Page 1: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Remi Hansen, PROMIS AS

Test Strategies Are 90% Waste

www.eurostarconferences.com

@esconfs#esconfs

Page 2: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Me and my message

Anti-patterns

Recommendations

Photo (Flickr): Spiroll

Page 3: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Senior PM in PROMIS, a leading provider of agile project and test management services in Norway (www.promis.no)

20+ years in IT Consulting business ◦ Primarily Project Manager and Business Consultant

on strategic projects in both private and public sector

Presenter on local and international conferences

B.Sc. in SW Engineering, M. Sc. in Industrial Economics

Certified Project Management Professional (PMP), PRINCE2 Practitioner, IT Project Professional (ITPP), CSPO, ISTQB Foundation and ITIL

no.linkedin.com/in/remihansen/

Q UAL I F Y

Page 4: EuroSTAR 2013 - Test Strategies are 90 percent waste!

1. Dare to break the test strategy anti-patterns

2. Test strategies are for communication – not for documentation

3. You will receive a limited amount of management attention –use it wisely - to gain the mandate you need to do your job effectively

Foto (Flickr):Jordan McCullough

Page 5: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Photo (Flickr):thegift73

Page 6: EuroSTAR 2013 - Test Strategies are 90 percent waste!

An anti-pattern is a pattern used in social or business operations or software engineering that may be commonly used but is ineffective and/or counterproductive in practice

Page 7: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Can you think of anytest strategy anti-patterns?

Page 8: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Use a template based on an international standard- make sure to fill in something in every section

Page 9: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Write as if the document exists without any context at all

Page 10: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Write as if the reader has never heard of the concept of testing

Page 11: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Do not communicate any of the contentuntil the document is complete, in perfect condition

and formally approved

Page 12: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Volume = Quality

Page 13: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Write for the test management community– Stick strictly to the test vocabulary!

Page 14: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Include a snapshot of the risk,

to have it declared once and for all

Page 15: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Write excessively about what the SW developers should do in their unit tests

Page 16: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Additional anti-patterns?

Page 17: EuroSTAR 2013 - Test Strategies are 90 percent waste!

If you follow these anti-patterns you should keep occupied for a long time

producing an impeccable documentof at least 50 pages

- With close to zero valuebecause nobody can endure reading it

- And if anybody does read itit’s certainly not the ones who should read it

Page 18: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Photo (Flickr):thegift73

Page 19: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Build support from management for the most important choices, which gives you a clear boundaries to manage within

Photo (Flickr):Michele M.F.

Page 20: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Be very clear on the distinction between

the strategy = what you must have management backing for

and

the plan = what you as a test professional and manager will

take responsibility for and management shouldn’t really worry too much about management by exception

Page 21: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Present the strategy incrementally – build consensus around the essential choices before moving on to more detailed issues

Presentation is more effective than documents

Create discussions and common conclusions

Do we need the traditional test strategy document?

Page 22: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Put forward the important choices in an understandable way ◦ Don’t let the important drown in details◦ Don’t make the readers relate to issues they need not

worry about – that will only dilute the message◦ Don’t waste space and attention on matters covered

elsewhere

The document has no value in itself– it’s the shared understanding and direction it gives that creates value

Page 23: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Don’t underestimate the level of test knowledge out there

A decision maker without test knowledge will not become knowledgeable even if you write a lot of details – don’t write a textbook on test management!

Page 24: EuroSTAR 2013 - Test Strategies are 90 percent waste!

What would you includeif you were to write a test strategy

on five slides?

Photo (Flickr):Captain Tenneal

Page 25: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Which tests will we perform?

When (in what phases) do we test?

Who (what roles) will perform the tests?

In which environments will we test?

What test techniques are required?

What are the test objects?

What are the acceptance criteria?

What tools will we use?

What documentation is needed?

What metrics do we need?

Page 26: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Distinguish clearly betweenTest strategy – the overall policies, guidelines and priorities that

Project Management and Steering Committee must support (contract between project management and TM)and

Test plans – everything you as a Test Manager can take responsibility for yourself

Page 27: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Which tests will we perform?

When (in what phases) do we test?

Who (what roles) will perform the tests?

In which environments will we test?

What test techniques are required?

What are the test objects?

What are the acceptance criteria?

What tools will we use?

What documentation is needed?

What metrics do we need?

Tabular / graphics presentation

Do we need this inthe strategy? Consider moving to test plan

What’s missing?

Page 28: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Test objectives / Business risk assessment

Strategy for test automation

Clarifications on scope, ambition and responsibility for more «peripheral» tests, like non-functional test incl. performance tests, regression tests, operational tests, quality assurance of documentation and training, usability tests, static testing, code quality, etc.

Resource requirements – type and amount

Page 29: EuroSTAR 2013 - Test Strategies are 90 percent waste!

What you should remember

1. Dare to break the test strategy anti-patterns

2. Test strategies are for communication

– not for documentation

3. You will receive a limited amount of management attention

– use it wisely - to gain the mandate you need to do your job effectively

Photo (Flickr):ILhan Gendron

Page 30: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Emancipate yourself from bloated test strategies!

Photo (Flickr):Jake Gagne

Page 31: EuroSTAR 2013 - Test Strategies are 90 percent waste!

Photo (Flickr):Horia Varlan

Reachable on [email protected]