
R A
LLIGN
MEN
T & A
NC
HO
RIN
G
OF U
NIT
IT IS IMPO
RTANT TO
CORR
ECTLY LEVELTH
E UN
IT USIN
G TH
E PACKING
PIECESPR
OVID
ED, O
NCE ASSEM
BLY INACCO
RD
ANCE W
ITH TH
E INSTR
UCTIO
NS
OVERLEAF IS CO
MPLETE AN
D PR
IOR TO
FIXING
THE U
NIT TO
THE G
ROU
ND
.
- SLIDE TH
E PACKING
PIECES UN
DER
THE
COR
NER
S OF TH
E UN
ITS BASE AS REQ
UIRED
UN
TIL AN EQ
UAL G
AP HAS
BEEN ACH
IEVED AR
OU
ND
THE D
OO
RS
ALLOW
ING
FOR TH
EIR SM
OO
TH O
PERATIO
N &
ALLIGN
MEN
T.
- DRILL TH
ROU
GH
THE EIG
HT H
OLES
IN TH
E BASE OF TH
E UN
IT USIN
G 6m
m D
IA MASO
NRY D
RILL TO
A DEPTH
OF 70m
m.
- SCREW IN
THE AN
CHO
R FIXIN
GS.
(THESE H
AVE A SELF CUTTIN
G TH
READ
)IF N
OT A
NC
HO
RIN
G TH
E UN
IT US
ETH
E SELF S
EAL P
LUG
S TO
BLO
CK
THE
FIXIN
G H
OLES
(FIT FRO
M U
ND
ERS
IDE)
PLEASE SEE OU
R WEBSITE FO
R DETAILS
OF M
AINTEN
ANCE O
F THIS PR
OD
UCT
WW
W.ASG
ARD
SSS.CO.U
K
1
1615
11
14
1
12
3
4
39869R
H REAR TO
P PNL
1150*1130
39871LH
FRT TO
P PNL
1150*1113
39873R
H FR
T TOP PN
L1150*1113
39892SH
OR
T TOP CAP
744*313
39893LO
NG
TOP CAP
1486*313
5
6
7
8
39832LH
BACK PNL
2048*1070
39833RH
BACK PNL
2048*11179
10
11
12
32874LH
REAR
SIDE PN
L1828*1107
32875R
H REAR
SIDE PN
L1828*1107
39814LH
FRT SID
E PNL
1828*1092
39815R
H FRT SID
E PNL
1828*1092
39831R
EAR BASE PN
L2196*1106
13
14
11
1 1 1
17 18
19
039841FR
ON
T BASE PNL
2196*1092
39860LH
FRT PNL
1861*387
039861R
H FR
T PNL
1861*387
39848FASCIA
1464*292
39897RO
OF BRACE
938*133
32943LH
DO
OR
SA1740*761
15
16
17
18
19
20
20 22 23
32944R
H D
OO
R SA
1740*725
32916SID
E CVR CH
NL
1720*31
40062FLO
OR
CVR CH
NL
1062*38
24 25
40094TO
P FRT-BAK CH
NL
1070*40
40063TO
P CVR CH
NL
1080*41
2223
2425
1 2 2 2 2
ZSCREW100
No10*5/8 S/TAPP ZSCREW
340ZSCR
EW04
ZSCREW
32M
5*12 CSK ST/STM
5*16 PAN H
EADM
7.5*60 ANCH
OR BO
LT
ZCOM
PPLAS22,23,242m
m,3m
m,5m
m PACKER
S
ZCOM
PPLAS39
25IA GRO
MM
ET
ZCOM
PPLAS02
SELF SEAL PLU
G
32030
48
4 + 4 +
4Q
TY2
818
32670STO
PPERBR
KT
PA
RTS
INSTR
UC
TION
REA
R B
AS
E - 1
3
FRO
NT B
AS
E - 1
4
FLOO
R C
VR
CH
NL
- 23 (X
2)
POSITIO
N R
EAR FLO
OR '1
3' & FR
T FLOO
R '1
4'
AS SHO
WN
ENSU
RIN
G H
OLES AR
E ALIGN
EDFIT ALL SC
REW
S IN TH
E VERTICAL FACE.
POSITIO
N FLO
OR
COVER
STRIPS '2
3' AS SH
OW
NFIT TH
E REM
AININ
G SC
REW
S IN TH
E TOP FACE O
F TH
E JOIN
T. (TH
E COVER
STRIPS W
ILL ON
LY FIT ON
EW
AY, THEY BU
TT TOG
ETHER
IN TH
E CENTR
E OF TH
EFLO
OR A
ND
HID
E THE SCR
EW PO
INTS ALO
NG
THE JO
INT)
17*
PA
RTS
INSTR
UC
TION
RH
BA
CK
- 8PO
SITION
THE R
H BACK '8
' UP TO
THE PR
EASSEM
BLED BASE EN
SUR
ING
THAT IT SLO
TSIN
TO TH
E CENTR
AL BASE CUT O
UT AN
D TH
AT ALLH
OLES AR
E ALIGN
ED, SCR
EW TO
GETH
ER.
PA
RTS
INSTR
UC
TION
4*
RH
REA
R SID
E-1
0
22*
LOCATE RH
REA
R SID
E PANEL '1
0' IN
TO TH
E BASE &
RH BACK AS SH
OW
N EN
SURIN
G TH
AT THE C
OR
NER
JOIN
T IS COR
RECTLY ALIG
NED
ALON
G W
ITH TH
E FIXING
HO
LES. SCR
EW TO
GETH
ER ALO
NG
THE BA
SE AND
VER
TICAL
JOIN
T.
LH B
AC
K - 7
PA
RTS
INSTR
UC
TION
INSTR
UC
TION
INSTR
UC
TION
INSTR
UC
TION
INSTR
UC
TION
PA
RTS
PA
RTS
PA
RTS
PA
RTS
STEP 1
STEP
2STEP
3S
TEP 4
STEP 5
STEP 6
STEP 7
STEP
8
22*
22*48*
36*
13
14
81
0
LOCATE LH
BACK PANEL '7
' INTO
THE BASE &
RH BA
CKAS SH
OW
N EN
SURIN
G TH
AT IT ALSO SLO
TS INTO
THE
BASE CUTO
UT AN
D TH
AT THE VER
TICAL FOLD
S ARE
COR
RECTLY A
LIGN
ED.
SCREW
TOG
ETHER
ALON
G TH
E BASE AND
VERTICA
LJO
INT.
7
9
LH R
EAR
SIDE
- 9REPEAT STEP
3 W
ITH LH
REAR
SIDE PAN
EL '9' EN
SURIN
GTH
E CORN
ER JO
INT IS CO
RRECTLY ALIGN
ED.
12
RH
FRO
NT SID
E - 1
2
LH FR
ON
T SIDE
- 11
SIDE C
VR
CH
NL
- 22
(X2
)
22
11
POSITIO
N R
H FR
ON
T SIDE '1
2' U
P TO BASE AN
D R
H R
EARSID
E AS SHO
WN
. FIX PANELS ALO
NG
THE BA
SE JOIN
T AND
THRO
UG
H TH
E REAR
SIDE JO
INT FIR
ST (SEE DETA
IL) THIS
WILL EN
AB
LE YO
U TO
THEN
FIX TH
E SID
E CO
VER
PLA
TE'22'
AS
IND
ICA
TED W
ITH TH
E REM
AIN
ING
EIGH
T SCREW
S FOR
THE JO
INT
SCREW
INTO
THIS JO
INT FIR
ST
REPEAT TH
E ABOVE STEP W
ITH LH
FRO
NT SID
E '11
'AN
D TH
E REM
AING
SIDE CO
VER CH
ANN
EL '22'
SCREW
INTO
TH
IS FACE
LAST
RH
FRO
NT P
AN
EL - 1
6
LH FR
ON
T PA
NEL
- 15
15
16
POSITIO
N R
H FR
ON
T PANEL '1
6' O
N TO
BASE AND
RH
FRO
NT
SIDE AS SH
OW
N ALIG
N H
OLES AN
D SCR
EW TO
GETH
ER.
REPEAT A
BOVE STEP W
ITH LH
FRO
NT PAN
EL '15
'
FAS
CIA
- 17
ATTACH FA
SCIA PANEL '1
7' A
CRO
SS THE FR
ON
T OF
THE U
NIT AS SH
OW
N, SCR
EW IN
TO TH
E LH &
RH
FRO
NT PAN
ELS.
17
10*
PR
IOR
TO FITTIN
G TH
E FRO
NT SID
ES IT IS
IMP
OR
TAN
TTO
RU
N A
BEA
D O
F SEA
LENT A
LON
G TH
E FULL LEN
GTH
OF TH
E VER
TICA
L JOIN
TS.
SEAL FU
LLLEN
GTH
OF
THESE JO
INTS.
PA
RTS
INSTR
UC
TION
LH R
EAR
TOP
PN
L - 1
RH
REA
R TO
P P
NL
- 2 TO
P FR
T- BA
CK
CV
R C
HN
L- 2
4
PRIO
R TO
FITTING
THE LH
REAR TO
P PANEL '1' &
RH
REAR
TOP PAN
EL '2' TO
GETH
ER ALO
NG
WITH
THE TO
P FRO
NT TO
BACK CO
VERCH
ANN
EL '24' AS SH
OW
N IT IS IM
PORTAN
T TO R
UN
A BEAD
OF ALL W
EATHER
SEALENT TH
E FULL LEN
GTH
OF TH
E JOIN
T FRO
M FR
ON
TTO
BACK.
FIT SCREWS IN
THE VERTICAL JO
INT FIR
ST ENSU
RIN
G TH
AT THE FR
ON
T, BACK AND
TOP O
F THE R
OO
F SECTION
S FIT FLUSH
TO
GETH
ER O
N ALL FACES, IN
TIGH
TENIN
G TH
ESE SCREW
S A SEAL SH
OU
LD BE M
AD
E ALON
G TH
IS JOIN
T. PR
IOR
TO FITTIN
G TH
E REM
AININ
G SIX SCR
EWS IN
THE H
ORIZO
NTAL JO
INT IT IS N
ECESSARY TO
POSITIO
N TH
E FRT - BACK TO
P COVER
CHAN
NEL '24
' AS SH
OW
N, TH
US H
IDIN
G TH
E POIN
TS FRO
M TH
E PREVIO
SLY FITTED SCR
EWS, TH
E REM
AININ
G SCR
EWS H
OLD
THE CH
ANN
EL IN PLACE.
12*
PA
RTS
INSTR
UC
TION
12*
INSTR
UC
TION
INSTR
UC
TION
INSTR
UC
TION
INSTR
UC
TION
PA
RTS
PA
RTS
PA
RTS
PA
RTS
STEP 9
STEP 1
0 &
11
STEP 12
STEP 13
STEP 1
4STEP
15
28*56*
1
ASS
EMB
LED R
EAR
RO
OF P
AN
ELS1
&2
STO
PP
ER B
RK
TS (X
8)
POSITIO
N PR
E-ASSEMBLED
REAR
TOP PAN
ELS OVER
THE R
EARSID
ES AN
D BACK PAN
ELS AS SHO
WN
. W
HEN
COR
RECTLY PO
SITION
ED TH
E PANELS SH
OU
LD SLO
T IN
TO TH
E CUTO
UTS O
N SID
ES AND
BACKS (SEE DETAIL) A
ND
FIXING
HO
LES SHO
ULD
BE ALLIG
NED
. SCR
EW IN
POSITIO
N FITTIN
G TH
E STOPPER
BRACKETS AS
IND
ICATED, TH
ERE AR
E TWO
BRAC
KETS TO FIT IN
EACH
OF
THE SID
E AND
BACK PAN
ELS.
TOP
CO
VER
CH
AN
NEL
- 25 (X
2)
POSITIO
N TO
P COVER
CHAN
NEL '2
5' AS SH
OW
N R
EMO
VESCR
EWS FR
OM
THE H
ORIZO
NTA
L FACE OF TH
E RO
OF JO
INT
AS REQU
IRED
, REFIT SCREWS FIXIN
G TH
E COVER
CHAN
NEL.
REPEAT W
ITH R
EMAIN
ING
COVER
CHAN
NEL.
RO
OF B
RA
CE
- 18
REM
OVE SIX SCR
EWS 'A
' FRO
M CEN
TRAL R
OO
F JOIN
T.PO
SITION
RO
OF BR
ACE '1
8' AS IND
ICATED
AND
REFIT
SCREW
S. (N
OTE) TH
IS COM
PON
ENT R
EQU
IRES TH
E RO
OF TO
BESU
PPORTED
PRIO
R TO
FITTING
, IT IS DESIG
NED
TO BE
A TIGH
T FIT.
RU
N A BEAD
OF SILICO
NE
SEALENT D
OW
N TH
E FULL
LENG
TH O
F THE LH
REAR
TOP
VERTICAL JOIN
T(R
UN
NIN
G FR
ON
T- BACK)PR
IOR
TO PO
SITION
ING
THE R
H R
EAR TO
P AND
FRT- BACK
COVER
CHAN
NEL.
REAR
OF TO
P PAN
EL
2
FRO
NT TO
BACKCO
VER C
HAN
NEL
- 24
HO
RIZO
NTAL JO
INT
REP
EAT S
TEP 9
WITH
LH FR
ON
T TOP PA
NEL '3'
& R
H FR
ON
T RO
OF PAN
EL '4' AN
D TH
E REM
AININ
G
RO
OF FR
ON
T TO BACK C
OVER
CHAN
NEL '2
4'
3
4
RO
OF FR
T-BACKCO
VER C
HN
L-2
4
LH FR
T TOP
PN
L - 3
RH
FRT TO
P P
NL
- 4 TO
P FR
T- BA
CK
CV
R C
HN
L- 24
2
1
6
5
INSTR
UC
TION
PA
RTS
4* SHO
RT TO
PSH
RO
UD
- 5 LO
NG
TOP
SHR
OU
D-6
PR
IOR
TO JO
ININ
G TO
P S
HR
OU
DS
TOG
ETHER
AP
PLY
A B
EAD
FO SEA
LENT O
N TH
E JOIN
T.ALLIG
N SH
ORT TO
P SHRO
UD
'5' & LO
NG
TOP SH
RO
UD
'6'
AS SHO
WN
SCREW
TOG
ETHER
.
3
4
ASS
EMB
LEDFR
ON
TR
OO
F PA
NELS
3&
4 STO
PP
ER B
RK
TS (X
10)
PR
IOR
TO FITTIN
G R
EMA
ININ
G R
OO
F PA
NELS
IT ISIM
PO
RTA
NT TO
RU
N A
BEA
D FO
F SEALEN
T ALO
NG
TH
E FULL LEN
GTH
OF TH
E CEN
TRA
L JOIN
T. PO
SITION
PRE-ASSEM
BLED FR
ON
T TOP PAN
ELS OVER
THE R
EARTO
P PANELS A
ND
FRO
NT SID
ES AS SHO
WN
. W
HEN
COR
RECTLY PO
SITION
ED TH
E PANELS SH
OU
LD SLO
T IN
TO TH
E CUTO
UTS O
N SID
ES AND
FASCIA (SEE DETAIL) AN
DFIXIN
G H
OLES SH
OU
LD BE ALLIG
NED
. SCR
EW IN
POSITIO
N FITTIN
G TH
E REM
AININ
G STO
PPERBR
ACKETS
SEAL FULL LEN
GTH
OF TH
IS JOIN
T.
25
25
CEN
TRA
L RO
OF JO
INT
WITH
CO
VER
PLA
TESIN
PO
SITIO
N
REM
OVE SC
REW
SAN
D R
EFIT FRO
MTH
IS FACE ASREQ
UIR
ED.
18
REMO
VE SIXCEN
TRAL
SCREW
S 'A'
AA
AA
A
A
PA
RTS
INSTR
UC
TION
PR
E AS
SEMB
LEDLO
NG
& S
HO
RT
TOP
SH
RO
UD
S - 5
& 6
RUN
A BEAD O
F SEALENT ALO
NG
THE CO
NTAC
T EDG
ESO
F THE TO
P SHR
OU
D.
LIFT THE SH
RO
UD
ON
TO TH
E RO
OF ALIG
NIN
G TH
E FIXING
HO
LES BOTH
IN TH
E, BOTH
IN TH
E END
S AND
ALON
G TH
ELEN
GTH
OF TH
E RO
OF.
SCREW
IN PO
SITION
.20*
PA
RTS
INSTR
UC
TION
LH D
OO
R - 1
9
RH
DO
OR
- 20
25
mm
DIA
GR
OM
MET
(X2
)
WE A
DV
ISE TH
AT Y
OU
USE H
AN
D H
ELD D
RIV
ERS
RA
THER
THA
N P
OW
ER D
RIV
ERS
WH
EN FIX
ING
THE D
OO
RS
.IT IS IM
PO
RTA
NT TO
SU
PP
OR
T THE D
OO
RS
AT A
LL TIMES
WH
ILST FITTING
THE S
CR
EWS TO
ENSU
RE C
OR
REC
T A
LLIGN
MEN
T.
PA
RTS
INSTR
UC
TION
PA
RTS
INSTR
UC
TION
INSTR
UC
TION
INSTR
UC
TION
INSTR
UC
TION
INSTR
UC
TION
PA
RTS
PA
RTS
PA
RTS
PA
RTS
STEP 16
STEP 1
7
5
6
4*
19
20
POSITIO
N LH
DO
OR
'19' (N
ON
LOCKIN
G D
OO
R) SO
THAT
THE H
ING
ES ARE ALLIG
NED
WITH
THE TH
READ
ED FIXIN
GH
OLES, SCR
EW IN
POSITIO
N.
REPEA
T PRO
CESS WITH
RH
DO
OR '2
0' FIT TH
E 25mm
DIA
GRO
MM
ETS TO TH
E FRO
NT SID
E PANELS
(THESE AR
E CABLE ACCESS POIN
TS IF REQ
UIR
ED)
24*
REFER
TO FR
ON
T SH
EET FOR
DO
OR
ALIG
NM
ENT A
ND
AN
CO
RIN
G O
F UN
IT.
FIT CABLEG
RO
MM
ETSH
EAR.
STEP 1
8
HJ
K
L
ASGAR
D
'GLA
DIA
TOR
EXTEN
SION
'
PACK CON
TENTS
ITEMN
OPAR
TD
ESCRIPTIO
NQ
TY
123456
40064EXT BASE PN
L2196*1103
111111
789
122
1011
ASGAR
DG
LADIATO
RSELF ASSEM
BLY INSTR
UCTIO
NS
PLEASE NO
TE FOR
SAFETY REASO
NS TH
EASSEM
BLY OF TH
IS UN
IT REQ
UIR
ES TW
O P
EOP
LE.
BA
SE INSTR
UC
TION
SA FIR
M, LEVEL ,FLAT SU
RFACE IS
REQ
UIR
ED AS A BASE FO
R TH
IS UN
IT SU
CH AS CO
NCR
ETE OR FLAG
S.- M
INIM
UM
BA
SE M
EAS
UR
EMEN
TFO
R G
LAD
IATO
R EX
TENSIO
N IS
AN
AD
DITIO
NA
L 109
2m
m IN
LENTG
HFO
R EA
CH
EXTEN
SIO
N O
N TO
P O
F THE
STAN
DA
RD
UN
IT.
FOLLO
WIN
G G
LAD
IATO
R
INSTR
UC
TION
S AT STEP
1 FIT EXT BASE PAN
EL '1' TOG
LADIATO
R R
EAR BASE PAN
EL '13
'PR
IOR TO
FITTING
GLAD
IATOR FR
ON
TBASE PAN
EL '14
' CO
NTIN
UE W
ITH TH
IS PATTERN O
FASSEM
BLY FITTING
THE EXTEN
SION
PANELS AT EACH
STAGE O
FCO
NSTR
UCTIO
N PR
IOR
TOFITTIN
G TH
E ADJO
ININ
G STAN
DARD
G
LADIATO
R FRO
NT SET O
F PANELS.
IF NO
T AN
CH
OR
ING
THE U
NIT U
SE
THE S
ELF SEA
L PLU
GS
TO B
LOC
K TH
E FIX
ING
HO
LES (FIT FR
OM
UN
DER
SID
E)
22
40066RH
EXT TOP PN
L1150*1110
40065LH
EXT TOP PN
L1150*1110
40095EXT TO
P CAP1092*313
39897R
OO
F BRACE938*133
40094TO
P FRT-BAK CH
NL
1070*40
32854R
H EXT SID
E PNL
1828*1092
ZSCREW100
No10*5/8 S/TAPP
ZSCREW
32
M7.5*60 AN
CHO
R BOLT
ZCOM
PPLAS22,23,242m
m,3m
m,5m
m PACKERS
ZCOM
PPLAS02
SELF SEAL PLU
G
1104
2 + 2 +
2Q
TY4
4 32670STO
PPERBR
KT
11
2
3
4
5
32853LH
EXT SIDE PN
L1828*1092
6
7
5
4
3
26
89
10
11
32916SID
E CVR CH
NL
1720*31
40062FLO
OR
CVR CH
NL
1062*38
40063TO
P CVR CH
NL
1080*41
HJKL
AS
SEM
BLY
INS
TUC
TION
S
IMP
OR
TAN
T NO
TE TH
E FOU
R D
IFFEREN
T TYP
ES O
F CO
VER
CH
AN
NELS
AN
D A
LSO R
OO
F BR
AC
E S
UP
PLIED
ON
THE EX
TENSIO
N A
ND
STA
ND
AR
D G
LAD
IATO
R A
RE C
OM
MO
NTO
BO
TH.
AS
GA
RD
GLA
DIA
TOR
EXTEN
SIO
NS
W
OR
K B
Y EX
TEND
ING
THE S
TAN
DA
RD
UN
IT FRO
M TH
E CEN
TRE.
THE EX
TENS
ION
S AR
E MO
DU
LAR
REP
EAT A
BO
VE IN
STR
UC
TION
S WH
ENFITTIN
G A
DD
ITION
AL EX
TENSIO
NS.
ASG
GLA
SHELF#
##
ASG
AR
D G
LAD
IATO
R SH
ELF FITTING
INSTR
UC
TION
S
PA
CK
CO
NTEN
TS:Q
TYPART
LH SH
ELF BRKT
RH
SHELF BR
KTG
LADIATO
R SH
ELFM
5*12BHD
SCREW
1234
2228
1
1
2
2
1
3
3
4
3
3
STEP 1
(SHELF SH
OW
N FRO
M U
ND
ERSID
E)FIT LH
AND
RH
SHELF BR
KTS AS SHO
WN
USIN
G TH
E SCREWS SU
PPLIED, SCREW
ING
INTO
THE TH
READ
ED IN
SERTS.
LEAVE THE SCR
EWS SLACK TO
ENABLE
THE SH
ELVES TO BE AD
JUSTED
ON
CE INPO
SITION
IN TH
E UN
IT.
SHELVES ARE SH
OW
N FITTED
SIDE BY SID
E INTH
E LH SID
E OF A G
LADIATO
R. (THEY CAN
BE FITTEDIN
BOTH
SIDES O
F THE U
NIT) AN
D ALSO
IN TH
EEXTEN
SION
SIDE PAN
ELS SH
ELVES CAN ALSO
BE FITTED O
NE ABO
VE THE
OTH
ER U
P TO TH
REE HIG
H.
FIG 5
AB A
B
FIG 5
SHO
WS TH
E CENTR
AL JOIN
T WH
ERE SH
ELVESARE BEIN
G FITTED
SIDE BY SID
E.TH
E SCREWS FITTIN
G TH
ESE BRKTS SHO
ULD
BEFITTED
THRO
UG
H TH
E BACK HO
LES 'A'
(THIS APPLIES O
N TH
E EXTENSIO
N JO
INTS ALSO
) TH
E FRO
NT AN
D R
EAR SH
ELF BRKTS ARE
FITTED U
SING
THE FRO
NT FIXIN
G H
OLES 'B
'
STEP 2
THE SH
ELF IS FIXED U
TILISING
THE SCREW
SALR
EADY IN
THE U
NIT.
POSITIO
N TH
E PRE-ASSEM
BLED SH
ELF AT THE D
ESIRED
HEIG
HT ALIG
NIN
G TH
E CLEARENCE H
OLES IN
THE SH
ELFBR
KTS WITH
THE CO
RRESPO
ND
ING
SCREW
S. (TWO
PER BRKT)
REM
OVE TH
E SCREW
S AS REQ
UIR
ED AN
D R
EFIT FIXING
THE
SHELF BR
KTS IN PLACE. (SEE FIG
5 B
ELOW
) W
HEN
SHELVES AR
E FITTED TIG
HTEN
MACH
INE SCREW
S '4' TO
SECURE.
FIT ALL W
OO
D FLO
OR
ING
PR
IOR
TO FITTIN
G SH
ELVES.