European Future Communications Research
2018-20 and post 2020 challenges
Remy BayouEuropean Commission DG ConnectFuture Connectivity Systems Unit
Lisbon, Oct 24th
![Page 2: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/2.jpg)
Funding 2017
5G PPP Phase 2: 149M€, 24 projectsResearch and Innovation Actions (101M€)
• wireless access and radio network technologies• high capacity elastic-optical networks• software networks
Innovation Actions (40M€)
• 5G access leveraging optical technologies• flexible network applications
Coop with Taiwan, CSA (5+3M€)
• Cooperation in access convergence
Beyond 5G: 18M€, 6 projects (call matching ETP Beyond5G white paper)
THz Com, VLC, D band radio, ng FECs for Tbit/s
![Page 3: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/3.jpg)
Beyond5G Retained proposalsTERRANOVATo provide reliable connectivity of extremely high data rates in the Tbit/s regime and almost ‘zero-latency’ in networks beyond 5G, TERRANOVA proposes to extend the fibre-optic systems Quality of Experience and performance reliability to wireless, by exploiting frequencies above 275GHz for access and backhaul links.
EPICEPIC aims to develop a new generation of Forward-Error-Correction (FEC) codes to enable practical wireless Tb/s link technology—corresponding to a 10x–100x throughput improvement over the SoA
ULTRAWAVEUltra capacity layer providing more than 100 Gbps per kilometer square in Point to Multi point at D-band (141 – 174.8 GHz) over 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Point high capacity links with more than 600 m range.
DREAMThe DREAM project, through the exploitation of the radio spectrum in D-band (130-174.8 GHz) with beam steering functionality
WORTECSHigh-frequency mm-wave (in the band above 90 GHz) radio communications will be combined with optical wireless communications in the infrared and visible regions of the optical spectrum, using novel heterogeneous networking concepts. An ultra-high density LiFi/Radio network providing multi-Gbps to virtual reality terminals will be developed.
TERAPODThe project will focus on end to end demonstration of the THz wireless link within a Data Centre Proof of Concept deployment, while also investigating other use cases applicable to beyond 5G such as wireless personal area networks, wireless local area networks and high bandwidth broadcasting.
![Page 4: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/4.jpg)
Funding 2018-20
§ (https://ec.europa.eu/programmes/horizon2020/sites/horizon2020/files/h2020-leit-ict-2018-2020_pre_publication.pdf) § ICT-17-2018: 5G End-to-End Facility (RIA)§ ICT-18-2018: 5G for Cooperative, Connected and Automated Mobility (CCAM) (IA)§ ICT-19-2019: Advanced 5G validation trials across multiple vertical industries (RIA and CSA)§ ICT-21-2018: EU-US Collaboration for advanced wireless platforms (CSA)§ ICT-22-2018: EU-China 5G Collaboration (RIA)§ EUJ-02-2018: 5G and beyond (RIA)§ EUK-02-2018: 5G (RIA)
§ The following Strategic objectives will be addressed by the Phase 3(.II) PSM (targeted in February 2018)§ ICT-20-2019-2020: 5G Long Term Evolution§ ICT–41-2020: Network innovations with 5G third party services§ ICT–42-2020: 5G core technologies innovation§ ICT-23-2019: EU-Taiwan 5G Collaboration
§ ICT-43-2020: EU-Brazil 5G collaboration 420M€
![Page 5: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/5.jpg)
§ EC H2020 5G Infrastructure PPP Phase 3 – Strategic Objectives (1/2)
09/11/2017 5
H20205GInfrastructurePPPPhase3(.I)PSMScope&Coverage(2/3)
![Page 6: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/6.jpg)
§ EC H2020 5G Infrastructure PPP Phase 3 – Strategic Objectives (2/2)
09/11/2017 6
H20205GInfrastructurePPPPhase3(.I)PSMScope&Coverage(3/3)
![Page 7: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/7.jpg)
DG RTD FP9 Programme Concept paper
- -The need to invest big- - intensify Int Coop / outreach civil society- - budget options- - evolution, not revolution- - 3 pillars: science; innovation; global challenges- - global challenges: societal and technology driven
missions- - centrally managed, agencies, simplification
![Page 8: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/8.jpg)
-DG CONNECT Digital in FP9 Programme concept
• Digital Missions (scientific, technology, societal)
• Scientific Mission: FET flagship, FET proactive (graphene, Hhuman brain, quantum, batteries)
• Technology Missions AI, NGI, Key techno (nanoelec,photonics), Open science cloud, HPC
• Societal Missions: cybersecurity, health,green, • ERC EIC
![Page 9: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/9.jpg)
![Page 10: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/10.jpg)
Future Com research in FP9?
• EC DG Connect Unit dealing with Communications Research: FP7 'Network technologies', FP8H2020'Future connectivity systems' with leading topic 5G and PPPinstrument
• FP9? challenges, narrative, title, instruments? Socio eco challenges? Smart connectivity, Future Networks?, PPP, Joint Undertaking? ..
• Consultation: who knows, who does?• ETP Networld2020 (consultation+ vision research workshop, Fora (etsi – NG protocols-,
ietf..), 5GIA, Industry/ Academics, new actors for 2025-30 markets? etc..
![Page 11: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/11.jpg)
Consultation: An EU operatorrecent contribution
![Page 12: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/12.jpg)
Future Com research in FP9?
• Ideas, papers, budgets already on their way and will impact the Communications Research community
• è Urgent need for ETP Networld2020 FP9 vision with socio eco and strong narrative; technologymission oriented white paper, SRIA with topics
• Other open questions• - link to NGI, "Connectivity" trends or establish independent
narrative?• - Societal challenges: Coverage, verticals Cars Health;sovereignty?• - Focus on? Access/ connectivity management/ services/
processors/ terminals? Terabit capacities? Optical? Deeper Reach (bio nano etc..)? Spectrum,Thz, Intelligence and Control?
![Page 13: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/13.jpg)
Stakeholders Information Opportunities
https://ec.europa.eu/digital-single-market/en/events/ict-proposers-day-2017
![Page 14: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/14.jpg)
Findoutmore
5GActionPlanforEuropehttps://ec.europa.eu/digital-single-market/en/5g-europe-action-plan
ICTWorkProgrammehttps://ec.europa.eu/programmes/horizon2020/en/what-work-programme
5GPPP http://www.5G-PPP.eu
Horizon2020website http://ec.europa.eu/programmes/horizon2020
Participantsportal http://ec.europa.eu/research/participants/portal
H2020Helpdesk,includingFAQ http://ec.europa.eu/research/index.cfm?pg=enquiries
![Page 15: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/15.jpg)
HORIZON 2020
Thank you for your attention!
![Page 16: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/16.jpg)
HORIZON 2020
BACK UP for ETP Networld2020 GA
![Page 17: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/17.jpg)
5G PPP Phase III
Information day and Stakeholders event
![Page 18: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/18.jpg)
5GintheDigitalSingleMarket(DSM)
The5GPublicPrivatePartnership(5GPPP)
- 700M€initiativeunderR&IH2020programme
- Technologies,systems,applications
- Programmaticapproach
- spectrum,standards,Internationalcooperation
The5GActionplan
- CommissionCommunication:tosupportEuropeanindustrialleadership;
- PartoftheSeptember2016"ConnectivityPackage"
- PreparingFrameworkConditionsatEUlevelfor5Gdeployment
![Page 19: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/19.jpg)
5GPPP:Addressing5Gasastrategicandglobalissue
• About10yearstodevelopanewnetworkgeneration,R&Istartedaround2012inmanycountries,Europeattheforefront;
• Today,hugeeffortsworld-wideinthecontextofPublic-Privatepartnerships;
• CriticaltomaintainEuropeattheforefrontof5G,bothasasupplycentreofexcellenceandasanearlyadopterthroughleadmarkets;
• Europehasdevelopeditsown5Gpathonwhichtractionisnowbeingcreatedandneedstoreachitsobjectives.
• The5GPPPsupporttheEU5GPolicygoals
![Page 20: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/20.jpg)
5GAP:"SingleMarket"approachtoEU5GIntroduction
Commercial launch of 5G services in at least one major city in all MS
Early 5G launch in selected areas
20185G in all urban areas andAlong main transport paths
2025
2020
Coordinated/quasi-simultaneous launch throughout single market
Aggressive roll-out with geographical and sectorial focus
![Page 21: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/21.jpg)
EuropeanVision
![Page 22: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/22.jpg)
EuropeanTrialsRoadmap
Trials roadmap announced in the 5G Action Planü To help technology and business model validationü To prepare for early deploymentsü Top foster partnership with verticals and creation of ecosystem
Roadmap announced in MWC in Barcelonaü Support by key players of 5G in Europeü Attraction towards verticals and cities
5G Pan-European Trials Roadmap v1: 3rd 5G Global Event, Tokyo
ü Part of this implementation is supported by the EC through the 5GAP, 5G PPP Phase 3.
ü Very important to implement the roadmap in time
![Page 23: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/23.jpg)
23
Phase3(.I)5GEnd-to-EndFacility,5GforCCAM,Advanced5Gvalidationtrialsacrossmultipleverticalindustries
Y2015 2016 2017 2018 2019 2020 2021 2022
Phase2 - DemosPoC- CoreTechsComponents
Phase3(.II)
PhaseICoreTechologies
5GPPPPhase3WP18-20,pre-published
5GLongTermEvolution
Kick off at EUCNC Conference 12-15 June,
Oulu, Fin
Networkinnovationswith5Gthirdpartyservices,5Gcoretechnologiesinnovation
![Page 24: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/24.jpg)
Reinforce5GPPPasanindustryDrivenimpactfulinitiativesupportEUpositioningintheglobal5Gcompetitionthrough:
– SupportimplementationofEUVisionhttps://5g-ppp.eu/wp-content/uploads/2015/02/5G-Vision-Brochure-v1.pdf
– Reinforcelinkswithnewplayers,especiallyVerticalsindustries– Reinforcedtrendtowardsdemosandpilotswithhighindustrialimpacts– Integrationtoandcontributiontowardsinternationalcooperationanddevelopments,e.g.standards,spectrum– Preparingfordeployment,trialsupportandlongertermneeds– Programmaticapproachthroughcollaborationagreementbetweenprojects
5GPPPPhase3Objectives
![Page 25: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/25.jpg)
• Theprojectsaretheengineofthe5GPPP:– SupportimplementationofEUVisionandpolicies– Populatingthe5Gassociation'sworkinggroupsandcollaborationstructures– Providingsubstantialinputs(ex:standardization,spectrum,KPIs)– Integrationtoandcontributiontowardsinternationaldevelopmentsand
deployment• CollaborationagreementbetweenprojectsthroughComplementarygrants,
Art41.4MGA(inthemodelofPhases1and2)– Jointdefinitionofissuesofcommoninterests– Sharingofresults– commonapproachestostandardization– commondisseminationandawarenessraisingactivities– …
Morethanjustprojects– it'saPROGRAMME!
Collaborationmatters!
![Page 26: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/26.jpg)
R&D,2018-20Work-programme PolicyJAPAN - Applicationsandtrialswith5Gnetworks
- Beyond5G,applicabilityofspectrum>275GHz- Spectrum,interoperabilityatdifferentbands
REPUBLICOFKOREA
- Applicationtrialsatmmwave bands- Interoperabilityandintegrationof5Gverticaltestbedsinheterogeneousenvironments
- Standards,validationofspecs
CHINA - eMBB trialsat3,5Ghz andtrialsinthe V2Xcontext- Spectrumco-operation- Standards,preparing5Gphase2throughtrialresults
TAIWAN - 5GtrialsaddressingEndtoEndTestbedsforspecificapplications
USA- CoordinationofEU-NSFprojectsrelevanttotheAdvancedWirelessPlatformprogramme
BRAZIL - Trials- Spectrumco-operation- Standards- Trials
Internationalcooperation,movingforward
![Page 27: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/27.jpg)
Title Closing Date
ICT-17-2018 5GEndtoEndFacility
31January2018ICT-22-2018 EU-China5GCollaboration
EUJ-02-2018 EU-JapanJointCall- 5Gandbeyond
EUK-02-2018 EU-KoreaJointCall- 5G
ICT-18-2018 5Gforcooperative,connectedandautomatedmobility(CCAM) 17April2018
ICT-21-2018 EU-USCollaborationforadvancedwirelessplatforms
ICT-19-2019 Advanced5Gvalidationtrialsacrossmultipleverticalindustries 14November2018
5GPPPPhase3topicsclosingin2018
![Page 28: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/28.jpg)
ICT-17-2018:5GEndtoEndFacility- GeneralContext
• AvailabilityofPanEuropeanplatformsthatcanbeusedtovalidateinendtoendmannerthe5GKPIs,fromthe5GPPPandbeyond
• Criticaltogobeyondcapabilitiesthatcanbedemonstratedwithrunningprecommercialtrialsofindustry
• Novelfeaturesinrelationtovertical,notablyendtoendslicingareofparticularimportance
• PlatformsaretobereusedbyICT19projects,insupportoftrials• Opentosupportimplementationof5GAPtrialroadmap.• Impactonstandardscritical• Opentosupportdifferentstakeholdersconstellations
![Page 29: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/29.jpg)
ICT-17-2018:5GEndtoEndFacility- Scope
• Thetarget5Gendtoendnetworkfacilitycoversfixed/multiradioaccess,backhaul,corenetwork,servicetechnologiesandarchitecturestargetedfor5Gincludingendtoendvirtualisationandslicingaskeycomponent
• Theobjectiveis– tovalidatethe5GnetworkKPIsthroughrepresentativenetworktrials,
asdefinedbythe5GPPP;– toprepareanextensivevalidationplatformforverticalsusecases
![Page 30: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/30.jpg)
ICT-17-2018:5GEndtoEndFacility- Scope
Thetargetedfacility– allowstovalidateearlyversionsofthestandardsandtopreparefor
later"forwardcompatible"versions– maybebasedontheinterworkingofseveralexperimentalplatforms
existinginEurope– requiresavailabilityofanopennessframework(bothlegaland
technical,e.g.openAPIs)enabling"vertical"projectstoaccessanduseit
– requiresamethodologytoconsistentlycomparetechnologieswhereappropriate
![Page 31: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/31.jpg)
ICT-17-2018:5GEndtoEndFacility- ExpectedImpact
• Demonstratedfeasibilityof5GPPPKPIsbeyond4Gevolution.Itrequiresclearanalysisofthestateoftheartandhow5Ggoesbeyond
• Demonstrationofinnovativeradiospectrumuseandsharingapplicableto5Gspectrum:(un)-licensed,licensed-sharedaccess
• Validationofarepresentativeendtoend5Garchitectureincludingendtoendserviceprovisioningwithslicingcapabilities
• Impactfulcontributiontostandards.ParticipationofkeyEuropeanindustrialpartnerswithhighstandardisationimpactisdesired
• Availabilityof5Gfacilitythatmaybefurtherusedforvalidationthroughspecificverticalusecasesand/orforlargescaleshowcasingevents
![Page 32: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/32.jpg)
ICT-17-2018:5GEndtoEndFacility
• Opening 31/10/2017• Closing 31/01/2018• Targetis3to4projects• Typeofaction:ResearchandInnovationaction• Specialconditions!
– Thelimitforafullproposalis100pages– Complementarygrantagreementswillbeimplementedacrossprojects
originatingfrom5G-PPPPhase3topics
upto60M€
![Page 33: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/33.jpg)
ICT-18-2018:5Gforcooperative,connectedandautomatedmobility(CCAM)- GeneralContext
• ConnectedandCooperativeAssistedMobility(CCAM)identifiedasastrategicindustrialsectorintheEU
• 5Gidentifiedastheconnectivityplatformofchoice(longterm)forCCAMusecases,asperthe5GActionPlan
• EuropeanAllianceofTelecomandAutomotive(EATA)launchedbyCommissionerOettingerinSeptember2016
• Industryhaslaunchedthe5GAA• MemberStateSupportwithLetterofIntent,signedatministeriallevelinMarch2017• Intheshortterm,non-cellulartechnology(G5)expectedtodevelopintheEUforearly
C-ITSrequirementsè ICT18aimsatvalidating5GforCCAMinthiswidertechno-policycontext
![Page 34: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/34.jpg)
ICT-18-2018:5Gforcooperative,connectedandautomatedmobility(CCAM)- Scope
• Validationof5GinabroadCCAMcontextisrealisedthroughcrossbordertrialsalong5Gcorridors
• Coretechnologicalinnovationexpectedfrom5G,suchas(butnotlimitedto):– NewRadio,newfrequencybands– C-RAN– MobileEdgeComputing– networkvirtualisation– newnetworkarchitecture– crossdomainsdataflows
![Page 35: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/35.jpg)
ICT-18-2018:5Gforcooperative,connectedandautomatedmobility(CCAM)- Scope
• defineoptionsfordeployment,takingintoaccounttheevolutionfromearliercellulartechnology(e.g.LTE-V2X),andpossibleco-existencewithothertechnologies(e.g IEEE802.11p)
• Includescost/complexityassessmentofthevarioustechnologydeploymentoptions.Identifieswhohastoinvestandwhowillbenefitcommercially
![Page 36: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/36.jpg)
ICT-18-2018:5Gforcooperative,connectedandautomatedmobility(CCAM)- ExpectedImpact
• Validationof5Gtechnologiesandarchitectureinan"extendedCCAM"context• Validatedcost/benefitanalysisofcrossborder 5GdeploymentenablingCCAM
along5Gcorridorspotentiallyincludingseveraloperator'sdomains• Availabilityofdeploymentscenariosandstrategieswithbroadbaseindustry
andadministrationconsensus• Identificationofspectrumandstandardisationgaps.Participationofkey
EuropeanindustrialpartnersofboththeICTandtheautomotivesectorsandwithhighstandardisationimpactisdesired
![Page 37: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/37.jpg)
ICT-18-2018:5Gforcooperative,connectedandautomatedmobility(CCAM)
• Opening 31/10/2017• Closing 17/04/2018• Targetis2to4projects• Typeofaction:Innovationaction• Specialconditions!
– Thelimitforafullproposalis100pages– Complementarygrantagreementswillbeimplementedacrossprojects
originatingfrom5G-PPPPhase3topics
upto50M€
![Page 38: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/38.jpg)
ICT-19-2019:Advanced5Gvalidationtrialsacrossmultipleverticalindustries- GeneralContext
• Trialsanddemonstrationsarekeytodemonstrate5Gapplicabilitytoverticalindustriesandtoprepareformaturecrosssectorbusinesscases
• Trialsmayalsobeconsideredinsupportofthe5GAPTrialRoadmapdevelopedunderthe5GPPP
• 5Gtechnologycanonlybevalidatedinitsfullestextentifusedbyseveralapplicationsatthesametimewithdifferentrequirements(cloudlikebehaviourandisolation)
• Multidomainmanagementofresourcesisimportantinsuchsharedtechnologyenvironments,includingstrongisolationandsecurityaspects
• Trialsexpectedtosupportlaterreleasesof3GPPstandardsenablingfullcoverageofverticalrequirements
![Page 39: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/39.jpg)
ICT-19-2019:Advanced5Gvalidationtrialsacrossmultipleverticalindustries– Scope
RIAs:• Trialsofvariousscales,dependingonthetargettechnology,demonstratingthat
performanceconformingto5GPPPKPIsrequirementsaremetinthecontextofspecificverticalusecases
• Technology/architecturetrialstargetingconcurrentusageofresourcebymultipleverticals,addressingeMBB,mMTC,URLLCusecases
• Todemonstratethat5Garchitectureandtechnologiesenablingmultidomainmanagementofresourcesareinlinewithconcurrentverticalperformancerequirements
• Verticalusecasesmayfocusonthoseoutlinedinthe5GPPPWhitepaper"5Gempoweringverticalindustries";Highdensitylocationandveryhighdatavolumesapplicationsshouldbecovered
• Preferablyimplementedoverthe5GendtoendplatformsdevelopedunderICT-17-2018andcontributeto5Gdemonstrationinthecontextoflargeshowcasingevents
![Page 40: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/40.jpg)
ICT-19-2019:Advanced5Gvalidationtrialsacrossmultipleverticalindustries– Scope
CSAs:• Cooperationoftheimplemented5GResearchandInnovationActions(RIA)and
InnovationActions(IA)towardsjointleveragingofresults:– Managementandorchestrationof5GPPPprojectcooperationforhorizontal
issuesofcommoninterests(e.g.KPIs,security,energyefficiency,spectrum,standardisation,societalimpactof5G)
– Portfolioanalysis,coverage,mappingandgapanalysis,roadmaps– Supporttokeyinternationalco-operationactivities (standards,spectrum)– Organisationofstakeholderevents– Monitoringoftheopenness,fairnessandtransparencyofthePPPprocess– Maintenanceofthe"5Gwebsite"
![Page 41: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/41.jpg)
ICT-19-2019:Advanced5Gvalidationtrialsacrossmultipleverticalindustries- ExpectedImpact
RIAs:• Validatedcore5Gtechnologiesandarchitecturesinthecontextofspecific
verticalusecasesanddeploymentscenariosandfordifferentiatedperformancerequirements
• Viablebusinessmodelsforinnovativedigitalusecases• Impactfulcontributionstowardsstandardisationbodies,involvingvertical
actors.ParticipationofkeyEuropeanindustrialpartnerswithhighstandardisationimpactisdesired
• ValidationofrelevantKPIslinkedtospecificverticalsectors• Europe5Gknowhowshowcasing
![Page 42: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/42.jpg)
ICT-19-2019:Advanced5Gvalidationtrialsacrossmultipleverticalindustries- ExpectedImpact
CSAs:• Organisationofthe5GPPPasaprogramme• Maximisedoutputandexploitationof5GPPPprojectresultsinkeydomains
(standardisation,spectrum)• Constituencybuilding,stakeholdersupport,supporttokeyinternational
cooperationeventsandactivities;dissemination,supporttorelevantstakeholderevents;definitionoffutureR&Iactions
![Page 43: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/43.jpg)
ICT-19-2019:Advanced5Gvalidationtrialsacrossmultipleverticalindustries
• Opening EarlySeptember2018• Closing 14/11/2018• Targetis6to9projects• Typeofaction:RIA(90M€),CSA(2 M€)• Specialconditions!
– Thelimitforafullproposalis100pages– Complementarygrantagreementswillbeimplementedacrossprojects
originatingfromall5G-PPPPhase3topics
upto92M€
![Page 44: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/44.jpg)
ICT-21-2018:EU-USCollaborationforadvancedwirelessplatforms(closing17April2018)
• ToestablishEUUScollaborationonadvancedwirelessresearchbeyond5G• Todevelopnotablyresearchroadmaps,workshops,scientificexchanges,tools
forexperimentation,crossatlantic trials• Proposalstoforeseeprojectsentitiestwinning,includingNSFPAWRprojects• Expectedimpact:reinforcedcooperationwiththeUSinWirelessresearch
towardsbeyond5Gconnectivitysystemsandservices• Target:1CSAproject(EU)withtotalfundingupto2M€
![Page 45: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/45.jpg)
ICT-22-2018:EU-China5GCollaboration
5Gtrialinfrastructures 5Gtrialinfrastructures
Twinning of projects
unifiedtrialspecificationsunifiedtrialfrequencybands
SharingofdataJointdeliverables,testsreports,whitepapers,publicationsand
standardcontributions
5G PPP Project NSTMP Project
TheNationalScienceandTechnologyMajorProject(NSTMP)isamain5GresearchprograminChina
6M€6M€
![Page 46: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/46.jpg)
ICT-22-2018:EU-China5GCollaboration(closing31January2018)
• Conduct5Gtrialsaddressingtwospecificscenarios:enhancedMobileBroadband(eMBB)andInternetofVehicles(IoV)
• Bothscenariosshallbeimplementedinbothregions(EUandChina)• Notrestrictedto5Gradioaccess,alsofornetworkslicing,virtualisation,cross-
domainorchestration• InEU,trialsarepreferablyimplementedoverthe5Gend-to-endplatforms
developedunderICT–17-2018.• ExpectedImpact:Globalinteroperabilitydemonstrationsfor5Gnetworks,
Jointcontributionstoglobal5Gstandardsspecifications,jointdemonstrationsacrossregions
• Target:1RIAproject(EU)withtotalfundingupto6M€
![Page 47: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/47.jpg)
EUJ-02-2018:5Gandbeyond(closing31January2018)
• Partofthe4th EU-JapanJointCallbetweenEC,MICandNICT• Area1:Large-scaledemonstrationsandtrialstowards5G
applications– Focusontrialsanddemonstrationsof5GapplicationsineMBB and
BroadbandAccessinDenseAreas• Area2:Jointresearchonenablingtechnologiesforbeyond5G
– Focusontheenormouscapacitiesforeseentobeneededinthebackhaulandfronthaul networks
• Target:2RIAprojects(1/area)withtotalfundingupto3M€(EU)• Checkthespecialconditions!
![Page 48: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/48.jpg)
EUK-02-2018:5G(closing31January2018)
• Partofthe2nd EU-KoreaJointCallbetweenECandMSIP/IITP
• Area1:mmwave andsuperbroadbandservices– shouldincludedemonstrationof5GtechnologiesforAccessnetworks,
Corenetworks• Area2:interoperabilityandintegrationof5Gverticaltestbedson
heterogeneousenvironments
• Target:2RIAprojects(1/area)withtotalfundingupto4M€(EU)• Checkthespecialconditions!
![Page 49: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/49.jpg)
49
FutureForeseenTopicsafter2018
![Page 50: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/50.jpg)
ICT-20-2019-2020:5GLongTermEvolution(closing March2019)
• Thelongertermvisiontargetstherealisationofpervasivemobilevirtualservices
• 3strands:– ExtensionofvirtualisationtechnologiesandarchitecturesforNetwork
Management– Security– Radionetworkenablingtechnologies,architecturesandadvanced
signalprocessing• RIAprojects
![Page 51: EuropeanFuture Communications Research · 500 m radius of coverage, fed by novel G-band (300 GHz) Point to Pointhigh capacity links with more than 600 m range. ... The project will](https://reader033.vdocuments.us/reader033/viewer/2022050208/5f5b66cb79a3945f6d31cc2a/html5/thumbnails/51.jpg)
ICT-23-2019:EU-Taiwan5Gcollaboration(Closing15January2019)
• Conduct5Gtrialsaddressingtechnologyandbusinessvalidationof5Gend-to-endconnectivityandassociatedmanagementfromapplicationsinTaiwan
• ExpectedImpact– Validationofcore5Gtechnologiesandarchitecturesinthecontextof
specificverticalusecases.– LeveragecooperationtowardsindustrialconsensusbetweenEUand
Taiwan– Acceleratethepre-commercializationtrialsoftheusecasesintroduced
byIMT-2020(eMBB,mMTC,URLLC)• RIAprojectswithtotalfundingupto4M€