DESCRIPTION
Excavation work is started. Excavation work continues. Foundation is poured. Foundation is finished. Modular house “boxes” are delivered and ready to be set on the foundation. Crane setting one of the modular house “boxes” on the foundation. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/1.jpg)
B BELL-AYR HOMES B
Excavation work is started.
![Page 2: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/2.jpg)
B BELL-AYR HOMES B
Excavation work continues.
![Page 3: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/3.jpg)
B BELL-AYR HOMES B
Foundation is poured.
![Page 4: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/4.jpg)
B BELL-AYR HOMES B
Foundation is finished.
![Page 5: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/5.jpg)
B BELL-AYR HOMES B
Modular house “boxes” are delivered and ready to be set
on the foundation.
![Page 6: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/6.jpg)
B BELL-AYR HOMES B
Crane setting one of the modular house “boxes”
on the foundation.
![Page 7: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/7.jpg)
B BELL-AYR HOMES B
Crane setting one of the modular house “boxes”
on the foundation.
![Page 8: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/8.jpg)
B BELL-AYR HOMES B
The roof starts to get raised.
![Page 9: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/9.jpg)
B BELL-AYR HOMES B
The roof is raised.
![Page 10: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/10.jpg)
B BELL-AYR HOMES B
Crane setting one of the modular house “boxes”
on the foundation.
![Page 11: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/11.jpg)
B BELL-AYR HOMES B
Crane setting the final “box” on the foundation.
![Page 12: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/12.jpg)
B BELL-AYR HOMES B
The modular house is completely set with the roof
raised – all in one day.
Next step is to complete the siding installation.
![Page 13: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/13.jpg)
B BELL-AYR HOMES B
Siding is completed. Next step is to build the front porch, and
finish the interior work.
![Page 14: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/14.jpg)
B BELL-AYR HOMES B
Front porch under construction.
![Page 15: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/15.jpg)
B BELL-AYR HOMES B
Front porch is finished.
![Page 16: Excavation work is started](https://reader031.vdocuments.us/reader031/viewer/2022013011/56813cd5550346895da67a2a/html5/thumbnails/16.jpg)
B BELL-AYR HOMES B
This modular home was finished and moved into in a
few short weeks.