  • Contents

    1

    Importance of Port in Korea

    Overseas Port Development of Korea

    Cooperation with ADB

    Port Development in Korea

  • Contents

    2

    Importance of Port in Korea

  • 1. Importance of Port in Korea

    3

    64 72 78 86 95 98 114

    143 192

    236 270

    316 338 372

    436

    531 573

    532

    358

    462

    534 505

    576

    644

    722

    845

    951

    1,049

    931

    834

    1,015

    1,115 1,129

    0

    200

    400

    600

    800

    1,000

    1,200

    (Unit: billion dollar)

    GDP

    CAGR: 14

    .6%

    CAGR: 4.9%

    Korea had enjoyed the world's fastest growing economies from the early 1980s to the late 2000s

    Korea had been ranked world top 15th in terms of the size of nominal GDP in 2012

  • The trade dependence of Koreas economy is constantly rising from 45.6% to 94.5%(CAGR 4.1%p between 1994 and 2012)

    Also, 99.7% of the international traffic volume was handled thru the port in 2012

    4

    1. Importance of Port in Korea

    45.6 49.0 48.9

    52.8

    63.0 57.1

    62.4 57.8

    54.6 57.9

    66.2 64.6 66.8 69.4

    92.1

    82.3 87.9

    96.9 94.5

    0.0

    20.0

    40.0

    60.0

    80.0

    100.0

    120.0

    0.0

    10.0

    20.0

    30.0

    40.0

    50.0

    60.0

    70.0

    80.0

    90.0

    100.0

    1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

    (Unit: %)

    Shipping Aviation dependence upon foreign trade

  • In order to keep the economy growth through trade, port is the key logistics node in Korea

    Total port throughputs and GDP are highly correlated as 0.98 Total volume increased 8.2% annually from 99 million tons in 1981 to 947 million tons

    in 2012

    5

    1. Importance of Port in Korea

    98,952

    241,496

    517,210

    946,775

    0

    200

    400

    600

    800

    1,000

    1,200

    0

    100,000

    200,000

    300,000

    400,000

    500,000

    600,000

    700,000

    800,000

    900,000

    1,000,000

    (Unit: thousand ton, billlion dollar)

    Total volume(except liquid bulk) Cargo Handling capacity GDP

    Pyeongtaek Port (West)

    Busan New Port (Phase1-1) Kwangyang Port (Jungma)

    Busan New Port (Phase 2-3)

  • 6

    1. Importance of Port in Korea Through sustainable port development, Korea has gained added value and vari

    ous efficiency gains Container throughput increased 10.4% annually from 2.5 million TEUs in 1990 to 22.6

    million TEUs in 2012 Container handling capacity increased 13.3% annually from 1.46 million TEUs in 1990

    to 22.9 million TEUs in 2012

    2,544

    4,918

    9,116

    15,216

    19,369

    22,550

    1,460 2,420

    7,118

    10,473

    21,268 22,960

    0

    2000

    4000

    6000

    8000

    10000

    12000

    0

    5,000

    10,000

    15,000

    20,000

    25,000

    1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

    (Unit: Thousand TEU)

    container throughput Container Handling capacity GDP

  • 7

    1. Importance of Port in Korea The share of container transshipment volume out of the total container throughp

    uts reached 37.7% in 2012 compared to 5.9% in 1990 Transshipment is the high value added logistics activity that values more than 1 billion

    dollars(US$) per annum

    2,393

    14,052

    151

    8,498

    -

    5,000

    10,000

    15,000

    20,000

    25,000

    1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

    (Unit: Thousand TEU)

    import/export transshipment

    CAGR: 20.1

    %(transshipm

    ent)

  • 8

    1. Importance of Port in Korea

    Port is the key infrastructure to increase the efficiencies of international trading and Nations economic growth

    67Dollars as GDP per capita Beneficiary Country of Economic Assist

    ance

    22,708 Dollars as GDP per capita Become a member of OECD DAC(2009)

    Hold the G20 Summit(2010) Reached over 1 trillion dollars as trade val

    ue for the last 3 years

    Port Development

  • Contents

    9

    Port Development in Korea

  • 10

    2. Port Development in Korea Port Master Plan of Korea It is a National Master Plan for Port Development Planned every ten years and modified each 5 years

    Currently, 3rd Port Master Plan is applying until 2020

    STAGE1: Designing Ma

    ster Plan

    STAGE2: Establishing M

    aster Plan

    STAGE3: Confirming M

    aster Plan

    Emerging needs for Port Development and Planning Increased demands for ports Changes in shipping patterns (Increase of container usage) Requests port development from Local residents and related agencies Needs on Port development and basic plan writing

    Master Plan and Feasibility study Cargo Throughput Estimation, Site Selection, Technical Feasibility Study, Economic Feasibilit

    y Study, etc.

    Establish Port Master Plan(Minister approval) and consult with related agencies Review and apply comments and discussions, confirm master plan Consideration and decision of National Port Policy Council Port Master Plan confirmation notice

    [Planning Process of Port Master Plan]

  • 11

    2. Port Development in Korea The Port Master Plan is being set up and promoted after considering the port logist

    ics environment and the environment in the future as well International logistics center, global port Approachable Water-Friendly Port Balanced development of regional port Conversion from passive demand-met type to active demand-creative type Sustainable port development and management

    Waterfront related to city function

    Green Port low carbon green port

    See Sightseeing Infra

    Multi Functional Port (Quality Growth Strategy)

    Import/Export Cargo Simple Transshipme

    nt Cargo High Value added Tr

    ansshipment

    Cargo Handling Port (Quantity Growth Strategy)

    Port Hinterland Complex

    Hinterland Industrial Complex

    Logistics Port (Quality Growth Strategy)

    Efficient usage of port spa

    ce

    Create volume, high competitiv

    -eness

    [Paradigm Change of Port Policy]

  • 2. Port Development in Korea

    12

    Promote the investments by private sector in Port development Since the IMF crisis in 1998, switched to private investment projects Regulated by Private Investment Law All kinds of Private investment can be applied

    BTO, BTL, BOT, BOO, etc. From 2003 and 2011, the cumulated investment on port development by private sector acc

    ounted 78.1 billion dollars

    Government

    Construction Company (Design + Construction)

    Financial Sector

    Operator (Maintenance/Operation)

    Investment

    Investment

    Construction Investment/Loan

    Dividend/ Principle &Interest

    Give an authority to operate

    Transfer the Ownership of Facility

    Give an authority to manage & operate

  • 13

    2. Port Development in Korea

    Target Business Appointed by Government

    Notification of Basic Plan of the Target Development by Government

    Submission of Business Plan by Private Sector

    Review, Evaluation and Selection of Preferred Bidders by Evaluation Body and Government

    Negotiation between Government and Preferred Bidder

    Conclude the Practical Agreement and Appoint the Business Contractor

    Application for the Approval of the Practical Business Plan

    Approval of the Practical Business Plan

    Confirmation of Construction Completion

    [Government Notified Project Case] Procedures for Private Investment

  • 2. Port Development in Korea

    14

    [Private Proposed Project Case]Submission of Proposal(Private Government)

    Request the Review of Proposal(Government Public Private Infrastructure Investment Management Center)

    Report the Review Opinion(Government Public Private Infrastructure Investment Management Center)

    Public Notification for 3rd partys Proposal

    Appoint the Proposer as the Preferred Bidder Review and Evaluate the Proposals

    Appoint the Preferred Bidder

    Negotiate & Appoint the Business Contractor

    Procedures for Private Investment

    No Yes

    Approve the Practical Business Plan

    Confirmation of Construction Completion

  • 2. Port Development in Korea

    15

    Incheon port -Steel pier(3) -Multipurpose-berth(phase 2-1)

    Pyeongtaek port -inner ease pier -Grain pier - International Ferry Terminal

    Gunsan port -Gerneral cargo pier

    Mokpo port -Multipurpose-berth(phase 1-1,1-2)

    Gwangyang port -Container terminal (phase 3-3)

    Masan port -Multipurpose-berth(phase 1-1)

    Busan new port -Container terminal (phase 1, 2-3,2-4) - Hinterland Road

    Ulsan new port -Container terminal (phase 1-1)

    Pohang youngilman new port -Container terminal (phase 1-1)

    [Busan New Port][Major Private Investments on Port]

  • Contents

    16

    Overseas Port Development of Korea

  • 17

    3. International Cooperation Project on Overseas Port Development

    Based on the experience of port development and economic growth, the international cooperation projects on overseas port development has been implementing since 2008 Aim to share the experience and knowledge with developing countries and improve t

    he national image

    Ministry of Oceans and Fisheries

    Aid the feasibility studies of port development master plan

    EDCF loan support of non-profit facility project

    Provide a training program to the public officers related to port and logistics departments

  • 18

    Since 2008, 13 international cooperation projects were carried out Currently, 4 projects are on going over the world

    3. International Cooperation Project on Overseas Port Development

  • 19

    Project Procedures

    3. International Cooperation Project on Overseas Port Development

    Discuss recruiting investors, loan support, KOICA support after determining the Project Promotion Methods based on the result of feasibility study

    Give Initiation Report of the Task Performance Plan, gather opinions through business meetings, final report to local government

    Open a public competitive bidding to Korean engineering companies for making Feasibility study and Port Master Plan for the target port

    Verify cooperative intentions through Exchange of Formal diplomatic letters, High-level interviews and set the range of cooperation

    Prepare grounds to support Port Development cooperation between bilateral maritime departments by concluding a MOU

    Prior Consultation

    Conclude MOU

    Order & Perform Tasks

    Business Conference

    Commercialization

  • 20

    To increase efficiency and effectiveness of the project, the Korean governmen

    t is planning to

    Establish an institute named as International Cooperation Project Manag

    ement Center

    Develop an Evaluation Tool for two steps(pre & post)

    Diversify the method to find a project

    Especially, through with ASEAN, UNDP, MDB(ADB, AFDB, IBRD

    ), etc.

    Expand the types of project from port development to port operation,

    disaster prevention facilities, ocean plants, planning & designing, et

    c.

    Open a regular training program

    3. International Cooperation Project on Overseas Port Development

  • 21

    Korea-Philippines Cooperation Project Case

    Project Overview

    Project Results

    1

    3

    Project Finding 2

    Project period : 2011. 10 ~ 2012. 12 Project Objectives : Port Development Plan & Feasibility of the modernizatio

    n of two ports(Iloilo and Cagayan de Oro)

    Request intergovernmental cooperation through the Korea-ASEAN meeting

    Cagayan de Oro (2030 basis) Traffic: containers (6.7 million TEU), General (762 tons), passengers (21

    2 million) Development Scale: 5 berth & facility improvements Total Project Cost: Approximately 133 million(US$)

    Iloilo (2030 basis) Traffic: containers (8.8 million TEU), General (736 tons), passengers (149 mil

    lion) Development Scale: 3 berths & facility improvements Total Project Cost: 48million dollar(US$)

    3. International Cooperation Project on Overseas Port Development

  • 22

    Korea-Philippines Cooperation Project Case [Location of Target Ports] [Proposed Ground Plan & Birds-Eye View for Cagayan de Oro Port]

    3. International Cooperation Project on Overseas Port Development

    Iloilo

    Cagayan de Oro

    [Proposed Ground Plan & Birds-Eye View for Iloilo Port]

  • 23

    Korea- Cambodia Cooperation Project Case

    Project Overview

    Project Results

    1

    3

    Project opportunities 2

    Project period : 2012. 4 ~ 2013. 4 Project Objectives : Development planning for 3 ports that dedicates to grain

    in order to revitalize the grain export of Cambodia

    Follow-up project of Korea - ASEAN cooperation projects

    3 Port (2030 basis) Traffic: containers ( 1.4 million TEU), General (4.5 million tons) Development Scale: 1 multi-purpose berths ( Phnom Penh New P

    ort Phase 3), grain terminals(Tonle Bet and Kilometer #6) Total Project Cost: Approximately 19 million dollar(US$) per po

    rt Economic feasibility : NPV (-60 ~ +126 billion), EIRR (at least

    6.25% , up 14.13%) Currently, looking for link plan with EDCF or ODA

    3. International Cooperation Project on Overseas Port Development

  • 24

    Korea- Cambodia Cooperation Project Case [Current Situation of Target Ports]

    [Proposed Ground Plan for Phnom Penh New Port Phase 3]

    3. International Cooperation Project on Overseas Port Development

    [Location of Target Ports]

    [Proposed Ground Plan for Km #6] [Proposed Ground Plan for Tonle Bet]

  • Contents

    25

    Cooperation with ADB

  • 26

    To increase efficiency and effectiveness of the project,

    Hold a Regular Meeting to share the experience and knowledge about por

    t and logistics development

    Request for advisory comment on the project

    Perform joint implementation

    Request participation for the step Country Partnership Strategy / Region

    al Cooperation Strategy

    4. Cooperation with ADB