exemples d'utilisation des solutions ccs. exemples dutilisation
TRANSCRIPT
Exemples d'utilisation des solutions CCSExemples d'utilisation des solutions CCS
Exemples d’utilisationExemples d’utilisation
Can run four times the number of jobs as before, giving engineers four times the design space
Designers can perform up to six computations simultaneously, three times as many as before
Moved from Linux server to Microsoft® Windows Compute Cluster Server 2003
Manufacturer needed to design America’s Cup boat using Computation Fluid Dynamics (CFD)
Needed to build boat in short time span
Needed personal computing solution to handle large amounts of data
America’s Cup challenger Migrates to Compute Cluster Server to Quadruple Productivity, Streamline Processes
“We will be able to quadruple our CFD and CAE productivity, streamlining all simulation activities and giving our engineers a user-friendly department supercomputer.
They will then focus on design and results rather than administration and IT problems.”
- Dimitri Nicolopoulos, Design Team Coordinator, Areva-Challenge
Reduced design cost through improved engineer productivity
Reduced time to market
Increased product performance
Lower computing acquisition and maintenance costs
Use Microsoft® Windows® Compute Cluster Server 2003, workflow orchestration, and developer tools to deliver interoperable, secure design platform based on CFD framework
Complex, lengthy design cycle with difficult collaboration and little knowledge reuse
High costs due to expensive computing infrastructure
Advanced IT skills required of engineers, slowing design
Aerospace firm speeds design, improves performance, lowers costs with clustered computing
“Simplifying our fluid dynamics engineering platform will increase our ability to bring solutions to market and reduce risk and cost to both
BAE Systems and its customers.”Jamil Appa, Group Leader, Technology and Engineering Services,
BAE Systems
Simplified IT management resulting in higher productivity
More efficient use of IT resources
Scalable foundation for future growth
Deployed Microsoft® Windows® Compute Cluster Server 2003 on 180 servers
Used Automated Deployment Services to rapidly install OS across large environment
Wanted to simplify managing research center’s HPC clusters
Sought to remove IT administrative burden from researchers
Needed to reduce time for HPC jobs, increase research center’s output
Microsoft HPC solution helps oil company increase the productivity of research staff
“With Windows Compute Cluster Server, setup time has decreased from several hours—or even days for large clusters—to just a few minutes, regardless of
cluster size.”IT Manager, Petrobras CENPES Research Center
Easier administration and job management
Nodes deploy in one hour instead of months
Cluster availability increases to 500%
Typical projects complete twenty times faster
Deployed Microsoft® Windows® Compute Cluster Server 2003, operating 30 nodes and 100 CPUs
Integrated with existing third-party applications
Main HPC cluster was used to capacity and smaller clusters were difficult to deploy and manage
Access to HPC from user desktops was limited
Smaller HPC projects took longer to complete
Easier management of high-performance computing cluster helps typical projects complete twenty times faster
“Windows Compute Cluster Server has caused a paradigm shift. Before I had to limit my problem size because I ran out of resources. Now I feel
enabled to think bigger.” Thi Pham, PhD, Systems Engineer, Space Technology Sector,
Northrop Grumman
Le cas d’une petite société française CIMES
Le cas d’une petite société française CIMES
Créée en 1989Spécialisée dans la simulation numériqueUne équipe d’ingénieurs pluridisciplinaireSes clients : des groupes internationauxSon défi : une petite structure confrontée à la concurrence des pays « low cost »
Créée en 1989Spécialisée dans la simulation numériqueUne équipe d’ingénieurs pluridisciplinaireSes clients : des groupes internationauxSon défi : une petite structure confrontée à la concurrence des pays « low cost »
« La compétition se joue désormais sur la réactivité et l’engagement à long terme sur des délais en tenant compte d’un besoin croissant de puissance de calul »
Arcangelo Schena, PDG de Cimes
Cimes : une puissance d’avanceCimes : une puissance d’avance
En 2007, un nouveau calculateur basé sur des
processeurs Intel Xéon bi-cœurs Une interconnexion GigabitWindows Compute Cluster Server
Après des tests WCCS a été choisi pour :Ses performances équivalentes aux autres solutionsSa facilité d’exploitation et d’utilisationSa compatibilité avec les logiciels utilisés
En 2007, un nouveau calculateur basé sur des
processeurs Intel Xéon bi-cœurs Une interconnexion GigabitWindows Compute Cluster Server
Après des tests WCCS a été choisi pour :Ses performances équivalentes aux autres solutionsSa facilité d’exploitation et d’utilisationSa compatibilité avec les logiciels utilisés
« L’environnement Windows nous affranchit de compétences spécifiques et de ressources dédiées tout en nous donnant accès à un support complet et performant »
Arcangelo Schena, PDG de Cimes
Cimes : une efficacité accrueCimes : une efficacité accrue
Des délais divisés par 5 / au précédent calculateurLes ingénieurs peuvent travailler simultanément sur plusieurs modèles et avec des logiciels différents sur les 16 cœurs dédiés au calcul
Des délais divisés par 5 / au précédent calculateurLes ingénieurs peuvent travailler simultanément sur plusieurs modèles et avec des logiciels différents sur les 16 cœurs dédiés au calcul
« La solution Microsoft Windows Compute Cluster Server 2003, couplée aux processeurs Intel Xeon permet aux PME de bénéficier d’une puissance de calcul jusqu’à présent inaccessible pour des raisons de coût tout en se démarquant des autres environnements par sa facilité d’exploitations »
Arcangelo Schena, PDG de Cimes
© 2007 Microsoft France
Votre potentiel, notre passion TM