  • Evaluation of Thin HMA Surfacing in NJEvaluation of Thin HMA Surfacing in NJ

    NESMEA Annual MeetingNESMEA Annual MeetingOctober 23, 2003October 23, 2003WilkesWilkes--Barre, PABarre, PA

  • Evaluation of Thin HMA Surfacing in NJEvaluation of Thin HMA Surfacing in NJ

    Objective:Objective: Determine optimum materials to meet Determine optimum materials to meet the service needs of NJthe service needs of NJApplication TypesApplication Types: HMA overlays

  • Evaluation of Thin HMA Surfacing in NJEvaluation of Thin HMA Surfacing in NJStudy ApproachStudy Approach

    Evaluate three materialsEvaluate three materialsAsphalt Rubber Open Graded Friction Course (ARAsphalt Rubber Open Graded Friction Course (AR––OGFC)OGFC)Modified Open Graded Friction Course (MOGFC)Modified Open Graded Friction Course (MOGFC)NovachipNovachip®®

    Design and construct comparative pavementsDesign and construct comparative pavementsSimilar Similar ProjectsProjects -- traffic, climate, structure, etc.traffic, climate, structure, etc.

    Evaluate long term performanceEvaluate long term performancePMS data PMS data –– rutting, cracking, ride, and skidrutting, cracking, ride, and skid

    Additional issuesAdditional issuesCostCostNoiseNoiseSafetySafety

    Wet pavementWet pavementWinter maintenanceWinter maintenance

  • Evaluation of Thin HMA Surfacing in NJEvaluation of Thin HMA Surfacing in NJ

    Preliminary ReportPreliminary ReportFive projects / Three materialsFive projects / Three materialsReport on:Report on:

    Pavement Design and Construction DataPavement Design and Construction DataMix Design and AsMix Design and As--constructed Dataconstructed DataPMS DataPMS DataRelative Safety Enhancements Relative Safety Enhancements –– skid, spray, etc.skid, spray, etc.Noise DataNoise DataInitial CostInitial Cost

  • Projects 1 & 2 Projects 1 & 2 –– Asphalt RubberAsphalt Rubber--OGFCOGFC

    Project DetailsProject Details

    LocationLocation II--195 (Jackson)195 (Jackson) Rt. 9 (Tuckerton)Rt. 9 (Tuckerton)

    Original pavementOriginal pavement ’’7272-- 6.5” HMA6.5” HMA ’’2525-- 8” PCC / ’53 HMA8” PCC / ’53 HMA’87’87-- 4” HMA4” HMA

    Construction dateConstruction dateTraffic (ESAL /20yr)Traffic (ESAL /20yr)

    Sept. Sept. –– 1992199227 million27 million

    Oct. Oct. –– 199319937.1 million7.1 million

    Overlay DesignOverlay Design 2”2”-- mill / 4”mill / 4”-- fillfill 2”2”-- mill / 3”mill / 3”-- fillfill

    SurfaceSurface 1” AR 1” AR –– OGFCOGFC 1” AR 1” AR -- OGFCOGFC

    IntermediateIntermediate 3” I3” I--2 base2 base 2” I2” I--2 base2 base

  • Projects 1 & 2Projects 1 & 2–– ARAR--OGFCOGFCMix Design & Construction Mix Design & Construction –– ARAR--OGFCOGFC

    DesignDesign I I -- 195195 Rt. 9Rt. 9

    % % -- Air Voids *Air Voids * 18%18% 16.5%16.5%

    % AC% AC--2020 + + 15% 15% Ground Tire RubberGround Tire Rubber

    6.6% 6.6% ((--80 mesh)80 mesh)

    6.5% 6.5% ((--40 mesh)40 mesh)

    Production varianceProduction variance((design) / prod. design) / prod. -- % % pass. #4pass. #4

    (39%) / 37%(39%) / 37% (35%) / 38%(35%) / 38%

    ((design) / prod. design) / prod. -- % air % air voidsvoids

    (18%) / 20%(18%) / 20% (16.8%) / 15.8%(16.8%) / 15.8%

    * 25 blow Marshall

  • Asphalt Rubber BlendingAsphalt Rubber Blending

  • Projects 1 & 2Projects 1 & 2–– ARAR--OGFCOGFC

    Safety, Noise, CostSafety, Noise, Cost

    I I –– 195195 Rt. 9Rt. 9

    NCAT NCAT –– Sound Sound trailer # trailer # dB(A)dB(A)

    96.696.6 96.896.8

    Bid price Bid price –– Ton / Ton / QuantityQuantity

    $146 / 470 T$146 / 470 T $60 / 1100 T$60 / 1100 T

    Other issuesOther issues Winter Winter maintenancemaintenance

    Winter Winter maintenancemaintenance

    * I-2 Base - $28/T

  • Project 3 Project 3 –– MOGFC over PCCMOGFC over PCCProject DetailsProject DetailsLocationLocation Rt.24 Union, NJRt.24 Union, NJ

    Original pavementOriginal pavement 9 ins. PCC / 25 years old9 ins. PCC / 25 years old

    Construction dateConstruction dateTraffic (ESAL /20 yr)Traffic (ESAL /20 yr)

    Sept. Sept. –– 1999199970 million70 million

    DesignDesign 1 ¼” 1 ¼” -- MOGFC + hot AC MOGFC + hot AC tack directly on old PCCtack directly on old PCC

    SurfaceSurface MOGFC #1 / PG 76MOGFC #1 / PG 76--22 + 22 + cellulose fiberscellulose fibers

  • Project 3 Project 3 –– MOGFC over PCCMOGFC over PCC

    Mix Design & ConstructionMix Design & Construction

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    Sieve Sizes (mm)

    Perc

    ent P

    assi

    ng

    12.5 19 1.18 2.36 4.750.075 0.3

    MOGFC - RT 24

    AR-OGFC / I-195

    AR-OGFC / Rt 9

  • Rt. 24 MOGFC on PCCRt. 24 MOGFC on PCC

  • Project 3 Project 3 –– MOGFC over PCCMOGFC over PCC

    Mix Design & Construction Mix Design & Construction –– MOGFC on PCCMOGFC on PCC

    DesignDesign NJ Rt. 24NJ Rt. 24% % -- Air Voids *Air Voids * 21.1%21.1%% % -- VMAVMA 35.1%35.1%% AC (PG 76% AC (PG 76--22)22) 6.8% (+ 0.4% fibers)6.8% (+ 0.4% fibers)

    Production varianceProduction variance((design) / prod. design) / prod. -- % pass. % pass. 3/8”3/8”

    (82.3%) / 85.3%(82.3%) / 85.3%

    ((design) / prod. design) / prod. -- % air % air voidsvoids

    (21.1%) / 20.0%(21.1%) / 20.0%

    * SGC – 50 Gyrations

  • Project 3 Project 3 –– MOGFC over PCCMOGFC over PCC

    Safety, Noise, CostSafety, Noise, Cost

    NJ Rt. 24NJ Rt. 24

    NCAT NCAT –– Sound Sound trailer # trailer # dB(A)dB(A)

    97.597.5

    Change orderChange orderprice price –– MGR / MGR / QuantityQuantity

    $ 81.50 / 8600 $ 81.50 / 8600

    Other issuesOther issues Winter maintenance Winter maintenance

  • Projects 4 & 5 Projects 4 & 5 –– Novachip / MOGFCNovachip / MOGFC

    Project DetailsProject Details

    Original Pavement: 4 lane Interstate IOriginal Pavement: 4 lane Interstate I--195195

    Construction:Construction: October October –– 20002000 May May -- 20012001

    Design:Design: Mill Mill –– 2” / replace 52” / replace 5--6” new HMA 6” new HMA –– PG 76PG 76--22 all22 all

    Traffic ESAL:Traffic ESAL: 27.8 Million27.8 Million

    Surface lift:Surface lift: ½” ½” NovachipNovachip®® -- Koch Koch proprietary product proprietary product ––Polymer emulsion tack Polymer emulsion tack applied in front of screedapplied in front of screed

    1” 1” MOGFCMOGFC #2 NCAT #2 NCAT mix design proc.+ mix design proc.+ mineral fibermineral fiber

    Intermediate Intermediate lift:lift:

    4 ½” 4 ½” –– 5 ½” 5 ½” 12.5mm/19mm Superpave12.5mm/19mm Superpave

    4” 4” –– 5” 12.5mm/ 5” 12.5mm/ 19mm Superpave19mm Superpave

  • Projects 4 & 5 Projects 4 & 5 –– Novachip / MOGFCNovachip / MOGFC

    Mix DesignMix Design ––Novachip / MOGFCNovachip / MOGFC

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    Sieve Sizes (mm)

    Perc

    ent P

    assi

    ng

    12.5 19 1.18 2.36 4.750.075 0.3

    Mod. OGFC-2

    12.5 MM - SP

    Novachip

  • Projects 4 & 5 Projects 4 & 5 –– Novachip / MOGFCNovachip / MOGFC

    Mix Design & ConstructionMix Design & Construction

    DesignDesign NovachipNovachip MOGFC #2MOGFC #2% % -- Air Voids *Air Voids * 23.0 %23.0 %% % -- VMAVMA 35.6 %35.6 %% % -- AC (PG 76AC (PG 76--22)22) 4.9%4.9% 6.0%6.0%(+ 0.4% fiber)(+ 0.4% fiber)

    Production varianceProduction variance((design) / prod. design) / prod. -- % pass. % pass. #4#4

    (33%) / 27%(33%) / 27% (13%) / 18%(13%) / 18%

    ((design) / prod. design) / prod. -- % pass. % pass. 3/83/8

    (73.5%) / 68%(73.5%) / 68%

    * SGC – 50 Gyrations

  • Projects 4 & 5 Projects 4 & 5 –– Novachip / MOGFCNovachip / MOGFCSafety, Noise, CostSafety, Noise, Cost

    NovachipNovachip MOGFC #2MOGFC #2

    NCAT NCAT –– Sound Sound trailer # dB(A)trailer # dB(A)

    98.298.2 98.398.3

    Bid price * Bid price * –– MG MG / Quantity/ Quantity

    $105 / 2920$105 / 2920 $51.50 / 9069$51.50 / 9069

    Other issuesOther issues Winter Winter maintenancemaintenance

    * 12.5 mm SP – $ 45

  • All ProjectsAll Projects

    Mix Design & ConstructionMix Design & Construction

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    Sieve Sizes (mm)

    Perc

    ent P

    assi

    ng

    12.5 19 1.18 2.36 4.750.075 0.3

    MOGFC #2 I-195

    AR - OGFC / I-195

    AR OGFC / Rt 9

    NovachipMOGFC #1 Rt. 24

  • Pre and Post Construction IRIPre and Post Construction IRI

    020406080

    100120140160180

    Rt. 24 MOGFC-1

    I-195 WBNovachip

    I-195 EBMOGFC-2

    IRI

  • Wet Weather PerformanceWet Weather Performance

    Skid ResistanceSkid ResistanceSpraySpray

  • Skid ResistanceSkid Resistance

  • Spray Spray -- Dense Graded AsphaltDense Graded Asphalt

  • Spray Spray -- Open Graded AsphaltOpen Graded Asphalt

  • Spray Spray -- NovachipNovachip

  • Winter MaintenanceWinter Maintenance

  • NCAT Noise TrailerNCAT Noise Trailer

  • Sound Pressure [dB(A)]Sound Pressure [dB(A)]

    96.6 96.897.5

    98.2 98.3 98.599.4

    98.7

    102.9

    93949596979899

    100101102103104

    I-195

    AR-

    OGFC

    Rt. 9

    AR-

    OGFC

    Rt. 2

    4 MOG

    FC-1

    I-195

    Nov

    achip

    I-195

    MOG

    FC-2

    12.5

    Supe

    rpave

    19 S

    uperp

    ave

    PCC

    DGPC

    C Rt

    . 280

    Dec

    ibel

    s

  • Cost ($/ Ton)Cost ($/ Ton)146

    6074

    95

    47 41

    020406080

    100120140160

    I-195

    AR-

    OGFC

    Rt. 9

    AR-

    OGFC

    Rt. 2

    4 MOG

    FC-1

    I-195

    Nov

    achip

    I-195

    MOG

    FC-2

    12.5

    Supe

    rpave

    Cos

    t ($/

    Ton)

  • NJ Rt. 24 NJ Rt. 24 -- ‘New” OGFC ‘New” OGFC -- paving over hotpaving over hot--applied tack applied tack (PG 64(PG 64--22 @ 0.3 liters/sq. meter22 @ 0.3 liters/sq. meter

  • NJ Rt. 24 “New OGFC NJ Rt. 24 “New OGFC -- Typical PCC joint Typical PCC joint

  • NJ Rt.24 NJ Rt.24 -- “new” OGFC “new” OGFC -- Reflective crack 4/00Reflective crack 4/00

  • NJ Rt. 24 (10/03) NJ Rt. 24 (10/03) –– “saw and seal” Joint“saw and seal” Joint

  • NJ Rt. 24 NJ Rt. 24 -- 20032003

  • NJ Rt. 24 (10/03) NJ Rt. 24 (10/03) –– broken slab endbroken slab end

  • NJ Rt. 24 NJ Rt. 24 -- 20032003

  • Questions?Questions?

    Evaluation of Thin HMA Surfacing in NJEvaluation of Thin HMA Surfacing in NJEvaluation of Thin HMA Surfacing in NJEvaluation of Thin HMA Surfacing in NJProjects 1 & 2 – Asphalt Rubber-OGFCProjects 1 & 2– AR-OGFCAsphalt Rubber BlendingProjects 1 & 2– AR-OGFCProject 3 – MOGFC over PCCProject 3 – MOGFC over PCCRt. 24 MOGFC on PCCProject 3 – MOGFC over PCCProject 3 – MOGFC over PCCProjects 4 & 5 – Novachip / MOGFCProjects 4 & 5 – Novachip / MOGFCProjects 4 & 5 – Novachip / MOGFCProjects 4 & 5 – Novachip / MOGFCAll ProjectsPre and Post Construction IRIWet Weather PerformanceSkid ResistanceSpray - Dense Graded AsphaltSpray - Open Graded AsphaltSpray - NovachipWinter MaintenanceNCAT Noise TrailerSound Pressure [dB(A)]Cost ($/ Ton)NJ Rt. 24 - ‘New” OGFC - paving over hot-applied tack (PG 64-22 @ 0.3 liters/sq. meterNJ Rt. 24 “New OGFC - Typical PCC jointNJ Rt.24 - “new” OGFC - Reflective crack 4/00NJ Rt. 24 (10/03) – “saw and seal” JointNJ Rt. 24 - 2003NJ Rt. 24 (10/03) – broken slab endNJ Rt. 24 - 2003Questions?