Evaluation of Thin HMA Surfacing in NJEvaluation of Thin HMA Surfacing in NJ
NESMEA Annual MeetingNESMEA Annual MeetingOctober 23, 2003October 23, 2003WilkesWilkes--Barre, PABarre, PA
-
Evaluation of Thin HMA Surfacing in NJEvaluation of Thin HMA Surfacing in NJ
Objective:Objective: Determine optimum materials to meet Determine optimum materials to meet the service needs of NJthe service needs of NJApplication TypesApplication Types: HMA overlays
-
Evaluation of Thin HMA Surfacing in NJEvaluation of Thin HMA Surfacing in NJStudy ApproachStudy Approach
Evaluate three materialsEvaluate three materialsAsphalt Rubber Open Graded Friction Course (ARAsphalt Rubber Open Graded Friction Course (AR––OGFC)OGFC)Modified Open Graded Friction Course (MOGFC)Modified Open Graded Friction Course (MOGFC)NovachipNovachip®®
Design and construct comparative pavementsDesign and construct comparative pavementsSimilar Similar ProjectsProjects -- traffic, climate, structure, etc.traffic, climate, structure, etc.
Evaluate long term performanceEvaluate long term performancePMS data PMS data –– rutting, cracking, ride, and skidrutting, cracking, ride, and skid
Additional issuesAdditional issuesCostCostNoiseNoiseSafetySafety
Wet pavementWet pavementWinter maintenanceWinter maintenance
-
Evaluation of Thin HMA Surfacing in NJEvaluation of Thin HMA Surfacing in NJ
Preliminary ReportPreliminary ReportFive projects / Three materialsFive projects / Three materialsReport on:Report on:
Pavement Design and Construction DataPavement Design and Construction DataMix Design and AsMix Design and As--constructed Dataconstructed DataPMS DataPMS DataRelative Safety Enhancements Relative Safety Enhancements –– skid, spray, etc.skid, spray, etc.Noise DataNoise DataInitial CostInitial Cost
-
Projects 1 & 2 Projects 1 & 2 –– Asphalt RubberAsphalt Rubber--OGFCOGFC
Project DetailsProject Details
LocationLocation II--195 (Jackson)195 (Jackson) Rt. 9 (Tuckerton)Rt. 9 (Tuckerton)
Original pavementOriginal pavement ’’7272-- 6.5” HMA6.5” HMA ’’2525-- 8” PCC / ’53 HMA8” PCC / ’53 HMA’87’87-- 4” HMA4” HMA
Construction dateConstruction dateTraffic (ESAL /20yr)Traffic (ESAL /20yr)
Sept. Sept. –– 1992199227 million27 million
Oct. Oct. –– 199319937.1 million7.1 million
Overlay DesignOverlay Design 2”2”-- mill / 4”mill / 4”-- fillfill 2”2”-- mill / 3”mill / 3”-- fillfill
SurfaceSurface 1” AR 1” AR –– OGFCOGFC 1” AR 1” AR -- OGFCOGFC
IntermediateIntermediate 3” I3” I--2 base2 base 2” I2” I--2 base2 base
-
Projects 1 & 2Projects 1 & 2–– ARAR--OGFCOGFCMix Design & Construction Mix Design & Construction –– ARAR--OGFCOGFC
DesignDesign I I -- 195195 Rt. 9Rt. 9
% % -- Air Voids *Air Voids * 18%18% 16.5%16.5%
% AC% AC--2020 + + 15% 15% Ground Tire RubberGround Tire Rubber
6.6% 6.6% ((--80 mesh)80 mesh)
6.5% 6.5% ((--40 mesh)40 mesh)
Production varianceProduction variance((design) / prod. design) / prod. -- % % pass. #4pass. #4
(39%) / 37%(39%) / 37% (35%) / 38%(35%) / 38%
((design) / prod. design) / prod. -- % air % air voidsvoids
(18%) / 20%(18%) / 20% (16.8%) / 15.8%(16.8%) / 15.8%
* 25 blow Marshall
-
Asphalt Rubber BlendingAsphalt Rubber Blending
-
Projects 1 & 2Projects 1 & 2–– ARAR--OGFCOGFC
Safety, Noise, CostSafety, Noise, Cost
I I –– 195195 Rt. 9Rt. 9
NCAT NCAT –– Sound Sound trailer # trailer # dB(A)dB(A)
96.696.6 96.896.8
Bid price Bid price –– Ton / Ton / QuantityQuantity
$146 / 470 T$146 / 470 T $60 / 1100 T$60 / 1100 T
Other issuesOther issues Winter Winter maintenancemaintenance
Winter Winter maintenancemaintenance
* I-2 Base - $28/T
-
Project 3 Project 3 –– MOGFC over PCCMOGFC over PCCProject DetailsProject DetailsLocationLocation Rt.24 Union, NJRt.24 Union, NJ
Original pavementOriginal pavement 9 ins. PCC / 25 years old9 ins. PCC / 25 years old
Construction dateConstruction dateTraffic (ESAL /20 yr)Traffic (ESAL /20 yr)
Sept. Sept. –– 1999199970 million70 million
DesignDesign 1 ¼” 1 ¼” -- MOGFC + hot AC MOGFC + hot AC tack directly on old PCCtack directly on old PCC
SurfaceSurface MOGFC #1 / PG 76MOGFC #1 / PG 76--22 + 22 + cellulose fiberscellulose fibers
-
Project 3 Project 3 –– MOGFC over PCCMOGFC over PCC
Mix Design & ConstructionMix Design & Construction
0
10
20
30
40
50
60
70
80
90
100
Sieve Sizes (mm)
Perc
ent P
assi
ng
12.5 19 1.18 2.36 4.750.075 0.3
MOGFC - RT 24
AR-OGFC / I-195
AR-OGFC / Rt 9
-
Rt. 24 MOGFC on PCCRt. 24 MOGFC on PCC
-
Project 3 Project 3 –– MOGFC over PCCMOGFC over PCC
Mix Design & Construction Mix Design & Construction –– MOGFC on PCCMOGFC on PCC
DesignDesign NJ Rt. 24NJ Rt. 24% % -- Air Voids *Air Voids * 21.1%21.1%% % -- VMAVMA 35.1%35.1%% AC (PG 76% AC (PG 76--22)22) 6.8% (+ 0.4% fibers)6.8% (+ 0.4% fibers)
Production varianceProduction variance((design) / prod. design) / prod. -- % pass. % pass. 3/8”3/8”
(82.3%) / 85.3%(82.3%) / 85.3%
((design) / prod. design) / prod. -- % air % air voidsvoids
(21.1%) / 20.0%(21.1%) / 20.0%
* SGC – 50 Gyrations
-
Project 3 Project 3 –– MOGFC over PCCMOGFC over PCC
Safety, Noise, CostSafety, Noise, Cost
NJ Rt. 24NJ Rt. 24
NCAT NCAT –– Sound Sound trailer # trailer # dB(A)dB(A)
97.597.5
Change orderChange orderprice price –– MGR / MGR / QuantityQuantity
$ 81.50 / 8600 $ 81.50 / 8600
Other issuesOther issues Winter maintenance Winter maintenance
-
Projects 4 & 5 Projects 4 & 5 –– Novachip / MOGFCNovachip / MOGFC
Project DetailsProject Details
Original Pavement: 4 lane Interstate IOriginal Pavement: 4 lane Interstate I--195195
Construction:Construction: October October –– 20002000 May May -- 20012001
Design:Design: Mill Mill –– 2” / replace 52” / replace 5--6” new HMA 6” new HMA –– PG 76PG 76--22 all22 all
Traffic ESAL:Traffic ESAL: 27.8 Million27.8 Million
Surface lift:Surface lift: ½” ½” NovachipNovachip®® -- Koch Koch proprietary product proprietary product ––Polymer emulsion tack Polymer emulsion tack applied in front of screedapplied in front of screed
1” 1” MOGFCMOGFC #2 NCAT #2 NCAT mix design proc.+ mix design proc.+ mineral fibermineral fiber
Intermediate Intermediate lift:lift:
4 ½” 4 ½” –– 5 ½” 5 ½” 12.5mm/19mm Superpave12.5mm/19mm Superpave
4” 4” –– 5” 12.5mm/ 5” 12.5mm/ 19mm Superpave19mm Superpave
-
Projects 4 & 5 Projects 4 & 5 –– Novachip / MOGFCNovachip / MOGFC
Mix DesignMix Design ––Novachip / MOGFCNovachip / MOGFC
0
10
20
30
40
50
60
70
80
90
100
Sieve Sizes (mm)
Perc
ent P
assi
ng
12.5 19 1.18 2.36 4.750.075 0.3
Mod. OGFC-2
12.5 MM - SP
Novachip
-
Projects 4 & 5 Projects 4 & 5 –– Novachip / MOGFCNovachip / MOGFC
Mix Design & ConstructionMix Design & Construction
DesignDesign NovachipNovachip MOGFC #2MOGFC #2% % -- Air Voids *Air Voids * 23.0 %23.0 %% % -- VMAVMA 35.6 %35.6 %% % -- AC (PG 76AC (PG 76--22)22) 4.9%4.9% 6.0%6.0%(+ 0.4% fiber)(+ 0.4% fiber)
Production varianceProduction variance((design) / prod. design) / prod. -- % pass. % pass. #4#4
(33%) / 27%(33%) / 27% (13%) / 18%(13%) / 18%
((design) / prod. design) / prod. -- % pass. % pass. 3/83/8
(73.5%) / 68%(73.5%) / 68%
* SGC – 50 Gyrations
-
Projects 4 & 5 Projects 4 & 5 –– Novachip / MOGFCNovachip / MOGFCSafety, Noise, CostSafety, Noise, Cost
NovachipNovachip MOGFC #2MOGFC #2
NCAT NCAT –– Sound Sound trailer # dB(A)trailer # dB(A)
98.298.2 98.398.3
Bid price * Bid price * –– MG MG / Quantity/ Quantity
$105 / 2920$105 / 2920 $51.50 / 9069$51.50 / 9069
Other issuesOther issues Winter Winter maintenancemaintenance
* 12.5 mm SP – $ 45
-
All ProjectsAll Projects
Mix Design & ConstructionMix Design & Construction
0
10
20
30
40
50
60
70
80
90
100
Sieve Sizes (mm)
Perc
ent P
assi
ng
12.5 19 1.18 2.36 4.750.075 0.3
MOGFC #2 I-195
AR - OGFC / I-195
AR OGFC / Rt 9
NovachipMOGFC #1 Rt. 24
-
Pre and Post Construction IRIPre and Post Construction IRI
020406080
100120140160180
Rt. 24 MOGFC-1
I-195 WBNovachip
I-195 EBMOGFC-2
IRI
-
Wet Weather PerformanceWet Weather Performance
Skid ResistanceSkid ResistanceSpraySpray
-
Skid ResistanceSkid Resistance
-
Spray Spray -- Dense Graded AsphaltDense Graded Asphalt
-
Spray Spray -- Open Graded AsphaltOpen Graded Asphalt
-
Spray Spray -- NovachipNovachip
-
Winter MaintenanceWinter Maintenance
-
NCAT Noise TrailerNCAT Noise Trailer
-
Sound Pressure [dB(A)]Sound Pressure [dB(A)]
96.6 96.897.5
98.2 98.3 98.599.4
98.7
102.9
93949596979899
100101102103104
I-195
AR-
OGFC
Rt. 9
AR-
OGFC
Rt. 2
4 MOG
FC-1
I-195
Nov
achip
I-195
MOG
FC-2
12.5
Supe
rpave
19 S
uperp
ave
PCC
DGPC
C Rt
. 280
Dec
ibel
s
-
Cost ($/ Ton)Cost ($/ Ton)146
6074
95
47 41
020406080
100120140160
I-195
AR-
OGFC
Rt. 9
AR-
OGFC
Rt. 2
4 MOG
FC-1
I-195
Nov
achip
I-195
MOG
FC-2
12.5
Supe
rpave
Cos
t ($/
Ton)
-
NJ Rt. 24 NJ Rt. 24 -- ‘New” OGFC ‘New” OGFC -- paving over hotpaving over hot--applied tack applied tack (PG 64(PG 64--22 @ 0.3 liters/sq. meter22 @ 0.3 liters/sq. meter
-
NJ Rt. 24 “New OGFC NJ Rt. 24 “New OGFC -- Typical PCC joint Typical PCC joint
-
NJ Rt.24 NJ Rt.24 -- “new” OGFC “new” OGFC -- Reflective crack 4/00Reflective crack 4/00
-
NJ Rt. 24 (10/03) NJ Rt. 24 (10/03) –– “saw and seal” Joint“saw and seal” Joint
-
NJ Rt. 24 NJ Rt. 24 -- 20032003
-
NJ Rt. 24 (10/03) NJ Rt. 24 (10/03) –– broken slab endbroken slab end
-
NJ Rt. 24 NJ Rt. 24 -- 20032003
-
Questions?Questions?
Evaluation of Thin HMA Surfacing in NJEvaluation of Thin HMA Surfacing in NJEvaluation of Thin HMA Surfacing in NJEvaluation of Thin HMA Surfacing in NJProjects 1 & 2 – Asphalt Rubber-OGFCProjects 1 & 2– AR-OGFCAsphalt Rubber BlendingProjects 1 & 2– AR-OGFCProject 3 – MOGFC over PCCProject 3 – MOGFC over PCCRt. 24 MOGFC on PCCProject 3 – MOGFC over PCCProject 3 – MOGFC over PCCProjects 4 & 5 – Novachip / MOGFCProjects 4 & 5 – Novachip / MOGFCProjects 4 & 5 – Novachip / MOGFCProjects 4 & 5 – Novachip / MOGFCAll ProjectsPre and Post Construction IRIWet Weather PerformanceSkid ResistanceSpray - Dense Graded AsphaltSpray - Open Graded AsphaltSpray - NovachipWinter MaintenanceNCAT Noise TrailerSound Pressure [dB(A)]Cost ($/ Ton)NJ Rt. 24 - ‘New” OGFC - paving over hot-applied tack (PG 64-22 @ 0.3 liters/sq. meterNJ Rt. 24 “New OGFC - Typical PCC jointNJ Rt.24 - “new” OGFC - Reflective crack 4/00NJ Rt. 24 (10/03) – “saw and seal” JointNJ Rt. 24 - 2003NJ Rt. 24 (10/03) – broken slab endNJ Rt. 24 - 2003Questions?