expansion of amri hospital from 313 beds to 400...

30
Of Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR M/S Advance Medicare Research Institute Limited At: Aiginia, Bhubaneswar, Odisha. JANUARY 2016 QUESTIONNAIRE CEMC CEMC Centre For Envotech and Management Consultancy Pvt. Ltd. AN ISO: 9001: 2008 and BS OSHAS 18001: 2007 certified company, Empanelled with OCCL, Govt. Of Odisha, OSPCB as Category “A” Consultant Organization, Accredited by NABET, Quality Council of India for EIA studies As Category “A” Consultant Organization. Regd. Off: N5/305, IRC Village, Bhubaneswar, Odisha Tele: 0674 - 2360344, E-mail: cemc_consultancy @yahoo.co.in, [email protected] Website: www.cemc.in

Upload: dothu

Post on 29-Aug-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

Of

Expansion of AMRI Hospital from 313 Beds to 400 Beds

FOR

M/S Advance Medicare Research Institute Limited

At: Aiginia, Bhubaneswar, Odisha.

JANUARY 2016

QUESTIONNAIRE

CEMCCEMC

Centre For Envotech and Management Consultancy Pvt. Ltd.

AN ISO: 9001: 2008 and BS OSHAS 18001: 2007 certified company,

Empanelled with OCCL, Govt. Of Odisha, OSPCB as Category “A” Consultant Organization,

Accr edite d by N AB ET, Q uali ty Co unc il of I n dia for E I A stu dies

As Cate gory “A ” Consul tant Organi z at i on.

Regd. Off: N5/305, IRC Village, Bhubaneswar, Odisha Tele: 0674 - 2360344, E-mail: cemc_consultancy @yahoo.co.in, [email protected]

Website: www.cemc.in

Page 2: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

1

QUESTIONNAIRE FOR THE ENVIRONMENTAL IMPACT

ASSESSMENT OF NEW CONSTRUCTION PROJECTS

I. BACKGROUND INFORMATION OF THE PROPOSED PROJECT

• State clearly the objective of the project :

Hospital Building Project

• Location of the project (attach map to a suitable scale) :

Location map of the project site is showed in the vicinity Map.

Town/Village: Aiginia District: Khurda State: Odisha

Latitude: 200 15’ 36.61” N Longitude: 85

0 46’ 38.46” E

• Names & distances from the nearest :

State/National Highway: National Highway-5

Railway Station: Bhubaneswar Railway Station (Approx.7.0 Km)

Airport: Biju Patnaik International Airport (Approx. 4.5 Km)

• Name of the agency proposing the new construction project

M/s: Advance Medicare Research Institute Limited (AMRI)

Name of the Chief Executive and Postal address:

Mr. S K Mohanty

Vice President

Plot No. 1, Beside Satyasai Enclave, Khandagiri, Bhubaneswar

Contact particulars (Tel/Fax/e-mail):

Tel: 0674-6666600

Fax: 0674-6666777

E-mail: [email protected]

Type of project: Housing project/Industrial Estate or others:

Hospital Project

• Estimated cost of the project :

12.23 Crore

Page 3: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

2

Location map of the project site

Page 4: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

3

II. SITUATION WITHIN 10 KM RADIUS FROM PROJECT SITE

General topography: The area is broadly divided into 3 zones, such as run-off

zone, infiltration zone and discharge zone. These zones have different

hydromorphic units. Hydromorphological maps prepared based on the satellite

imagery as well as secondary information. The various land use/land cover

classes identified within the 10 Km buffer zone are:

Settlement

It is defined as an area of human habitation developed due to non-agricultural

use and that which has a cover of buildings, transport and communication,

utilities in association with water, vegetation and vacant lands. In the buffer

zone the major part of the settlement is occupied by the urban area.

The rural settlements are mostly associated with vegetation cover and smaller in

size.

Urban areas

These are areas of human settlement covered by modern buildings, well

developed transport and communication system in association with vegetation

and water bodies.

Agricultural Land

It is defined as the land primarily used for farming and for production of food,

fiber, and other commercial and horticultural crops.

Plantation

These are the areas associated with degraded forest land where plantation has

been made to regenerate the forest or areas where orchards/horticulture has

been developed. These areas are characterized by regular shape.

Land with/ without Scrub

These lands occupy (relatively) higher topography like uplands or high grounds

with/without any scrub cover. These lands are more prone to degradation or

erosion.

Water Bodies

It is a natural course of flowing water on the land along definite channels. It

may be perennial or non-perennial.

Waste Land

These lands are generally uplands without any vegetation or agriculture.

Page 5: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

4

Contour map of the project site

Page 6: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

5

• Specify general features of land

Tree cover-prominent species

Fauna-wildlife/domesticated

Avifauna

Land feature (within 10 km radius):

Land use refers to “man’s activity and the various uses which are carried on

land.” Land cover refers to “natural vegetation, water bodies, rock/soil, artificial

cover and others resulting due to land transformation.” The Land use/Land cover

map of the study area has been prepared based on the satellite imagery as well

as secondary information along with limited field survey.

Soil Characteristics:

The soil zone in earth is in fact the life layer known as biological factory. It

controls the quantity, quality and circulation of surface as well as ground water

to a great extent. The main sources of ground water is rain water and melt water

(snow / ice) which infiltrates downward through the pore spaces of soil and is

being collected in aquifers of varying sizes and locations. The quantity and

quality of ground water is also controlled by various characteristics of soil like its

texture, composition, erosion characteristics, depth etc. In this regard the soils

in the world are classified on the basis of six categories or levels of hierarchy (as

developed by U.S. Soil Conservation Service and used worldwide), which is

called “Comprehensive Soil Classification System or Soil Taxonomy”. On the

basis of this soil taxonomy, the various soil types found within the buffer zone

are described below.

Aeric Tropaquepts associated with Vertic Tropaquepts

Deep, poorly drained, fine loamy soils on nearly level river island with loamy

surface slight erosion moderate flooding and slight salinity associated with very

deep moderately well drained fine cracking soils with clayey surface and slight

erosion.

Rhodic Plaeustalfs associated with Rhodustalfs

Very deep, well drained, fine loamy soils on gently sloping upland with sandy

surface and moderate erosion associated with deep, well drained, fine loamy

soils with sandy surface and moderate erosion.

Typic Ustropepts associated with Typic Ustorthent

Moderately shallow, well drained, gravelly loamy soils on very gently sloping

upland with loamy surface and moderate erosion associated with moderately

shallow, well drained, coarse loamy soils with sandy surface and severe erosion.

Page 7: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

6

Tree cover within 10 km radius:

Tree species selected for Greenbelt as per CPCB are:

TYPE Botanical Name Common Name

SCHEDULES OF TREES

T1 Caesalpinia pulcherrima Krushnachuda

T2 Peltophorum ferrugineum Radhachuda

T3 Mesua feria Nageswar

T4 Azadirachta indica Neem

T5 Millingtonia hortensis Akash malli

T6 Calophyllum inophyllum Polanga

T7 Saraca indica Ashok

T8 Pongamia glabra Karanja

T9 Michelia champaca Champa

T10 Mimusops elengi Baula

T11 Morus australis Tuta

T12 Thespesia populnea Indian Tulip Tree

SCHEDULES OF PALMS

P1 Caryota urens Salap

P2 Hyophorbe lagenricaulis Bottale Palm

SCHEDULES OF FRUIT TREE

F1 Mangifera indica Amba

F2 Phyllanthus emblica Anla

F3 Psidium guava Pijuli

F4 Aegle marmelos Bela

SCHEDULES OF LARGE SHRUB

S1 Thevetia peruviana Kaniara

S2 Ervatamia divaricata Tagar

S3 Hibiscus chinensis Mandar

S4 Nerium oleander Karabir

S5 Murraya exotica Kamini

S6 Cassia fistula Sunari

S7 Cestrum nocturnum Hena

Fauna-Wildlife/Avifauna within 10 km radius:

LOCAL NAMES ENGLISH NAMES LATIN NAMES

ANIMALS

Gunduchimusa 3 stripped palm squirrel Funambulus palmarum

Badudi Shortnosedfruitbat Cynopterus sphinx

Mankad (Hanu) Monkey Presbytis entellus

Page 8: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

7

Musa Rat Rattus rattus

Neula (Kuji) Small Indian mangoose Herpestes auropunctatus

Thekua Hare Lepus nigricollis

REPTILES & AMPHIBIANS

Dhamana Rat snake Ptyas musosus

Pani dhanda Checkeered keel back Natrix piscator

BIRDS

Baya Baya weaver bird Ploceus phillipinus

Bulbul or

Gobrachadhei

Bulbul Red vented Pyononotus cafer

Para Pigeon Columba livia

Kau Crow house Corvus splendens

Koili Cuckoo Indian Cuculus micropterus

Kapota Dove spotted Streptopelia chinensis

Kajalpati Drongo Black or King crow Dicrurus adsimilis

Baga Egret Cattle Babulcus ibis

Bani Myna indian Acridotheres tristis

FISHES

Chenga - Ophiocaphalus gachus

Gadisa - Ophiocaphalus punctatus

Kantia - Myotus cavasius

Kerandi - Barbus ambassis

Mahurali - Amblypharyngodon mola

Seula - Ophiocephalus striatus

Page 9: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

8

Flood prone areas:

The area does not come under flood prone area.

Geological features including seismic zone:

Geological formation plays a vital role in planning and implementation of artificial

recharge structures. The project site is underlain by alluvial formations of

quaternary period. The study area within the buffer zone of the project site is

underlain by upper Gondwana formation followed by laterites and alluvium. The

upper Gondwana formation is exposed in and around Bhubaneswar city and

comprises mainly of sandstone-shale sequence. The sandstones are fine to

coarse grained and at times pebbly, gritty to conglomaratic in nature. They are

white to gray and pink in color. The sandstones are feldspathic and ferruginous

in nature. The sandstones in general are friable and jointed but at places also

massive and compact. The upper part of the sandstones is lateritised. The

thickness of laterites varies from 5M to 20M.

• Existing landuse (area & percentages) map (to include agricultural &

non-agricultural uses, commercial, industrial dense/open forests, fallow

land, human settlements, water bodies, transport systems etc.)

The Land use/Land cover map of the study area is prepared based on the

satellite imagery as well as secondary information along with limited field survey.

The various land use/land cover classes identified as settlement, urban area,

agricultural land, Waste land, open/shrub Forest etc. Most of the land of the 10

Kms buffer zone coming under agricultural land, settlement and urban area.

Howrah-Chennai (NH-5) Road is passing through this area. Hence lot of demand

has been generated for the area.

• Predominant activities

Residential, institutional, commercial etc :

� Residential

• Special features :

(Such as tourist spots, monuments/archaeological sites, hospitals,

schools, institutions, religious places, heritage areas and places of other

interests)

Page 10: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

9

Educational Institutions nearer to the site

Name Distance Direction Vivekananda Institute of Science 1.0 Km E

Institute of Science Education 3.2 Km NE DAV School 2.4 Km NW

Kendriya Vidyalaya No. 5 2.5 Km NW

IBCS Campus 2.5 Km N

Hospital nearer to the site

Name Distance Direction

SUM Hospital 2.6 Km N

Gandhi Hospital 1.4 Km S Apex Hospital 2.6 Km NE

AIIMS Hospital 3.4 Km S Tourist spots- Not found

• Specific environmental problems, if any

(Such as water and air pollution, land spoliation by natural & manmade

factors, endemic diseases, traffic congestion spots in the vicinity of

project site, loss of tree cover, open spaces etc.):

� No specific environmental problem in the vicinity of existing as well as

proposed project site.

• Ground level concentrations (major parameters)

SPM/RSPM, SO2, NOx, HC, Noise

� The ambient air quality monitoring was conducted during Nov 2015. Based

on the local meteorological condition monitoring locations are fixed.

Ambient Air Quality of the study area during Nov 2015

Nov 2015

Project Site (µg/m

3)

Khandagiri (µg/m

3)

Date PM10 PM2.5 SO2 NOx PM10 PM2.5 SO2 NOx

02.11.2015 43.0 23.7 14.6 19.1 61.3 32.1 10.4 21.7

03.11.2015 42.4 22.4 13.4 18.8 62.1 33.4 10.8 20.9 09.11.2015 41.8 24.6 13.1 20.2 64.7 32.7 10.6 22.4

10.11.2015 40.2 23.6 12.0 20.5 62.5 32.2 12.5 21.6

16.11.2015 41.6 22.1 13.8 19.6 62.8 33.6 11.6 20.8

17.11.2015 41.2 23.9 11.9 21.3 65.3 34.1 11.8 22.5

23.11.2015 40.6 24.8 10.3 20.4 62.7 33.9 10.5 24.1

24.11.2015 42.4 25.3 11.3 19.5 63.4 36.2 11.7 23.6

Average 41.7 23.8 12.6 19.9 63.1 33.5 11.2 22.2

Page 11: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

10

• Noise Level of the Project site

Sampling Location Noise level (dB) Lday Lnight

Project site 46.8 37.5 Khandagiri 51.4 39.7

Limits* 55 45

• General meteorological data (wind direction, speed, rainfall,

temperature) Details if any of heat islands, inversions, venture effect

Impacts on the conceptualization of the proposal:

� Wind direction : South

� Annual rainfall is about 1401.07 mm.

� Mean maximum temperature 37.40C and mean minimum temperature

15.30C

• Human Resources

I. Population of study area (10 km radius),

II. Decadal growth rate, settlement pattern and growth,

III. Socio-economic conditions

IV. Health: Endemic diseases, Mortality, Epidemics.

• Environmental assessment and suitability of the proposed

development

(Specifically identifying the limits)

Key Socio-Economic features of 10 Km Buffer zone:

Name

Ru

ra

l/

Urb

an

To

ta

l P

op

ula

tio

n

To

ta

l

Lit

era

te

s

To

ta

l W

ork

ing

Po

pu

latio

n

%

Cu

ltiv

ato

rs

Nu

mb

er o

f H

ou

se

ho

ld

Se

x r

atio

Wo

rk

Pa

rtic

ipa

ti

on

Ra

te

Andharua Rural 2372 1800 874 17.39 500 1017.01 36.85

Dasapur Rural 2277 1105 834 25.18 448 983.45 36.63

Malipada Rural 1658 1350 480 8.13 325 971.46 28.95

Nuagan Rural 989 691 393 15.27 201 909.27 39.74

Paikarapur Rural 1805 1382 507 18.54 349 992.27 28.09

Gothapatna Rural 1641 1316 438 5.25 251 684.80 26.69

Ghangapatna Rural 1640 1254 678 15.93 355 936.25 41.34

Kantabad Rural 2461 1816 836 19.02 488 994.33 33.97

Giringaput Rural 1260 1004 476 25.21 271 906.20 37.78

Jamujhari Rural 1235 969 434 15.90 245 837.80 35.14

Page 12: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

11

Chatabar Rural 1963 1463 606 16.83 387 972.86 30.87

Kantabad Rural 893 594 339 7.67 238 980.04 37.96

Kaimatiapatna Rural 689 516 206 15.05 119 1026.47 29.90

Harapur Rural 365 238 139 38.85 72 941.49 38.08

Narada Rural 2252 1625 851 16.10 526 948.10 37.79

Tamando Rural 1808 1427 555 3.78 359 921.36 30.70

Bijipur Rural 1834 1438 639 13.77 377 972.04 34.84

Deuliapatna Rural 1543 1206 787 25.79 313 919.15 51.00

Mendhasal Rural 3867 2819 1225 13.80 769 971.95 31.68

Madanpur Rural 1257 1015 484 10.12 241 982.65 38.50

Chatabar Rural 1963 1463 606 16.83 387 972.86 30.87

Arisal Rural 221 159 65 4.62 52 955.75 29.41

Janla Rural 1008 836 316 18.67 183 909.09 31.35

Alakar Rural 562 357 196 17.86 85 1613.95 34.88

Ogalapada Rural 3341 2423 1102 9.26 720 919.01 32.98

Gopalpur Rural 154 113 66 0.00 44 750.00 42.86

Ogarsuan Rural 607 496 200 35.50 120 996.71 32.95

Uttarmundamuhan Rural 1938 1607 747 27.84 375 957.58 38.54

Chhelda Rural 191 164 69 0.00 49 819.05 36.13

Gobindapur Rural 524 450 159 19.50 99 933.58 30.34

Mahura Rural 703 602 222 35.59 148 969.19 31.58

Kasipur Rural 827 649 257 15.18 154 941.31 31.08

Patrapada Rural 141 67 71 1.41 27 905.41 50.35

Suanga Rural 660 479 221 11.31 128 952.66 33.48

Jadupur Rural 71 46 22 0.00 15 1151.52 30.99

Santarapur Rural 352 205 114 0.00 73 1058.48 32.39

Kapileswar Rural 558 417 177 10.17 121 904.44 31.72

Padhansahi Rural 1367 1116 499 15.43 270 911.89 36.50

Barakuda Rural 1139 879 397 24.18 220 998.25 34.86

Radhacharanapur Rural 532 430 167 58.08 85 1086.27 31.39

III. PROMINENT FEATURES WITHIN ABOUT 100 METRES RADIUS FROM THE

SITE BOUNDARY (LOCAL AND IMMEDIATE VICINITY)

• General description

(Contours at 1m intervals)

• Natural resources

A. Water

• Ground water table, rate of recharge present restrictions on drawl,

available yield, quality of water (physical, chemical, biological)

� Depth of Water Level = 2.15-10.45 mbgl (Pre-monsoon)

Page 13: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

12

WATER QUALITY

Water sample from the pumping well was collected and analyzed for major

parameters by standard laboratory technique as follows-

Sl. No. Parameter TEST METHOD RESULT

Units of Measurements

1. Colour IS: 3025 (P-4) < 5.0 Hazen

2. Odour IS: 3025 (P-5) Unobjectionable -

3. Taste IS: 3025 (P-7) Agreeable -

4. Turbidity IS: 3025 (P-10) < 2.0 NTU

5. pH IS: 3025 (P-11) 7.3 -

6. Total Hardness (as CaCO3) IS: 3025 (P-21) 236.0 mg/l

7. Calcium (as Ca) IS: 3025 (P-40) 68.5 mg/l

8. Iron (as Fe) IS: 3025 (P-53) < 0.1 mg/l

9. Chloride (as Cl) IS: 3025 (P-32) 36.2 mg/l

10. Residual Free Chlorine IS: 3025 (P-26) < 0.2 mg/l

11. Fluoride (as F) IS: 3025 (P-60) < 1.0 mg/l

12. Total Dissolved Solids IS: 3025 (P-16) 347.0 mg/l

13. Magnesium (as Mg) IS: 3025 (P-46) 27.9 mg/l

14. Copper (as Cu) IS: 3025 (P-42) < 0.05 mg/l

15. Manganese (as Mn) IS: 3025 (P-59) < 0.1 mg/l

16. Sulphate (as SO4) IS: 3025 (P-24) 65.6 mg/l

17. Nitrate (as NO3) IS: 3025 (P-34) 4.5 mg/l

18. Phenolic Compounds (as C6H5OH)

IS: 3025 (P-43) < 0.001 mg/l

19. Mercury (as Hg) IS: 3025 (P-48) < 0.001 mg/l

20. Selenium (as Se) IS: 3025 (P-56) < 0.01 mg/l

21. Arsenic (as As) IS: 3025 (P-37) < 0.01 mg/l

22. Cyanide (as CN) APHA 4500 CN-C < 0.05 mg/l

23. Lead (as Pb) IS: 3025 (P-47) < 0.05 mg/l

24. Zinc (as Zn) IS: 3025 (P-49) < 0.5 mg/l

25. Chromium (as Cr+6

) IS: 3025 (P-52) < 0.05 mg/l

26. Alkalinity (as CaCO3) IS: 3025 (P-23) 318.0 mg/l

27. Aluminium (as Al) IS: 3025 (P-55) < 0.03 mg/l

28. Boron (as B) IS: 3025 (P-57) < 0.25 mg/l

29. Cadmium (as Cd) IS: 3025 (P-41) < 0.01 mg/l

30. Anionic Detergents (as MBAS)

APHA 5540-C < 0.05 mg/l

31. Total Coliform IS: 1622 < 2 MPN/100 mL

32. E.Coli IS: 1622 Absent MPN/100 mL

The review of the above data indicates that the ground water quality of the

area is potable. The different parameters are well within the permissible

limits of human consumption and ground water is well suited for most types

of irrigation requirement. From above discussion, it is evident that ground

water quality of the study area conforms to the BIS: 10500 for potable

drinking water.

Page 14: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

13

• Surface water location, source and yield, present use (for agriculture,

human consumption, industry, etc.)

No surface water bodies located within nearby 100 m radius.

B. Ambient air quality levels (standard parameters including noise)

National Ambient Air Quality Standards (µg/m3) as per MoEF

Declaration under Schedule-VII, Rule- 3(3B).

Sl. No.

Pollutant Time Weighted Average

Concentration in Ambient Air

Industrial, residential, Rural and Other Area

Ecologically Sensitive

Area

Methods of Measurement

1 Sulphur Dioxide

(SO2), µg/m3

Annual *

24 hours **

50

80

20

80

- Improved West and

Gaeke - Ultraviolet

fluorescence

2 Nitrogen Dioxide (NO2), µg/m

3

Annual * 24 hours

**

40 80

30 80

- Modified Jacob & Hochheiser (Na-Arsenite)

3 Particulate

Matter (size < 10µm or PM10) µg/m

3

Annual *

24 hours

**

60

100

60

100

- Gravimetric - TOEM - Beta attenuation

4 Particulate Matter (size < 2.5µm) or PM2.5 µg/m

3

Annual *

24 hours **

40

60

40

60

- Gravimetric - TOEM - Beta attenuation

5 Ozone (O3) µg/m

3

8 hours **

1 hour **

100 180

100 180

- UV photometric - Chemilminescence - Chemical Method

6 Lead (Pb) µg/m

3

Annual * 24 hours

**

0.50 1.0

0.50 1.0

- AAS/ICP method after sampling on EPM 2000 or equivalent filter paper

- ED-XRF using

Teflon filter 7 Carbon

Monoxide (CO)

µg/m3

8 hours **

1 hour **

02 04

02 04

- Non dispersive Infra Red

- (NDIR) spectroscopy

8 Ammonia (NH3)

µg/m3

Annual *

24 hours **

100

400

100

400

- Chemiluminescence

- Indophenol blue method

9 Benzene (C6H6) µg/m

3

Annual * 05 05 - Gas chromatography

based continuous analyzer

- Adsorption followed by GC analysis

10 Benzo(a)Pyrene (BaP) – particulate

Annual * 01 01 Solvent extraction followed by HPLC/GC analysis

Page 15: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

14

phase only,

µg/m3

11 Arsenic (As), µg/m

3

Annual * 06 06 AAS/ICP method after sampling on EMP 2000 or equivalent filter

paper 12 Nickel (Ni),

µg/m3

Annual * 20 20 AAS/ICP method after sampling on EMP 2000

or equivalent filter paper

* Site taken twice a week 24 hourly at uniform intervals.

** 24 hourly or 08 hourly or 01 hourly mentioned values, as applicable, shall be

complied with 98 % of the time in a year, 2 % of the time; they may exceed the

limits but not on two consecutive days of monitoring.

AMBIENT NOISE STANDARDS

Area Code Area Category Limit in dB(A) Leq

Day time Night time

A Industrial Area 75 70

B Commercial Area 65 55

C Residential Area 55 45

D Silence Zone 50 40

Source: CPCB

Note 1: Daytime is reckoned in between 6 a.m. and 9 p.m.

Note 2: Night time is reckoned in between 9 p.m. and 6 a.m.

Note 3: Silence zone is defined as areas up to 100 metres around such premises

as hospitals, educational institutions, and courts. The silence zones are declared

by a competent authority.

Note 4: Mixed categories of areas should be declared as ‘one of the four above

mentioned categories by the competent authority and the corresponding

standards shall apply.

C. Minerals: type, location, quantum (estimated)

� Not applicable

D. Energy: consumption pattern for hydrocarbons, gas, electricity and

any other non-conventional energy source

� Not applicable

� Details of new construction Plot coverage, height, FSI

(permissible/proposed) Building materials for construction (may

cover the quantities, source, processes involved, special attributes

such as life cycle costs, efforts towards greening the supply chain:

� Plot area- 20235.00 sqm.

Page 16: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

15

� Maximum height of building- 27.80 m.

� Construction materials source: Local Market.

� Construction materials-

� Details of public utilities required for the project during:

(May be indicated separately for construction & operation phases

I. Water supply:

a. Source of water supply and quantities to be drawn.

� Ground water/Municipal Supply Water: 232 KLD (Existing +

Expansion))

b. Type of treatment, if any.

� Yes, Filtration

c. Continuous/Intermittent supply

� Continuous

d. Storage capacity in Kiloliters

� Fire Tank = 200 KL

� Raw Water Tank = 350 KL

II. Sewage, Collection, Treatment & Disposal

a. Mode of collection of domestic effluent

o Surface drains

o Underground

o System and capacity

� Surface drains & pipeline

b. Mode of treatment

Sl. No Materials Unit Quantity

1 Fly ash Bricks No 2489063

2 Cement Bags 130805

3 Sand Cu Mtr 18003

4 Chips Cu Mtr 6381

5 Steel Ton 1002

Page 17: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

16

Septic tank and filters (capacity)

- Biological treatment capacity & other details

� STP (Details enclosed in EMP Report)

c. Mode of disposal

- Soak pits / Disposal to local sewer / water bodies (specify)

Use for cultivation

� It will be reused and excess water will be discharge to nearby

drainage system.

E. Solid Wastes:

- Estimated quantity of each types of solid waste:

- Mode of collection and disposal:

- Recycling to be instituted, if any:

� Domestic waste : 499 kg/day

� Biomedical Waste : 194 kg/day

� Collected from the garbage bin, waste will be given to assigned

agency for final disposal.

F. Power System:

- Sources of power and supply capacity

- Distribution System

- Alternate supply for essential services

- DG Set: Type of fuel used and capacity

� Source : CESU

� 11 KV of CESU

� 3 nos. of DG sets of 1250 KVA

• Impact of the new development on the surrounding areas

1. Traffic management at peak hours

� There will be some increase in road traffic during construction phase

due to transport of construction materials to the project site. During

operation phase also there will be little increase in road traffic,

however it will not posses any significant impact on existing traffic.

Page 18: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

17

2. Buffer zone planned, if so, details

� The 10 km buffer zone of the project side encompasses various urban

landuse activities like hospital, schools, community facilities.

3. Activities likely to come up in the surrounding areas from the

project during construction & operation phases

� Adequate sewage treatment plant, greenbelt, solid waste

management plan will be adopted adequately which will be precedent

for later developments.

• State briefly impacts predicted on the quality and quantity of

natural resources from the proposed new development:

- Air quality

- Vegetation

- Animal/Aquatic life

- Surface/ Ground Water

� Air quality: Since the GLC of pollutants lie within permissible limits of

NAAQ standards as per CPCB, so there is no adverse impact on

surrounding area due to the project.

� Vegetation/Animal –Aquatic life: no adverse effect.

� Ground water: it comes under safe category as per ground water

assessment.

• State briefly impacts predicted on the quality and quantity of manmade features from the proposed new development:

- Transport Linkages:

a. Road

� There will be some increase in road traffic during construction

phase due to transport of construction materials to the project

site. During operation phase also there will be little increase in

road traffic.

b. Rail

� Nearest Railway station Bhubaneswar railway station at a distance

of about 4.5 km.

c. Water

� Treated Effluent that is within prescribed standard will be reused

for different purposes and rest will be disposed off to the drain.

d. Air

Page 19: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

18

� During construction phase, fugitive dust emission will take place.

However adequate mitigation measures will be taken to suppress

it.

e. Others

- Heritage areas/ecologically sensitive areas

� There are no ecologically sensitive areas present nearer to the

site.

• Landscaping /Tree Plantation

� 20 % of the total plot area

• Any other relevant information of environmental significance-such as disabled-friendly design, fly ash utilization, Greening of supply chain, heat islands/inversions/venturi effects, Timber-free construction, Green rating, energy efficiency for lighting &

ventilation, Intelligent building, life cycle costs, measurable design impacts on human health, indoor environment related to occupational health etc.

� There will be use of Fly ash bricks.

� Solar Street light, Solar Water heating will be provided.

� Conservation of energy can be done by Passive and Active

Measures.

� Energy efficient electrical appliances will be used.

Page 20: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

ffi€i)

STATE ENVIRONMENT IMPACT ASSESSMENTAUTHORITY(sE|AA), ORtSSA,

s.O, 1674.(F) Oate tTihtlor 20bs or nisiry dr Enrironhenr & Forejr, coyt. or tndDLrnder,Edvifoin?nr pfotedio; Acr. 1936.)

o ro . . rRr? r t i , B- .ou " .a . . to tzE.m:[email protected]

aate on '64'sEtAA-40/11

B bq_a'l'. B-rra FSDra, ror Ervror - .1rc r -specia SpcraGf, !o Co\rI Veno- Sec etafr, SctAA Ori "d

D Saryab%re Lpaa uJrve ' or vk6 DrF5oe, r (Pbe. r ,rovar e lvFo ca e & R".-d cn tn6rr_LeBo( ! / , C" ,5a lqodo86 , !dp O ,a i i i a B ' : d9e rho tara - '00029

Sub: Env rof|.nenrat Ctearance for constr!ction of MuttiSpeciaty Hospita ButLdrng atv d rdd . i iB ! ' bc r e rqa .o [ f 5 d r , tF r -o ,o .d .

sir

a) ThE h4 refe€nde to your ietlef ro I tdaled o2o3 2oo9 ahd slbsequ€nt terers9 : : d i ! 9 q r 0 9 : r . 0 4 2 0 r 0 r 7 . o . . o o 2 9 0 6 . / 0 o 0 5 0 3 " o . o . o 0 3 2 0 . o0 3 0 2 0 1 0 l a l 0 2 0 1 0 , t t _ 0 0 . 2 7 . 1 0 0 I O r 2 o f i d r o 2 ! . 0 . 0 . . o n

, ea D o v - e 1 r @ 6 d s b l e c l t a T d i e - - d o s a r r f l t , . e s t a t e t n , . o . - e . r a t h p d . ,ro ddvdro lvad (a .e qe .ea (h 8 - , t ' ' u

" ' td \p rVR, r < ld rdra l Bn . ban; !^a n'1" d rrr I o' /5,rda r." Dr.0i-9 aro cols-,clon o,o "c.s are o.eo ar S.., B(.. orr r r - "dLe r de B r '6oo .y o t E A o t .d ron , .oob d , d a re to o" appra sed b , ̂ - ccI e o o e . l p r o p o r e l L s J b m , l e d p . e s " b e d . o . 1 - t & f o f . t , a T f . c o . " p t J e t p a r

o" " ra l -osoGt o o .e . Le orooo, eo rL i >o- d t , .o .p i , "b , r d r l a * f i , 2 b e d s d - a 2 ) r , . . e d a . o o o . . r t o . r o e o , J .

r h o r d - g B r L b a r " . r J O d c " t e o L r L p r e a 6 , a B 5 s q n , d o o c a n i " i a e d or f 6 .o ' ) t ra . raave. p rp<Fr td t o - o 1e )d e , I f "a rd .es o , , t " p oe . i o I a .d . - '^ L o . ! 0 , 0 I f . S c ^ L o e i o e o l o L o . . i o e r q a . o , e . r o . r " I r s a a . . " a . +' ' s s o r o f , e l d r i l ' o - a l o r . , L o o o 1 i 1 a 0 c a i - I , F - t p - F p o p o . " a r

r a sJ € d ' o r d " L L s s o ̂ { . r 6 c t l o a d , o q o , E T F S L p p r e , d t e . . a r o t o a o . i l F_ o i D , a _ - r - r ' t s r 6 d b t r e o o o o l q r h e p o o o l a . t c d , F ̂ , . f d . r D d , p d r t o .

o 1 ( . J w a ( r o . - . . " " o o t - - o o r l t o . T . p o . o . d . d a o t 4 F

Page 21: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

deliberatons lhe SEAC recommended ior condLlonarJor plantation Ailer delarledFnvironmenlaL Clearance

Based on the information/ dqcLme;E and clarllications prolided bv yoLr ne

o"" i^ ^t'*tnt ot,t"" nerebv;ccords ior grant ol Enlironmenial clearafce n

; , ; ; " - ; . ' i ; ; ' . , " , , ro 'a our .oo ot 5 .ve veoc r t " ';:.,;-^-"", -";,, as\e<smel \orrLa|o 2ooo dro zooe aro elos€q e'r

" . : i . , . * r r " " , " . "

- -o" , ! r 'o .< i /oEr Go\e ane ' ^" ro a c " ra \ lh" rer oe

and subecl to the foLlowing stjpulaied c0ndltions

L GEI!EN9!Dll!9!ls

r he aoDt(ar ' rP,o l " I Propo e lF '^*" " i - - * 'o '

"no nrq.Lo- o ' d i Po ' rLor \ !are

"p"- t , " "

" - L- " pour 'o l ' ruo g !od $asrA dro oomedca /asr"

."""g"t""i * n]*t-"1 tv them ; Form'1' Form_1A and Enviofment

r,/ana;ement Plair (EVIP) n compliance wllh lhe prescibed stalutory norms

and standardsi T\e app can wi lake s auto l cer d- (e I aob ovc

''nn! aneo aJ.nolies . respecl o''Fe o ojed a' a'd $\en "oL''d, , . I n e d o o l , . o 1 r $ ' s u o . r l ' a r / e a r / ' o i p a r c e r F o o I ' o o o d e l r o r a l r l

a ' e 'p"c o Fe sLoJ ed Le 's a d _o1d"o, ' '1 . . "

i""i*".*or c*""*" to ihe stete EnlLronn\ehl lmpacl assessment

o"ii".'tv. tse'oAf orissa.n lrlJufe and l"tDecembet ol each calendar

, , ' t . " o o" , t propo"" , . lJ oo lor o ' r rodc ocLLpa e le^a ' cer l ' i a l "

Ioa ' omperer l aLrro. l a( "n " re1" ' or J .o ' /er - as oFr I e D o\ iso 'o l

condLLLons slrp!lated by lhe Fre

Prevention Ofi icer, Orlssavi) Th; applcanl wil! adopl the p€sc bed noffis' specliicatons and standards

as Drovlded in the NationalbuildihC Code of lhdia 2005 specialy relating to I

a) Fire proiection and tife saletv ol ocoupanis oflhe buildjnqs

bj sarety ol personneL dlinq cbnstrucuon operauon and demoilion or

Natjonal B!ilding Code (NBC) 2005.

v) lhe pojecl proponeit shallcompLv io alLthe

i)s)

oayLishnh! and nalura lvenl r la l ronolbu l !d lnqsSale'y lrom..ecu ca i,_F s oc' a-o g t "_ 1q o'lte oLid a)

Alr-c;ndiiioning, heating and mechanical vmt lhlion or the bLr ldings'

Acolstics and noise conirololthe buildingsMahtenance and lunc|oning with emi$sions iiom gene'aiofs suppJingpower to common spaoe/ residential ih .ase ol Power failure along with

I!eL handllng /storage.h) lhsrallalion ofllfts and esoalalors ln lhe buildings

) watssupply draLnage and sanltauohlni!dln9 soidwasle manaqement'j) Lardscapinq ofsurcundi.a areas orthe buLdin0s

Page 22: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

l l .SPEclALcoNDlTlONSi

A. CONSTRUCTION PHASE.No ground waier shall be extracted fo. the prciecl worh at anv stagedurifg consiruct.n phas€

il) Provisof shal be hade fbr the housing of constrlcllon laboLlers wnhrnthe site with alnecessary inlrastruciure and iaciilles such as fue iorcooking. mobie lailels moblc STP saf€ drnkng waler, medicai heallhcare creche etc The housing may be n the form of t€mporary strlcluresto be rerioved ailerlhe coripelioi of lhe pfoj€ct

ir) A First Ad Rdom wlll be provlded ln th€ proiect sile both dufngconstlction and operalioi of rhe projecl

iv) AlLthe top sai excavaied dlrns conslrucubn acUviiies sroud be storedsepafalely ld. lse ii L6nd rling horiclllure/landscape dev€lophenlwithin the proj€ct siie

!) Dsposal of mlck d! ng cdnsiructon phase sh00d not creale anyadverse eitecl o. ih€ neighbo.ing conrffuntes and vrllbe disposed offtaking lhe necessary precautons fo. Seneral salely and health aspecis oipeople ofly in apprcv€d s tes w llr the approva!of competent authonly

vi) Sol and ground lvater sampes sil be tesled lo ascedain ihat there s nothreatlo qroud wal€r qually by leachlfg ol hoavy melals and othef Iox c

!i) Constrlcllon spois includfq biluminols mater al afd othef hazardousmaierals shoud noi be alowed to contam nal€ v/alercaurses groLfd

. waler ard dump s i tes by lo low ng safe dumpfg /d isposa practceasperslalutory rues and norns L,iih n€cessary approvalof rhe O.issa Polullon

vli) The dleselgeneraior sets to be used dlrinq c.nskucton phase shal beow sulruf d€se type aid should conform lo E.v.orment (Prolectan)Ru es 1936 prescrbed lora i r and noiseenlsson s tandards

x) the d esel requred rorop€rat ing DC aetsshal be s(ored Ln under l rourdtahks and ir req!ired clBafance noh the Ohiel Conl.oLler oi E:ploslvessha lbe taken

x) V€hcles used iof brhgrnq conskircton materals to the stre shoud be i.good condlloh and sh.urd have a poLtutan ctreck cedtitcate and conJormto statllory o r and no se emissonstandards and shou d be operated orydufn! non peak houls of the day.

r0 Ambient holse levers slroud coiiom to €sidenlta srandards borh durn!day and nlght rncrcm€nlal po!l!liof loads on rhe amb enr air and no seq!elly sho!ld be closety monirored d!ring constr!ction phase. Adequatemeaslres shlr.rLd be raken lo reduce aribeni an afd nose leve durngconsttuclron phas€ sD as lo contorm to th. stpllated sranda.ds byCPCB/OPCB

Page 23: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

. r , l v a s l b r . s s r o ' a b e ' " o " s o i 0 1 0 ' d " ' '0 " , u " p ro .= . - . o l r ' a \o r ' !d [o_ o sPo la 'oe 999 "

d a

d. ..deo re ear.', , R e d d \ m , ^ e o c o ( " e ̂ a J d b e J ! " d i n b d r ' ! ' : ! c 1 o 1

. , : , s ; : ; ^ ; : ; . i " ; ' " " " : , . , - . , * . . ,0 b: . o" ' c6,vB r o B

standards for these aPP icalonsrv) Watef demaid dlring coislrlciion Ehoud

practLces witho!t comproniisjn! qualrtv,be optimized bY adoPtrng best

,D Separaton ol grey and black waler sLlpplresdone by the use or dlal pllmbno Llne Grevirealed separateLy before recvcrng /reus€.

xvii) Fixiues for showers loiletlushing and drhklng water should be ol low

flow type and .€st cled to €q!tremenls by use ol aeratoB avodnq

vrastage pressure reducln! dexvil) Use ofglass may bd maxjmlm uplo40% of lota outerwaLarea (0 r€ouce

the enerqy cofslrnpiioi and load o. akconditonng li nec€ssarv hgn

quality dolble oass wilh special rcllecllve coaling mav be used Ln |re

xx) Rool should meetth€ prescrbed feqliremertas per Erergv ConseNal on

Bul ld ing code by usr9 approprate thermar ns l la l .n ma€raxx) Opaque wall',should meel prescfptjve requrements as p€r Energy

ConsenaiionBulLdin! Codexx) The approva ol lhe competent allhortv shal be obtaned ior sl'uctural

sarety of lhe blrldLngs due io earlhquake and cvclonei adequacv ar rire

. nghting equlpmenls etc as per NatlonaL buiding Cod€ of lndia 2005

incLLrdih! protecllon meas!red iiom ighienng elcxriD Regllar slpedislon ol tho above and other measues r0. monrtorng

should be in plac€ al ttlrough the conslruclon phas. to ararddlsturbances and pallutioi lo the s!rcundihEs

B. OPERATION PHASE

The ETP to ireat erfluenls fiom ihe hospital un t (bolh ouldoor and ndooflaciiiies) and STP ior kltchen / doheslic erlluents shoLrd be separate andwth sliialrle lechno ogy to render ihe lrcatmefl process eflecilve a.d reuseot processed waler possrbleT€niary lreaiment is proposed lo be done through provlsioo oi sand,acUvated nlters and UV exposufe whlch shold be strctly followed and theo f ! ' ' \ a e o ! r l / r " . o o e r dwofkabiity ol ihe prooessETP/ SIP sLudge processlng and subseqlent sal€ dlsposa with mdobialq '

" i r _ o 1 ' o , . q s t s o r d b e 5 1 . ! ' , o d " " d o

and colcclion sholld beahd back watcr shoud be

Page 24: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

l:';,.fu.'r'

!) The rr.splta sholld have ihe. own Lncn€ratoo racilty wrlh alreouired aifpo luon conko measures 1o enslG sal€ dlsposaloi b omeilca soid lvas(esralher lhan pass on thd same lo an agency whose facltes are nol checked

v) The inslalLdtion ofthe Sevage Tr€almeni Flanl (STP)shoud be cert(ed by acompetent agency and a reporl rn lhs regad shoLrld be subtoilled lo lheSEIAA Orssa betofc the protect s comfiisso.ed lor op€raton TrealedeiJllent itum SIP shal be recyc;d / relsed lo llre maximw exlenl pos6 bieTreatmetrt ol 100% grey water by decentralzed trealnent sholLd be doneDsbharoe or rnused k€at€d elltuenr shal coniorn ro rhe norms and'ar dd d o! r '6 O' ( \ r 5G€ Po - oa Co i or Eodro

shou d be iaken l0.iitigale lhe odoupfobLem irom STP. . - t 6 . _ F , ' r d o e

5 1 o L t . r . r e - . 1 . o r . .o " , o r . \ o r ' D . B O a d

vl) Ihe prcteci propoheht wlL ensue ihdi under no crumstahces, theen\ribnment s paLlted due to nonlrnction n!/ uoder periornrance ofsewerage d isposa systen of ihe pro lec i Toacheveths astand-by STPwlth sim ar capacty shoLrd be instated to be pll .1o setotce durin! lhema nr€fance/ o leT hal tng o ' the or tq tna Srp

vli) The soLd wasle genefat€d shoud be prop€ry cotecred and s€gregated r!€lgarbage shoud be dslos€d off la cofnpftred and dfy/ nelt sojd wasreshould be d isposed or f io a d .drec agency tor sate dsposa N! .essaryapproval / perm ss of may be obta ned rrod the concer.ed aurhor I es

x) Th€ b o medica wast. generated sra L ba.co Lecied and d spos€d ofi as perlhe pro.rsldns of ihe B tL.ry (Maiagemeit & hand n9) Ru.s, 19eS ard asl n d b d i 6 6 o

x) The proponent shal rrn,.t ,tut"tei tpecnoaton "nd

desjgn pa6mdlc6 .fproposed fcjneEtorw hin tnree honths iro; rhe date oftssue or Ec

xl) Dlesol Fower generalrg seis pioposed as solde or DacK-up povr€r ror rjrselevators and comhon area tLrhina(rof during opera|of prrase shoud lre ojencrosed type ,nd corrorm to Envnofnen( prorecton (Ep) fues 1996 thehe ght of th9 sets sriourd be eq!a l0 rhe hei!hr needed lof theoao_-o rprc , o . p-ooo '60 Dc set ( on tog" . r " .

should be used. The acaron. i (he DG sels r iay be.Jecrded n consuLia i fwlh Orssa Sta le Pol l t ior Coni rcL Boad, Care may be raken to avo.d sposa ol smoke/ pltutartsJrom D9 sels n lhB resdenUa area

rl) Nose should be contro ted 1o enslre lhat it does nol exceed the pfescr be(slardards Duf n9 n ght I me, rhe notse eve s'measlred at the boundary othe stes shat be rest.leil to |re Fermissbt€ eves ro comp! s ll.r ii!

ceei-bel & avenue pahtalof oi tees over atEast 20% of lhe site are.shaL be done !sin! narive rroe sl)ec es / ptanG ihpro! -9 gre€iery & keep.(In vew aes| re t rcs.onsdera ions i r the vrhoe camp!s. profoss.na

9 6 j . a . r o

Page 25: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

"a,iors envronmenrar param;l€rs like dust folse enrissons elc ard

pl ,^." jr ."".r.q d \' rd F 'r o' a) D'd rb' 'o

"r,"r J u" ilJlor"r*L,r. e"l*e rechargin! th€ ruri oit pre treath ent nrLrsl be

done to remove slspended mal\er oil greas€ and oiher so!b€ components

as Der norms Rainwater recha€e should be lh.ough specred recharle

sholLd be throlgh specllied recharge pits of requn€d fwberc The sldace

runoff waler shoud lre stored suitablv lrealed and Elsed for landscaprng'

The bore-welL Jor El.water redlrarg nq should bsLeDi a\ Least 5 mF abov€io ro waerlloie itreliiiiotoav mav prelembv be adopted

fion a commerclaLftm wilh perrormance glaranleeWeep holes in lhe compornd walLs sliall be provlde.r ro

drai.age ol excessile €n Waier in the prolod area ourngperiod alter lhe haruasu.g operalons Care trlstbe bken sowaterlogglng l. ihe tedtory and drainage is 1c0%

,/"t Tlre grolfd waler evel ard i{s quaLlty snould be monLtor€d

consu tation w th CenLraL/ Stal€ Cround Waler A!(hod{y

xv ) Traliic congestLon neal the entrv and eril Polnls irom \ne roads adjonng theproposed project sile nrlsl be avoded Traliic congeston shal be alordedinsde the projbct ste Ihe aiea ear marked lol parkLng shalLnol be !sed fordiy olher p;pose. allemale enlry anrl exit hrust be provi!€d to haideexcess traiiic end €nerc€ncy s IuatLons.

x!Li) A repo on the energy conserualon meadures conrirming lo enersyconsedaiion norms fitralzed by the Bureao of Energv Efirclendv should beprepared fcofporating deialls abolt buidin! indterzls & techho oov R & UFaclors elc and slbmitled to ihe sElM Orssa in three monlhs time befcr.o D c d i o - | d b i r a , o .

xr) Prc! sions af solar hot waier stodg€ / supples at ihe rooi iop may be madeag persiatulory noris of cPcB/MoEF/sPcB orissa

!r) Ene.qy conserva[on measlfeE rk€ ]nstaialon or cFLs fiFLs ior lghlng lheareas ouiside the buiLdrn! should be inte!ral pan oi lhe project delgn andshold be in pLace belore proj€ct commissioning used CFLS afd TFLSshouid be propery colecled and disposed oii/sent lor rccycl.q as per thepfevai l lns gudeines / ruLes o! ih€ rewlatory au lhor ly lo avo ld toxccontamnation Use of so ar panes may be adopted to ihe maxrmunr exl.ntposs bLe. especla ly for slreeisiqhis

a) The buldn! bLocks sho|d hale adequale dislance between them io alLorvmovemento i l .esh a i f and passale o l na l l ra l lght arandvent la tor

x\Li) The iunds earmarked for the environme.l proleclion measur€s shal bejudico!sLy utLlLz€d !nd€. no circuhslafces this rdnds shalbe diverled ioroiher plrposes Like An.ual alLocatLon and nlalnbnance I monitorlng etc andexp€ndture fo . ths l lnd should ba repor t€d to (he SE M Orssa

Page 26: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

' - te reo o, r f e ocr Feooia - t -o ! to oe app op. a .e / add.esspo . I e - .D

a. f . i [es o be J oena-e- oy.1€ o.o,€( t propo-e1( i1 rhe:er d1a. r .o-pah ih ths regad shbutd be preparEd and submitredto SEM, Olssa.

he aoove -efl o, Fo stio lrled colot ors rhat o" .o. pt 6d r. r re.ooL,o I cnnerrau e 'o @noy co lo . tds -e l , io lao(a ' . . r a l i o o f , 1 . e1 { ' o mer r c t . F r .a . c€ d .d a l r . r I dc i i o l L r de . .T Dro . eo . .or Er , ,on-F1. p o le( ror ) !cr , 1sg6

:1..::g:jl,iq. ".1"1,:" or ErA Nofficdrion. 2006 by you in corsrrucrine /d€v4dprnE bero e tahhq o i to , Ehvt .onne- lar Ctearance. the maue, ts be i .q d ;at tseparar€ry by th ' Star€ Oovernne.r fo .a ! fo l rorsuct_ v io .a l ion,

/ol

' l / i l s l , r o r r / i ! -er r 8 |o , " ! ts Co4 o,^

, o m b r e , L o d t R o a d N " 4 0 " . , i o , . - d r r t o r n a r o - ..

. ; i l i i J:-",n. -"".8 E-.io1relrDeoi coF.,." ol

Bhawan, CcO

' !I,11; :"f,:""Jtf;;:;i:.""i1"1_:i::"' BlJx-l ^' 3 \,a d d' ::',:,:";:"iii. "; ::J:';"-:"8::;:"oJ.;""rr, I, i;:-"i :, " -,

" li::;ri,l,";J.:, li;"ll;!::::"u:ij, ;,'" .- "; -" q. -.b-",, g,s a ;

Bh!baheswar Deveopment A!lhorir

!:',{"tti+'i:"'i,-:;,5:'";"i,'r"+;ir#1"r'-,'lil'":,"';' B:tl yi#i:Hii::; i;i:1*r:*Ili,xl1":u'p'/

a sea-"eeI t :r; ;;; .5;g-r;qiri!" ";a:^:,m' ;:', ,'i";, :,,;-^ umlv I , bnLbaneswartor Ind ntormaton

' >oL_lVember Socrerary

Page 27: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

,/

HBHUBANESWAR OE!ELOPMENT AUTHOR Y

/VALAYA /\!ARC, EHUBANESWAR

tsee Requ a!od.e (4)lp1/BDA Bhuban4war

: " : : " .

,,",,. "..":.". ..;, ;;t;;;i|"::":1,:::."-"d AltRt HocD,!. buird,ng

F m d e , n d a H _ M c h r s A r Moler cAoepsnmed a o[ed ur3wns prol No l!1/1

(tsdsPirar arockl lin sq.mlr)

T

i"$,." ii;ld,'".l a*,,;",,;ovc'l lo be Dror' e;

;":l"l,l""r .:|1"fffiir".t=- - r

' : '&" l i : . " . , l" , , r = i , | " . . . . , , : 1 . -

Page 28: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR
Page 29: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

: :;.:";i:;: :li:,:":l^ :::: i. ; *.

" ". s noi 0p,10 -alied o':" i:l';:]" " :":i:::T-: "1 : "' :'',.. ":,;:'i'';'ii'li. ?;1":"

', I ;-"-:r:l -" "* "'| : " "; . ;"",: ;l :^:l'":;,:::" ""-:ll::T,? rh. p._*_ " __d.. ;;;"il1il,:t:ff ".ll;:,ffiil: *^*

am ree

B.rre s0utrlcesanfu;l;

[email protected]

a!shl9!L

I

-l::" I

Page 30: Expansion of AMRI Hospital from 313 Beds to 400 …environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · Expansion of AMRI Hospital from 313 Beds to 400 Beds FOR

1*

Memo No *lcpjaBDA Bhdrn6sr o.ed lAlt:qol!!

.opies or'rhe apprcved pan lo S'i oayanandanrornauon.nd necesssrv

PLA NNC MEM8ER/AIJIIIORISEOOFFICER

cy cad ri..ra idmodr.ro y.

A{,"."

Br'u baoeswa, Deveiopmenr Aullr o ily

*i{'roMaded ro the Land one. GA oeoadmenl Bhuban*warl in@seor

d 60, ol -. app o.coco.po€liodExecurve ofli.e, Khu,da Municpa ry/E:ecurive

/Eiecurve ofice, fto'i NAcro, nlo,malon

PLATINING MEMBER/AUTHORISEO OFFLCER

otussa Bhubaies$'lEnrorcemenl se.ron soa

PLANNING MEI{BER/AUTHORISED OFFICERBhubanesM. DevelopmenrAurho y