existing access control open plan - gpaa · 2016. 11. 15. · existing access control 4 m ... 7215...

6
T N IC 27 m² SCM SNR MANAGER CARPET TILE SECURITY 17 m² MANAGER OFFICE CARPET TILE 12 m² MANAGER OFFICE CARPET TILE 93 m² TENDER CENTRE CARPET TILE NEW EMERGENCY EXIT DOOR EXISTING ACCESS CONTROL 4 m² TENDER BOX CARPET 35 m² SCM STORE CARPET TILE Water cooler TV fixed to wall 1800x1800mm high Aluminium window Coffee table Coffee table 10 m² SECURITY ROOM TILE Granite top @ 1000mm high Granite top @ 850mm high 600x600 cabinet below granite top 600x600 cabinet below granite top 600x600 cabinet below granite top 600x600 cabinet below granite top Gun safe Metal detector Scanner Couch Drinking Fountain Wall to be plastered smooth and painted. Wall to be plastered smooth and painted. Wall to be plastered smooth and painted. Wall to be plastered smooth and painted. Wall to be plastered smooth. Wall paper to be installed Wall to be plastered smooth. Wall paper to be installed Wall to be plastered smooth. Red Mamoran finish to be applied. Wall to be plastered smooth. Red Mamoran finish to be applied. New Access control gated to be installed Wall to be plastered smooth. Wall paper to be installed 20mm thick laminated glass installed on top of Granite top by specialist Wall to be plastered smooth. Wall paper to be installed Wall to be plastered smooth. Wall paper to be installed NEW PORCELAIN TILES TO BE INSTALLED NEW PORCELAIN TILES TO BE INSTALLED NEW PORCELAIN TILES TO BE INSTALLED NEW PORCELAIN TILES TO BE INSTALLED D1 D1 D1 D1 D1 D1 5415 10405 115 4620 230 2500 230 8945 2255 7215 3000 3140 4060 1355 4360 5855 3140 4360 8995 5415 6300 4165 4675 1300 3005 3025 1650 6235 2320 2800 19 m² OFFICE CARPET TILE 10 m² OFFICE CARPET TILE 8 m² OFFICE CARPET TILE 95 m² RECEPTION PORCELAIN TILE 87 m² OPEN PLAN CARPET TILE TELEPHONE BOARD DOUBLE PLUG POINT 16AMP DISTRIBUTION BOARD TELEPHONE POINT NETWORK DATA POINT NEW 3 CHANNEL P/SKIRTING INSTALLED AT FLOOR LEVEL BIOMETRIC READER POP-UP IN DEST CONSIST OF: 2X NORMAL(WHITE) PLUGS 1XDATA POINT 2X DEDICATED(RED) PLUGS 1X 2-PIN EURO PLUG COPYRIGHT IS RESERVED NOTES: WORK STAGE PROJECT NO. DRAWING NO. REVISION PROJECT SCALE: DRAWING SITE: DRAWN BY: CHECKED BY: DRAWING DATE: PLOT DATE: COPYRIGHT IS VESTED IN THE PRACTICE IN TERMS OF THE COPYRIGHT ACT (ACT 98 OF 1978) Contact: Thabiso Cell: 073 353 3490 Email: [email protected] 2015/12/28 05:25:38 PM 1 : 50 D:\WORK\2015\GPAA\SCM-Reception\SCM-Reception.rvt RDM 2015/04/19 NEW OFFICE LAYOUT FOR GPAA: PRETORIA OFFICE GPAA PRETORIA OFFICE SCM-LAYOUT PLAN GPAA 100 4 0 TS REVISIONS Description: No.: Date:

Upload: others

Post on 01-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EXISTING ACCESS CONTROL OPEN PLAN - GPAA · 2016. 11. 15. · existing access control 4 m ... 7215 3000 3140 4060 1355 4360 5855 3140 4360 8995 5415 6300 4165 4675 1300 3005 ... carpet

T

N

IC

27 m²

SCM SNR MANAGERCARPET TILE

SECURITY

17 m²

MANAGER OFFICECARPET TILE

12 m²

MANAGER OFFICECARPET TILE

93 m²

TENDER CENTRECARPET TILE

NEW EMERGENCYEXIT DOOR

EXISTING ACCESS CONTROL

4 m²

TENDER BOXCARPET

35 m²

SCM STORECARPET TILE

Watercooler

TV fixed to wall

1800

x180

0mm

hig

hA

lum

iniu

m w

indo

wCof

fee

tabl

eC

offe

e ta

ble

10 m²

SECURITY ROOMTILE

Gra

nite

top

@ 1

000m

m h

igh

Gra

nite

top

@ 8

50m

m h

igh

600x600cabinetbelowgranite top

600x600cabinetbelowgranite top

600x

600

cabi

net

belo

wgr

anite

top

600x

600

cabi

net

belo

wgr

anite

top

Gun

saf

e

Metal detector Scanner

Couch

Drin

king

Fou

ntai

n

Wall to be plastered smooth and painted.

Wal

l to

be p

last

ered

sm

ooth

and

pai

nted

.

Wal

l to

be p

last

ered

sm

ooth

and

pain

ted.

Wall to be plastered smooth andpainted.

Wal

l to

be p

last

ered

sm

ooth

.W

all p

aper

to b

e in

stal

led

Wal

l to

be p

last

ered

sm

ooth

.W

all p

aper

to b

e in

stal

led

Wall to be plastered smooth. RedMamoran finish to be applied.

Wal

l to

be p

last

ered

sm

ooth

. Red

Mam

oran

fini

sh to

be

appl

ied.

New Access control gated to be installed

Wall to be plasteredsmooth. Wall paper tobe installed

20mm thick laminated glass installedon top of Granite top by specialist

Wall to be plastered smooth.Wall paper to be installed

Wal

l to

be p

last

ered

sm

ooth

. Wal

l pap

er to

be

inst

alle

d

NEW PORCELAINTILES TO BEINSTALLED

NEW PORCELAINTILES TO BEINSTALLED

NEW PORCELAINTILES TO BEINSTALLED

NEW PORCELAINTILES TO BEINSTALLED

D1

D1

D1

D1

D1

D1

5415 10405 115 4620 230 2500 230 8945 2255

7215

3000

3140

4060 1355

4360

5855

3140

4360

8995

5415 6300 4165 4675

1300

3005

3025 1650

6235

2320

2800

19 m²

OFFICECARPET TILE

10 m²

OFFICECARPET TILE

8 m²

OFFICECARPET TILE

95 m²

RECEPTIONPORCELAIN TILE

87 m²

OPEN PLANCARPET TILE

TELEPHONE BOARD

DOUBLE PLUG POINT 16AMP

DISTRIBUTION BOARD

TELEPHONE POINT

NETWORK DATA POINT

NEW 3 CHANNEL P/SKIRTINGINSTALLED AT FLOOR LEVEL

BIOMETRIC READER

POP-UP IN DEST CONSIST OF:2X NORMAL(WHITE) PLUGS 1XDATA POINT2X DEDICATED(RED) PLUGS 1X 2-PIN EURO PLUG

CO

PY

RIG

HT

IS

RE

SE

RV

ED

NOTES:

WORK STAGE

PR

OJE

CT

NO

.D

RA

WIN

G N

O. REVISION

PROJECT SCALE:

DRAWING

SITE:

DRAWN BY:

CHECKED BY:

DRAWING DATE:

PLOT DATE:

CO

PY

RIG

HT

IS V

ES

TE

D IN

TH

E P

RA

CT

ICE

IN T

ER

MS

OF

TH

E C

OP

YR

IGH

T A

CT

(A

CT

98

OF

197

8)

Contact: ThabisoCell: 073 353 3490

Email: [email protected]/12/28 05:25:38 PM

1 : 50

D:\WORK\2015\GPAA\SCM-Reception\SCM-Reception.rvt

RDM

2015/04/19

NEW OFFICE LAYOUT FOR GPAA: PRETORIA

OFFICE

GPAA PRETORIA OFFICE

SCM-LAYOUT PLAN

GPAA

100

4

0

TSREVISIONS

Description: No.: Date:

Page 2: EXISTING ACCESS CONTROL OPEN PLAN - GPAA · 2016. 11. 15. · existing access control 4 m ... 7215 3000 3140 4060 1355 4360 5855 3140 4360 8995 5415 6300 4165 4675 1300 3005 ... carpet

T

N

IC

TOP1200x1200600x600

AUTO MATION

TOP1200x1200600x600

TOP1200x1200600x600

TOP1200x1200600x600

TOP1200x1200600x600

TOP1200x1200600x600

TOP1200x1200600x600

TOP1200x1200600x600

TOP1200x1200600x600

TOP1200x1200600x600

TOP1200x1200600x600

TOP1200x1200600x600

PA

CARBINET

27 m²

SCM SNR MANAGERCARPET TILE

TOP600x600

TOP600x600

TOP600x600

TOP600x600

TOP600x600

TOP600x600

TOP600x600

TOP600x600

TOP600x600

TOP600x600

TOP600x600

TOP600x600

TOP600x600

TOP600x600

TOP600x600

TOP600x600

SECURITY

17 m²

MANAGER OFFICECARPET TILE

12 m²

MANAGER OFFICECARPET TILE 93 m²

TENDER CENTRECARPET TILE

DE

SK

1800

X90

0D

ES

K18

00X

900

DE

SK

1800

X90

0

NEW EMERGENCYEXIT DOOR

EXISTING ACCESS CONTROL

5-BAY BULK FILLER

7-B

AY

BU

LK F

ILLE

R

7-B

AY

BU

LK F

ILLE

R

4 m²

TENDER BOXCARPET

35 m²

SCM STORECARPET TILE

Watercooler

TV fixed to wall

1800

x180

0mm

hig

hA

lum

iniu

m w

indo

wCof

fee

tabl

eC

offe

e ta

ble

10 m²

SECURITY ROOMTILE

Coffeetable CouchCouch

Gra

nite

top

@ 1

000m

m h

igh

Gra

nite

top

@ 8

50m

m h

igh

600x600cabinetbelowgranite top

600x600cabinetbelowgranite top

600x

600

cabi

net

belo

wgr

anite

top

600x

600

cabi

net

belo

wgr

anite

top

Gun

saf

e

Metal detector Scanner

Couch

Drin

king

Fou

ntai

n

Wall to be plastered smooth andpainted.

Wal

l to

be p

last

ered

sm

ooth

and

pai

nted

.

Wal

l to

be p

last

ered

sm

ooth

and

pain

ted.

Wall to be plastered smooth andpainted.

Wal

l to

be p

last

ered

sm

ooth

.W

all p

aper

to b

e in

stal

led

Wal

l to

be p

last

ered

sm

ooth

.W

all p

aper

to b

e in

stal

led

Wall to be plastered smooth. RedMamoran finish to be applied.

Wal

l to

be p

last

ered

sm

ooth

. Red

Mam

oran

fini

sh to

be

appl

ied.

New Access control gated to be installed

Wall to be plasteredsmooth. Wall paper tobe installed

20mm thick laminated glass installedon top of Granite top by specialist

Wall to be plastered smooth.Wall paper to be installed

Wal

l to

be p

last

ered

sm

ooth

.W

all p

aper

to b

e in

stal

led

NEW PORCELAINTILES TO BEINSTALLED

NEW PORCELAINTILES TO BEINSTALLED

NEW PORCELAINTILES TO BEINSTALLED

NEW PORCELAINTILES TO BEINSTALLED

D1

D1

D1

D1

D1

D1

TELEPHONE BOARD

DOUBLE PLUG POINT 16AMP

DISTRIBUTION BOARD

TELEPHONE POINT

NETWORK DATA POINT

NEW 3 CHANNEL P/SKIRTINGINSTALLED AT FLOOR LEVEL

BIOMETRIC READER

POP-UP IN DEST CONSIST OF:2X NORMAL(WHITE) PLUGS 1XDATA POINT2X DEDICATED(RED) PLUGS 1X 2-PIN EURO PLUG

CO

PY

RIG

HT

IS

RE

SE

RV

ED

NOTES:

WORK STAGE

PR

OJE

CT

NO

.D

RA

WIN

G N

O. REVISION

PROJECT SCALE:

DRAWING

SITE:

DRAWN BY:

CHECKED BY:

DRAWING DATE:

PLOT DATE:

CO

PY

RIG

HT

IS V

ES

TE

D IN

TH

E P

RA

CT

ICE

IN T

ER

MS

OF

TH

E C

OP

YR

IGH

T A

CT

(A

CT

98

OF

197

8)

Contact: ThabisoCell: 073 353 3490

Email: [email protected]/12/28 05:25:42 PM

1 : 50

D:\WORK\2015\GPAA\SCM-Reception\SCM-Reception.rvt

RDM

2015/12/24

NEW OFFICE LAYOUT FOR GPAA: PRETORIA

OFFICE

GPAA PRETORIA OFFICE

SCM-FURNITURE LAYOUT

GPAA

200

4

0

TSREVISIONS

Description: No.: Date:

Page 3: EXISTING ACCESS CONTROL OPEN PLAN - GPAA · 2016. 11. 15. · existing access control 4 m ... 7215 3000 3140 4060 1355 4360 5855 3140 4360 8995 5415 6300 4165 4675 1300 3005 ... carpet

T

N

IC

27 m²

SCM SNR MANAGERCARPET TILE

SECURITY

17 m²

MANAGER OFFICECARPET TILE

12 m²

MANAGER OFFICECARPET TILE

93 m²

TENDER CENTRECARPET TILE

NEW EMERGENCYEXIT DOOR

EXISTING ACCESS CONTROL

4 m²

TENDER BOXCARPET

35 m²

SCM STORECARPET TILE

Watercooler

TV fixed to wall

1800

x180

0mm

hig

hA

lum

iniu

m w

indo

w

10 m²

SECURITY ROOMTILE

Gra

nite

top

@ 1

000m

m h

igh

Metal detector Scanner

Couch

Drin

king

Fou

ntai

n

Wall to be plastered smooth and painted.

Wal

l to

be p

last

ered

sm

ooth

and

pai

nted

.

Wal

l to

be p

last

ered

sm

ooth

and

pain

ted.

Wall to be plastered smooth and painted.

Wal

l to

be p

last

ered

sm

ooth

.W

all p

aper

to b

e in

stal

led

Wal

l to

be p

last

ered

sm

ooth

.W

all p

aper

to b

e in

stal

led

Wall to be plastered smooth. RedMamoran finish to be applied.

Wal

l to

be p

last

ered

sm

ooth

. Red

Mam

oran

fini

sh to

be

appl

ied.

New Access control gated to be installed

Wall to be plasteredsmooth. Wall paper tobe installed

20mm thick laminated glass installedon top of Granite top by specialist

Wall to be plastered smooth.Wall paper to be installed

Wal

l to

be p

last

ered

sm

ooth

. Wal

l pap

er to

be

inst

alle

d

NEW PORCELAINTILES TO BEINSTALLED

NEW PORCELAINTILES TO BEINSTALLED

NEW PORCELAINTILES TO BEINSTALLED

NEW PORCELAINTILES TO BEINSTALLED

D1

D1

D1

D1

D1

D1

87 m²

OPEN PLANCARPET TILE

95 m²

RECEPTIONPORCELAIN TILE

8 m²

OFFICECARPET TILE

10 m²

OFFICECARPET TILE

19 m²

OFFICECARPET TILE

TELEPHONE BOARD

DOUBLE PLUG POINT 16AMP

DISTRIBUTION BOARD

TELEPHONE POINT

NETWORK DATA POINT

NEW 3 CHANNEL P/SKIRTINGINSTALLED AT FLOOR LEVEL

BIOMETRIC READER

POP-UP IN DEST CONSIST OF:2X NORMAL(WHITE) PLUGS 1XDATA POINT2X DEDICATED(RED) PLUGS 1X 2-PIN EURO PLUG

CO

PY

RIG

HT

IS

RE

SE

RV

ED

NOTES:

WORK STAGE

PR

OJE

CT

NO

.D

RA

WIN

G N

O. REVISION

PROJECT SCALE:

DRAWING

SITE:

DRAWN BY:

CHECKED BY:

DRAWING DATE:

PLOT DATE:

CO

PY

RIG

HT

IS V

ES

TE

D IN

TH

E P

RA

CT

ICE

IN T

ER

MS

OF

TH

E C

OP

YR

IGH

T A

CT

(A

CT

98

OF

197

8)

Contact: ThabisoCell: 073 353 3490

Email: [email protected]/12/28 05:25:44 PM

1 : 50

D:\WORK\2015\GPAA\SCM-Reception\SCM-Reception.rvt

Checker

NEW OFFICE LAYOUT FOR GPAA: PRETORIA

OFFICE

GPAA PRETORIA OFFICE

SCM-FLOOR FINISHES

GPAA

300

4

0

AuthorREVISIONS

Description: No.: Date:

Page 4: EXISTING ACCESS CONTROL OPEN PLAN - GPAA · 2016. 11. 15. · existing access control 4 m ... 7215 3000 3140 4060 1355 4360 5855 3140 4360 8995 5415 6300 4165 4675 1300 3005 ... carpet

T

N

IC

TELEPHONE BOARD

DOUBLE PLUG POINT 16AMP

DISTRIBUTION BOARD

TELEPHONE POINT

NETWORK DATA POINT

NEW 3 CHANNEL P/SKIRTINGINSTALLED AT FLOOR LEVEL

BIOMETRIC READER

POP-UP IN DEST CONSIST OF:2X NORMAL(WHITE) PLUGS 1XDATA POINT2X DEDICATED(RED) PLUGS 1X 2-PIN EURO PLUG

CO

PY

RIG

HT

IS

RE

SE

RV

ED

NOTES:

WORK STAGE

PR

OJE

CT

NO

.D

RA

WIN

G N

O. REVISION

PROJECT SCALE:

DRAWING

SITE:

DRAWN BY:

CHECKED BY:

DRAWING DATE:

PLOT DATE:

CO

PY

RIG

HT

IS V

ES

TE

D IN

TH

E P

RA

CT

ICE

IN T

ER

MS

OF

TH

E C

OP

YR

IGH

T A

CT

(A

CT

98

OF

197

8)

Contact: ThabisoCell: 073 353 3490

Email: [email protected]/12/28 05:25:45 PM

1 : 50

D:\WORK\2015\GPAA\SCM-Reception\SCM-Reception.rvt

Checker

NEW OFFICE LAYOUT FOR GPAA: PRETORIA

OFFICE

GPAA PRETORIA OFFICE

ELECTRICAL LIGHTING

GPAA

400

AuthorREVISIONS

Description: No.: Date:

Page 5: EXISTING ACCESS CONTROL OPEN PLAN - GPAA · 2016. 11. 15. · existing access control 4 m ... 7215 3000 3140 4060 1355 4360 5855 3140 4360 8995 5415 6300 4165 4675 1300 3005 ... carpet

T

N

IC

TELEPHONE BOARD

DOUBLE PLUG POINT 16AMP

DISTRIBUTION BOARD

TELEPHONE POINT

NETWORK DATA POINT

NEW 3 CHANNEL P/SKIRTINGINSTALLED AT FLOOR LEVEL

BIOMETRIC READER

POP-UP IN DEST CONSIST OF:2X NORMAL(WHITE) PLUGS 1XDATA POINT2X DEDICATED(RED) PLUGS 1X 2-PIN EURO PLUG

PA

27 m²

SCM SNR MANAGERCARPET TILE

SECURITY

17 m²

MANAGER OFFICECARPET TILE

12 m²

MANAGER OFFICECARPET TILE 93 m²

TENDER CENTRECARPET TILE

5-BAY BULK FILLER

7-B

AY

BU

LK F

ILLE

R

7-B

AY

BU

LK F

ILLE

R

4 m²

TENDER BOXCARPET

35 m²

SCM STORECARPET TILE

10 m²

SECURITY ROOMTILE

D1

D1

D1

D1

D1

D1

CO

PY

RIG

HT

IS

RE

SE

RV

ED

NOTES:

WORK STAGE

PR

OJE

CT

NO

.D

RA

WIN

G N

O. REVISION

PROJECT SCALE:

DRAWING

SITE:

DRAWN BY:

CHECKED BY:

DRAWING DATE:

PLOT DATE:

CO

PY

RIG

HT

IS V

ES

TE

D IN

TH

E P

RA

CT

ICE

IN T

ER

MS

OF

TH

E C

OP

YR

IGH

T A

CT

(A

CT

98

OF

197

8)

Contact: ThabisoCell: 073 353 3490

Email: [email protected]/12/28 05:25:48 PM

1 : 50

D:\WORK\2015\GPAA\SCM-Reception\SCM-Reception.rvt

Checker

NEW OFFICE LAYOUT FOR GPAA: PRETORIA

OFFICE

GPAA PRETORIA OFFICE

ELECTRICAL LAYOUT

GPAA

500

AuthorREVISIONS

Description: No.: Date:

Page 6: EXISTING ACCESS CONTROL OPEN PLAN - GPAA · 2016. 11. 15. · existing access control 4 m ... 7215 3000 3140 4060 1355 4360 5855 3140 4360 8995 5415 6300 4165 4675 1300 3005 ... carpet

T

N

IC

TELEPHONE BOARD

DOUBLE PLUG POINT 16AMP

DISTRIBUTION BOARD

TELEPHONE POINT

NETWORK DATA POINT

NEW 3 CHANNEL P/SKIRTINGINSTALLED AT FLOOR LEVEL

BIOMETRIC READER

POP-UP IN DEST CONSIST OF:2X NORMAL(WHITE) PLUGS 1XDATA POINT2X DEDICATED(RED) PLUGS 1X 2-PIN EURO PLUG

27 m²

SCM SNR MANAGERCARPET TILE

SECURITY

17 m²

MANAGER OFFICECARPET TILE

12 m²

MANAGER OFFICECARPET TILE

93 m²

TENDER CENTRECARPET TILE

4 m²

TENDER BOXCARPET

35 m²

SCM STORECARPET TILE

10 m²

SECURITY ROOMTILE

D1

D1

D1

D1

D1

D1

5415 10405 115 4620 230 2500 230 8945 2255

7215

3000

3140

4060 1355

4360

5855

3140

4360

8995

5415 6300 4165 4675

1300

3005

3025 1650

6235

2320

2800

19 m²

OFFICECARPET TILE

10 m²

OFFICECARPET TILE

8 m²

OFFICECARPET TILE

95 m²

RECEPTIONPORCELAIN TILE

87 m²

OPEN PLANCARPET TILE

CO

PY

RIG

HT

IS

RE

SE

RV

ED

NOTES:

WORK STAGE

PR

OJE

CT

NO

.D

RA

WIN

G N

O. REVISION

PROJECT SCALE:

DRAWING

SITE:

DRAWN BY:

CHECKED BY:

DRAWING DATE:

PLOT DATE:

CO

PY

RIG

HT

IS V

ES

TE

D IN

TH

E P

RA

CT

ICE

IN T

ER

MS

OF

TH

E C

OP

YR

IGH

T A

CT

(A

CT

98

OF

197

8)

Contact: ThabisoCell: 073 353 3490

Email: [email protected]/12/28 05:25:51 PM

1 : 50

D:\WORK\2015\GPAA\SCM-Reception\SCM-Reception.rvt

RDM

2015/12/28

NEW OFFICE LAYOUT FOR GPAA: PRETORIA

OFFICE

GPAA PRETORIA OFFICE

WALL FINISHES

GPAA

600

4

0

TSREVISIONS

Description: No.: Date: