    table of contents

    1 Introducon

    2 References

    3 Relevant Experience

  • 8/4/2019 Extended Package

    3/18

    1 Introducon

  • 8/4/2019 Extended Package

    4/18

    INC

    457 Minna Street, Suite 100

    San Francisco, CA 94103

    T: 415.367.9399 www.buildgc.com

    Build Group is a bouque general contractor focused on providing a higher than usual level of service to an

    exclusive clientele. Highly selecve about deploying their top er sta, the owners have deep understanding

    of their clients business and are commied to providing Principal involvement on all projects. To themclient relaonships are everything and are driven by trust and integrity. Consequently, Build Group clients

    depend on the company to act as an extension of their own organizaons. While most general contractors

    are simply pricing plans, Build Group sta source new real estate opportunies and gure out creave ways

    to make deals pencil.

    In 2007, Ross Edwards Jr. and Eric Horn founded the company aer spending nearly 25 years growing

    regional construcon powerhouse Webcor. Colleagues since just aer college, the two had become majority

    shareholders and senior execuves. Although they were extremely proud of their many accomplishments,

    they realized that the company had grown into a large corporate organizaon and that they had become

    fairly far removed from the trenches. They felt inspired to do something more entrepreneurial, which would

    allow them to work more closely with their clients.

    Build Group has grown consistently since its incepon. Employee owned, the company now has a total of

    230 sta and revenue for 2011 is projected at $100 million.

  • 8/4/2019 Extended Package

    5/18

    2 References

  • 8/4/2019 Extended Package

    6/18

    INC

    457 Minna Street, Suite 100

    San Francisco, CA 94103

    T: 415.367.9399 www.buildgc.com

    Relevant Project ReferencesJack vanHartesvelt

    T: 206-623-4739

    C: 206-369-1193

    Sanjib Sah, Vine Street Ventures Inc.

    T: 415-845-5785

    [email protected]

    Mike Desimone Sr.,ChannelProperesT: 510-234-0233

    C: 707-486-6657

    Mike McCone, Intracorp

    T: 415-369-2800 ext 102

    C: 415-302-4135

    [email protected]

    John McInerneyT: 415-2229-1201

    C: 415-350-1750

    [email protected]

    Dean Givas, Osyster Development

    C: 415-298-3326

    [email protected]

    Sal Masoto,WesieldCentre

    [email protected]

    John Buss

    [email protected]

    C: 415-847-6388

  • 8/4/2019 Extended Package

    7/18

  • 8/4/2019 Extended Package

    8/18

    To Whom It May Concern

    It is my sincere pleasure to write this letter of recommendation on behalf of the Fine Line

    Group (FLG). FLG was our builder for the premier West Coast location of Bliss Spa at the

    newly constructed W Hotel in San Francisco.

    Some of the highlights of this project included:

    - 5,000 square foot tension-fighting facilities featuring a retail boutique, three-movie

    -while-you wait manicure stations, eight treatment rooms, with mens and womens lounges

    that adjoin outdoor escapes, a wet massage room, and heated and steam showers;

    - The project was constructed within a tight schedule of eighteen weeks, and required

    coordination and installation of carefully detailed, elegant European style furnishings,

    custom cherry and walnut millwork and imported glass and limestone tiles from Asia

    and Italy;

    - The hotel remained completely operational throughout the construction of the spa,

    particularly difficult with meeting rooms below and guest rooms above.

    FLG worked diligently, proficiently and were highly responsive to the tasks at hand. They did

    a wonderful job and we are quite pleased with the final results. In my opinion, it is one of ourbest facilities in the family of spas for the W Hotels.

    In particular, we appreciated the quality of the staff assigned and were greeted with their

    exceptional service, quick responsiveness, and can-do attitude. Even post-construction,

    they continued to service our spa, and that speaks volumes about their client care.

    FLG is an extremely capable, agile, responsive and highly professional firm that are passionate

    about the resulting quality of their work as well as continuing their tradition of striving for

    excellence with an uncompromising attention to detail.

    Sincerely,

    Namrata Gupta

    Director of Development+Design

    Bliss and Remede Spas Worldwide

    Blissworld llc.

  • 8/4/2019 Extended Package

    9/18

  • 8/4/2019 Extended Package

    10/18

    3 Relevant Experience

  • 8/4/2019 Extended Package

    11/18

    ARTERRA SAN FRANCISCO, CA

    Build Group was brought in as the Construcon Manager

    for Arterra. The 269 unit project consisted of three

    interconnected buildings: a 16 level tower, a 9 level building

    and a 6 level building. The project was an urban inll site in

    Mission Bay and was built on top of 160 steel H piles. The

    project was San Franciscos rst LEED Silver rated high rise

    residenal building. Build was instrumental in increasing the

    communicaon between the Owner, the Contractor and the

    Design team to facilitate clearer project informaon ow

    and faster decision making.

    DESCRIPTION

    269 Units

    Luxury Condominium Building

    ARCHITECT

    Kwan Hemni

    CLIENT

    Intracorp

    COMPLETION DATE

    2008

    INC

  • 8/4/2019 Extended Package

    12/18

    TIMBER HILL RESORT CAZADERO, CA

    This 130 acre resort was a full ground up construction project includ-ing roads, utilities and the relocation of existing buildings. The mainlodge included two massive stone replaces, heavy timber beam

    ceilings, a climate controlled wine room, and a 900 square footkitchen. Other amenities included complete spa facilities, gym anda pub.

    Of the 20 proposed guest cabins the Fine Line Group constructeda fully functional prototype. With a spectacular view of the foot-hills beyond, this cabin features custom nished hardwood oors,

    vaulted ceilings throughout and an elegant claw foot tub.

    This prototype also included a concrete and stone shower and twoDanish wood burning stoves.

    ARCHITECTJonathan L. Foote Associates

    PROJECT DURATION2 years

    PROJECT SCOPE130 acres

    INC

  • 8/4/2019 Extended Package

    13/18

    VILLA FLORENCE HOTEL SAN FRANCISCO, CA

    In order to maintain maximum occupancy during construction, this

    seismic and renovation project was divided into three phases.

    Phase 1 completed all foundation work and brace frames up toand through the 1st oor. Phase 2 started June 13th completed

    the remodeling of the rooms, public areas and restaurant. Thisnal phase, an area of approximately 110,000 square feet, wascompleted in only 2 months.

    This project was completed on time, enabling the Villa Florence toaccommodate guests for their critical March 15th opening.

    ARCHITECTWill Wong

    PROJECT DURATION4 months (fast track)

    PROJECT SCOPE125,000 sf

    INC

  • 8/4/2019 Extended Package

    14/18

    HYATT REGENCY EMBARCADERO

    SAN FRANCISCO, CA

    This project involved the total remodel of the top two oors of ClubRooms and public areas. It also included the total remodel of all thesuites on all oors.

    All construction was pre-scheduled and performed in phases in orderto maximize hotel occupancy and minimize disruption to the guests.

    ARCHITECT

    N/A

    PROJECT DURATION

    5 months (fast track)

    PROJECT SCOPE

    Public areas, club rooms & suites

    INC

  • 8/4/2019 Extended Package

    15/18

    BLISS SPA @ THE HOTEL W SAN FRANCISCO, CA

    Voted Conde Nast Travelers Best Hot New Spa, the rst west coastBliss Spa is located in the super-chic W Hotel in San Francisco.

    The interior of this high-end spa showcases custom lounge areas,treatment rooms, showers and lobby area are simply elegant with

    European style furnishings, custom mahogany and walnut millwork,imported glass and limestone tiles from Asia and Italy.

    The hotel remained operational throughout the construction.

    ARCHITECT

    Hornberger + Worstell

    PROJECT DURATION

    16 Weeks

    PROJECT SCOPE

    5,500 sf

    INC

  • 8/4/2019 Extended Package

    16/18

    POSTRIO RESTAURANT @ THE PRESCOTT HOTEL

    SAN FRANCISCO, CA

    This elegant remodel included a bentwood curved ceiling, customlighting, and birds eye maple columns, and was accented with

    Gilhooly glass wall sculptures.

    The bar and pizza oven were redone in classic style with exposedbrick and custom copper ribbons.

    Postrio was able to remain fully operational during construction.

    ARCHITECTEngstrom Design Group

    PROJECT DURATION3 months (fast track)

    PROJECT SCOPE2,500 sf

    INC

  • 8/4/2019 Extended Package

    17/18

    KOKKARI RESTAURANT @ JACKSON SQUARE

    SAN FRANCISCO, CA

    Designed by the award-winning architect Howard Backen of Backen& Gillam Architects, the decor captures the feel of the European

    old-world.

    The commitment to excellence embodied in this restaurant placesit instantly at the forefront of Hellenic Mediterranean venues

    nationally.

    Major features of this signature restaurant include specially dis-

    tressed hardwood foors, exposed ceiling beams, lintels, shutters,and operable windows, which provide the feel of a Mediterraneanopen air caf.

    ARCHITECTBacken & Gillam

    PROJECT DURATION7 months

    PROJECT SCOPE8,000 sf

    INC

  • 8/4/2019 Extended Package

    18/18

    MCCORMICK & KULETOS RESTAURANT@ GHIRARDELLI SQUARE, SAN FRANCISCO, CA

    This spectacular bay view restaurant was built using a full

    compliment of specialty nishes, including the use of natural dark wood, all custom built lighting, rich colors and original glass work to create to embody a more traditional ambience.

    The now signature restaurant also included a new public stairway to Ghirardelli Square, landscaping the adjacent park, and relighting

    the Municipal Pier.

    ARCHITECTKuletos Consulting and Design

    PROJECT DURATION

    8 months

    PROJECT SCOPE18,000 sf

    INC