Exhibit Planning & Design Task 4 Submittal RFP 11-001 Production Documents, Book 1 of 3 Exhibit Design Drawings Material and finishes AV equipment specifications Reference material for specialized elements Submitted to: NJ Pinelands Commission New Lisbon, NJ Submitted by: Content • Design Collaborative LLC Scituate, Massachusetts

Upload: vuque

Post on 29-May-2019

221 views

Category:

Documents


1 download

TRANSCRIPT

Exhibit Planning & Design

Task 4 Submittal RFP 11-001

Production Documents, Book 1 of 3Exhibit Design Drawings

• Material and finishes• AV equipment specifications• Reference material for specialized

elements

Submitted to:NJ Pinelands CommissionNew Lisbon, NJ

Submitted by: Content•DesignCollaborativeLLCScituate, Massachusetts

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

0.0

Table of Contents

SSDrawn by:

2.15.12 Task 3

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pine

land

s C

omm

issi

on

Table of Contents

0.1 Exhibit Plan

0.2 Exhibit Gallery Plan

0.3 Wall Location

0.4 Reflected Ceiling Plan

0.5 Overall Wall Elevation

1.0 Introduction Area

1.1 Touchable Map

1.2 Hidden Wonders Wall

1.3 Hidden Wonders Flip Up Panels

2.0 Area 2.0 Geology

2.1 Geology

2.2 Details

2.3 Aquifer Interactive

2.4 Aquifer Interactive

3.0 Area 3.0 Uplands

3.1 Uplands Elevations

3.2 Details

3.3 Flipbook

4.0 Area 4.0 Wetlands

4.1 Wetlands Elevations

5.0 Area 5.0 Surface Waters

5.1 Elevations and Details

5.2 Cedar Water Interactive

5.3 Cedar Water Interactive

6.0 Pinelands Resources

6.1 Elevations

6.2 Elevations

6.3 Object Reference Key

6.4 Graphic Rail Details

7.0 Map Graphic

7.1 Video & Frame Details

8.0 General Details

8.1 Renderings

5.31.12 Task 4NoteUse this book in conjunction with • Book 2 Graphics • Book 3 Content/Technical

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

0.1

Exhibit Plan

SSDrawn by:

8.30.11 Review

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pine

land

s C

omm

issi

on

3/16" = 1'-0"Exhibit Plan1

14'-

2"

21'-8 3/4"

1.0 Introduction

6.0 Natural Resources

3.0 The Pine Uplands

4.0 Wetlands

5.0 Water

2.0 Geology

New Receptionist Area

Elevation KeySheet-Detail

1.1-2 Touchable Map

1.2-1 Flap Interactive Wall

2.0-1 Geology

3.1-1 The Pineland Uplands

4.1-1 The Wetlands

5.1-2 Surface Waters

6.0 Natural Resources

7.0-1 Graphic Panel

7.0-2 Screen

2.1

4.1

1.2

1.12

3

1

1

5.0

1

6.0

7.0 1

2

2.15.12 Task 3

7.0 Lobby

7.1 Welcome

7.3 Video

7.2 Orientation

7.4 Smartboard

13.1

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

0.2

Exhibit Gallery Plan

SSDrawn by:

8.30.11 Review

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pine

land

s C

omm

issi

on

3/8" = 1'-0"Exhibit Gallery Plan1

14'-

2"

21'-9"

9'-5

"

4'-0

"

1.12 Topo Map

1.2 Hidden Wonders

2.3 Aquifer Interactive

3.5 Serotiny Video

4.3 Terrarium

5.5 Aquarium

5.3 Cedar Water Interactive

2.1 Feel the difference

1.0 Introduction

6.0 Pinelands Resources

3.0 Uplands

4.0 Wetlands

5.0 Surface Waters

2.0 Geology

3.6

3.2 Case

Aquarium access door

0.52

Note:Changes to wall; window removal and door installation are completed by the General Contractor

2.15.12 Task 3

3.3

4.5

4.6

3.4

5.4

Key1.1 Introduction graphic1.12 Topographical map1.13 Topo map base2.0 Geology graphic2.1 Feel the difference interactive2.3 Aquifer interactive3.0 Uplands graphic3.1 Area strip graphic3.2 Case3.3 Flipbook3.4 Snake model3.5 Serotiny video3.6 Case4.0 Wetlands graphic

4.1 Area strip graphic4.3 Terrarium tree frog4.42 Changeable label4.5 Flipbook4.6 Boat case5.0 Surface waters /1.2

Hidden wonders graphic5.1 Area strip graphic5.3 Cedar water interactive5.4 Flipbook5.5 Aquarium6.0 Pinelands resources6.1 Reader rail: Bog iron6.2 Reader rail: Sand

3.1

4.1

5.1

6.1

6.2

6.3

6.4

6.5

1.11.13 Base

7.1 Welcome Text

4.425.51

5.31.12 Task 4

6.3 Reader rail: Charcoal6.4 Reader rail: Cedar6.5 Reader rail: Piney lingo6.6 Ceiling graphic7.1 Welcome text7.2 Map7.3 Video frame

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

0.3

Wall Location

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pine

land

s C

omm

issi

on

14'-

2"

21'-9"

R 6'-11 1/2''

R 1

0'-6

''

R 108'-3''

R 23'-11 1/2''

R 18'-5''

R 1

8'-1

1/2

''

R 10'-4''

R 40'-9''

R 31'-7 1/2''

R 33'

R 17'-6 1/2''

L 9

'-10

''

L 3'-2''

L 8'-5''

L 4'-4''

L 4'-3''

L 6

'-5'

'

L 7'-5 1/2''

L 6'-8''

L 5'

L 1'6''

L 5'-5''

3/8" = 1'-0"Exhibit Gallery Plan1

Exhibit Wall Specifications

-Typical plywood and MDF construction

-Curves must be smooth and true from top to bottom

-Paint back of walls

BaffleSee sheet 8.0 for details

2.15.12 Task 3

Power Required

5.31.12 Task 4

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

0.4

Reflected Ceiling Plan

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

3/16" = 1'-0"Lighting Plan1

14'-

2"

21'-8 3/4"

2'-2

3/4

"

Lighting SpecificationsLume LEX series C (600 lumen)Beam spread 10°-60°

Manufacturer and contact:Gordon [email protected] Services Inc

2.15.12 Task 35.31.12 Task 4

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

0.5

Wall Elevation

SSDrawn by:

8.30.11 Review

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pine

land

s C

omm

issi

on

3/16" = 1'-0"Flattened Elevation 3

R 12' R 12'2'' R 2895'5''

8'-8

"

7'-6

"

3'-3

1/2

"

1.2 Flap Interactive Wall

5.0 Surface Water4.0 Wetlands3.0 Pine Uplands2.0 The Land

3/16" = 1'-0"Entry Elevation 1

3/16" = 1'-0"Entry Section2

3/16" = 1'-0"Topographical Map Elevation 4

3/16" = 1'-0"7.3 Map Elevation 5

3/16" = 1'-0"Quote Elevation 6

3/16" = 1'-0"Video Elevation 7

3'-1"

6'-0

"

BaffleExhibit wall

2.15.12 Task 3

2.0

2.12.3

3.2

3.0

3.1

3.5 3.3 3.4

3.6 4.14.0

4.3

4.6

4.5

5.05.3 5.4

5.5 1.2

Access door

1.1

1.13

7.2

Key1.1 Introduction graphic1.12 Topographical map1.13 Topo map base2.0 Geology graphic2.1 Feel the difference interactive2.3 Aquifer interactive3.0 Uplands graphic3.1 Area strip graphic3.2 Case3.3 Flipbook3.4 Snake model3.5 Serotiny video3.6 Case4.0 Wetlands graphic

4.1 Area strip graphic4.3 Terrarium tree frog4.42 Changeable label4.5 Flipbook4.6 Boat case5.0 Surface waters /1.2

Hidden wonders graphic5.1 Area strip graphic5.3 Cedar water interactive5.4 Flipbook5.5 Aquarium5.51 Changeable label6.0 Pinelands resources6.1 Reader rail: Bog iron6.2 Reader rail: Sand

6.3 Reader rail: Charcoal6.4 Reader rail: Cedar6.5 Reader rail: Piney lingo6.6 Ceiling graphic7.1 Welcome text7.2 Map7.3 Video frame

7.1

7.31.12

5.1

5.31.12 Task 4

Speaker

4.42

5.51

6.18.12 Update

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

1.0

1.0 Introduction Area

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

Area 1 Introduction

There are two components in this area: 1.1 Introduction, a combination of graphic panel and tactile topo map, and 1.2 Hidden Wonders, a curved graphic mural wall with 16 horizontally opening flaps built into the wall. The flaps must be durable, quiet, and must return from open to close position automatically. We recommend a cord and weight type system. The topo map will be provided by a company Solid Terrain Modeling in California or equivalent.

2.15.12 Task 31/4" = 1'-0"

Area 1.0 Plan 1

1.12 Topo Map

1.2 Hidden Wonders

1.0 Introduction

1.1

1.13 Base

5.31.12 Task 4

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

1.1

1.1 Touchable Map

SSDrawn by:

8.30.11 Review

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pine

land

s C

omm

issi

on

4'-0"

4'-3

1/2

"

7'-6

"

15°

2'-8

1/2

"

3'-2

1/2

"

2"

3/4" = 1'-0"Plan 1

3/4" = 1'-0"Front Elevation 2

3/4" = 1'-0"Side Elevation 3

R 24''

Note:Exhibit contractor responsible to level exhibit and to ensure there is no gap between topo map base and wall graphic

1.1

2.15.12 Task 3

3" = 1'-0"Graphic Panel Detail4

1"

Metal rim

Woodenbase with

appliedgraphic

Metal rim

Wall

Phenolic graphic panel

6" = 1'-0"

Base Detail5

Bendable plywood base

Graphic

6" = 1'-0"Metal Rim Detail6

Inset topographical map

Painted contour surface

Existing wall

1.13

Metal rim

Topographical map

1.12

Topo Map SpecificationMedium density foam laser cut topo map with printed surface with satin clear coat, from Solid Terrain Modeling 800-548-7621 or equivalent

Topo map is screwed in from below so it can be replaced

5.31.12 Task 4

Phenolic panel

GWB building wall

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

1.2

1.2 Hidden Wonders Wall

SSDrawn by:

8.30.11 Review

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

1" = 1'-0"1.2 Flattened Elevation 1

Portion of wall in common area

7"5"

7"

5"6 1/2"5"5"8"7"5 1/2" 2 1/2"

6 1/

2"7"

1'-2 1/2"

2'-3

"7"

6"

8"7 1/2"

T

F D

XEAZ

K W M O J

H Q VL

Hinged Graphic Flaps

1.2

1/2" = 1'-0"1.2 Axon View 2

2.15.12 Task 35.31.12 Task 4

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

1.3

1.2 Hidden Wonders Flip Up Panels

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

3" = 1'-0"Flip Panel Horizontal 1

110°

7"

5"

1/2"1"

1"2"

1/2"

110°

5"

7"

3"

1/2"

3" = 1'-0"Flip Panel Vertical 2

3" = 1'-0"Flip Panel Axon 3

2.15.12 Task 3

Phenolic graphic panel

Exhibit Wall

Handle

Inset graphic surface

Hinge

5.31.12 Task 4

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

2.0

Area 2.0 Geology

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pine

land

s C

omm

issi

on

Area 2 Geology

This area is made of four components: the exhibit wall, sand and gravel cases, scenic (painted) wall sections, and aquifer interactive. The sand and gravel cases are filled with actual sand and gravel from the Pinelands that has been disinfected. The aquifer interactive contains acrylic sand, polished stone and other material to simulate the action of water being absorbed by the aquifer. During the prototype phase, the use of actual materials can be investigated. It is not intended to visually duplicate the strata, but to evoke the idea. The liquid being used to simulate water will have bromide or other disinfectant added for stability.

SubmittalsThe Exhibit Contractor must create a prototype that can be used by the NJ Pinelands Commission for testing with school groups. It can be a table top version but must be similar in scale and will be used to test the interactive process.

The intention of the rubber ring at the touch hole is to remove any sand that adhered to the visitors finger tip. The entire structure is removable for filling with new sand or gravel as needed.

In addition to the submittals above, see the graphics schedule for graphics submittals and shop drawings that will be submitted.

2.15.12 Task 3

1/4" = 1'-0"Area 2.0 Plan 1

2.3 Aquifer Interactive

2.1 Feel the difference

2.0 Geology

5.31.12 Task 4

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

2.1

Geology

SSDrawn by:

8.30.11 Review

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

7'-6

"

3'-3

1/2

"

4'-1

1/4

"

6"7"

7 1/

2"6"

2'-0"

6"

6"

5 1/

2"

8"

2.1 Feel thedifference interactive

2.3 Aquifer interactive

1 Translucent wall

2 Clear curved acrylic face

B

C

K

A

Bridgeton

Cohansey

Kirkwood

Alloway

Painted dimensional layers

3 Painted base layer

R 12' R 12'2'' R 2895'5''

3/4" = 1'-0"2.0 Flattened Elevation 3

3/4" = 1'-0"Plan 1

3/4" = 1'-0"2.0 Section2

2.0

Note:See sheet 0.3 for wall area details

2.15.12 Task 3

2.12

Note:Exhibit wall extends past this edge

2.31

SpecificationsTop 3 dimensional layers scenically painted to match graphic sample provided by designer

Base color:Matthews acrylic poly. MP11705 Chocolate Thunder

5.31.12 Task 4

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

2.2

Feel the Difference Interactive

SSDrawn by:

8.30.11 Review

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion6" = 1'-0"

Hole Detail1

Acrylic soil containers

Acrylic back

2.15.12 Task 3

7"9

1/2"

5"5"

6 1/

2"

7"

7 1/

2"

3"

2"

1"

1-1/2" = 1'-0"Sand Case Plan2

1-1/2" = 1'-0"Sand Case Front Elevation3

1-1/2" = 1'-0"Cases Plan4

Gravel

Coarse Sand

Fine Sand

Clay

1" = 1'-0"Sand Case Exploded View5

1/6'' Rubber lip

Acrylic

Soil

Start the water cycle

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

2.3

AquiferInteractive

EPMDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pine

land

s C

omm

issi

on

2.15.12 Task 3

Graphics prompt the visitor to start interactive by pushing button at right to start rain sequence

1

1

Pump motor is actuated and forces water from lower reservior to upper reservior where is begins to 'rain' upon the Pinelands

2

2

2

Rainfall fills the Pinelands, between 1 quart and 2 quarts of blue-tinted, bromide treated water

3

Water is slowly absorbed by the aquifer4

Start the water cycle

Start the water cycle

3

4

Once water is absorbed it is visible contained in the aquifer until button is pushed to restart the cycle.

5

5

Specifications

Sand and gravel is synthetic or polished and discinfected sand and gravel.

Synthetic or natural sand and gravel color should match actual sand and gravel used in adjacent tactile exhibit as close as possible.

Back wall has graphic that is the same as the mural wall graphic.

Pump must be located in a ventilated and sound proof enclosure and must use the building power supply.

Pump is a typical aquarium pump similar to a Iwaki WMD-30RLXT Pump

Aquifer interactive enclosure is metal with a 2 part Matthews acrylic polyurethane or equal.

Acrylic is an abrasion resistant type, Exhibit Contractor must provide recommended cleaning instructions to prevent accidental surface wear due to improper cleanser use.

Water return holes

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

2.4

Water Interactive

EPMDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

4

609-

894-

7300

New

Jer

sey

Pine

land

s C

omm

issi

on

2.15.12 Task 3

2'-0" 3 1/4"

10 1

/2"

2"

2 1/

4"2"

4 3/8"

5"

Exhibit wall

Interactive structure

Building wall

Circulation pump

Assembled view

Sand and gravel chambers

Acrylic scenic elements

Lower opaque clay ayers

Upper reservior

Aquifer interactive body

Button

Acrylic face

Sand and gravel layers

Opaque layers

Scenic Pinelands cut-out

Control button

Exhibit wall

Lower reservoir

Return line

Upper reservoir

Feed line

Flex line connection to pup

1-1/2" = 1'-0"Interactive detail plan and front1

1-1/2" = 1'-0"Section2

1-1/2" = 1'-0"Interactive detail plan2

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

3.0

Area 3.0 Uplands

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

Area 3 Uplands

This area consists of an exhibit wall, two artifact cases that are partially protruding from the wall, with one of the cases containing a small embedded video, a flip book structure mounted directly to the wall, and finally a snake artifact also mounted directly to the wall. The audio is located in the suspended ceiling above. The mural exhibit wall has a large base that is a continuation of the base on Area 2, and has a baffle area that provides an environmental infill between the top of the exhibit wall and the room ceiling.

SubmittalsThere are no special submittals for this area. See the graphics specifications for information on the media component and shop drawings.

CoordinationThe exhibit contractor is responsible for the continuous loop video and ambient audio as well as confirming the correct alignment of graphics and casework.

2.15.12 Task 3

1/4" = 1'-0"

Area 3.0 Plan 1

3.5 Serotiny Video

3.0 Uplands

3.6

3.2 Case

3.3

3.4

3.1

5.31.12 Task 4

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

3.1

Uplands Elevations

SSDrawn by:

8.30.11 Review

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pine

land

s C

omm

issi

on

Line of suspended clg.

1/2" = 1'-0"3.0 Flattened Elevation 1

20'-6 3/8"

8"

2'-1"

3'-7

" 4'-4

"

1'-6 1/2"

1'-7

"

10"

2'-1

0"

2'-0

"

3.5 Serotiny Video

3.2 Case

3.6 Case

Note:Final video cut-out to be determined by EC upon procurement of equipment

3.0

2.15.12 Task 3

1/2" = 1'-0"

3.0 Section 2

3.3 Flipbook 3.4 Snake

Model

3.1

3.21

3.61

5.31.12 Task 4

3.12

SpeakerSpeaker

Artifact case

Video panel

NoteTest speaker location prior to final installation on site

6.14.12 Speaker

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

3.2

Details

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pine

land

s C

omm

issi

on

3" = 1'-0"7

Case mounting detail

2'-1"

6 1/

2"

3"

1-1/2" = 1'-0"1

1'-6 1/2"

1'-7

"

3.6 Case Plan

2.15.12 Task 3

7"1'-1"

1'-6 3/4"

1'-1

"

7"Basketartifact

2'-1"

2'-0

"

3"6 1/2"

1-1/2" = 1'-0"2

3.6 Case Front Elevation

1-1/2" = 1'-0"3

3.6 Case Side Elevation

1-1/2" = 1'-0"4

3.2 Case Plan

1-1/2" = 1'-0"5

3.2 Case Front Elevation

1-1/2" = 1'-0"6 3.2 Case Side Elevation

7

Painted

Acrylic case

Graphic mural

3.5 Videoscreen

Video screen

Back of exhibit wall

Mountingbracket

Graphicmural

Acryliccase

Mountingbracket

Case

Graphic

Graphic surface

Graphic

3.213.61

Note:See sheet 8.0 for video details and specifications

AudioPower

5.31.12 Task 4

Power & Signal

Artifactlabel

6.18.12 Update

Barkspecimen

Pine cones

Pitch pine branch specimen

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

3.3

Flipbook

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

7 1/

2"10

1/2

"1'-7 1/2"

9"

11"

3" = 1'-0"1

Flip Book Plan

3" = 1'-0"2

Side Elevation

3" = 1'-0"3

Front Elevation

3" = 1'-0"4

Single Page Detail

Graphic mural

Wooden base

2.15.12 Task 3

Phenolic panel

Exhibit wall

Metal hinge

Double-sidedphenolic panel

Fixed outer panel

Fixed outer panel

4.3 Terrarium

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

4.0

Area 4.0 Wetlands

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

Area 4 Wetlands

In addition to the exhibit wall with base and mural graphics, there is a surface mounted case with a half model of a Barnegat Bay sneakbox with sail. In addition, there is also the typical flip book structure and a terrarium (from Showcase cages) mounted on a slide-out system. The terrarium has a bezel frame that is removable for access. A label will be provided for mounting and placement next to the terrarium.A graphic panel is also provided that covers the terrarium opening in the event that there is no species available. The terrarium and model are provided by the exhibit contractor.

SubmittalThere are no special submittals for this area. See the graphics specifications and provide shop drawings.

CoordinationThe exhibit contractor is responsible to ensure the artifact case and model are the correct size, as well as confirming the correct alignment of graphics and casework.

2.15.12 Task 3

1/4" = 1'-0"

Area 4.0 Plan 1

4.0 Wetlands

4.54.6

4.14.42

5.31.12 Task 4

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

4.1

Wetlands Elevations

SSDrawn by:

8.30.11 Review

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

1/2" = 1'-0"4.0 Flattened Elevation 1

2'-0"1'

-6"

2'-1

1"

10" 8'-6 1/2"

2'-1

1 1/

2"

1'-5

1/2

"

1'-7 1/2"

Line of suspended clg.

4.3 Terrarium:Tree Frog

4.0

4"

1/2" = 1'-0"Section 2

3" = 1'-0"3

Terrarium detail

Terrarium

4.12

2.15.12 Task 3

Terrarium

Metal slider

Stand

Exhibit wallRoom wall

4.6 Boat Case

4.5 Flipbook

Terrarium slides out

4.1

4.43

4.42

Terrarium Specificiations:showcasecages.comItem#: C241816BGBlack granite

5.31.12 Task 4

Half hull model

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

5.0

Area 5.0 Surface Waters

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

Area 5 Surface Waters

In addition to the flip book, cedar water interactive, and exhibit wall graphics, embedded in the graphic mural is an aquarium, with an access door to to the right of it. This typical 'stage set' door is designed with angled inside door frame faces and a pivot hinge for minimal gap between door and mural. The door continues the graphic wall mural, and is locking. The exhibit contractor is responsible for the proper alignment of the aquarium with the face of the mural, the support for the aquarium, and the utility light. Power and water will be provided, it is not a plumbed aquarium. A lable will be provided for mounting and placement next to the aquarium.

SubmittalThere are no special submittals for this area, see the graphics specifications for information on the media component and shop drawings.

CoordinationThe exhibit contractor is responsible to coordinate the aquarium opening and access door swing with the room structure.

2.15.12 Task 3

9'-5

"

1/4" = 1'-0"

Area 5.0 Plan 1

5.5 Aquarium5.3 Cedar Water Interactive

5.0 Surface Waters

Aquarium access door

5.45.51

5.1

5.31.12 Task 4

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

5.1

5.0/1.2 Elevations & Details

SSDrawn by:

8.30.11 Review

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

1/2" = 1'-0"5.0 Flattened Elevation 2

5.3 Cedar Water Interactive

5.5 Aquarium

21'-5 1/2"10"

3'-0"2'

-0"

2'-1

1"

2'-10 1/2"

7'-5

1/2

"

8"

3'-7

1/2

"

8"11"

1/2" = 1'-0"Section3

Aquarium access door

1-1/2" = 1'-0"4 Aquarium detail

1/2"

AquariumFinish

edge

5.02

5.0

110°

1/2" = 1'-0"Aquarium Access Door Plan 1

4

Line of suspended clg.

Graphicmural Back of wall

5.4 Flipbook

2.15.12 Task 3

Aquarium

Stand

Baffle

Light

5.1

5.51

Aquarium Specificiations:Possible source: Glasscages.com LLC, 1600 East Piney Road, Dickson TN 37055  615-446-8877

Glass must be 3/4" thick safety glass

Exhibit contractor must coordinate mounting details with supplier

Aquarium must be level and no gaps between indie of exhibit wall and aquarium case.

5.31.12 Task 4

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

5.2

Cedar Water Interactive

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

1" = 1'-0"Cedar Water Interactive Front Elevation1

2.15.12 Task 3

Sequence

1. Position yourself in front of the viewing frame so you can see through to the gray section of the water graphic.

2. Place the correct color wands behind the frame so that the color of the gray section of the graphic now matches the rest of the water color.

8"

2'-4

"

148°

1'-7 1/2"

8"

6 1/

2"

4 1/2"

1/2" 1/2"3/8"

7"

4 1/

2"

3 1/2"

3" = 1'-0"Viewing Frame Plan3

3" = 1'-0"Viewing Frame Front5

3" = 1'-0"Viewing Frame Side4

4" 1"

1/2" 3/8" 1/2"

6" = 1'-0"Rod Side6

6" = 1'-0"Rod Front7

Painted window frame

3" = 1'-0"Axon View2

Color Wand

Rod

Viewing frame

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

5.3

Cedar Water Interactive

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

2.15.12 Task 3

6 1/

2"

5"1/

4"1/

2"7"

1/4"

3" = 1'-0"Color Wand Detail2

3" = 1'-0"Color Wand Plan1

3" = 1'-0"Color Wand Side3

1/8'' Colored acrylic

Handle with label

Hole for pivot on rod

Frame

1 2

3 4

Roscolux #88 Light Green

(Organic Matter)

Roscolux #30 Light Salmon Pink

(Iron Ore)

Roscolux #325 Henna Sky

(Soil)

Roscolux #2004 Storaro Green

(Pollution)

3" = 1'-0"Color Matching4

3" = 1'-0"Sample Color Overlays5

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

6.0

Pinelands Resources Plan

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pine

land

s C

omm

issi

on

11.9.11

Rail 6.1 Bog Iron

Rail 6.5 Piney lingo

Rail 6.4 Cedar

Rail 6.3 Charcoal

Rail 6.2 Sand

1" = 1'Pinelands Resources Plan1

1

4

2

3 5

56

11

9

12

10

8

13

14

18

19

21

15

16

2.15.12 Task 3

Area 6 Pinelands Resources

This is a sculpture which represents all that has been produced from natural resources as well as harvested. Where possible, durable tactile elements that are actual artifacts, such as a historic mason jar reproduction will be used, as well as scenic elements such as the sand pile. The tree will have elements pinned off it and the upper level will have scenically reproduced branches and needles. The contractor will install an edge illuminated graphic in a recessed ceiling space, [graphic element 6.6].

The charcoal pile will have a glowing ember located within the pile. Power will be located by the general contractor in the ceiling for the glowing ember charcoal effect (#13).

Shop Mock Up

The exhibit contractor will create a massing model prototype for review.

5

7 12

18

18

22

23

17

19

18

20

See sheet 6.3 for further details regarding the resource details

3.12.12

6.1 1

6.1

2

6.21

6.2

2

Key

1. Bog Iron

2. Iron Pot

3. Iron Ingot or sprue

4. Tombstone

5. Cannonball (4lb & 6lb)

6. Section of Pipe

7. Fireback

8. Sand Pile

9. Mason Jar

10. Glass Paperweight

11. Slag

12. Jersey Glass

13. Charcoal

14. Charcoal (inner)

15. Cedar Tree

16. Cedar Planks

17. Wooden Shingles

18. Duck Decoys (Progressive - 3 Steps)

19. Sphagnum Moss

20. Crates

21 Cranberries

22. Cranberry Scoop

23. Jersey Devil

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

6.1

Sculpture Elevations

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pine

land

s C

omm

issi

on

11.9.11

1" = 1'Pinelands Resources Elevation 22

17

15

7

8

13

1

4

3

2

1" = 1'Pinelands Resources Elevation 11

1

4

7 65

13

32

20

21

17

1715

16

23

225

5

8

912

12

11

23

9

1011

12

12

7

5

55

622

14

2.15.12 Task 33.12.12

Rail 6.2 SandSee sheet 6.4 for details

11

Rail 6.2 Sand

Rail 6.1 Bog Iron

Note:Glowing ember colored light effect to be located within pile.Final details to be determined during shop drawing phase and shop mock-up.

Glowing ember effect within pile

Rail 6.3 Charcoal

Rail 6.1 Bog

Rail 6.5 Piney lingo

See sheet 6.4 for rail details

Paint base to match surrounding exhibit base

Level as required

Existing marmoleum floor

Note:Sculpture should not require bolting to floor to be secure

5.31.12 Task 4

Key

1. Bog Iron

2. Iron Pot

3. Iron Ingot or sprue

4. Tombstone

5. Cannonball (4lb & 6lb)

6. Section of Pipe

7. Fireback

8. Sand Pile

9. Mason Jar

10. Glass Paperweight

11. Slag

12. Jersey Glass

13. Charcoal

14. Charcoal (inner)

15. Cedar Tree

16. Cedar Planks

17. Wooden Shingles

18. Duck Decoys (Progressive - 3 Steps)

19. Sphagnum Moss

20. Crates

21 Cranberries

22. Cranberry Scoop

23. Jersey Devil

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

6.2

Sculpture Elevations

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pine

land

s C

omm

issi

on

11.9.11

1" = 1'Pinelands Resources Elevation 31

2.15.12 Task 3

8'-8

"1'

-2"

4"

3/4" = 1'Recessed Ceiling Detail2

Rail 6.1 Bog Iron Rail 6.4 Cedar

Rail 6.5 Piney lingo

Circular-shaped recessed portion of ceiling. Radius to match sculpture base's larger circular dimension.

Lighting

6.6 Graphic, illuminated from above

3.12.12

VIF

Line of structural ceiling

Circular graphic strip

Note:General contractor will provide a finished opening, power for lightbox, and applied graphic

Line of suspended ceiling

Key

1. Bog Iron

2. Iron Pot

3. Iron Ingot or sprue

4. Tombstone

5. Cannonball (4lb & 6lb)

6. Section of Pipe

7. Fireback

8. Sand Pile

9. Mason Jar

10. Glass Paperweight

11. Slag

12. Jersey Glass

13. Charcoal

14. Charcoal (inner)

15. Cedar Tree

16. Cedar Planks

17. Wooden Shingles

18. Duck Decoys (Progressive - 3 Steps)

19. Sphagnum Moss

20. Crates

21 Cranberries

22. Cranberry Scoop

23. Jersey Devil

17

16

15

13

8

18

20

20

21

1214

Rail 6.2 Sand1818

23

19

Rail 6.4 Cedar

Rail 6.5 Pineylingo Rail 6.3 Charcoal

1. Bog Iron

Obtain actual bog iron from the area. Clean to remove bacteria and spray with a matte polyurethane clear-coat to reduce dust.

2. Iron pot

Use existing iron pot, clean and finish as above. Modify to allow for support that raises pot above bog iron.

3. Iron ingot or sprue

To be provided by client during shop drawing phase

4. Tombstone

Fabricate to match existing tombstone (unless actual specimen can be sourced)

5. Cannon ball (4lb and 6lb)

Fabricate from resin and mount on acrylic rod (unless actual specimen can be sourced)

6. Section of Pipe

7. Fire Back

8. Sand pile

Replicate actual sand pile matching the fine sand used in glassmaking

9. Mason Jar

Purchase and mount replica 19th century mason jars (Old Sturbridge Village)

10. Glass Paper Weight

11. Slag

12. Jersey Glass

13. Charcoal

Use act pine segments, seal with matte polyurethane spray. Construct so outer log segments are lifting away to reveal darkened charcoal within.

14. Charcoal (inner)

Use actual 'lump charcoal' available for purchase. Create glowing ember effect within pile.

15. Cedar Tree

Typical scenic representation of cedar tree trunk

16. Cedar Planks

Finish actual cedar to resist staining, use rods and bolts to stand away from cut cedar trunk

17. Wooden Shingles

Finish with matte clearcoat to resist staining, mounted with pins to create dynamic effect of standing away from cedar tree

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

6.3

Object Reference Key

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

11.9.11

18. Duck Decoys (Progressive -3 Steps) Step 1: Rough blocks of cedar wood, hollowed center

Step 2: Partially carved decoy

Step 3: Finished decoy

19. Spagnum Moss

20. Crates

To be provided by client during shop drawing phase

21. Cranberries

22. Cranberry Scoop

23. Jersey Devil

2.15.12 Task 33.12.12

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

6.4

Graphic RailDetails

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

1-1/2" = 1'Graphic Rail Front Elevation2

2.15.12 Task 3

Powdercoated metal posts

1'-1"

9"

1'-9

"

1 1/2"

1-1/2" = 1'Graphic Rail Plan1

Graphic panel

Painted plywood base, 1/4'' radius

R 26''

R 29'' Edge of base

R 30''

3.12.12

Contractor is responsible for mounting and leveling

4"

1'-1"

3"

1/4"

7"

3" = 1'Graphic Rail Plan Detail3

3" = 1'Graphic Rail Front View Detail4

1/4'' thick steel panel with text

Finish edges

Note: Finish rail support tube opening with thin escutcheon plate painted to match tube

Finish SpecificationsTube & panel paintedMatthews acrylic poly. MP20090 Champagne Brut MetallicClearcoat satin finish

Text silkscreen colorMatthews acrylic poly. MP11705 Chocolate Thunder

Welded connection

1'' tube diameter

5.31.12 Task 4

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

7.0Map Graphic

SSDrawn by:

8.30.11 Review

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

3/4" = 1'-0"Graphic Panel Elevation 1

7'-4"

4'-0

"2'

-8"

2 1/

2"1'

-1 1

/2"

1'-0

"

1'-5"

3" = 1'-0"Detail3

2.15.12 Task 3

1 1/2"

3/4" = 1'-0"Side Elevation 2

3

Existing table

Painted edge

1/2'' Plywood

1/16'' Phenolicgraphic

Brochureholder

Typical painted GWB wall

7.2

Brochure holder

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

7.1

7.3 Video & Frame

SSDrawn by:

8.30.11 Review

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pine

land

s C

omm

issi

on

3/4" = 1'-0"7.3 Video Front Elevation 1

3'-7

7/8

"2'

-10

5/8"

4'-2 5/8"

7 1/2"

7 1/

2"

6" = 1'-0"7.3 Frame Corner Detail 4

2 1/4"

1-1/2" = 1'-0" 7.3 Frame Plan View 3

2.15.12 Task 3

Video Panel

Note:Exhibit Contractor must fabricate frame from existing reception wall shown in photo.

Verify by Exhibit Contractor

"X" to be determined by video panel mounting

X''

Video panelVentillation slot

Decorative frame

3/4" = 1'-0"7.3 Video Side Elevation 2

Decorative frame

433

Cou

ntry

Way

Sci

tuat

e, M

A 02

066

781-

378-

1484

p

781

-849

-791

0 f

cont

entd

esig

n@m

e.co

m

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

8.0

General Details

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pine

land

s C

omm

issi

on

1" = 1'-0"Baffle Detail1

2.15.12 Task 3

11 1/2"

Exhibit wall

Visitor Control Playback Signal Process Output Device

Proximity switch Playback device

AmplifierSpeaker

Video Panel

3.5 Serotiny Video

Product List Qty Mfg. Model Description

1 Meyer Sound UP-4XP Ultra compact speaker

1 ViewSonic VFM1035-52 Video playback

2 Dakota Sound Mounting U-bracket

1 Alcorn McBride AM4/E Solid state player w/ ethernet

1 Bogen ANS501 Ambient noise sensor and microphone

1 Museum Tech. BB-150 Motion detector with power supply

5.31.12 Task 4

Varies

Paint to match ceiling color, matte finish

6.14.12 Spkr.

Written dimensions supercede scaled measurements. Contractors and fabricators shall verify & be responsible for verifying all dimensions and conditions on site and inform Content Design Collaborative of any discrepancy in drawings prior to performing the work.

This document represents design intent only. Contractors and fabricators shall comply with all local electrical, structural & safety codes. Content Design Collaborative LLC will NOT assume responsibility or liability for inappropriate engineering, construction, handling or installation of any component represented herein.

Title

DATES ISSUED

8.1

Renderings

SSDrawn by:

15 S

prin

gfie

ld R

oad

New

Lis

bon,

NJ

0806

460

9-89

4-73

00

New

Jer

sey

Pin

elan

ds

Com

mis

sion

Area 1.0 1 Area 2.02 Area 2.0 Detail 3

Area 3.0, 4.0, 6.0 Sculpture4 Area 4.0, 5.0/1.24

5.31.12 Task 4