1 External Information Points (EIP) This is the updated 45 day External Information Point (EIP5) which provides the EIP dates, and describes any known intended scope which Openreach has scheduled to be delivered as part of EMP R4150, due for delivery on 21 September 2019. As with previous releases, the deployment of any functionality shown below is dependent on successful completion of our testing activities. Openreach continues to review candidates for Release R4150 and will be further communicating scope in EIP7 communications. If you have any queries regarding product plans or progression of developments then you can refer to the Product Industry Forums. The Industry Forum details and collateral are in the secure area so you will need an Openreach portal account to access these. You can request access here. Once you have successfully logged in, the Industry Forums can be found here. For any queries relating to IT customer engagement including business to business interfaces or Openreach portal versions relating to Openreach products and services, please refer to your IT customer engagement manager. Openreach holds Technical Change Forums on a regular basis. Dates and contact details for both these and the Product Industry Forums can be found on the Industry Forum calendar here by clicking on the appropriate forum. If you need contact details for IT customer engagement then please contact your Sales & Relationship Manager. R4150 will contain changes to the following product areas: NGA Ethernet Copper Ducts and Poles Access Details of the changes for each product are as follows: NGA

Upload: others

Post on 31-Jan-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

1

External Information Points (EIP)

This is the updated 45 day External Information Point (EIP5) which provides

the EIP dates, and describes any known intended scope which Openreach has

scheduled to be delivered as part of EMP R4150, due for delivery on 21

September 2019.

As with previous releases, the deployment of any functionality shown below is dependent on

successful completion of our testing activities. Openreach continues to review candidates

for Release R4150 and will be further communicating scope in EIP7 communications. If you

have any queries regarding product plans or progression of developments then you can

refer to the Product Industry Forums. The Industry Forum details and collateral are in the

secure area so you will need an Openreach portal account to access these. You can

request access here. Once you have successfully logged in, the Industry Forums can be

found here. For any queries relating to IT customer engagement including business to

business interfaces or Openreach portal versions relating to Openreach products and

services, please refer to your IT customer engagement manager.

Openreach holds Technical Change Forums on a regular basis. Dates and contact details

for both these and the Product Industry Forums can be found on the Industry Forum

calendar here by clicking on the appropriate forum.

If you need contact details for IT customer engagement then please contact your Sales &

Relationship Manager.

R4150 will contain changes to the following product areas:

• NGA

• Ethernet

• Copper

• Ducts and Poles Access

Details of the changes for each product are as follows:

NGA

Page 2: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

2

Reference ID Products Change description

OR-50452 /

ORCE-149746

All copper and NGA

products Phase 2 uplift of text note format presented to CP customers

OR-46562 /

ORCE-143783 All NGA products

Incorrect SFVA / Remote assure KCI being sent to CP

Moved to R4200

OR-43082 /

ORCE-126983

LLU MPF

LLU SMPF

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

SOGEA(VDSL)

SOGEA(G.fast)

T2R Process: Governance Process Service Wrap for E2E SLD

Journey on production environment

Good news story

OR-51540 /

ORCE-150520

OR-53793 /

ORCE-158508

GEA-FTTC(VDSL)

SOGEA(VDSL)

Volume discount: Managed Pre-Order Check & Appointment

Reservation

Initial design ref: OR-51540 / ORCE-150520

OR-53624 /

ORCE-157880

GEA-FTTP

GEA-FTTP - ONT Shift Ordering

This is the Test & Deploy story for the R4100 design OR-46055

/ ORCE-135927

The functionality for this story will remain ‘switched off’ in

R4150. ‘Switch-on’ will be in a future release TBC

OR-50202 /

ORCE-148979 GEA-FTTP TMA Exception Suppression

OR-53008 /

ORCE-156160

SOGEA(VDSL)

SOGEA(G.fast)

SOGEA Day 1: Support for SVR as part of Non-Tech Change

Modify Order {Build, Test and Deploy} - Follows ORCE-150720

{Amend & Cancel}

OR-52294 /

ORCE-154829 GEA-FTTP Inside Out

Page 3: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

3

Reference ID Products Change description

OR-52095 /

ORCE-154284 GEA-FTTP GEA-FTTP 40/10 Pricing where GEA-FTTC is available

OR-52091 /

ORCE-154260

GEA-FTTP

FVA

GEA-FTTP FVA - Support withdrawal of Battery Backup Unit

Moved to R4200.

OR-51850 /

ORCE-153419

SOGEA(VDSL)

SOGEA(G.fast)

SOGEA Day 1 - SOGEA New Provides - Part 7 (Frames IRC

scenarios)

OR-51440 /

ORCE-152535

GEA-FTTP

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

GEA-FTTP L2C - Improvements to GEA-FTTP Capacity Issue

SMC Queue

Good news story

OR-51095 /

ORCE-152460 GEA-FTTP

GEA-FTTP VMJ Order Progress Raw Data

Moved to R4200

OR-51007 /

ORCE-151408 GEA-FTTP

Support Amend of SiteVisitReason on GEA-FTTP

Moved to R4200

OR-50978 /

ORCE-151200

SOGEA(VDSL)

SOGEA(G.fast)

SOGEA Day 1 - SOGEA New Provides - Part 8

OR-50655 /

ORCE-150426

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

WLR3 PSTN

LLU MPF

LLU SMPF

L2C: OR Siebel to build new logic to reject duplicate SIM2

orders raised by CP with same LORN and Post code

Targeted to R4200.

OR-50478 /

ORCE-149850

GEA-FTTC(VDSL)

SOGEA(VDSL)

DAY 2 Test - SOGEA/GEA-FTTC (VDSL) Minimum Speed

Standard {T2R/T&D NGA Process & OSS with Network

consultancy}

Page 4: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

4

Reference ID Products Change description

Moved to R4200.

OR-46059 /

ORCE-135928 GEA-FTTP Migration to GEA-FTTP from SOGEA

OR-46340 /

ORCE-136582 GEA-FTTP

GEA-FTTP L2C - Make Saturday and Sunday as Normal

Working Days

Moved to R4200.

OR-52969 /

ORCE-156111

SOGEA(VDSL)

SOGEA(G.fast)

SOGEA: Document L2C welfare process

Good news story

OR-52166 /

ORCE-154528

SOGEA(VDSL)

SOGEA(G.fast)

SOGEA - Multi/historical view of trouble report & CSV file

download option on Fault Tracker & continuation from ORCE-

137504

OR-50994 /

ORCE-151314

SOGEA(VDSL)

SOGEA(G.fast)

SOGEA/ FTTC: Operational tuning - delay management

OR-50992 /

ORCE-151304

SOGEA(VDSL)

SOGEA(G.fast)

SOGEA: Operational tuning - Siebel/ eMLC

Good news story, no direct CP impact

Moved to R4200

OR-51544 /

ORCE-150531

GEA-FTTC(VDSL)

SOGEA(VDSL)

Volume Discount Orders

OR-48495 /

ORCE-143375

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

SOGEA(VDSL)

SOGEA(G.fast)

Validate customer connection on T2R GEA service

OR-51944 /

ORCE-153807

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

Remove eMLC validation on Post Code in FTTC SIM2 provide

orders

Page 5: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

5

Reference ID Products Change description

WLR3 PSTN

LLU MPF

(R4050 reference: OR-50113 / ORCE-148666)

Moved to R4200.

OR-43076

LLU MPF

LLU SMPF

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

SOGEA(VDSL)

SOGEA(G.fast)

Production environment for Service Level Data (SLD)

OR-47446 /

ORCE-139744

NGA Products

WLR3 PSTN

LLU

Correction of ELF and DoA definition

Good news story.

OR-53104 /

ORCE-156648

GEA-FTTP GEA-FTTP View My Job Raw Data File naming convention

OR-53896 /

ORCE-159020

GEA-FTTP

FVA

GEA-FTTC(VDSL &

G.fast)

SOGEA(VDSL &

G.fast)

FTTP T2R - Create a solution to support MDU for both Green

and Brown field FTTP networks

Deployment of R4050 design: OR-46570 / ORCE-137039.

Ethernet

Reference ID Products Change description

OR-51257 EAD Q2F Equipment Discovery Phase 1c - Pre Fill Order

Page 6: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

6

Reference ID Products Change description

Further enhancements to the equipment discovery tool,

including adding a facility to prepopulate an order with slot

details.

OR-48573 EAD Ethernet Backhaul Direct (EBD) Coiled Cable Handover

Allowing the EBD backhaul link to be commissioned, tested and

left on coiled cables ahead of customers' installation and

commissioning of their own transmission.

Added at EIP2

OR-51346 EAD KCI sequencing

Fixing an in-life issue where the ReceivedDateTime attribute in

B2B KCIs is incorrect and does not reflect the original received

date and time of the order.

Added at EIP5

Copper

Reference ID Products Change description

OR-50452 /

ORCE-149746

All copper and

NGA products Phase 2 uplift of text note format presented to CP customers

OR-43082 /

ORCE-126983

LLU MPF

LLU SMPF

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

SOGEA(VDSL)

SOGEA(G.fast)

T2R Process: Governance Process Service Wrap for E2E SLD

Journey on production environment

Good news story

OR-51769 /

ORCE-153240 SOTAP

L2C SOTAP Dialogue Services - Manage line Plant Availability

(Test only- split from OR-45418)

Page 7: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

7

Reference ID Products Change description

OR-51769 /

ORCE-153231 SOTAP

L2C - SOTAP Dialogue Services - Tie Pair Applications (Test

only - split from OR-45418)

OR-51769 /

ORCE-153220 SOTAP

L2C SOTAP - Dialogue Services - Enhance Line Characteristics

(Test Only- split from OR-45418)

OR-51769 /

ORCE-153216 SOTAP

L2C - SOTAP Dialogue Services - Number Portability Checker

(Test only - split from OR-45418)

OR-51769 /

ORCE-153210 SOTAP

L2C - SOTAP Dialogue Services - Access & Test Address

Matching (Test Only- split from OR-45418)

OR-51784 /

ORCE-153276 SOTAP

L2C SOTAP - Ability to Effectively Bill My Customers (Atlantis)

(Build, Test & Deploy) Design Only OR-48933

OR-48945 /

ORCE-144796 SOTAP

Migration of Existing Working Services to SOTAP Part 1 - Order

Placement and Progression to KCI2 (Design Only)

OR-48947 /

ORCE-144797 SOTAP

Migration of Existing Working Services to SOTAP Part 2 - KCI3

including Amends & Pre-PONR Cancellations (Design Only)

OR-51730 /

ORCE-153120 SOTAP

L2C - SOTAP - Migration of Existing Working Services to SOTAP

Part 1 - Order Placement and Progression to KCI2 (build, test &

deploy)

OR-51727 /

ORCE-153098 SOTAP

SOTAP - L2C Start of Stopped Part 3 - Progression of Order

from KCI2 - KCI3 (Including Amends) (build, test & deploy)

OR-50655 /

ORCE-150426

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

WLR3 PSTN

LLU MPF

LLU SMPF

L2C: OR Siebel to build new logic to reject duplicate SIM2 orders

raised by CP with same LORN and Post code

Moved to R4200

OR-48052 /

ORCE-142023 SOTAP

L2C - SOTAP Urgent Restoration of Service to Previous Product

(Process Only)

Page 8: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

8

Reference ID Products Change description

OR-48947 /

ORCE-144797 SOTAP

SOTAP Migration of Existing Working Services to SOTAP Part 2

- KCI3 including Amends & Pre-PONR Cancellations (Design

Only)

OR-49717 /

ORCE-147135

WLR3 PSTN

LLU MPF

Working at Heights TETRA Closure

OR-50115 /

ORCE-148668 WLR3 PSTN

WLR Siebel to add gaining stack Cancellation Reasons which

are available in OR Siebel

Moved to R4200

OR-51550 /

ORCE-152772

WLR3 PSTN L2C- Novation Process Improvement

OR-52517 /

ORCE-155022 SOTAP

L2C - SOTAP - Frames Reservation (Test Only) Delta of OR-

48412

OR-53443 /

ORCE-157591 SOTAP

L2C - SOTAP Dialogue Services 2 - Appointing Services (Test

Delta Story completing ORCE-133999)

OR-43076

LLU MPF

LLU SMPF

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

SOGEA(VDSL)

SOGEA(G.fast)

Production environment for Service Level Data (SLD)

Good news story.

OR-47446 /

ORCE-139744

NGA Products

WLR3 PSTN

LLU

Correction of ELF and DoA definition

Good news story.

Page 9: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

9

Reference ID Products Change description

OR-51944 /

ORCE-153807

SIM2 orders for

GEA-FTTC

Remove eMLC validation on Post Code in FTTC SIM2 provide

orders

(R4050 reference: OR-50113 / ORCE-148666)

Deferred to R4200

OR-31183 /

ORCE-137515

OR-31162 /

ORCE-87966

ISDN2e

ISDN2e Fault Orchestration System migration from current

legacy to a strategic system

ISDN2e Fault Orchestration System migration from current

legacy to a strategic system - Parallel Run

Note: Initial rollout will be OR-31162 where strategic system will

handle ISDN2e fault in parallel run. Once successful trial run

complete, OR-31183 will be enabled.During Parallel run, few of

the WLR ISDN2e faults as defined in our internal logic will be

managed on a strategic system but most of the fault will still be

managed on the legacy system to support the trials.

Bothe stories (OR-31183, OR-31162) will be “Build only”

in R4150.

Ducts and Poles Access

Reference ID Products Change description

OR-51659 Amending an NoI &

Build Completion

Monitoring

Ability for CPs to extend the expiry date on Notice of Intent orders to

a maximum of 18 months (from 12 months), subject to certain

criteria.

OR-51655 NoI Projects and

Network Adjustment

Fund

Ability for CPs to ‘link’ a number of Notice Intent Orders within the

same geographical location into a project and benefit from a

combined network Adjustment fund pool.

Due to the impact of this new development on the existing order

journeys we will work with CPs on a soft-launch approach from

October 2019. Details will be shared at the Passives Industry Working

Group.

Page 10: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

10

Reference ID Products Change description

OR-52012 Partial Build

Completion

Recording

Ability for CP to record separate build completion dates for individual

routes contained within a Notice of Intent order.

OR-52018 Map Tool Roaming Deliver the ability via the Openreach portal to pan across the whole

UK on the map tool (5km x 5km order area will remain).

OR-52026 Network Adjustment

Contribution fund for

an NoI <126 metres

Ability to secure Network Adjustment funds against a Notice of Intent

order with less than 125m of spine duct.

OR-51213 Expansion of PIA

case management

Addition of the following case categories that can be raised by CPs

through the Openreach portal;

- General Query

- Escalations

- Infrastructure Queries

- Other

The ability for CPs to search and track case progression.

OR-51354 Legacy Asset Data

Management

Migration of data/orders that have been created using the CRF-

based order journey onto the strategic processes and platforms.

More details will be shared with CPs through our collaboration

sessions, the first of which is on the 8th August 2019.

OR-52180 Network Adjustment

Self Provide Orders

(SPO) payments –

Phase 1

Ability to pay a CP for a Network Adjustment that they have carried

out from the available Network Adjustment fund.

For tracking purpose please find below EIP3:

Reference ID Products Change description

OR-50452 /

ORCE-149746

All copper and NGA

products Phase 2 uplift of text note format presented to CP customers

OR-46562 /

ORCE-143783 All NGA products Incorrect SFVA / Remote assure KCI being sent to CP

Page 11: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

11

Reference ID Products Change description

OR-43082 /

ORCE-126983

LLU MPF

LLU SMPF

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

SOGEA(VDSL)

SOGEA(G.fast)

T2R Process: Governance Process Service Wrap for E2E SLD

Journey on production environment

Good news story

OR-51540 /

ORCE-150520

OR-53793 /

ORCE-158508

GEA-FTTC(VDSL)

SOGEA(VDSL)

Volume discount: Managed Pre-Order Check & Appointment

Reservation

Initial design ref: OR-51540 / ORCE-150520

OR-53624 /

ORCE-157880

GEA-FTTP

GEA-FTTP - ONT Shift Ordering

This is the Test & Deploy story for the R4100 design OR-46055

/ ORCE-135927

OR-50202 /

ORCE-148979 GEA-FTTP TMA Exception Suppression

OR-53008 /

ORCE-156160

SOGEA(VDSL)

SOGEA(G.fast)

SOGEA Day 1: Support for SVR as part of Non-Tech Change

Modify Order {Build, Test and Deploy} - Follows ORCE-150720

{Amend & Cancel}

OR-52294 /

ORCE-154829 GEA-FTTP Inside Out

OR-52095 /

ORCE-154284 GEA-FTTP GEA-FTTP 40/10 Pricing where GEA-FTTC is available

OR-52091 /

ORCE-154260

GEA-FTTP

FVA

GEA-FTTP FVA - Support withdrawal of Battery Backup Unit

OR-51850 /

ORCE-153419

SOGEA(VDSL)

SOGEA(G.fast)

SOGEA Day 1 - SOGEA New Provides - Part 7 (Frames IRC

scenarios)

Page 12: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

12

Reference ID Products Change description

OR-51440 /

ORCE-152535

GEA-FTTP

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

GEA-FTTP L2C - Improvements to GEA-FTTP Capacity Issue

SMC Queue

Good news story

OR-51095 /

ORCE-152460 GEA-FTTP GEA-FTTP VMJ Order Progress Raw Data

OR-51007 /

ORCE-151408 GEA-FTTP Support Amend of SiteVisitReason on GEA-FTTP

OR-50978 /

ORCE-151200

SOGEA(VDSL)

SOGEA(G.fast)

SOGEA Day 1 - SOGEA New Provides - Part 8

OR-50655 /

ORCE-150426

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

WLR3 PSTN

LLU MPF

LLU SMPF

L2C: OR Siebel to build new logic to reject duplicate SIM2

orders raised by CP with same LORN and Post code

OR-50478 /

ORCE-149850

GEA-FTTC(VDSL)

SOGEA(VDSL)

DAY 2 Test - SOGEA/GEA-FTTC (VDSL) Minimum Speed

Standard {T2R/T&D NGA Process & OSS with Network

consultancy}

OR-46059 /

ORCE-135928 GEA-FTTP Migration to GEA-FTTP from SOGEA

OR-46340 /

ORCE-136582 GEA-FTTP

GEA-FTTP L2C - Make Saturday and Sunday as Normal

Working Days

OR-52969 /

ORCE-156111

SOGEA(VDSL)

SOGEA(G.fast)

SOGEA: Document L2C welfare process

Good news story

OR-52166 /

ORCE-154528 SOGEA(VDSL) SOGEA - Multi/historical view of trouble report & CSV file

download option on Fault Tracker & continuation from ORCE-

Page 13: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

13

Reference ID Products Change description

SOGEA(G.fast) 137504

OR-50994 /

ORCE-151314

SOGEA(VDSL)

SOGEA(G.fast)

SOGEA/ FTTC: Operational tuning - delay management

OR-50992 /

ORCE-151304

SOGEA(VDSL)

SOGEA(G.fast)

SOGEA: Operational tuning - Siebel/ eMLC

Good news story, no direct CP impact

OR-51544 /

ORCE-150531

GEA-FTTC(VDSL)

SOGEA(VDSL)

Volume Discount Orders

OR-48495 /

ORCE-143375

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

SOGEA(VDSL)

SOGEA(G.fast)

Validate customer connection on T2R GEA service

OR-51944 /

ORCE-153807

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

WLR3 PSTN

LLU MPF

Remove eMLC validation on Post Code in FTTC SIM2 provide

orders

(R4050 reference: OR-50113 / ORCE-148666)

OR-43076

LLU MPF

LLU SMPF

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

SOGEA(VDSL)

SOGEA(G.fast)

Production environment for Service Level Data (SLD)

OR-47446 /

ORCE-139744 NGA Products Correction of ELF and DoA definition

Page 14: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

14

Reference ID Products Change description

WLR3 PSTN

LLU

Good news story.

OR-53104 /

ORCE-156648

GEA-FTTP GEA-FTTP View My Job Raw Data File naming convention

OR-53896 /

ORCE-159020

GEA-FTTP

FVA

GEA-FTTC(VDSL &

G.fast)

SOGEA(VDSL &

G.fast)

FTTP T2R - Create a solution to support MDU for both Green

and Brown field FTTP networks

Deployment of R4050 design: OR-46570 / ORCE-137039.

Ethernet

Reference ID Products Change description

OR-51257 EAD Q2F Equipment Discovery Phase 1c - Pre Fill Order

Further enhancements to the equipment discovery tool,

including adding a facility to prepopulate an order with slot

details.

OR-48573 EAD Ethernet Backhaul Direct (EBD) Coiled Cable Handover

Allowing the EBD backhaul link to be commissioned, tested and

left on coiled cables ahead of customers' installation and

commissioning of their own transmission.

Added at EIP2

Copper

Page 15: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

15

Reference ID Products Change description

OR-50452 /

ORCE-149746

All copper and

NGA products Phase 2 uplift of text note format presented to CP customers

OR-43082 /

ORCE-126983

LLU MPF

LLU SMPF

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

SOGEA(VDSL)

SOGEA(G.fast)

T2R Process: Governance Process Service Wrap for E2E SLD

Journey on production environment

Good news story

OR-51769 /

ORCE-153240 SOTAP

L2C SOTAP Dialogue Services - Manage line Plant Availability

(Test only- split from OR-45418)

OR-51769 /

ORCE-153231 SOTAP

L2C - SOTAP Dialogue Services - Tie Pair Applications (Test

only - split from OR-45418)

OR-51769 /

ORCE-153220 SOTAP

L2C SOTAP - Dialogue Services - Enhance Line Characteristics

(Test Only- split from OR-45418)

OR-51769 /

ORCE-153216 SOTAP

L2C - SOTAP Dialogue Services - Number Portability Checker

(Test only - split from OR-45418)

OR-51769 /

ORCE-153210 SOTAP

L2C - SOTAP Dialogue Services - Access & Test Address

Matching (Test Only- split from OR-45418)

OR-51784 /

ORCE-153276 SOTAP

L2C SOTAP - Ability to Effectively Bill My Customers (Atlantis)

(Build, Test & Deploy) Design Only OR-48933

OR-48945 /

ORCE-144796 SOTAP

Migration of Existing Working Services to SOTAP Part 1 - Order

Placement and Progression to KCI2 (Design Only)

OR-48947 /

ORCE-144797 SOTAP

Migration of Existing Working Services to SOTAP Part 2 - KCI3

including Amends & Pre-PONR Cancellations (Design Only)

Page 16: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

16

Reference ID Products Change description

OR-51730 /

ORCE-153120 SOTAP

L2C - SOTAP - Migration of Existing Working Services to SOTAP

Part 1 - Order Placement and Progression to KCI2 (build, test &

deploy)

OR-51727 /

ORCE-153098 SOTAP

SOTAP - L2C Start of Stopped Part 3 - Progression of Order

from KCI2 - KCI3 (Including Amends) (build, test & deploy)

OR-50655 /

ORCE-150426

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

WLR3 PSTN

LLU MPF

LLU SMPF

L2C: OR Siebel to build new logic to reject duplicate SIM2 orders

raised by CP with same LORN and Post code

OR-48052 /

ORCE-142023 SOTAP

L2C - SOTAP Urgent Restoration of Service to Previous Product

(Process Only)

OR-48947 /

ORCE-144797 SOTAP

SOTAP Migration of Existing Working Services to SOTAP Part 2

- KCI3 including Amends & Pre-PONR Cancellations (Design

Only)

OR-49717 /

ORCE-147135

WLR3 PSTN

LLU MPF

Working at Heights TETRA Closure

OR-50115 /

ORCE-148668 WLR3 PSTN

WLR Siebel to add gaining stack Cancellation Reasons which

are available in OR Siebel

News Item only

OR-51550 /

ORCE-152772

WLR3 PSTN L2C- Novation Process Improvement

OR-52517 /

ORCE-155022 SOTAP

L2C - SOTAP - Frames Reservation (Test Only) Delta of OR-

48412

Page 17: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

17

Reference ID Products Change description

OR-53443 /

ORCE-157591 SOTAP

L2C - SOTAP Dialogue Services 2 - Appointing Services (Test

Delta Story completing ORCE-133999)

OR-43076

LLU MPF

LLU SMPF

GEA-FTTC(VDSL)

GEA-FTTC(G.fast)

SOGEA(VDSL)

SOGEA(G.fast)

Production environment for Service Level Data (SLD)

Good news story.

OR-47446 /

ORCE-139744

NGA Products

WLR3 PSTN

LLU

Correction of ELF and DoA definition

Good news story.

OR-51944 /

ORCE-153807

SIM2 orders for

GEA-FTTC

Remove eMLC validation on Post Code in FTTC SIM2 provide

orders

(R4050 reference: OR-50113 / ORCE-148666)

OR-31183 /

ORCE-137515

OR-31162 /

ORCE-87966

ISDN2e

ISDN2e Fault Orchestration System migration from current

legacy to a strategic system

ISDN2e Fault Orchestration System migration from current

legacy to a strategic system - Parallel Run

Note: Initial rollout will be OR-31162 where strategic system will

handle ISDN2e fault in parallel run. Once successful trial run

complete, OR-31183 will be enabled.During Parallel run, few of

the WLR ISDN2e faults as defined in our internal logic will be

managed on a strategic system but most of the fault will still be

managed on the legacy system to support the trials.

Ducts and Poles Access

Page 18: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

18

Reference ID Products Change description

OR-51659 Amending an NoI &

Build Completion

Monitoring

Ability for CPs to extend the expiry date on Notice of Intent orders to

a maximum of 18 months (from 12 months), subject to certain

criteria.

OR-51655 NoI Projects and

Network Adjustment

Fund

Ability for CPs to ‘link’ a number of Notice Intent Orders within the

same geographical location into a project and benefit from a

combined network Adjustment fund pool.

OR-52012 Partial Build

Completion

Recording

Ability for CP to record separate build completion dates for individual

routes contained within a Notice of Intent order.

OR-52018 Map Tool Roaming Deliver the ability via the Openreach portal to pan across the whole

UK on the map tool (5km x 5km order area will remain).

OR-52026 Network Adjustment

Contribution fund for

an NoI <126 metres

Ability to secure Network Adjustment funds against a Notice of Intent

order with less than 125m of spine duct.

OR-51213 Expansion of PIA

case management

Addition of the following case categories that can be raised by CPs

through the Openreach portal;

- General Query

- Escalations

- Infrastructure Queries

- Other

The ability for CPs to search and track case progression.

OR-51354 Legacy Asset Data

Management

Migration of data/orders that have been created using the CRF-

based order journey onto the strategic processes and platforms.

OR-52180 Network Adjustment

Self Provide Orders

(SPO) payments

Ability to pay a CP for a Network Adjustment that they have carried

out from the available Network Adjustment fund.

In line with the External Information Points (EIP) process for EMP releases, we can confirm that the

additional documentation to support Release R4150 has been published. Documentation only change

subject to each release requirement and can be found on the Openreach web site at the following

addresses:

NGA (http://www.openreach.co.uk/sffa)

Page 19: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

19

XML code & documentation

GEA-FTTC/P functional upgrade specification

FVA XML and baseline specification

List of values (GEA-FTTC, GEA- GEA-FTTP and FVA)

Ethernet Services (www.openreach.co.uk/ethernetservices)

These provide design specifications for the functions that are required to be developed by users of the

Openreach gateway. These files are intended for CP technical teams responsible for designing and

building the B2B interface into the Openreach gateway. The Ethernet B2B baselines and functional

specs can be found under:

Ethernet Access Direct release information

Ethernet Backhaul Direct release information

Openreach Network Backhaul Services release information

LLU (www.openreach.co.uk/llu)

On the pages below you will find the updated EMP xml specifications, functional changes and web

services user guides. Information specific to Dialogue services, Orders and Faults can be also be

found on the corresponding pages:

MPF/SMPF release information

WLR3 release documentation (www.openreach.co.uk/wlr3)

On the pages below you will find the updated EMP xml specifications, functional changes and web

services user guides. Information specific to Dialogue services, Orders and Faults can be also be

found on the corresponding pages.

WLR3 PSTN release documentation

WLR3 ISDN2 release documentation

WLR3 ISDN30 release documentation

Page 20: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

20

Cross products

EMP response code list

As the development process progresses Openreach reserve the right to amend the scope of the

release and the supporting documentation as this may be refined and reduced. Openreach accepts no

liability for planning undertaken by CPs based on this documentation.

CPs will also be advised via formal planned outage notifications of the planned downtime as the new

services are being implemented on EMP.

For further information please contact your Sales & Relationship Manager.

Please do not forward, republish or permit unauthorised access. The content is accurate at the time of

writing and is subject to change.

CPs will also be advised via formal planned outage notifications of the planned downtime as the new services are

being implemented on EMP.

As the development process progresses Openreach reserves the right to amend the scope and dates of the

release. Openreach accepts no liability for planning undertaken by CPs based on this indicative list.

Terminology Definitions

Feasibility only To establish the viability and practicality of the demand

Investigation only To explore the demand to identify different options available to provide a

solution

Funding only The demand is seeking funding only, and no other activity will take place during

this release

Page 21: External Information Points (EIP)...including Amends & Pre-PONR Cancellations (Design Only) OR-51730 / ORCE-153120 ... Due to the impact of this new development on the existing order

21

Build only The demand will be built only during this release

Build and Test The demand, will be built and tested during this release

Test only The demand has been built, and will be tested only during this release

Test and deploy The demand will be deployed upon successful testing during this release

E2E Delivery The demand will be built, and deployed upon successful testing during this

release

Deployed (switched

off)

The successfully tested demand will be deployed in a “switched off” state during

this release, ready to “go live” and consumed by the CP’s at a release TBC.