Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Application Covering Letter: The application letter must be provided by the Applicant, co-signed by all entities that are members of the Applicant, and addressed to the Employer as follows: To: Senior Contracts and Procurement Director Qatar Railways Company Contracts and Procurement Department P.O. Box 29988 Dear Sir, Re – Doha Metro Phase 1 - Architectural Prequalification submission We the undersigned, submit our application for prequalification to tender for the Doha Metro Phase 1 (insert name of category you wish to be considered for) The submitted prequalification documents that constitute this application have been completed to the best of our knowledge and signed as instructed. We understand that the submission of the application and associated prequalification documents do not obligate you or the D&B contractor towards us nor to any party associated with or related to us. We also understand that the assessment of information presented will be at the sole discretion of the revenue. We further understand that you will treat the information provided in the prequalification documents as strictly confidential and will not make it available to any third party except to your appointed D&B Contractors and consultants. Furthermore, we understand that you will not be responsible for, nor pay any expense, which we may incur in the preparation and submission of the application and prequalification documents. Doc. No.: 1 Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Upload: others

Post on 06-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Application Covering Letter:

The application letter must be provided by the Applicant, co-signed by all entities that are members of the Applicant, and addressed to the Employer as follows:

To: Senior Contracts and Procurement DirectorQatar Railways CompanyContracts and Procurement DepartmentP.O. Box 29988

Dear Sir,

Re – Doha Metro Phase 1 - Architectural Prequalification submission

We the undersigned, submit our application for prequalification to tender for the Doha Metro Phase 1 (insert name of category you wish to be considered for)

The submitted prequalification documents that constitute this application have been completed to the best of our knowledge and signed as instructed.

We understand that the submission of the application and associated prequalification documents do not obligate you or the D&B contractor towards us nor to any party associated with or related to us.

We also understand that the assessment of information presented will be at the sole discretion of the revenue.

We further understand that you will treat the information provided in the prequalification documents as strictly confidential and will not make it available to any third party except to your appointed D&B Contractors and consultants.

Furthermore, we understand that you will not be responsible for, nor pay any expense, which we may incur in the preparation and submission of the application and prequalification documents.

Each of the signatories below represents the authorised signatory of our company/JV/consortium members and each JV/consortium member confirms by this application and the associated prequalification documents, that it guarantees the truth and accuracy of all statements contained herein.

Dated this................ day of..................

Doc. No.: 1Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 2: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

1. Name of the Lead Entity:Name of Authorised Signatory for Application:Signature

2. Name of Entity:Name of Authorised Signatory for Application:Signature

3. Name of Entity:Name of Authorised Signatory for Application:Signature

In the capacity of:

[Provide in similar format the name and signature of authorised signatory for each additional entity that is part of the Applicant.]

End

The submitted prequalification documents shall be structured strictly in accordance with the Prequalification Questionnaire (PQQ) requirements as set out in section 6

The hard copy will be deemed to be the “original” submission of the application.

All documents shall be provided in the English language. Where information is provided in another language, it shall be

Doc. No.: 2Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 3: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

accompanied by an English translation. This translation will govern and be used for interpreting the information.

Queries regarding the submission of prequalification documents shall be directed to [email protected] referenced Doha Metro Phase 1 Architectural subcontracts Prequalification.

Clarifications will be issued by email.

Qatar Rail and the D&B Contractor shall not be responsible for, nor reimburse, any expenses incurred by whomsoever in the preparation and submission of the prequalification documents or any clarification/further information which Qatar Rail may request for the proper assessment of the submitted prequalification documents.

Doc. No.: 3Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 4: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

6 Examination of DocumentsThe Employer and D&B Contractors reserve the right not to examine documents that are received after the closing date and time as listed in Section 4.

Information provided by the Applicant in the submitted prequalification documents will be treated as strictly confidential.

The Employer reserves its right to request the Applicant to prepare and furnish any clarification considered necessary for the proper assessment of the submitted prequalification documents.

The Employer does not bind itself with any process subsequent to this prequalification, short listing, open tenders, communication with the Applicant, etc.

The Employer reserves its right to amend the scope of the Works described in this document prior to award of the subcontract by the D&B Contractor.

Doc. No.: 4Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 5: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

7 Prequalification Questionnaire (PQQ)A. Title PageB. Notes to ApplicantsC. Joint Venture /ConsortiumD. Financial StatementE. Structure and Organisation 1F. Structure and Organisation 2G. Resources: PersonnelH. Resources: Capacity, Labour Force, Subcontractors and

FabricationI. Resources: Contractor’s Plant, Equipment and FacilitiesJ. Experience: GeographicalK. Experience: Relevant Projects CompletedL. Experience: All Projects in ProgressM. Quality Assurance SystemN. Health and SafetyO. Environmental Policy and Corporate Social ResponsibilityP. TrainingQ. Operation and MaintenanceR. Litigation and Arbitration History 1S. Litigation and Arbitration History 2T. Additional Information

Doc. No.: 5Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 6: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

A. Title Page

Company Information

Name of the Applicant:

Address:

Telephone No (s):

Fax No (s):

Contact details of two key personnel:

Name:Telephone No:Mobile No:Email:

Name:Telephone No:Mobile No:Email:

Doc. No.: 6Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 7: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

B. Note to Applicants1. Please answer all questions and provide information as

requested.2. Supplementary pages may be photocopied or copied and

inserted if required.3. Please retain a copy of your complete submission.4. If a JV / consortium is proposed, all members are to respond

to all questions.5. All financial data is to be given in Qatari Riyals.6. Please address all queries regarding the submission of

prequalification documents via email to [email protected]. Clearly referenced ‘Doha Phase 1 Metro – Architectural Prequalification’

Standard PagesA. Title PageB. Notes to ApplicantsC. Joint Venture /ConsortiumD. Financial StatementE. Structure and Organisation 1F. Structure and Organisation 2G. Resources: PersonnelH. Resources: Capacity, Labour Force, Subcontractors and

FabricationI. Resources: Contractor’s Plant, Equipment and FacilitiesJ. Experience: GeographicalK. Experience: Relevant Projects CompletedL. Experience: All Projects in ProgressM. Quality Assurance SystemN. Health and SafetyO. Environmental Policy and Corporate Social ResponsibilityP. TrainingQ. Operation and MaintenanceR. Litigation and Arbitration History 1S. Litigation and Arbitration History 2T. Additional Information

Additional PagesPlease list below any additional pages attached to each standard page.

Doc. No.: 7Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 8: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

C. Joint Venture / ConsortiumIf the Applicant is a JV / consortium for the Works, please give the following information, otherwise state “not applicable”

1. Names and addresses of JV / consortium partners.

2. Name of company leading the JV / consortium.

3. Name and address of bankers to the JV / consortium.

4. The indicative percentage of participation in the JV/consortium of each of its members.

5. A pre-bid agreement from each JV/consortium member confirming its intention to be part of the JV/consortium that will bid at a later stage in the process.

6. Please provide a short summary of any joint venture agreement would work in practice.- with an explanation of how the Joint Venture arrangement would be led.

7. Confirmation that each member will be jointly and severally liable.

8. Confirmation of the intention that the JV/consortium, if successfully prequalified, will submit a tender for the Works.

Doc. No.: 8Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 9: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

9. Individual figures as contained within financial statements for all members of the JV/Consortium. This will be the basis for Qatar Rail assessment of financial robustness for the pre-qualification.

10. It is recommended that if a JV Consortium is proposed that one member is an established local (Qatari) company with experience in Architectural works or that one of the JV members has had significant experience working in similar projects in Qatar or the GCC.

11. Where the Applicant is proposing the use of a JV please provide:

a) Name and address of bankers from whom references can be obtained if required.

b) Name(s) of insurers.

Doc. No.: 9Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 10: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

D. Financial Statement

Table 1 Turnover over the last 3 years

Turnover for the last three years only based on auditable published financial statements

No Year NIn QAR 2010 2011 2012 2013- *Others

(Specify) Total

1 Domestic

2Overseas excl. Middle East

3 Middle East4 Total

5Turnover as published in Financial statements *

*Note – Please ensure that row 5 is reconcilable to row 4

The Applicant should also provide the following information:1. Latest three year audited published financial accounts. 2. Bank guarantees issued and credit limits in the last three (3)

years and status to date.

3. Name and address of bankers from whom references can be obtained if required.

4. Name(s) of insurers.

5. Written confirmation from Bond provider that a bond can be obtained in due course.

6. Details of current Employers Liability, Public Liability, Professional Indemnity.

Doc. No.: 10Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 11: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

7. Confirmation that the company provide a Parent Company Guarantee from the Ultimate Parent.

8. Name all Parent Companies up to the Ultimate Parent and name all daughter or related companies.

Doc. No.: 11Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 12: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

E. Structure and Organisation 1

1. Name of Applicant.

2. Description of Applicant or members of Applicant for JV/consortium.

3. Names and addresses of associated companies intended to be involved in the Works, and whether parent/subsidiary/other.

4. If the Applicant (or members of Applicant for JV/consortium) is a subsidiary, what involvement, if any, will the parent company have in the Works?

5. Names and addresses of proposed sub consultant designers for the project (if any)

6. Design capability – Please provide evidence of the applicants in house and /or design consultants/sub consultants technical capability to carry out detailed 3D implementation design co-ordination and production of construction drawings and develop a BIM model.

Doc. No.: 12Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 13: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

F. Structure and Organisation 21 Names and addresses of any associates the Applicant or

members of Applicant for JV/consortium has/have in the country of the Works, knowledge of the local procedures of customs, immigration, etc.

2 Please indicate here or attach an organisation chart showing the Applicant’s proposed project specific structure including the positions of Directors and key personnel, if relevant. An additional company organisation chart may also be attached

3 Copy of commercial registration and licenses issued by Qatar’s Ministry of Business and Trade (Where Applicant / Applicant members are not registered in Qatar then registration and licenses from their relevant local governmental authorities shall be provided).

4. Provide details of the Applicants capability of working in a BIM environment and the capability of any proposed subcontractors. Provide examples of projects, process, and software utilised.

Doc. No.: 13Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 14: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

G. Resources: Personnel1. Number of staff

- Technical

- Administrative

2. Please list present Executive Directors

Name Present position

Years of experience with the company and/or in the industry

3. Please provide CV’s of 5 key members of staff who would be responsible for this project detailing their relevant experience – no more than 2 pages per CV.

Note:

If the Applicant is a JV then you need to provide items 1 & 2 above for each member of the JV. Item 3 above must include a minimum of 2 CVs from the JV leader and the rest may be provided by the other members of the JV.

Doc. No.: 14Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 15: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

H. Resources: Capacity, Labour Force, Subcontractors and Manufacture/Fabrication

1. Design Capabilities

a) Number of design staff based in:In-house Sub-contractors

i. Qatar

ii. MENA

iii. Globally

b) Number of management staff

i. Qatar

ii. MENA

iii. Globally

2. Construction Capabilities

a) Number of construction operatives based in:In-house Sub-contractors

i. Qatar

ii. MENA

iii. Globally

b) Number of management staff

i. Qatar

ii. MENA

Doc. No.: 15Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 16: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

iii. Globally

a) State the maximum number of packages that the applicants wishes or able to undertake.

b) State your preferred packages, if any, Stations) ranked 1st, 2nd, 3rd, 4th etc. see table in sections 1.2. – This should be category specific

NOTE: A package means one Station including any necessary above and below ground internal fit out, entrance structures, ancillary buildings and the landscaping within the curtilage of the Station

3. On the basis of the information provided herein provide a forecast indicate the likely source of the labour force required to undertake the Works in total and per discipline and type of personnel whether technical, commercial, or administration. Provide details of the source of the labour force.

4. Please provide information on the Applicants ability to secure the services of sufficient numbers of skilled tradesmen, able to deliver high quality insitu applied: wall, ceiling and floor finishes in complex geometrical shapes.

5. If it is foreseen that any part of the Works will be sub-contracted state the type of work to be undertaken by the subcontractor(s) and, if known, provide the name and address of the subcontractor(s) to be used.

6. Manufacture/fabrication/planting nursery facilities to be used for Architectural systems and landscaping.. List those in the control of any subsidiary companies where applicable.

The applicant is asked to confirm where these facilities are within their control or are still to be procured,

Summary:

Description:

Location:

Capacity:

Annual throughput:

Doc. No.: 16Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 17: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Confirmation that facility is available for inspection in Q3/Q4 2015: Yes/No

7. Details of employment of local and foreign companies/firms in existing contracts in order to demonstrate that the applicant has an established local supply chain.

Doc. No.: 17Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 18: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

I. Resources: Contracts Plant, Equipment and Facilities1. On the basis of the information provided herein please provide

a forecast equipment and facilities considered by the Applicant to be necessary for undertaking the Works.

2. Confirm whether this is already in the Applicant’s ownership or will be purchased, leased or hired for the Works.

3. Provide information on the age of the equipment and confirmation that it is less than 5 years old.

Doc. No.: 18Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 19: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

J Experience: Geographical1. List projects involving similar Architectural scope undertaken

in

A. Qatar B. MENAC. Globally

Within the last 10 years. This should be limited to 5 projects per category

Doc. No.: 19Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 20: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

K. Experience: Architectural Projects CompletedPlease provide information about the Architectural projects the applicant has completed over the past ten (10) years using the criteria below. Answer all questions in the format below. Additional project images / data may be attached to support this.

In order to allow Qatar Rail to verify that the information provided is accurate, please supply extracts/ copies of pages from the actual contract documentation/ Letter of Award (LOA) relating to the referenced projects illustrating -

• Names of the parties

• Name of the contract/ project

• Value

• Date

• Signatories

1. Name, address and contact details of employer.

2. Your Contract/Subcontract Award Value.

3. Your Contract/Subcontract Final Account Value.

4. Award date.

5. Original Completion date at award.

6. Actual completion date on final completion and acceptance of works by the Employer.

7. Date of completion of all defaults and close out of your contract/subcontract.

8. State reasons if the final completion date exceeds the original completion date.

9. Was contract satisfactorily completed.

10. Were there any disputes, if yes state number and values and final resolution.

11. State all contract variations and values and why

Doc. No.: 20Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 21: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

12. Name, address and contact details of (consulting) engineer responsible for supervision.

13. Names, addresses and contact details of Main Contractor/Joint venture Partner/Consortium Member/Subcontractor.

14. Percentage of participation of company in the project.

15. Short description of project including location and type of works and intended purpose of the main works.

16. Please state if the projects referenced were constructed to QSAS , QGBC or LEED standards.

17. If the projects referenced used BIM please note and describe your involvement.

Doc. No.: 21Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 22: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

L. Experience: All Projects in Progress – current workload Provide information on all projects currently in progress and secured workload for the period 2015 to 2019. This should including projects where the Applicant has received a letter of intent, but a formal contract has not yet been awarded. Answer ALL questions in the format below. Additional project images/ data may be attached to support this.

In order to allow Qatar Rail to verify that the information provided is accurate, please supply extracts/ copies of pages from the actual contract documentation relating to the referenced projects illustrating -

Names of the parties

Name of the contract/ project

Value

Date

Signatories

1. Name, address and contact details of the Employer.

2. Your Contract/Subcontract Award Value.

3. Your Contract/Subcontract Final Account Value.

4. Award date.

5. Original completion date at contract award.

6. Anticipated date for final completion and acceptance of works by the Employer.

7. Anticipated date of completion of all defects and close out of your contract/subcontract.

8. If the final anticipated completion date exceeds the original completion date, state reasons.

Doc. No.: 22Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 23: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

9. Were there any disputes, if yes state number and values and final resolution.

10. State all contract variations and values and reasons why.

11. Name, address and contact details of (consulting) engineer responsible for supervision.

12. Names, addresses and contact details of Main Contractor/Joint venture Partner/Consortium Member/Subcontractor.

13. Percentage of participation of company in the project.

14. Short description of project including location and type of works and intended purpose of the main works.

15. If the f this project was constructed to QSAS, QGBC or LEED standards please advised.

16. State if BIM was used on this project and what was your involvement.

Doc. No.: 23Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 24: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

M.Quality Assurance SystemThe Applicant’s must comply with a Quality Management System Certified to ISO 9001, or have in place as necessary a quality system and have engaged Quality personnel so as to demonstrate an effective and robust Quality system that meets with the Quality requirements of the D&B Contractor. A copy of the applicants Quality Management document may be attached but should be separate.

1. Please describe the Applicant’s quality assurance system.

2. Please describe the Applicant’s design verification and validation process and procedures.

3. Please describe the Applicant’s proposed strategy for the completion of defects and outstanding works.

4. Please provide evidence of accreditation if achieved to the following international standards. If you are a JV then you must state the same for each JV member.

a. ISO 9001

b. ISO 14001

c. ISO 18001

Doc. No.: 24Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 25: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

N. Health and Safety The Applicant’s must comply with a Safety Management System Certified to OSHAS 18001, or have in place as necessary a safety system and have engaged safety personnel. In order to demonstrate an effective and robust safety system that meets with the safety requirements of the D&B Contractor, together with providing copies of past accident records.

A copy of the Applicants Health and Safety document may be attached

1. Please describe the Applicant’s health and safety plan. Qatar Rail and the D&B contractors request the applicant to provide information on how they can reduce H&S risks of working at height/falls, manual handling and risks of personnel and machinery collisions on these type of projects

2. Provide Lost Time Injury Frequency Rate (“LTIFR”) over the last three (3) years. If you are a JV then you must state the same for each JV member. Please provide details of any major LTI’s of fatalities that may have occurred in the last 5 years.

Doc. No.: 25Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 26: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

O. Environmental Policy and Corporate Social ResponsibilityApplicants company requirements

1. Migrant worker facilities – Please provide details of existing and planned migrant worker welfare and living accommodation specifying how the applicant is meeting the requirement of the following document:

“Welfare Standards for migrant workers – QF migrant workers initiative”

Please advise:

1. How future welfare accommodation will meet the required standards

2. Details of any worker accommodation and welfare audits carried out to date

3. How the applicant is working to ensure compliance with Qatari Labour law and section 12 of the welfare standards including any accommodation provided by subcontractors.

2. The Subcontractor/Sub-Consultant/Supplier must comply with an Environmental Management System Certified to ISO 14001, or have in place as necessary an effective management system, including engaging environmental personnel that meet with the requirements of the Main Contract’s:

1) Please describe the Applicant’s environmental policy.

2) Please provide details of how you consider energy use in the design and use of your product/service.

3) Please provide details of any programme for monitoring your current level of environmental performance.

4) Please provide details of environmental certification.

Doc. No.: 26Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 27: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

P. Training Licencing and accreditation1. The appointed contractor will be required to provide

operational training for operatives of the completed Works, please name the location(s) where this would be carried out and the method of training.

2. Please provide four (4) examples from previous projects where operational support and training has been provided by the Applicant, to a client/customer.

3. Industry Accreditations

a) Provide copies of ISO accreditations

b) Provide copies of other accreditations or evidence of training of personnel relevant to activities connected with the following stakeholders:

Kahramma QCDFSS QSAS QGBC LEED

Doc. No.: 27Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 28: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

Q. Operation and Maintenance1. The appointed contractor may be required to maintain the

installation until final handover , please indicate in general terms the manner and methods by which this would be carried out.

2. Please provide details of the applicant’s capability to produce Operation and maintenance manuals in a timely and complete fashion.

i.e. Is this produced in house or subcontracted out to a third party.

3. Please provide a reference in this regard if possible.

Doc. No.: 28Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 29: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

R. Litigation and Arbitration History 11. Please describe the Applicant’s (or members of Applicant for

JV/consortium) history of litigation and/or arbitration from contracts executed or completed during the last six (6) years, and those currently under execution.

Doc. No.: 29Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 30: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

S. Litigation and Arbitration History 21. Please describe for each year, the name of the employer, the

main claims and counterclaims (if any) in the litigation or arbitration, the respective amounts claimed and counterclaimed (if any), the court or arbitral institution or arbitration rules concerned and amount awarded to and/or against the Applicant (or members of Applicant for JV/consortium), as appropriate.

Doc. No.: 30Printed copy is uncontrolled and only valid at the time of printing. Always refer to the electronic copy as the latest version.

Page 31: Examination of Documents - Qatar Rail€¦ · Web viewQatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts Doc. No.:5 Printed copy is uncontrolled and

Qatar Rail – Prequalification for Doha Metro Phase 1 - Architectural Subcontracts

Project:

Applicant:

T. Additional Information1. Please add further information which the Applicant considers to

be relevant to the evaluation of its application for prequalification.

[If you wish to attach other documents, please list them below.]