expeditionary fighting vehicle (efv)
DESCRIPTION
EXPEDITIONARY FIGHTING VEHICLE (EFV). Program Brief for National Marine Corps Council 18 Apr 09. EFV MISSION. Provide High Speed Transport of Embarked Marine Infantry From Ships Located Beyond the Horizon to Inland Objectives. - PowerPoint PPT PresentationTRANSCRIPT
1For Official Use Only
EXPEDITIONARY FIGHTING VEHICLE (EFV)
Program Brief for National Marine Corps Council 18 Apr 09
2For Official Use Only
Provide High Speed Transport of Embarked
Marine Infantry From Ships Located Beyond the Horizon
to Inland Objectives
Provide Armor Protected Land Mobility and Direct
Fire Support During Combat Operations
EFV MISSION
3For Official Use Only
Move Move (Water)(Water)
ShooShoott
CarryCarry ProtectProtectCommunicaCommunicatete
Move Move (Land)(Land)
EFVMISSION ESSENTIAL FUNCTIONS
4For Official Use Only
EFV KEY PERFORMANCE PARAMETERS
Reliability - Mean Time Between Operational Mission Failure
CRITERIA
High Water Speed - 2’significant wave height, for not less than 1 continuous hour
Land Speed - Forward speed on hard surface road
Firepower - Maximum effective rangeInteroperability/standard ammunition with other service(s)
Armor Protection - Any azimuth
20 knots
69 kph
1500m
14.5mm/300m
25 knots
72 kph
2000m
30mm/1000m
43.5 hrs 56 hrs
THRESHOLD OBJECTIVE
Carrying Capacity 17 Marines 18 Marines
Net Ready * Compliance based on IA, GIG-KIPs, & SDE testing
100% of designated enterprise-level or critical
interfaces & services
100% of all enterprise-level &
critical interfaces & servicesPlan to Demonstrate
Currently Demonstrated
5For Official Use Only
EFV PROGRAM STATUS
O N D J F M A M J J A S
FY2013O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S
FY2011 FY2012FY2007 FY2008 FY2009 FY2010
MS CDAB(Long Lead)
DAB(CDR)
DAB(PDR)
SFR PDR CDR SVR
SDD-2 Contract
DT & RGT
OA
SDD/DFR Contract
KP-2 KP-3 KP-4 KP-5
TRNG500hr
KP-1
Qual Testing
500hr
New Design Demo on SDD-1
LRIP Lot 1 (17) DeliveryLRIP Lot 2 (24)
Vehicle Build
53224170000Quantity
11,10859848470000PMC
12988174189212256244RDT&E
To CompleteFY13FY12FY11FY10FY09FY08(Millions)
53224170000Quantity
11,10859848470000PMC
12988174189212256244RDT&E
To CompleteFY13FY12FY11FY10FY09FY08(Millions)
SDD-1 / DFR
6For Official Use Only
DT/OT EVENTS
FY11FY10FY09FY08 FY11FY10FY09FY08
OA 2OA 2Trng OA 2OA 2Trng
OA Test Readiness Reviews at
T-90, T-60, T-30
TPD Issued
T-180
WS DT/OTWS DTPh Test
Feed System
WDS-IIDT/OT
WDS-IDT/OT
Vision System
Turret Testing
High Water Speed Testing
HW DT/OT
Software8.0.4.2
Software9.2/9.3
Sys DataExchange
HEU, HPDU, CDP,RACMALT/HALT
Electronic Architecture Testing
DARI
Trim Tab
Component Test
TEMP Test
Mod 100
Install
Component Sub-system SystemComponent Sub-system System
7For Official Use Only
PV1 AT LIMA
8For Official Use Only
www.efv.usmc.mil
QUESTIONS?