evergreen concept development drawing - cbe

4
EVERGREEN MIDDLE SCHOOL SCALE: NTS SITE PLAN 3200 3200 57935 41945 41855 6400 4000 1400 900 3200 15600 3600 3200 3400 2500 3000 min 2400 8400 grey hatch denotes light sandblast concrete finish pea gravel playground area 10.0m diameter asphalt hard surface area 28.8m X 18.2m informal seating / eating area open grass area native grass berms max 1.0m height w/ 20% slopes native grass berms max 1.0m height w/ 20% slopes parking area parking area building above garbage area fire lane access on street parking accent bench seating inner courtyard shall contain raised planting beds for teaching purposes typical U-style bike racks a total of 25 units installed as per city of calgary requirements concrete pads outside all emergency exits to be constructed 1600mm X 2400mm and to be standard broom finish concrete native grass berms max 1.0m height w/ 20% slopes native grass berms max 1.0m height w/ 20% slopes open grass area city sidewalk property line setback 3.0m u/rw shared access lane bus loading city sidewalk property line setback typical concrete pads outside all emergency exits accent sandblast concrete at main building entrances notes ornamental grass planting informal 2.0m wide pathway connections to existing soccer fields property line property line denotes rows of ornamental grass plantings roughly 1.0m wide - orientated as shown 150mm high curb wall behind bench seating area native grass berms max 0.5m height w/ 20% slopes denotes shrub massing open grass area concrete pathway connection to existing sports fields mail box to be relocated ointing set at 1200mm by 45° from building edges hatch denotes native seed mix area 20% control joint for 2.0m wide sidewalks to deviate from typical jointing - 1.0m O.C. all shrub bed edges to be deep 'V' cut concrete to extend up to building edge - slope towards parking at 2% bench seating installed along fire lane, bench pads to coincide with control joint pattern 1.4m & 0.9m wide rundlestone fines pathways to allow for planter access 1.4m wide standard concrete perimeter sidewalk 20% 20% concrete layout determined by typical control joint spacing 2400 3200 .0m diameter open space grass area around playground sidewalk flares are dependent on control joint layout control jointing set at 1200mm by 1600mm to run 45° from building edges control jointing set at 1200mm by 1600mm to run 45° from building edges 1.6m X 1.2m concrete pad for flag pole proposed plant list for trees symbol description number brandon elm ulmus americana 'brandon' patmore green ash fraxinus pennsylvanica ' patmore' mayday tree prunus padus var commutata total overall trees provided deciduous trees = 41 coniferous trees = 18 59 18 large shade deciduous trees - 85mm caliper denotes tree spread at planting snowbird hawthorn crataegus x mordenensis 'snowbird' thunderchild crabapple malus 'thunderchild' schubert chokecherry prunus virginiana 'schubert' spring snow crab malus 'spring snow' medium ornamental deciduous trees - 50mm & 35mm caliper 23 large coniferous trees - 3.5m & 2.5m ht hoopsii spruce picea pungens 'hoopsii' mountain pine pinus uncinata colorado spruce picea pungens shrub massing 18 native grass seed mix manicured grass ornamental grass massing karl forestor grass Calamagrostis x acutiflora 'Karl Foerster legend symbol surface mounted bench description 150mm high curb built into sidewalk with thickened edge 400mm high bench planter wall @ 200mm depth grey hatch denotes light sandblast finish concrete, all other concrete to be broom finished U-Style bike rack surface mounted to concrete - site requirement is 25 units

Upload: others

Post on 15-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Evergreen Concept Development Drawing - CBE

EVERGREEN MIDDLE SCHOOL SCALE: NTS

SITE PLAN

3200

3200

5793

5

4194

5

41855

6400

4000

1400

900

3200

15600

36003200

3400

2500

3000

min

2400

8400

n:\0

1 pr

ojec

ts\3

- in

stitu

tiona

l dev

elop

men

t\14

.305

- e

verg

reen

mid

dle

scho

ol\0

2 dr

awin

gs\g

3_eg

ms-

dp s

et.d

wg

1100 & 1150 Everridge DriveSW Calgary, Alberta

KEYPLAN

Zeidler Partnership ArchitectsSuite 200, 255 - 17th Avenue SW. Calgary, AB T2S 2T8Phone: 403-663-0125

WILLIAMS ENGINEERINGEdmonton OfficeSuite 200, 10065 - 100 Street Edmonton, AB T5J 3B1Phone: 780-424-2393, 1-800-263-2393

Plan 0712869; Block 25; Lot 190MSRPlan 0410195; Block 18; Lot 16MR

Evergreen Middle School

overall

concept plan

dc

jss

1:300

14/07/24

14.305 L0.02

general notes1. contractor to verify limits of disturbance and reconcile field conditions with drawings

and schedules if discrepancies exist2. the contractor shall report any discrepancies between the site conditions illustrated

here to those existing at the time of construction to the owner's representative3. this drawing has been prepared using information provided by ziedler -BKDI on

august 1, 20144. contractor is responsible for locating utilities and protecting same from damage

during construction. contact alberta 1st call at 1.800.242.3447. commencement ofwork indicates completion of utility locates

5. all drawings are property of the landscape architect6. this design and drawing may not be reproduced without permission of the landscape

architect7. do not scale drawings8. all drawings are in metric unless noted otherwise9. all landscape construction shall be in accordance to city of calgary parks

development guidelines and standard specifications landscape construction, currentedition

10. contractor is to coordinate and attend (in conjunction with the landscape architect) allinspections and approvals required by the owner

11. any and all work shall be maintained within the property lines and/or limit ofdisturbance. the contractor is responsible for any intrusion or damage to adjacentproperty

12. contractor is responsible for maintaining a clean job site at all times and removingdebris on a regular basis. all loose trash will be maintained on site and/or cleaned upby the contractor, this is incidental to the work

13. all landscape areas are to be sloped to ensure positive drainage drainage unlessnoted otherwise

proposed plant list for treessymbol descriptionnumber

brandon elm ulmus americana 'brandon' patmore green ash fraxinus pennsylvanica ' patmore'

mayday tree prunus padus var commutata

total overall trees provideddeciduous trees = 41 coniferous trees = 18

59

18large shade deciduous trees - 85mm caliperdenotes tree

spread at planting

snowbird hawthorn crataegus x mordenensis 'snowbird'

thunderchild crabapple malus 'thunderchild' schubert chokecherry prunus virginiana 'schubert' spring snow crab malus 'spring snow'

medium ornamental deciduous trees - 50mm & 35mm caliper23

large coniferous trees - 3.5m & 2.5m ht

hoopsii spruce picea pungens 'hoopsii' mountain pine pinus uncinata colorado spruce picea pungens

shrub massing

18

native grass seed mix

manicured grass

grey hatch denotes lightsandblast concrete finish

pea gravelplaygroundarea 10.0m

diameter

asphalt hard surface area28.8m X 18.2m

informal seating / eating area

open grassarea

native grass bermsmax 1.0m heightw/ 20% slopes

native grass bermsmax 1.0m heightw/ 20% slopes

parking area

parking area

building above

garbage area

fire laneaccess

on street parking

accent bench seating

inner courtyard shall contain raisedplanting beds for teaching purposes

typical U-style bike racks a total of 25 unitsinstalled as per city of calgary requirements

concrete pads outside all emergencyexits to be constructed 1600mm X2400mm and to be standard broom finishconcrete

native grass bermsmax 1.0m heightw/ 20% slopesnative grass berms

max 1.0m heightw/ 20% slopes

open grassarea

city sidewalk

property line

setback

3.0m u/rw

sharedaccess lane

bus

load

ing

city

sid

ewal

k

prop

erty

line

setb

ack

typical concrete padsoutside all emergencyexits

accent sandblast concrete atmain building entrances

everridge drive SW

ever

oak

driv

e S

W

spr

msr

denotes ornamental grass planting

informal 2.0m wide pathwayconnections to existing soccerfieldsproperty line

prop

erty

line

A1 overall concept planL0.02 Scale 1:300

denotes rows of ornamental grassplantings roughly 1.0m wide- orientated as shown

150mm high curb wall behindbench seating area

native grass bermsmax 0.5m heightw/ 20% slopes

ornamental grass massing

karl forestor grass Calamagrostis x acutiflora 'Karl Foerster'

denotes shrub massing

open grassarea

concrete pathway connectionto existing sports fields

1 issued for DP 14.07.28 dc

legendsymbol

surface mounted bench

description

150mm high curb built into sidewalk with thickened edge

400mm high bench planter wall @ 200mm depth

grey hatch denotes light sandblast finish concrete, all other concrete to be broom finished

U-Style bike rack surface mounted to concrete - site requirement is 25 unitsexisting mail box to be relocated

control jointing set at 1200mm by1600mm to run 45° from building edges

hatch denotes native seed mix area

20%

control joint for 2.0m widesidewalks to deviate fromtypical jointing - 1.0m O.C.

all shrub bed edges to bedeep 'V' cut

concrete to extend up tobuilding edge - slopetowards parking at 2%

bench seating installedalong fire lane, bench padsto coincide with control jointpattern

1.4m & 0.9m wide rundlestone finespathways to allow for planter access

1.4m wide standard concreteperimeter sidewalk

20%

20%

concrete layout determined bytypical control joint spacing

2400 3200

23.0m diameter open space grassarea around playground

sidewalk flares are dependenton control joint layout

control jointing set at 1200mm by1600mm to run 45° from building edges

control jointing set at1200mm by 1600mm to run45° from building edges

1.6m X 1.2m concretepad for flag pole

2 issued for DP 14.08.01 dc

3200

3200

5793

5

4194

5

41855

6400

4000

1400

900

3200

15600

36003200

3400

2500

3000

min

2400

8400

n:\0

1 pr

ojec

ts\3

- in

stitu

tiona

l dev

elop

men

t\14

.305

- e

verg

reen

mid

dle

scho

ol\0

2 dr

awin

gs\g

3_eg

ms-

dp s

et.d

wg

1100 & 1150 Everridge DriveSW Calgary, Alberta

KEYPLAN

Zeidler Partnership ArchitectsSuite 200, 255 - 17th Avenue SW. Calgary, AB T2S 2T8Phone: 403-663-0125

WILLIAMS ENGINEERINGEdmonton OfficeSuite 200, 10065 - 100 Street Edmonton, AB T5J 3B1Phone: 780-424-2393, 1-800-263-2393

Plan 0712869; Block 25; Lot 190MSRPlan 0410195; Block 18; Lot 16MR

Evergreen Middle School

overall

concept plan

dc

jss

1:300

14/07/24

14.305 L0.02

general notes1. contractor to verify limits of disturbance and reconcile field conditions with drawings

and schedules if discrepancies exist2. the contractor shall report any discrepancies between the site conditions illustrated

here to those existing at the time of construction to the owner's representative3. this drawing has been prepared using information provided by ziedler -BKDI on

august 1, 20144. contractor is responsible for locating utilities and protecting same from damage

during construction. contact alberta 1st call at 1.800.242.3447. commencement ofwork indicates completion of utility locates

5. all drawings are property of the landscape architect6. this design and drawing may not be reproduced without permission of the landscape

architect7. do not scale drawings8. all drawings are in metric unless noted otherwise9. all landscape construction shall be in accordance to city of calgary parks

development guidelines and standard specifications landscape construction, currentedition

10. contractor is to coordinate and attend (in conjunction with the landscape architect) allinspections and approvals required by the owner

11. any and all work shall be maintained within the property lines and/or limit ofdisturbance. the contractor is responsible for any intrusion or damage to adjacentproperty

12. contractor is responsible for maintaining a clean job site at all times and removingdebris on a regular basis. all loose trash will be maintained on site and/or cleaned upby the contractor, this is incidental to the work

13. all landscape areas are to be sloped to ensure positive drainage drainage unlessnoted otherwise

proposed plant list for treessymbol descriptionnumber

brandon elm ulmus americana 'brandon' patmore green ash fraxinus pennsylvanica ' patmore'

mayday tree prunus padus var commutata

total overall trees provideddeciduous trees = 41 coniferous trees = 18

59

18large shade deciduous trees - 85mm caliperdenotes tree

spread at planting

snowbird hawthorn crataegus x mordenensis 'snowbird'

thunderchild crabapple malus 'thunderchild' schubert chokecherry prunus virginiana 'schubert' spring snow crab malus 'spring snow'

medium ornamental deciduous trees - 50mm & 35mm caliper23

large coniferous trees - 3.5m & 2.5m ht

hoopsii spruce picea pungens 'hoopsii' mountain pine pinus uncinata colorado spruce picea pungens

shrub massing

18

native grass seed mix

manicured grass

grey hatch denotes lightsandblast concrete finish

pea gravelplaygroundarea 10.0m

diameter

asphalt hard surface area28.8m X 18.2m

informal seating / eating area

open grassarea

native grass bermsmax 1.0m heightw/ 20% slopes

native grass bermsmax 1.0m heightw/ 20% slopes

parking area

parking area

building above

garbage area

fire laneaccess

on street parking

accent bench seating

inner courtyard shall contain raisedplanting beds for teaching purposes

typical U-style bike racks a total of 25 unitsinstalled as per city of calgary requirements

concrete pads outside all emergencyexits to be constructed 1600mm X2400mm and to be standard broom finishconcrete

native grass bermsmax 1.0m heightw/ 20% slopesnative grass berms

max 1.0m heightw/ 20% slopes

open grassarea

city sidewalk

property line

setback

3.0m u/rw

sharedaccess lane

bus

load

ing

city

sid

ewal

k

prop

erty

line

setb

ack

typical concrete padsoutside all emergencyexits

accent sandblast concrete atmain building entrances

everridge drive SW

ever

oak

driv

e S

W

spr

msr

denotes ornamental grass planting

informal 2.0m wide pathwayconnections to existing soccerfieldsproperty line

prop

erty

line

A1 overall concept planL0.02 Scale 1:300

denotes rows of ornamental grassplantings roughly 1.0m wide- orientated as shown

150mm high curb wall behindbench seating area

native grass bermsmax 0.5m heightw/ 20% slopes

ornamental grass massing

karl forestor grass Calamagrostis x acutiflora 'Karl Foerster'

denotes shrub massing

open grassarea

concrete pathway connectionto existing sports fields

1 issued for DP 14.07.28 dc

legendsymbol

surface mounted bench

description

150mm high curb built into sidewalk with thickened edge

400mm high bench planter wall @ 200mm depth

grey hatch denotes light sandblast finish concrete, all other concrete to be broom finished

U-Style bike rack surface mounted to concrete - site requirement is 25 unitsexisting mail box to be relocated

control jointing set at 1200mm by1600mm to run 45° from building edges

hatch denotes native seed mix area

20%

control joint for 2.0m widesidewalks to deviate fromtypical jointing - 1.0m O.C.

all shrub bed edges to bedeep 'V' cut

concrete to extend up tobuilding edge - slopetowards parking at 2%

bench seating installedalong fire lane, bench padsto coincide with control jointpattern

1.4m & 0.9m wide rundlestone finespathways to allow for planter access

1.4m wide standard concreteperimeter sidewalk

20%

20%

concrete layout determined bytypical control joint spacing

2400 3200

23.0m diameter open space grassarea around playground

sidewalk flares are dependenton control joint layout

control jointing set at 1200mm by1600mm to run 45° from building edges

control jointing set at1200mm by 1600mm to run45° from building edges

1.6m X 1.2m concretepad for flag pole

2 issued for DP 14.08.01 dc

Page 2: Evergreen Concept Development Drawing - CBE

EVERGREEN MIDDLE SCHOOL SCALE:1:300

FLOOR PLANS

LEVEL TWO

LEVEL ONE

Page 3: Evergreen Concept Development Drawing - CBE

EVERGREEN MIDDLE SCHOOL ELEVATIONS

1:200

NORTH ELEVATION

SOUTH ELEVATION

EAST ELEVATION

WEST ELEVATION

Page 4: Evergreen Concept Development Drawing - CBE

EVERGREEN MIDDLE SCHOOL CONCEPTUAL RENDERS