PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FOR K.PITCHAMPATTI LIME STONE MINE (Extent: 1.02.0Ha)-B2Project IN S.F.Nos: 644/2 (P), 645/2 (P) Village: K.Pitchampatti Taluk: Karur District: Karur State: Tamilnadu SUBMITTED TO State Level Environment Impact Assessment Authority (SEIAA), Government of Tamilnadu Chennai. SUBMITTED BY A.V.Elamurugu (Proprietor, M/s. Mother Earth Minerals No.20-A, Koneripatti Extension II, Rasipuram – 637 408, Rasipuram Taluk, Namakkal District..

Upload: ngongoc

Post on 26-Aug-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE

FOR K.PITCHAMPATTI LIME STONE MINE

(Extent: 1.02.0Ha)-B2Project

IN

S.F.Nos: 644/2 (P), 645/2 (P)

Village: K.Pitchampatti

Taluk: Karur

District: Karur

State: Tamilnadu

SUBMITTED TO

State Level Environment Impact Assessment Authority (SEIAA),

Government of Tamilnadu

Chennai.

SUBMITTED BY

A.V.Elamurugu

(Proprietor, M/s. Mother Earth Minerals

No.20-A, Koneripatti Extension II,

Rasipuram – 637 408,

Rasipuram Taluk,

Namakkal District..

INDEX FILE

S.No Description Page

No’s

1 To Obtain Environmental Clearance 3

2 Environmental Clearance Format 5-9

3 Declaration Letter 11

4 Demand Draft 13

5 Form-1 15-51

6 Approved Scheme of Mining 53-325

7 Pre-Feasibility Report 327-381

8 VAO signed for Quarry site 383

9 Baselines Studies 385-407

10 Affidavit Document 409-411

11 Details of Quarries 413

12 Habitation details from VAO 415

13 Copy of Explosive License 417-419

14 Consolidated above Document in

PDF Format (CD)

421

To consider the proposal for the grant of Environmental Clearance for Limestone mining in 1.02.0Ha in

S.F.Nos: 644/2 (P), 645/2 (P)of K.Pitchampatti Village in Karur Taluk,Karur District by A.V.Elamurugu,

(Proprietor, M/s. Mother Earth Minerals).

The salient features of the proposal are as follows:

S.No: Details of the proposal : Data furnished Page No:

1.

Name of the owner/Firm

:

A.V.Elamurugu

(Proprietor, M/s. Mother Earth Minerals),

No.20-A, Koneripatti Extension II,

Rasipuram – 637 408,

Rasipuram Taluk,

Namakkal District.

3,17,53,57,

,85,93,327,

2.

Type of quarrying

(Savudu/Rough stone/

Sand/Granite/ Limestone)

:

It is a Limestone Mining project in K.Pitchampatti

village.

3,17,53,57,

,85,93,327,

3. S.F.No of the quarry site with

area break up :

644/2 (P), 645/2 (P) 3,17,53,57,

,85,93,327,

4. Village in which situated

: K.Pitchampatti Village 3,17,53,57,

,85,93,327,

5. Taluk in which situated

: Karur Taluk 3,17,53,57,

,85,93,327,

6. District in which situated

: Karur District 3,17,53,57,

,85,93,327,

7. Extent of quarry (in ha)

1.02.0Ha 3,17,53,57,

,85,93,327,

8.

Period of mining proposed

:

Mining lease period is thirty years (14.09.1998 to

13.09.2018).

Mining plan period = 1998-99 to 2002-03

1st Scheme of Mining period = 2009-10 to 2013-14

2nd

Scheme of Mining period = 2013-14 to 2018-19

83,223,289

,329,

9.

Production (Quantity in Ts)

:

The proposed quantity of Limestone 8,845Ts (70%

Limestone) and 3,791Ts (30% of Mineral Reject) for

the remaining scheme periods.

17,347

10. Latitude and Longitude of all

corners of the quarry site : N 10

048’10’’

E 780 05’ 03’’

17,343

11. Topo sheet No : 58-J/01 17,343

12. G.O.No : G.O. (3D). No. 215 Industries (MMA2) Department,

dated 16.12.1997.

83,223,289

,329,

13. Mining plan approved by the

IBM,RCOM :

TN/TNL/MP/LST/895-MDS, dated 11.01.96 55,

14.

Water Requirement:

1. Drinking & Domestic

purpose (in KLD)

2. Dust suppression & Green

Belt (in KLD)

;

Purpose Quantity

KLD

Source

Drinking 0.2KLD Water vendors

Domestic purpose 0.4KLD From Existing bore hole on

nearby mine

Dust suppression

and Afforestation

0.4KLD From Existing bore hole on

nearby mine

31.355

15. Depth of mining : The depth of the mining is 7 m below the ground level. 93,103

16.

Project cost (including EMP

cost) :

The total project cost including EMP cost (A+B+C) is

about Rs. 32,33,875/- (Rupees thirty two lakhs and

thirty three thouosands eight hundered five only).

283,331

17. EMP cost

: The total EMP cost is about Rs. 3,97,500/- (Rupees

three lakhs ninety seven thousand and five hundred).

283,331

Checklist for Mining of Limestone 1.02.0 Ha mine lease area

S.No Details of the proposal : Data furnished Page No

1. Name of the owner/Firm

: A.V.Elamurugu

(Proprietor, M/s. Mother Earth Minerals),

3,17,53,5

7,,85,93,3

27,

2.

Correspondence Address with Pin

Code :

No.20-A, Koneripatti Extension II,

Rasipuram – 637 408,

Rasipuram Taluk,

Namakkal District.

3. Email Address : [email protected] 17,

4. Mobile Number : 94432 47673 17,

5.

Type of quarrying

(Earth/ Rough stone/Sand/Granite/

Limestone)

:

It is a Limestone Mine Project in K.Pitchmpatti Village. 3,17,53,5

7,,85,93,3

27,

6.

S.F. No of the mine site

:

644/2 (P), 645/2 (P) 3,17,53,5

7,,85,93,3

27,

7.

Village in which situated, Town

Panchayat/ Panchayat Union in

which the village is situated

:

Village Panchayat: K.Pitchampatti

Panchayat Union :Karur

3,17,53,5

7,,85,93,3

27,

8.

Taluk in which situated

:

Karur Taluk 3,17,53,5

7,,85,93,3

27,

9.

District in which situated

:

Karur District 3,17,53,5

7,,85,93,3

27,

10.

Extent of mine (in Ha)

:

1.02.0Ha 3,17,53,5

7,,85,93,3

27,

11.

New or existing mine

:

It is an existing Limestone Mine Project of K.Pitchampatti

Village.

3,17,53,5

7,,85,93,3

27,

12.

If in case of existing Rough Stone/

Blue Metal/ Granite/ Limestone

mine, the length, width and depth to

which quarrying has already been

done (below the ground level/ above

the ground level)

:

Pit L (m) W(m) D(m) Max

I 43 20 2

II 50 25 8

119,121

13.

If mining had been done below the

ground level/above the Ground level,

the height of mining

: If the mining had been done maximum 18m 119

14.

Name of the owner who had earlier

undertaken the mining& a copy of

mining lease issued with date

:

It is an existing Limestone Mine Project of K.Pitchampatti

Village.

3,17,53,

15.

Proof of land ownership.

If owned patta copy.

If not own patta land agreement/

lease copy entered with the owner

(to be enclosed)

:

It is a patta land, owned by the Rajeswari, the applicant

obtained consent from the pattadhars.

85,333,

16. Period of mining

: Mining lease period is Twenty years (14.09.1998 to

13.09.2018).

83,223,28

9,329,

The scheme of mining plan is prepared for a period of five

years (98-99 to 2002-03).

17.

Production (quantity in Ts)

Description

ROM (Ts)

Limestone

@ 70%

(Ts) of

ROM

Mineral

Rejects

(30%) Ts of

ROM

Side

burden

(TS)

Top

soil

(Ts)

Total waste

(30%

Mineral +

SB)

Geological

Resources 284851 199396 73155 5023 95630 19314

Mineable

Reserves 71427 49999 21428

Year wise

Reserves 21216 14851 6365 3276 1888 9641

99,161,33

1

18.

Method of Mining

:

One bench is proposed on the topsoil with 1m height and

width with 45o slope.

In mineral, two benches are proposed with 3m height & 5m

width slope maintained as 60o from horizontal in North,

East, West and Southern Side of the lease area and one

bench is proposed with 3m height & 5m width..

155,331,3

51

19. Top soil/ Overburden in case of

Rough Stone/ Blue Metal : The average depth of top soil is about 1m depth. 1,276Ts of

top soil proposed for the remaining scheme periods.

125,141,3

31,359

20. Quantity of rejects in Ts in case of

LimestoneMining. : Mineral rejects are generated in the scheme periods would

be 3,791 Ts (Remaining 2016-17 to 2018-19).

83,223,28

9,329,

21.

Length, Width, Depth & Proposed

mine in meters.

:

Dimension of the year wise: Length (m) Width (m) Depth (m)

75 (max) 38 (max) 7

Ultimate pit dimensions

Dimen

sions

Present size of pit

Ultimate pit

dimensions at the end

of present scheme

period

Ultimate pit

dimensions

at the end

of life of the

mine Pit-1 Pit-2

Pit-1 Pit-2

Length

(m) 43 50 75 50 152

Width

(m) 20 25 35 25 35

Depth

(m) 2 18 7 18 18

119,121

22.

Land use pattern for a radius of 1Km

around the mine site such as

Agriculture, Habitation etc., :

Road– 06%

Habitation – 13%

Trees – 03%

Agricultural Land – 58%

Barren Land –20%

327

23.

Details of other mining for a radius

of 1Km, around the quarry site. :

The village Topo sketch map showing the quarry proposed

site.

There is no mine within the radius of 500m.

327

24. Aerial distance from periphery of the

site to the nearest habitation : The Nearest habitation K.Pitchmapatti is 1km on Southern

side.

47,327

25.

Aerial distance to the interstate

borders, in case of Rough Stone/

Blue Metal/ Granite/Limestone mine

to be obtained from IRS, Anna

University.

:

There is no interstate boundary within the radius of 15km. 47,333

26.

In case of Rough Stone/ Blue Metal/

Granite/Limestone mine no objection

certificate from the concerned

district Forest Officer/ Wild Life

Sanctuaries/ National Parks/ HACA/

Western Ghats region if the quarry

site is within 15 Kms of these areas.

:

There are no wild life sanctuaries, National parks, HACA,

Western Ghats region within the radius of 15km.

47,333

27.

Aerial distance to the nearest eco-

sensitive areas, CRZ, Forests,

Monuments etc., within 15Kms of

these areas.

:

There is no CRZ, Monuments, forest and sensitive areas

within the radius of 15km.

47,333

28. Latitude and Longitude of all corners

of the mine site. : N 10

048’10’’

E 780 05’ 03’’

17,343

29. Topo Sheet No : 58-J/01 255,295,

30.

Copy of explosives license and a

consent letter/ agreement of

competent recognized person who

has agreed to handle explosive for

the blasting, in case of Rough Stone/

Blue Metal/ Granite/ Limestone

mine.

:

A copy of consent letter and license copy enclosed.

371-377

31.

Brief details of APC measures

proposed to be proposed to be

implemented.

:

The generation of the dust will be suppressed by means of

water sprinkler immediately by mechanical means. The

generation of dust during the course of drilling will be

suppressed at source by means of wet drilling or dust

extractors. The periodical environmental monitoring test is

been proposed to carry out by accredited laboratories. The

change in air quality will be minimal well within the

prescribed limits.

155

32.

Mine Closure Plan to be furnished in

Scheme of Mining.

:

During the end of the life of the mine, when the mine

reaches its ultimate pit limit, the pit will be partially

backfilled and partially act as a good storage for water. The

spring water and seepage water will prove to be a viable

source for water supply to agriculture lands nearby.

Along the permanent roads and vacant places,

afforestation is being carried out present. Before closure of

the mine, a parapet wall will be constructed to prevent

inadvertent entry of cattle and human beings.

The dumps will be vegetated to prevent slitting and

157

always maintained at 45-degree slope.

33. Mining plan prepared by (Xerox

copy of certificate to be attached) :

Dr.P.Thangaraju, M.Sc.,Ph.D.,

RQP/MAS/206/2007/A.

87,

34. Precise area communication

approved by the District Collector : G.O. (3D). No. 215 Industries (MMA2) Department, dated

16.12.1997.

227,

35.

Mining plan approved by the

Deputy/ Assistant Director of the

District. :

The Mining plan was approved by the Regional Controller

of Mines, Indian Bureau of Mines, Chennai vide Letter.

No: TN/TNL/MP/LST/895-MDS, dated 11.01.96.

55,

36.

Water requirement :

a) Drinking & domestic

purposes in KLD.

b) Dust suppression (in KLD)

c) Green belt (in KLD)

:

Drinking Water - 0.2 KLD

& Domestic purpose

Dust Suppression - 0.4 KLD

Green belt -0.4 KLD

Total -1.0 KLD

33,309,32

7,

37.

Source of water

:

Purpose Sources

Drinking &

Domestic

Purpose

Packaged drinking water is available from

the nearby approved water vendors

Dust suppression From Existing Borehole on nearby mine

Green belt

development

From Existing Borehole on nearby mine

33,309,32

7,

38. Ground water table : The Ground water is about 38mt depth from ground level. 99,

39.

Project Cost including EMP Cost)

:

A. Fixed asset cost = Rs. 4,04,000/-

B. Project cost = Rs. 24,32,375/-

C. EMP cost = Rs. 3,97,500/-

Total cost = Rs. 32,33,800/-

283,331

40. EMP Cost : The total EMP cost is about Rs. 3,97,500/- 283,331

41. Disclosure RQP

:

Dr.P.Thangaraju, M.Sc.,Ph.D.,

RQP/MAS/206/2007/A.

87,

42.

Soft copy of the Form–1,

Pre –feasibility report and Mining

plan in CD.

:

There is enclosed Soft copy for form–1, Pre– feasibility

report and mining plan in CD.

251

43.

Key map showing the approach

roads to the site to be attested by the

Deputy/ Assistant Director of

Geology and Mining of the

concerned District.

:

The Route map showing with approach roads to the site is

enclosed Plate No: IA

257

44.

Village map with S.F. Nos& salient

features such as vegetation,

habitations etc., for a radius of 500m

around the mine site.

:

Village map with S.F.No and Salient features such as

vegetation, habitation etc., for 500mt radius is enclosed as

Plate no. VIII

273

45.

If lakes, Ponds, river, nallah, odai

etc. are situated near the mine site

permission from the concerned PWD

authorities for mining

There is no Rivers/Stream, Lakes, and Reservoir within the

500m distance to the lease applied area.

Amaravathi river is passing 17km away from the Northern

side of the area.

283,319,

46.

Section map for mining to be

attested by the Deputy/ Assistant

Director of Geology and Mining of

the concerned District.

:

The Geological Plan and section in 1:1000 & 1:500 scale is

enclosed: IV.

265

47.

Photograph of the proposed Mining

site with S.F.No and attested by at

least VAO.

:

The Photo of the mining site is enclosed. 317

48. Form –I To be signed by applicant : I am hereby signed 53

49. Pre- Feasibility Report to be signed

by applicant. :

Pre-feasibility report has been signed by the applicant

335

50.

First and last page and the page at

which quantity of mining has been

worked out to be signed by the

Deputy/Assistant Director of

Geology and Mining of the

concerned District.

:

First page and last page and the quantity proposed in the

plan have been signed by the Commissioner of Geology

and Mining.

79,177

51.

Affidavit from the applicant that

child labor is not being employed in

the mining activity. :

It is been ensured that the labor will not be employed less

than 18 years, No child labor will engaged or entertained

for any kind of mining operations. All the labor engaged

for mining operations will be insured during the mine lease

period.

363,365

52.

Affidavit from the applicant

regarding planting of trees around

the quarry site in fulfillment of the

Green belt commitment furnished.

:

Affidavit from the applicant regarding the proposal for

planting trees around the mining and fulfillment of

greenbelt commitment is enclosed

363,365

53.

Details (POD) Regarding

communicating the proposal to the

members of the committee.

:

1. Signature of the applicant

A.V.Elamurugu

(Proprietor, M/s. Mother Earth Minerals)

2. Signature of the Recognized qualified person

Dr. P. Thangaraju M.Sc., Ph.D.,

RQP /MAS/206/2007/A

K.PITCHAMPATTI LIMESTONE MINE LEASEAREA (1.02.0Ha)

The proponent A.V.Elamurugu, has applied for Environmental clearance for the existing Limestone

Mine over an extent of 1.02.0Ha in S.F.Nos: 644/2 (P), 645/2 (P) of K.Pitchampatti Village in Karur

Taluk, Karur District.

Salient features of the proposal are as follows:

S.

No

Details of the proposal :

Data furnished Page No

1. Name of the Owner +

Firm

: A.V.Elamurugu

(Proprietor, M/s. Mother Earth Minerals),

No.20-A, Koneripatti Extension II, Rasipuram – 637 408,

Rasipuram Taluk, Namakkal District .

3,17,53,

57,,85,9

3,327,

2. Location of the mine-

S.F.No.

: S.F.Nos:644/2 (P), 645/2 (P) of K.Pitchampatti Village in

Karur Taluk,Karur District.

3,17,53,

57,,85,9

3,327,

3. Purpose of Application : It is a Limestone Mine Project in K.Pitchampatti Village. 3,17,53,

57,,85,9

3,327,

4. Extent of mine in Ha. : 1.02.0Ha 3,17,53,

57,,85,9

3,327,

5. Land use planning

a) Mining

b) Storage of Topsoil

over burden

c) Infrastructure Road d) Utilized Area

Total

S.

No Description

Presen

t Area

(Ha)

Additional area required

during the present MS

Period(Ha)

(2014-15 to 2018-19)

Area at the

end of

present

scheme

period

(Ha)

1 Mining (Quarry ) 0.21.1 0.17.6 0.53.2

2. Waste dump 0.14.0 0.13.7 backfilling

3. Office &

infrastructure 0.01.0 - 0.01.0

4. Processing plant - - -

5. Mineral stack

processing yard 0.00.3 - -

6. Low grade mineral

stacks - - -

7. Mine roads 0.03.0 - 0.03.0

8. Areas under

plantation 0.05.0 0.06.0 0.11.0

9. Un utilized area 0.57.6 - 0.33.8

10. Total 1.02.0 0.37.3 1.02.0

21,155,

253,369

6. Production (quantity in Ts)

Scheme of Mining period the

Mineral reserves (ROM) = 71,427 Tonnes

Recoverable Mineable reserves (70%) = 49,999 Tonnes

Low grade Limestone (30%) = 21,428 Tonns

99,161,3

31

7. Top soil & overburden (quantity in m3)

: The average thickness of the top soil is about 1m. 1,276Ts

of top soil available in present scheme period.

125,141,331,359

8. Method of Mining : Mining operation is proposed to be carried out by opencast

semi mechanized method and proposed benches are 3m

height and 5m width with 60º slope.

155,331,

351

9. Life of Mine as per

approved mining plan

: Mining lease period is twenty years (14.09.1998 to

13.09.2018).

83,223,2

89,329,

10. Height / width of the bench

: In Topsoil - 1m Height. In Mineral

Height 3.0m & Width 5.0m

155,331,351

11. Source of water / quantity

required

:

Quantity

required

(in litres)

Source

31.355

a. Drinking&Domestic

Purpose

0.3 KLD Packaged drinking water is available from the approved

water vender

b. Dust Suppression 0.3KLD From Existing bore hole on nearby mine

C. Afforestation 0.4 KLD From Existing bore hole on nearby mine

12. Waste water

Sewage water

Mode of disposal

:

:

There is no waste water. 37,

The septic tank is constructed on permanent structure with

in the mine lease area.

To local Panchyat Authority

13. APC Measures : 1.Mist Spray using water tankers,

2. Enclosed covered system. (Tarpaulin) for transportation.

37,

14. Ariel distance of nearest

habitation

:

S.

No Name of the Village

Approximate Distance &

Direction from lease area

Approximate

population

1. P.Kullampatti 1.0km-NE 400

2. K.Pitchampatti 1.0km – SE 1000

3. MustakinathuPatti 4.0Km-NW 1000

4. Vasanthakathirapalayam 4.0km- SE 1200

47,367,

15. Ariel distance from

Reserve forest, Sensitive

areas, Forest, Bird

sanctuaries, Wild life

sanctuaries, National

parks, Monuments etc.,

within 15km

: Bird Sanctuaries – Nil

Wild life sanctuaries - Nil

National Park – Nil

Monuments – Nil

Reserve forest –Nil

47,333

16. Land owner ship document

Own patta land

Lease Govt. Poromboke

:

:

:

It is Patta land registered in the name of proponent, hence the proponent has surface right over the area.

85,333,

17. Land use classification : It is an existing Limestone Mine Project of K.Pitchampatti Village.

3,17,53,57,,85,9

3,327,

18. Mining plan prepared by

:

Dr.P.Thangaraju, M.Sc.,Ph.D.,

RQP/MAS/206/2007/A

87,

19. Approved by : The Mining plan was approved by the Regional Controller

of Mines, Indian Bureau of Mines, Chennai vide Letter. No:

TN/TNL/MP/LST/895-MDS, dated 11.01.96

83,223,2

89,329,

20 Precise area statement

Approved by

: The Mining lease was granted vide G.O. (3D). No. 215

Industries (MMA2) Department, dated 16.12.1997. 83,223,2

89,329,

21. Nearby quarries : There is no mine within 500m radius lease area. 365

22. Nearby lake / river/ odai /

channel etc.

: There is no Rivers/Stream, Lakes, and Reservoir within the

500m distance to the lease applied area.

Amaravathi river is passing 17km away from the north-western side of the area.

47,333

23. Latitude / Longitude : N 10048’10’’

E 780 05’ 03’’

17,343

24. GI Sheet No. : 58 – J/01 17,343

25. Project Cost(Project cost +EMP cost)

: A. Fixed asset cost = Rs. 4,04,000/-

B. Project cost = Rs. 24,32,375/-

C. EMP cost = Rs. 3,97,500/-

Total cost = Rs. 32,33,800/-

333,371

26. EMP Cost (Capital and

recurring)

: The total EMP cost is about Rs. 3,97,500/- 333,371

27. Water table : The Ground water is about 38mt depth from ground level. 97,

28. Interstate boundary : There is no interstate boundary within the radius of 15km. 47,333

29. Western Ghats : There is no Western Ghats within the radius of 15km. 47,333

From:

A.V.Elamurugu

(Proprietor, M/s. Mother Earth Minerals),

No.20-A, Koneripatti Extension II,

Rasipuram – 637 408,

Rasipuram Taluk,

Namakkal District.

To:

THE CHAIRMAN,

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY,

PANAGAL BUILDING, SAIDAPET,

CHENNAI

Sir,

Sub: Submission of Form–1, Pre-feasibility report and Scheme of Mining (Ref. Scheme of

Mining Letter. No: TN/KRR//LST/MS-1124.MDS, dated 05.11.2014.) for obtaining

Environmental Clearance for our K.Pitchampatti Limestone mine Lease area- Reg.,

****************

I am here by submitting the processing fee in the form of demand draft for rupees ten thousand,

along with Form-1, Pre-feasibility report and scheme of mining plan to your good office for obtaining

clearance from SEIAA, Chennai, for our K.Pitchampatti Limestone mine Lease area for over an extent of

1.02.0Hain S.F.Nos. 644/2 (P), 645/2 (P) of K.Pitchampatti Village, Karur Taluk and Karur District,

Tamilnadu.

I have submitted all the relevant documents to your good office to the best of our knowledge. If

any clarifications are required, we are ready to submit the same to your office at your convenient time.

Also we are ready to present the project in front of the committee.

Hence we request your good office to kindly process our application and allow us to present our

project at the earliest.

Thanking you.

Yours sincerely

A.V.Elamurugu,

For

M/s. Mother Earth Minerals.

Place: Namakkal

Dated: