European Developments. Transmission Workgroup 3 rd May 2012. Gas Balancing Update. Transmission Workgroup 3 rd May 2012 Chris Shanley. ENTOG - project plan. ACER. FG. Development of Network Code with stakeholder on the basis of the final Framework Guidelines. 2011. 2012. Nov. Jan. - PowerPoint PPT PresentationTRANSCRIPT
European Developments
Transmission Workgroup3rd May 2012
Gas Balancing Update
Transmission Workgroup
3rd May 2012
Chris Shanley
Stakeholder
Workshop
Dec Jan Feb Mar Apr June JulyMayNov Jun JulOct Apr Aug Sep Nov
Invitation from Commission
SubmitNetwork Code
Project launch13/14 Dec 23 SJWS
7-8 SJWS
Consultation
May
Workshop
FG Development of Network Code with stakeholder on the basis of the final Framework Guidelines ACER
2011 2012
Development of draft network code in cooperation with stakeholders ENTSOG
Oct
9 SJWS 26 SJWS
11-12 SJWS
ENTOG - project plan
3
Date Event
13 April 2012 Public consultation on the Draft Code launched
9 May 2012 Mid-consultation workshop
12 June 2012 Deadline for responses to the public consultation
26 July 2012 Post-consultation workshop
22 August 2012 Code and supporting document published; Stakeholder process starts
4 September 2012 Stakeholder Support process ends
5 November 2012 Final ENTSOG – drafted Code submitted to ACER
Consultation Phase
Balancing Draft Code and Consultation issued 13 April
The response deadline is 17:00 CET 12 June
The ENTSOG consultation and other documentation can be found at:
http://www.entsog.eu/publications/balancing.html
ENTSOG have requested that responses are:
Focused and succinct as possible and provide supporting evidence where available
Made via the formal consultation response form
Mid-consultation stakeholder workshop
There will be a Workshop in Brussels on 9th May
Opportunity for an exchange of views about the Supporting Document and Draft Code
Agenda TBC but expected to concentrate on key stakeholder issues/concerns
Please register via the ENTSOG website
EU Gas Balancing Draft Code
There are 11 chapters and 46 pages of text
NG has identified some minor issues with text and these are being progressed directly with ENTSOG
NG initial view is that the code is generally consistent with framework guidelines and GB regime but some impacts have been identified
Chapter Title
1 General Provisions
2 Balancing System
3 Cross-border cooperation
4 Operational Balancing
5 Nominations
6 Daily Imbalance Charges
Chapter Title
7 Within Day Obligations
8 Neutrality Arrangement
9 Information Provisions
10 Linepack Flexibility Services
11 Implementation, Interim measures and entry into force
NG initial impact assessment of draft Network Code against UNC (1)
Chapter Conflict or inconsistency? TSO Obligation
1. General Provisions
• Network code shall prevail over another network codes or national legislation
2. Balancing System
• None identified
3. Cross-border cooperation
Consultation on options
4. Operational Balancing
Short term standardised products: •No GB physical product defined but product could be replicated by Location Market Transaction•Temporal Market Product (an optional tool available to NG)
NG Initial IA of draft Network Code against UNC (2)
Chapter Conflict or inconsistency? TSO Obligation
5. Nominations • New Nomination process required for Interconnection Points (IPs)
• Interactions with CAM, CMP, interoperability still being analysed by NG
Daily and hourly nominations (at IP) – consultation on whether harmonisation is required
6. Daily Imbalance Charges
• Marginal prices and average price to only include Title Market Products
7. Within Day Obligations (WDOs)
Consultation on any proposal to introduce a WDO
8. Neutrality Arrangements
• None Identified
NG Initial IA of draft Network Code against UNC (3)
Chapter Conflict or inconsistency? TSO Obligation
9. Information Provision
• NDM Derived Forecast – day ahead at 12.00 UTC (timescale linked to IP Nominations process)
More frequent info - Cost Benefits Analysis (CBA) and consultation
10. Linepack Flexibility Service
Prior approval of proposal by NRA
11. Implementation, Interim Measures and Entry into force
• Interim measures are unlikely to apply to GB
• TSOs have 12 months to comply after code comes into force
TSO can request an additional 12 months (24 months in total)
Annex 1. Definitions
• Gas day (5:00 to 5:00 UTC)
Consultation questions of interest to GB stakeholders
57 questions raised
Views on key elements of a daily balancing regime and the level of detail provided:
Operational balancing and trading related questions (Q5 to Q14
Daily Imbalance charges and small adjustment (Q19 to Q23)
Neutrality (Q30 to Q36)
Level of detail in the code (Q55 to Q57)
Views on the new Nomination process for IPs
Nominations (Q15 to Q18)
Interoperability Update
Transmission Workgroup
3rd May 2012
Interoperability Update
Reminder that ACER’s consultation on the draft Framework Guideline closes on 16th May 2012
We would encourage the industry to respond
We will present a summary of the National Grid NTS response at the June Transmission Workgroup
EU CAM Network Code and CMP Guideline Proposal Update
Transmission Workgroup
3rd May 2012
Capacity Allocation Mechanism (CAM) - Update
CAM Network Code was formally issued to ACER 6th March 2012.
ACER need to provide an opinion on the compliance with the CAM Framework Guideline by 6th June 2012.
ENTSOG continue to discuss with ACER questions in relation to the CAM code
Centred around withholding capacity
The sale of unbundled capacity
Technical Interconnection Point Mismatches
Incentive Release.
Tariffs.
Establishing Virtual Interconnection Points.
Congestion Management Procedures (CMP) Guidelines - Update
Revised CMP Guidelines sent via Ofgem to GB stakeholders 10th April 2012.
Further comments provided from National Grid to DECC and Ofgem.
Discussions held at GB Stakeholder meeting on the 13th April 2012 prior to the Comitology meeting.
Comitology meeting held 20th April 2012.
EU Updates Timetable
Timetable aims to highlight the key items (consultations, workshops, decisions, etc.) National Grid NTS expect to cover via this agenda item in the forthcoming months
Topic TX Workgroup
• CAM update• Summary of NG response to Interoperability FG
consultation
June 2012
• Output from SJWS on TYNDP / Final ENTSOG TYNDP proposal
July 2012