No 8, Barrister Obinna Okwara Crescent/Plot 37 Chief Executive Quarters, Opposite Ahiajoku Convention Centre. Area B, New Owerri, Imo State.
NDSP4 & MPP9 WORKS PROGRAMME IMPLEMENTATION IN THE NINE NIGER DELTA STATES
EUROPEAN UNION (EU) NIGER DELTA SUPPORT PROGRAMME COMPONENT 4 (NDSP4) IN IMO STATE
LEGACY BOOK
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019IMO STATE
IMO STATE MAP
MBAITOLI
ISIALA MBANO
IDEATO SOUTH
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 IMO STATE
Page 3
TABLE OF CONTENTS
FOREWORD 4
PROGRAMME OVERVIEW 5
WORKS CONTRACT OVERVIEW 8
PROGRAMME IMPLEMENTATION TEAM 10
DETAILS OF NDSP4 PROGRAMME IN IMO STATE
• STAKE HOLDERS TEAM 11
• PROJECT LIST 12 & 13
• PHOTOGRAPH OF IMPLEMENTED PROJECTS 14
Publication: NDSP4/013/09/2019
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019IMO STATE
Page 4
FOREWORD
The NDSP4 Publication series is an attempt to bring some of our key reports and consultancy reports to our stakeholders and a wider audience.
The overall objective of the Niger Delta Support Programme (NDSP) is to mitigate the conflict in the Niger Delta by addressing the main causes of the unrest and violence: bad governance, (youth) unemployment, poor delivery of basic services. A key focus of the programme will be to contribute to poverty alleviation through the development and support given to local community development initiatives.
The NDSP4 aims to support institutional reforms and capacity building, resulting in Local Gov-ernment and State Authorities increasingly providing infrastructural services, income gener-ating options, sustainable livelihoods development, gender equity and community empow-erment. This will be achieved through offering models of transparency and participation as well as the involvement of Local Governments in funding Micro projects to enhance impact and sustainability. Specifically, 863 community projects are expected to be implemented as part of the EU support to community development in the Niger Delta.
By the end of August 2019, some 690 out of the 863 micro-projects had been completed and accepted.
In addition, under the NDSP4 Service Contract, 330 uncompleted projects were taken up un-der an addendum No.1 to the contract (mpp9) and successfully completed 302 by the end of December 2017; the remaining 28 were carried over to NDSP4 Works contract-2.
Kingsley FossuTeam Leader – NDSP4
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 IMO STATE
Page 5
PROGRAMME OVERVIEW
NDSP Component 4 (NDSP4)NDSP4 is an extension of MPP9 and is building on its achievement, focussing on focal com-munities and capable and reform-minded Local Government authorities. This component is implementing micro-projects co-funded with Local Governments, which will contribute to building the capacity of local governments in service delivery to the poor and to strength-ening the partnership between Government authorities and communities. By implementing Micro-Projects in a wide range of communities, the programme aims to improve the delivery of social and economic services and to sensitise communities to demand good governance through the community participatory planning and development.
NDSP4 includes allowance for community-based action in support of conflict prevention/management or addressing other issues of relevance to the affected communities, including environmental improvements.
The Objective of NDSP Component 4 is to support local communities’ development initiatives and conflict alleviation by completing the 9th EDF MPP9 project, which has a financial short-fall. Expected results to be achieved are:
Result 1: Strengthened Community Governance through adoption of Community Development Action Plans by Communities and Local Government authorities.Result 2: Increased equitable access to basic infrastructure services by women and men.Result 3: Increased equitable access to income generating options and sustainable livelihood development by women and children.Result 4: Improved social cohesion among village communities.
Management StructureThe MBNP, represented by the National Authorising Officer (NAO), is the FGN implementation agency and is supported by the following management structure:• National Project Steering Committee (PSC)• State Level Project Stakeholders Coordination Committee (SLPSCC)• Project Implementation Management Unit (PIMU): • Implementation Field Offices (IFOs)• Micro-Projects Implementation Committees (PICs)
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019IMO STATE
Page 6
Funding ArrangementThe funding arrangement was based as follows:• Total EU Funding: €45,000,000.00 (for works/Services)• European Union: €25,905,000.00 (50% for works)• LGAs: €12,952,500.00 (25% for works)• Communities: €12,952,500.00 (25% in kind)• States: To facilitate, coordinate and monitor projects.
Micro Projects CategoriesMenu of proposed micro projects under NDSP-C4 include:• Basic Water Supply and Sanitation infrastructure, • Health Centres, • Educational Infrastructure, • Civic Centres/Town Halls and • Income Generating Infrastructure (Palm Oil Mills, Cassava Mills)• Open and Lock-up Markets, etc.
NDSP4 Achievement and Challenges So FarBelow are Achievements of NDSP4 since its inception in January 2014:• Completion of the 9th MPP9 project under NDSP4 Additional Services contract with over
90% completion rate.• Facilitated the successful selection of NDSP4 LGAs and communities with the support of
the nine ND States.• Sensitisation of key stakeholders on NDSP4 for awareness creation and seamless partici-
pation.• Establishment of SLPSCCs & PICs in the nine ND States and communities for programme
coordination, implementation and sustainability.• Successful procurement of works contractors (Lots 1 to 9) for construction of over 860
MPs via Works Contract 1 and Works Contract 2 in the nine ND States with high success in contract execution.
• Preparation and Implementation of Programme Estimate 1 to facilitate full participation of key stakeholders (Communities, CSOs, State and LGA officials, etc.) in NDSP4.
• Implementation of a robust visibility and communication action plan to create programme awareness and information dissemination via production and distribution of NDSP4 vis-
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 IMO STATE
Page 7
ibility materials and promotional items (brochures, folders, jotters, Tee shirts and Caps, pens etc.).
• Development and regular update of NDSP4 website with mobile application software for upload of events and progress of work during field missions.
• Widening the scope of NDSP4 visibility via creation of NDSP4 Facebook account and Twit-ter handle.
• Capacity building of State, LGA and communities on procurement, project monitoring, management, operation and maintenance of water and agro processing mills.
• Commissioned study and publication of key stakeholders’ engagement on the sustaina-bility of provided micro projects facilities.
• Main challenge is late commencement of construction work and delay by LGAs in the dis-charge of their counterpart contribution.
Related Programmes/Donor Activities in NDThere are similar initiatives in the Niger Delta region funded by the EU and other international donor agencies that are targeted towards alleviating poverty and conflict. The donors and agencies include CIDA, UNDP, DFID, WHO, USAID etc.
1. Kingsley Fossu (Team Leader) Email: [email protected] Phone: 09031271414
Office Address:Project Implementation Unit (PIMU),
No. 8 Barrister Obinna Okwara Crescent, Plot37 Chief Executive Quarters, Area B, New Owerri, Imo State.Website: www.ndsp4.org Facebook: www.facebook.com/NDSP4
Twitter Handle: @EU-NDSP4
For Further Information, Please Contact:
2. Engr. Uwadiale, Oziegbe Wisdom (Chief Engineer) Phone: 08035439955 [email protected]
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019IMO STATE
Page 8
NDSP4 WORKS CONTRACT & CONSTRUCTION PROGRESS.
1) Overview of NDSP4 Works Contracts (Works Contract-1 & Works Contract-2)The NDSP4 works contracts are construction contracts comprising buildings and water projects. They are micro projects of basic standards. Building project; The walls are made of sand Crete block and the surface is rendered with cement-sand mortar finishing. The roof structural members are wood cov-ered with long span aluminium roofing sheets finished with wooden fascia boards. The ceiling sheets are cements fibre materials. The windows are made of aluminium casement and the doors are made of metals with transom. The floor is finished with cement / sand mortar screeded on a concrete damp proof course (DPC) except health center buildings which are finished with tiles. The walls and ceilings are painted with emulsion paint. Water project; The water project is a basic standard motorized bore-hole powered by solar energy. The tank stand is a steel structure with base plate bolted to concrete foundation footing with anchor bolts. The water tanks are plastic tanks with in-let and out-let units for water supply and distribution services. The solar power system is automatic in operation with the CU200 panel. This system is protected against thunder by proper earthing system. The water distribu-tion point is constructed with block and concrete structure with three battery taps units. The projects types include; solar powered motorised borehole, school block, health post, civic center, market stall, cassava mill and palm oil mill.
NDSP4 Works Contract 1 (WC1) & Works Contract 2 (WC2); A total of 863 numbers of community pro-jects were planned to be implemented as part of the EU support to community development in the Niger Delta. Of these, 579 projects were awarded in 9 Lots in the first tranch as Works Contract -1 (WC1). A total of 254 projects were also awarded in 8 Lots for the second tranch as Works Contract – 2 (WC2) except in Cross River State where a balancing 30 projects are yet to be awarded under WC2. These have been achieved through offering models of transparency and participation as well as the involvement of States in coordination and Local Governments in funding Micro projects to enhance impact and sustainability.
Outstanding MPP9 construction completion activities; Micro Projects Programme in the Nine Niger Delta States (MPP9) was the preceding programme before NDSP4. The outstanding part of uncom-pleted works in MPP9 was awarded to the consultant as addendum to their contract to provide su-pervision activities for the remaining MPP9 projects that were not completed during the life span of the programme. When the addendum contract (NDSP4-Addendum No.1) ends in June 2017, there were still residual of MPP9 construction activities not completed. The NDSP4 main part has technically provided supervision services for the MPP9 residual works since June 2017. The works done on the residual of MPP9 construction completion activities are clearly outlined.
MPP3, MPP6 and MPP9 Inventory Documentation: Additional activities of inventory documentation of MPP3, MPP6 and MPP9 have been added to NDPS4 assignment as part of its deliverables. Experts have been fully mobilized to site on the 18th June 2019 to commence these activities in the Nine Niger Delta States. The result of this assignment will provide detailed data of all completed projects under Micro Projects Programme in the Three Niger Delta States (MPP3 – Bayelsa, Delta & Rivers), Micro Pro-
WORKS CONTRACT OVERVIEW
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 IMO STATE
Page 9
jects Programme in the Six Niger Delta States (MPP6 – Abia, Akwa-Ibom, Cross River, Edo, Imo & Ondo) and Micro Projects Programme in the Nine Niger Delta States (MPP9 - Abia, Akwa-Ibom, Bayelsa, Cross River, Delta, Edo, Imo, Ondo & Rivers State)
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019IMO STATE
Page 10
S/N STATE NAMES OF EXPERTS DESIGNATION OF EXPERTS
1 All States Kingsley Fossu Key Expert – 1 (Team Leader)
2 All States Engr. Uwadiale, Oziegbe Wisdom
Key Expert – 2 (Chief Engineer)
3 All States Engr. Ibrahim Musa Key Expert – 3
4 All States Engr. Prosper Erah Coordinating Engineer
5 All States Mr. Henry Akinsulire Account & Contract Officer
6 Imo Engr. Kenneth Nwangwu Non-Key Expert (NKE)
Engr.Evans Ohaji Rural Infrastructure Engineer (RIE)
Mrs. Patience Njoku Project Assistance (PA)
IMPLEMENTATION TEAM
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 IMO STATE
Page 11
STAKE HOLDERS
IMO STATE
S/N DESIGNATION DURATION NAMES /MINISTRY/ DEPT.
1 GOVERNORS 2014 - 2019
May 2019 till date
Owelle Anayo Rochas Okorocha
Rt. Hon. Emeka Ihedioha
2 DEPUTY GOVERNORS 2014 -May 2019
May 2019 till date
Prince EzeMadumere
Engr. Gerald Ironna
3 COMMISSIONERS 2014 – 2017
2017 – 2019
2017 – 2019
July 2019 till date
Mrs Adaora Ijesie (Planning)
Hon. Iyke Njoku ( Planning)
Dr. Ernest Nwaigbo( MIGADA)
Hon. Reginald Ihebuzo (Planning)4 DESK OFFICERS 2014 – 2016
2016
2016 – 2019
2019
2014 – 2015
2015
2015 - 2019
Mr. Bismark Eziohuru
Dr. C. C. Iwuagwu
Elder Anthony Amadi
Rev. Reginald Udeh
Late Mrs Ugochi
Mr. John Njoku
Mr. George Amakaihe.
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019IMO STATE
Page 12
NDSP4 PROJECTS COMPLETED DATA BASE FOR IMO STATE
S/N Project ID Community Project LGA State Status
1 1 Ogboko Water Ideato South Imo Completed
2 2 Ugbelle Health Centre Ideato South Imo
3 3 Ogboza Open Market Ideato South Imo Completed
4 4 Umuobom Civic Centre Ideato South Imo Completed
5 5 Dimagu Civic Centre Ideato South Imo Completed
6 6 Umuchioke Open Market Ideato South Imo Completed
7 7 Dikenafia Water Ideato South Imo Completed
8 8 Umuma isiaku Health Centre Ideato South Imo Completed
9 9 Isiekenesi Open Market Ideato South Imo Completed
10 10 Okohia Civic Centre Ideato South Imo Completed
11 11 Ogwume Civic Centre Ideato South Imo Completed
12 12 Amanato Open Market Ideato South Imo Completed
13 13 Umuezela Civic Centre Ideato South Imo Completed
14 14 Umulewe Open Market Ideato South Imo Completed
15 15 Umueshi Open Market Ideato South Imo Completed
16 16 Awala Civic Centre Ideato South Imo Completed
17 17 Umueze Amanato Water Ideato South Imo Completed
18 18 Umueezedike Water Ideato South Imo Completed
19 19 Umuaghobe Water Ideato South Imo Completed
20 20 Ogboko (2) Civic Centre Ideato South Imo Completed
21 1 Ofodim – Umunike Health Centre Isiala Mbano Imo
22 2 Amauzari Water Isiala Mbano Imo
23 3 Umunachi - Osu Owerri II Water Isiala Mbano Imo
24 4 Amaraku1 Palm Oil Isiala Mbano Imo
25 5 Ogbor School Block Isiala Mbano Imo
26 6 Anara School Block Isiala Mbano Imo
27 7 Umunkwo Water Isiala Mbano Imo
28 8 Umudara- Ikwuano Civic Centre Isiala Mbano Imo
29 9 Ibeme School Block Isiala Mbano Imo
30 10 Umuagwuaro- Osu-Owerri I Water Isiala Mbano Imo
31 11 Ezihe Health Centre Isiala Mbano Imo
32 12 Oka Palm Oil Isiala Mbano Imo
33 13 Umuozu Water Isiala Mbano Imo
34 14 Umuagu Water Isiala Mbano Imo
35 15 Umuluwe Water Isiala Mbano Imo
36 16 Umuneke Civic Centre Isiala Mbano Imo
37 17 Nta Umunachi Water Isiala Mbano Imo
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 IMO STATE
Page 13
38 18 Ofodim-Umuni Water Isiala Mbano Imo
39 19 Ugiri Health Centre Isiala Mbano Imo
40 20 Isheibu Civic Centre Isiala Mbano Imo
41 1 Obi Mbieri Civic centre Mbaitoli Imo Completed
42 2 Ishi Ubomiri School block Mbaitoli Imo Completed
43 3 Ofekata Civic Centre Mbaitoli Imo Completed
44 4 Umunneato Ogwa Water Mbaitoli Imo Completed
45 5 Umuezi Mbieri Health Centre Mbaitoli Imo Completed
46 6 Ogbaku Civic Centre Mbaitoli Imo Completed
47 7 Obazu Mbieri Civic Centre Mbaitoli Imo Completed
48 8 Alaenyi Ogwa Civic Centre Mbaitoli Imo Completed
49 9 ishi Orodo Water Mbaitoli Imo Completed
50 10 Amaukwu Orodo Health Centre Mbaitoli Imo Completed
51 11 Egbeada Health centre Mbaitoli Imo Completed
52 12 Afara Open market Mbaitoli Imo Completed
53 13 Azara Obiato Health Centre Mbaitoli Imo Completed
54 14 Umuagha School block Mbaitoli Imo Completed
55 15 Amaike Mberi School Block Mbaitoli Imo Completed
56 16 Ezi Mber Open Market Mbaitoli Imo Completed
57 17 Hitte Mbieri Civic Centre Mbaitoli Imo Completed
58 18 Obi Orodo Water Mbaitoli Imo Completed
59 19 Okwu Ogbaku Civic Centre Mbaitoli Imo Completed
60 20 Umueze/Abazu Ogwa Health Centre Mbaitoli Imo Completed
Total No. of projects 60
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019IMO STATE
Page 14
No. 1COMMUNITY: OGBOKOPROJECT TYPE: WATERLGA / STATE: IDEATO SOUTH, IMO STATE
No. 3COMMUNITY: OGBOZAPROJECT TYPE: OPEN MARKETLGA / STATE: IDEATO SOUTH, IMO STATE
No. 5COMMUNITY: DIMAGUPROJECT TYPE: CIVIC CENTRELGA / STATE: IDEATO SOUTH, IMO STATE
No. 2COMMUNITY: UGBELLEPROJECT TYPE: HEALTH CENTRELGA / STATE: IDEATO SOUTH, IMO STATE
No. 4COMMUNITY: UMUOBOMPROJECT TYPE: CIVIC CENTRELGA / STATE: IDEATO SOUTH, IMO STATE
No.6COMMUNITY: UMUCHIOKEPROJECT TYPE: OPEN MARKETLGA / STATE: IDEATO SOUTH, IMO STATE
COMMUNITIES/PROJECTS – IMO STATE
( IDEATO SOUTH )
ONGOINGPROJECT
ONGOINGPROJECT
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 IMO STATE
Page 15
No. 7COMMUNITY: DIKENAFAIPROJECT TYPE: WATERLGA / STATE: IDEATO SOUTH, IMO STATE
No. 9COMMUNITY: ISIEKENESIPROJECT TYPE: OPEN MARKETLGA / STATE: IDEATO SOUTH, IMO STATE
No. 11COMMUNITY: OGWUMEPROJECT TYPE: CIVIC CENTRELGA / STATE: IDEATO SOUTH, IMO STATE
No. 8COMMUNITY: UMUMA-ISIAKUPROJECT TYPE: HEALTH CENTRELGA / STATE: IDEATO SOUTH, IMO STATE
No. 10COMMUNITY: OKOHIAPROJECT TYPE: CIVIC CENTRELGA / STATE: IDEATO SOUTH, IMO STATE
No. 12COMMUNITY: AMANATOPROJECT TYPE: OPEN MARKETLGA / STATE: IDEATO SOUTH, IMO STATE
COMMUNITIES/PROJECTS – IMO STATE
( IDEATO SOUTH )
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019IMO STATE
Page 16
COMMUNITIES/PROJECTS – IMO STATE
( IDEATO SOUTH )
No. 13COMMUNITY: UMUEZEALAPROJECT TYPE: CIVIC CENTRELGA / STATE: IDEATO SOUTH, IMO STATE
No. 15COMMUNITY: UMUESHIPROJECT TYPE: OPEN MARKET LGA / STATE: IDEATO SOUTH, IMO STATE
No. 17COMMUNITY: UMUEZE AMANATOPROJECT TYPE: WATER LGA / STATE: IDEATO SOUTH, IMO STATE
No. 14COMMUNITY: UMULEWEPROJECT TYPE: OPEN MARKET LGA / STATE: IDEATO SOUTH, IMO STATE
No. 16COMMUNITY: AWALLAPROJECT TYPE: CIVIC CENTRELGA / STATE: IDEATO SOUTH, IMO STATE
No. 18COMMUNITY: UMUEZEDIKEPROJECT TYPE: WATER LGA / STATE: IDEATO SOUTH, IMO STATE
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 IMO STATE
Page 17
COMMUNITIES/PROJECTS – IMO STATE
( IDEATO SOUTH )
No. 19COMMUNITY: UMUAGHOBEPROJECT TYPE: WATERLGA / STATE: IDEATO SOUTH, IMO STATE
No. 20COMMUNITY: OGBOKO 2PROJECT TYPE: CIVIC CENTRELGA / STATE: IDEATO SOUTH, IMO STATE
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019IMO STATE
Page 18
No. 21COMMUNITY: OFODIM UMUNIKE PROJECT TYPE: HEALTH POST LGA / STATE: ISIALA MBANO, IMO STATE
No. 23COMMUNITY: UMUNACHIPROJECT TYPE: WATERLGA / STATE: ISIALA MBANO, IMO STATE
No. 25COMMUNITY: OGBOR PROJECT TYPE: EDUCATION BLOCK LGA / STATE: ISIALA MBANO, IMO STATE
No. 22COMMUNITY: AMAUZARIPROJECT TYPE: WATERLGA / STATE: ISIALA MBANO, IMO STATE
No. 24COMMUNITY: AMARAKUPROJECT TYPE: PALM OILLGA / STATE: ISIALA MBANO, IMO STATE
No. 26COMMUNITY: ANARAPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ISIALA MBANO, IMO STATE
COMMUNITIES/PROJECTS – IMO STATE
( ISIALA MBANO )
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 IMO STATE
Page 19
No. 27COMMUNITY: UMUNKWOPROJECT TYPE: WATERLGA / STATE: ISIALA MBANO, IMO STATE
No. 29COMMUNITY: IBEMEPROJECT TYPE: EDUCATION BLOCKLGA / STATE: ISIALA MBANO, IMO STATE
No. 31COMMUNITY: EZIHEPROJECT TYPE: HEALTH CENTRELGA / STATE: ISIALA MBANO, IMO STATE
No. 28COMMUNITY: UMUDARA IKWUANOPROJECT TYPE: CIVIC CENTRELGA / STATE: ISIALA MBANO, IMO STATE
No. 30COMMUNITY: UMUAGUPROJECT TYPE: WATERLGA / STATE: ISIALA MBANO, IMO STATE
No. 32COMMUNITY: OKAPROJECT TYPE: PALM OILLGA / STATE: ISIALA MBANO, IMO STATE
COMMUNITIES/PROJECTS – IMO STATE
( ISIALA MBANO )
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019IMO STATE
Page 20
No. 33COMMUNITY: UMUOZUPROJECT TYPE: WATERLGA / STATE: ISIALA MBANO, IMO STATE
No. 35COMMUNITY: UMULUWE AJIRIJAPROJECT TYPE: WATERLGA / STATE: ISIALA MBANO, IMO STATE
No. 37COMMUNITY: UMUNCHIPROJECT TYPE: WATERLGA / STATE: ISIALA MBANO, IMO STATE
No. 34COMMUNITY: UMUAGWU-AROPROJECT TYPE: WATERLGA / STATE: ISIALA MBANO, IMO STATETE
No. 36COMMUNITY: UMUNEKE NTAPROJECT TYPE: CIVIC CENTRE LGA / STATE: ISIALA MBANO, IMO STATE
No. 38COMMUNITY: OFODIMPROJECT TYPE: WATERLGA / STATE: ISIALA MBANO, IMO STATE
COMMUNITIES/PROJECTS – IMO STATE
( ISIALA MBANO )
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 IMO STATE
Page 21
No. 39COMMUNITY: UGIRIPROJECT TYPE: HEALTH POST LGA / STATE: ISIALA MBANO, IMO STATE
No. 40COMMUNITY: ISHIEBUPROJECT TYPE: CIVIC CENTRE LGA / STATE: ISIALA MBANO, IMO STATE
COMMUNITIES/PROJECTS – IMO STATE
( ISIALA MBANO )
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019IMO STATE
Page 22
No. 41COMMUNITY: OBI MBIERIPROJECT TYPE: CIVIC CENTRELGA / STATE: MBAITOLI, IMO STATE
No. 43
COMMUNITY: OFEKATA ORODOPROJECT TYPE: CIVIC CENTRE LGA / STATE: MBAITOLI, IMO STATE
No. 45COMMUNITY: UMUEZE MBIERI PROJECT TYPE: HEALTH CENTRE LGA / STATE: MBAITOLI, IMO STATE
No. 42COMMUNITY: ISHI UBOMIRI PROJECT TYPE: EDUCATION BLOCKLGA / STATE: MBAITOLI, IMO STATE
No. 44COMMUNITY: UMUNNEATO OGWA PROJECT TYPE: WATER SCHEMELGA / STATE: MBAITOLI, IMO STATE
No. 46COMMUNITY: OGBAKU PROJECT TYPE: CIVIC CENTRE LGA / STATE: MBAITOLI, IMO STATE
COMMUNITIES/PROJECTS – IMO STATE
( MBAITOLI )
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 IMO STATE
Page 23
No. 47COMMUNITY: OBAZU MBERI PROJECT TYPE: CIVIC CENTRE LGA / STATE: MBAITOLI, IMO STATE
No. 49COMMUNITY: ISHI ORODOPROJECT TYPE: WATER PROJECT LGA / STATE: MBAITOLI, IMO STATE
No. 51COMMUNITY: EGBEDAPROJECT TYPE: HEALTH POST LGA / STATE: MBAITOLI, IMO STATE
No. 48COMMUNITY: ALAENYI OGWAPROJECT TYPE: CIVIC CENTRELGA / STATE: MBAITOLI, IMO STATE
No. 50COMMUNITY: AMAUKWU ORODO PROJECT TYPE: HEALTH POST LGA / STATE: MBAITOLI, IMO STATE
No. 52COMMUNITY: AFARAPROJECT TYPE: OPEN MARKETLGA / STATE: MBAITOLI, IMO STATE
COMMUNITIES/PROJECTS – IMO STATE
( MBAITOLI )
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019IMO STATE
Page 24
No. 53COMMUNITY: AZARA OBIATOPROJECT TYPE: HEALTH POSTLGA / STATE: MBAITOLI, IMO STATE
No. 55COMMUNITY: AMAIKE MBIERI PROJECT TYPE: EDUCATION BLOCKLGA / STATE: MBAITOLI, IMO STATE
No. 57COMMUNITY: IHITTE MBIERI PROJECT TYPE: CIVIC CENTRELGA / STATE: MBAITOLI, IMO STATE
No. 54COMMUNITY: UMUAGHA PROJECT TYPE: EDUCATION BLOCKLGA / STATE: MBAITOLI, IMO STATE
No.56COMMUNITY: EZI MBIERIPROJECT TYPE: OPEN MARKETLGA / STATE: MBAITOLI, IMO STATE
No. 58COMMUNITY: OBI ORODOPROJECT TYPE: WATER PROJECT LGA / STATE: MBAITOLI, IMO STATE
COMMUNITIES/PROJECTS – IMO STATE
( MBAITOLI )
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 IMO STATE
Page 25
No. 59COMMUNITY: OKWU OGBAKUPROJECT TYPE: CIVIC CENTRE LGA / STATE: MBAITOLI, IMO STATE
No. 60COMMUNITY: UMUEZE/ABAZU OGWA PROJECT TYPE: HEALTH CENTRELGA / STATE: MBAITOLI, IMO STATE
COMMUNITIES/PROJECTS – IMO STATE
( MBAITOLI )
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019IMO STATE
Page 26
1. DescriptionofLGAsContribution
S/No.FacilitytobeConstructed DescriptionofWorks DetailsofActivities ProjectsConcerned
1. FenceinProject
TheLGAshallConstructaperimeterfencearoundtheprojectwherenecessary.TheConstructionofthefenceincludesthefollowingprocesses:
• ExcavationofFoundation;0.45mwidex0.60mdeep
• Blindingandcastingoffoundationconcrete;0.15mthick(350kg/m3)
• Constructionoffencewallwith0.15mthickcement/sandblocksupto1.8mabovegroundlevel.
• Construction,installationandfinishingofsteelentrancegatesof3.0mwideforallprojectsand1.20mwideforborehole/watertower
AllProjects
2.ConstructionofToilets
TheLGAshallundertaketheconstructionofPourFlushToiletsforprojectswheretoiletfacilityarerequiredtocomplimentthemainactivityandfunctionoftheproject.Theconstructionoftoiletsinvolvesthefollowing:
• Construction of a simple building withCement/sand blocks, timber roof trusses andAlu-zinc roofing sheets with overall dimensions6.0mx3.30m.Thebuildingcomprisesofnotlessthan4unitsofsquattoilets,2noeachformenand women separated with central hand washlobby.
• ExcavateFoundation;0.45mx0.60m• Blindandcastconcretestrip foundation;0.15m
thick(350kg/m3)• Foundation and structural walls; 0.15m full
masonry blocks and finished trowelled cementplaster.
• Roofing;hardwoodtrussesandcoveringinAlu-zincroofingsheets
• Doors;solidcoreflushdoorsonhardwooddoorframeandfittedwithappropriatelocks.
• Plumbing; Twyford or similar make ceramicsquattoiletpansfittedonthefloorandplumbedtoSoakaway/septictankpitswithPVCpipesandaccessories.
• Constructseptictankof2.10mx3.60mx2.89mandfinishtodrawingsdetails
ConstructionProjects
3.WaterSupply(BoreholewithHandPump)
The LGA shallundertake the drillingand installation ofborehole with handpump for the supply ofwater to projects thatrequire water tocomplement function.The borehole isconstruction shallincludethefollowings:
• Conduct geophysical survey (field work,interpretation and report) for the location ofboreholeatasuitablesite.
• Drillingofboreholeinsedimentaryformation• (0-60m).• Supply and install 110mm diameter UPVC
casings of 10 bar and 110mm diameter UPVCscreensof10barpressurerating;slotsize0.5.
• Conduct water quality analysis (biological,chemical and physical) and boreholedisinfection.
• Install to designed depth an appropriate handpump on a concrete plate form withbucket/users'standwithdraintroughstowastechannel.
Healthcentres,Agroprocessingandmarkets
4.ConstructionofDryingPlatform
TheLGAshall constructa drying platform forwarehouseprojectsandthe drying platformshall be constructed as
• The drying platform shall be constructed ofreinforcedconcrete3.0mx6.0m
• Excavatefoundation0.45mx0.45m• Blindandcastfoundationconcrete/beam0.15m
thickx0.25m(350kg/m3)
AgroProcessing
EUROPEAN UNION NIGER DELTA SUPPORT PROGRAMME NDSP4 LEGACY BOOK 2019 IMO STATE
Page 27
follows: • Fillandcompactwithgoodqualitylaterite• Cast 0.10m thick concrete with BRC
reinforcement
5.SupplyofFurniture
The LGAs shall supplyfurnitureforusebytheSchool pupils andTeachers. Suchfurniture shallbemadeof seasonedhardwoodand finished inappropriate woodpolish. The items shallinclude the followingand shall be approvedby the Local EducationAuthority:
• School Desk: 1.2m long double seaterwritingdeskwithintegralbenchunit.
• TeachersTable:1.4x0.7x0.9msize• Teachers Chair; 0.45 X 0.45m back chair
with seat and back rest finished in foamandleathercovering.
School ClassroomBlocks
6.SupplyofEquipment
The LGA shall supplymedical equipment tothe specification andapprovaloftheMinistryof Health: PrimaryHealth CareDepartment. Themedical equipmentshall include thefollowing basic andminimum numbers ofitems:
Patients’Requirements• Beds• Dripstand• Bedsidelocker• Deliverybed• Waitingchairs
StaffRequirements• Consultingtables• ConsultingChairs• Examinationbed• Treatmentkit
HealthCentres
7.AccommodationforStaff
TheLGAshallundertaketheprovisionofresidentialaccommodationforstationnursesatthehealthpostaswellasheadteachersattheprojects.Theaccommodationshallcomplywiththefollowingminimumspecifications:
• Separatelivingandsleepingrooms• Kitchenette• Toilet
HealthCentresandSchoolProjects
8.ConstructionofIncineratorPit
TheLGAshallundertaketheconstructionofanincineratorforagroprocessingprojects.Theincineratorshallbeconstructedinthefollowingmanner:
• Incineratorsize;0.9x1.35m• Walls to be of laterite brick units, 2.70m
high and with base window for fire andanother at 0.9m for filling of waste forburning.
• Roof to be reinforced concrete restingdirectly on the walls with windowsunderneath.
AgroProcessingMills