Molvania. Stari Grad. Yenikale. Turkistan. Evaluation Proposal. Construction of a Border Crossing Check Point. Group 5. T h e o r y C h a n g e. Economic Development. Social Cohesion in the CBC Regions. Increased Cross Border Mobility (Traffic). Quality of T ransport Improved. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Evaluation Proposal](https://reader035.vdocuments.us/reader035/viewer/2022072013/56812c2f550346895d90b3c6/html5/thumbnails/1.jpg)
EVALUATION PROPOSAL
Construction of a Border Crossing Check Point
Molvania
Turkistan
Stari Grad
Yenikale
Group 5
![Page 2: Evaluation Proposal](https://reader035.vdocuments.us/reader035/viewer/2022072013/56812c2f550346895d90b3c6/html5/thumbnails/2.jpg)
T H E O R Y C H A N G E OF
Inhabitants of CBC Regions :: Technical Assistance
Funding :: Contracts and Budgets
Preparation of design documentationLand Acquisition Construction of the Check PointSupervision of construction worksPurchasing Ferryboat
Border Crossing Check Point Opened
Increased Cross Border Mobility (Traffic)
Economic Development
Social Cohesion in the CBC Regions
Quality of Transport Improved
![Page 3: Evaluation Proposal](https://reader035.vdocuments.us/reader035/viewer/2022072013/56812c2f550346895d90b3c6/html5/thumbnails/3.jpg)
C
O
N
T
E
X
T
A
S
S
U
M
P
T
I
O
N
and
Context
Bilateral agreement was reached
Cultural differences
3 other Crossing Points exist
External financial support needed
Existing preliminary design
Land acquisition process has been started
Assumptions
New investors and companies attracted to the two regions
Labor migration doesn’t negatively influence the social cohesion
Whole investment returned
Travelling time decreased
Willingness of people to use BCCP
Information campaign provided
Stable climate conditions – no extreme floods
![Page 4: Evaluation Proposal](https://reader035.vdocuments.us/reader035/viewer/2022072013/56812c2f550346895d90b3c6/html5/thumbnails/4.jpg)
Design Matrix for Evaluation
Question Sub-Question Type
1. To what extent has the
construction of the Border
Crossing Check Point impacted
on the economical
development?
a) Has the project increased the GDP per capita in the two regions?
Cause & Effect
b) Has the project increased the real income in the two regions?
Cause & Effect
c) Has the project increased the trade volume in the two regions?
Cause & Effect
![Page 5: Evaluation Proposal](https://reader035.vdocuments.us/reader035/viewer/2022072013/56812c2f550346895d90b3c6/html5/thumbnails/5.jpg)
1. To what extent has the construction of the Border Crossing Check Point impacted on the economy development?
Measures/Indicators Regional GDP per capita
Design Interrupted time series comparison design
Data Sources National Statistics Offices (Mol. – Turk.)
Sample or Census Reports for each of the past 10 yearsData Collection Instrument Record Retrieval Document
Data Analysis Line Charts Trend Analysis
Comments “You make me happy!...”
a) Has the project increased the GDP per capita in the two regions?
![Page 6: Evaluation Proposal](https://reader035.vdocuments.us/reader035/viewer/2022072013/56812c2f550346895d90b3c6/html5/thumbnails/6.jpg)
Design Matrix for Evaluation
Question Sub-Question Type
2. Was the Border Crossing
Check Point project
effective?
a) Has the investment returned, in two years, as expected?
Normative
b) Has mobility increased as expected? Normative
c) Has the average travelling time shorten? Normative
![Page 7: Evaluation Proposal](https://reader035.vdocuments.us/reader035/viewer/2022072013/56812c2f550346895d90b3c6/html5/thumbnails/7.jpg)
2. Was the project effective?
Measures/Indicators Return on investment
Design One Shot
Data Sources Border Control Authority Financial
Sample or Census Reports of the past 2 yearsData Collection Instrument Record retrieval document
Data Analysis Comparison of real data to the estimated
Comments “Who invented love?”
a) Has the investment returned, in two years, as expected?
![Page 8: Evaluation Proposal](https://reader035.vdocuments.us/reader035/viewer/2022072013/56812c2f550346895d90b3c6/html5/thumbnails/8.jpg)
Design Matrix for Evaluation
Question Sub-Question Type
3. What were the main problems which affected
the Border Crossing Check Point project?
a) Was there any information campaign about opening and benefits of the new BCCP?
Descriptive
b) Were people satisfied with the new BCCP? Descriptive
![Page 9: Evaluation Proposal](https://reader035.vdocuments.us/reader035/viewer/2022072013/56812c2f550346895d90b3c6/html5/thumbnails/9.jpg)
3. What were the main problems which affected the BCCP project?
Measures/Indicators N/A
Design One Shot
Data Sources Project Manager, Project Reports, Check Point Users
Sample or Census Stratified Random SampleData Collection Instrument Interview, Record retrieval document, Survey
Data Analysis Content analysis, Content analysis & Frequency count
Comments Clever girls! FUN IS OVER...
a) Was there any information campaign about opening & benefits of the new Border Crossing Check Point?
![Page 10: Evaluation Proposal](https://reader035.vdocuments.us/reader035/viewer/2022072013/56812c2f550346895d90b3c6/html5/thumbnails/10.jpg)
Come to Molvania
Thank you for your attention!