exhibit plan - documents.techno-science.ca€¦ · drawi umber: dd 3-1 project umber: 16010...
TRANSCRIPT
drawing number:
DD 3-1
project number:16010project:Canola Exhibit
drawing: date: 30 NOV 2016
Canola Exhibit – Concept Design
EXHIBIT PLAN
1 2
4 3
4.0 ON THE FARM3.0 AT HOME & ON THE ROAD
Oil Extractions
StrollerParking
Graphic CentrifugeBottles
Interactive
Case Case
CaseCaseTablet ObjectCase
Smell
BenchAV
1.23.5
4.4.1 Bees
4.1
4.4
6.2.7 6.36.3.1
6.4
6.56.2.6
7.3
7.1 7.2
7.3
7.46.2.1
6.1
2.1 IntroMagnets
Kitchen
SieveToy Storage
Toy Storage
5.1
5.2
1.1
4.2
4.3.1
4.4
3.2.1
3.2.23.1
3.2
AV AV
AV
AV
AV
AV
3.3
3.4
AV
1.0 INTRO 5.0 KIDS2.0 PROCESSING PLANT
6.0 THE LAB
7.0 FUTURE
EXHIBIT PLANScale 1:100
6.2.56.2.3 6.2.26.2.4
Mechanical/Electrical
StorageStorage
4.34.2.1
drawing number:
DD 3-2
project number:16010project:Canola Exhibit
drawing:
Canola Exhibit – Concept Design
date: 30 NOV 2016
CONTENT DIAGRAM – AT HOME AND ON THE ROAD
3.0 AT HOME AND ON THE ROADElevationScale 1:50
drawing number:
DD 3-3
project number:16010project:Canola Exhibit
drawing:
Canola Exhibit – Concept Design
date: 30 NOV 2016
CONTENT DIAGRAM – ON THE FARM
4.0 ON THE FARMElevationScale 1:50
drawing number:
DD 3-4
project number:16010project:Canola Exhibit
drawing:
Canola Exhibit – Concept Design
date: 30 NOV 2016
SCHEDULE
Reich+Petch Exhibits | Canada Agriculture & Food Museum | Canadian Science & Technology Museums Corporation
W - Workshop | M - Meeting | P - Presentation | S - Shop - Site Review
MAR APR MAY JUNE
3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30
Task Description: 20175.0 Production & Fabrication
5.1 Pre-Production
Procurement Planning & Scheduling
AV Development Planning
Shop Drawings/Samples
5.2 Fabrication
Carpentry
CNC Cutting
Specialty Work
Painting
Lighting Integration
AV & Interactive Integration
5.3 Graphic
Printing, Lamination
5.4 AV/Interactives & Mechanicals
Mock-up & Prototypes
Hardware Integration
Testing
6.0 Installation & Commissioning
Packing and Delivery
Exhibit Installation
Electrical Work
Graphic Installation
Artifacts
A/V & Interactive Set-up & Testing
Touch Ups
Cleaning
6.1 Project Turnover
Deficiencies (Reviews & Corrections)
CAFM Staff Training
Maintenance & Operating Manuals
7.0 Opening
8.0 Post-opening (July 17 - June 18)
SEPT OCT NOV DEC JAN FEB MAR APR
2 9 16 23 30 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 3 10 17 24 3 10 17 24 31 7 14Task Description: 2016 2017
1.0 Conceptual Design
Kick-Off Meeting
Tour Gallery Space & Collection
Receive Background Material
Design Workshop WDevelop Concept M M M MUpdate Interpretive Outline
Costing
Present Concept Design PCAFM & Review Approval
2.0 Preliminary Design
Design Workshop W Develop Preliminary Design M M MDevelop Interpretive Plan
Sample Text
Update Costing
Present Preliminary Design PCAFM Review & Approval
3.0 Detailed Design/Final Content
Design Workshop WDevelop Detailed Design M M M M MFinal Text (by CAFM)
Update Project Schedule
Final Project Costing
Develop Exhibit Prototypes
Prototype Testing SPresent Detailed Design & Schedule PCAFM Review & Approval
4.0 Graphic Production Files
Edit Final Text
Graphic Production Files