EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed be needed to clarify the followings: Interior design and furniture specifications Electro-Mechanical Design IT Equipment layout based on generic equipment data. Infra-structure systems design for medical and support services based on generic equipment data. Infra-structural contractual specifications and drawings based on generic equipment data.

Upload: corey-james

Post on 27-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed

EXISTED SITUATION OF HOSPITAL

1. Feasability of the hospital is necessary.2. Construction Completed as informed.3. Architectural Detay Drawings Completed be needed to clarify the

followings: Interior design and furniture specifications Electro-Mechanical Design IT Equipment layout based on generic equipment data. Infra-structure systems design for medical and support services based on generic equipment data. Infra-structural contractual specifications and drawings based on generic equipment data.

Page 2: EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed

EQUIPMENT PURCHASE

1. Analysis of hospital equipment needs and preparation of a requirements list.

Page 3: EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed

EQUIPMENT PURCHASE

2. Preparation of Request for Proposals (RFP) or Request for Quotation (RFQ) documents which will consist of the following three parts:

1. Administrative Specifications.Required proposal or quotation method.

2. Technical Specifications.3. Draft contract including warranty conditions and

after-warranty maintenance agreement.

Page 4: EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed

EQUIPMENT PURCHASE

3. Evaluation of offers based on objective criteria for brand and model selection:1. Correction of deficiencies and

standardization of offers.

2. Price and feature comparison tables.

Page 5: EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed

EQUIPMENT PURCHASE

4. Price and contract terms negotiations and final selection.

Page 6: EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed

EQUIPMENT PURCHASE

5. Commissioning support:

1. Pre-acceptance test.2. Trial period management.3. Final-acceptance check.

Page 7: EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed

EQUIPMENT PURCHASE

5. Warranty and maintenance management support. A well maintained equipment provides the following benefits to its owner:

1. Longer service life 2. Increased up-time3. Increased safety to patients and operators through

inspection and preventive maintenance.4. Better accuracy and faster service times as a result of

superior performance obtained through periodic maintenance and calibration.

Page 8: EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed

EQUIPMENT MANAGEMENT SYSTEM

1. :Keep your medical equipment at the best of its standard performance by helping the hospital

« to establish a computerized medical equipment management system «

with the following capabilities

1. Organize an in-house biomedical engineering department2. An inventory system for equipment, its spare parts, accessories, location,

manufacturer, representative, etc.3. A planned preventive maintenance (PPM) system scheduling and

recording regular maintenance activities during warranty period and afterwards.

4. A corrective maintenance system keeping track of failures and repair activities.

Page 9: EXISTED SITUATION OF HOSPITAL 1.Feasability of the hospital is necessary. 2.Construction Completed as informed. 3.Architectural Detay Drawings Completed

EQUIPMENT PURCHASE

THANK YOU