european carbon dioxide capture and storag e laboratory ... · new capture facilities (extract)...

27
HORIZON 2020 European Carbon Dioxide Capture and StoragELaboratory Infrastructure Sverre Quale Project Director 1 www.eccsel.org E-mail: [email protected] www.eccsel.org

Upload: others

Post on 30-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

European Carbon Dioxide Capture and StoragE Laboratory Infrastructure

Sverre QualeProject Director

1

www.eccsel.org

E-mail: [email protected]

www.eccsel.org

Page 2: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

20202

� Vision and objectives

� Timeline

� Implementation

� Permanent operation

� Investments

� Membership development

� INFRADEV-3 Transnational access programme

Content

www.eccsel.org

Page 3: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

20203

Reduce global warming

Reduce CO2 emissions

Close the knowledge gaps

Nuclear 8% (8%)

Power gen. efficiency and

fuel switching 3% (1%)

Renewables 21% (23%)

End-use fuel switching 12% (12%)

CCS 17%

End-use fuel and electricity

efficiency 42% (39%)

Reduction needed to keep global warming within 1,5 °C ??

IEA 2 degrees low carbon path

www.eccsel.org

Vision and Objectives

Page 4: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

20204

ECCSEL vision:

Enabling low to zero CO2 emissions from industry and power generation

Main objectives

� Establish and operate a world class distributed CCS research

infrastructure in Europe

� Integrate and upgrade existing research facilities and supplement with

new ones

� Enhance European science, technology development, innovation and

education in the field of CCS

� Enable spin-off activities and generation of new business

Vision and Objectives

www.eccsel.org

Page 5: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

ECCSEL timeline

5

2008 20202009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019

Implementation

FP7 pre-project granted

Preparatory phase

INFRADEV-3 (H2020)PP1 (FP7) PP2 (FP7)

H2020 Infradev-3 project granted

ECCSEL to be converted into a legal entity (ERIC)

Permanent Operation

Upgrades and new builds (200 Mill Euro until 2030)

European RI legal entity

www.eccsel.org

Page 6: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

ECCSEL INFRADEV-3 Partners

6

14 partners are part of this project:

• NTNU (Norway) – Project Leader

• BGS (United Kingdom)

• BRGM (France)

• CERTH (Greece)

• CIUDEN (Spain)

• ETH Zurich (Switzerland)

• GIG (Poland)

• OGS (Italy)

• PGI-NRI (Poland)

• SINTEF Energy (Norway)

• SINTEF Materials and Chemistry

(Norway)

• SINTEF Petroleum (Norway)

• SOTACARBO (Italy)

• TNO (The Netherlands)

Implementation

www.eccsel.org

Page 7: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

20207

� Final application sent to EC December 2016

� Expected EC approval by May 2017

� Planned ECCSEL ERIC Inauguration June 12th

2017 in Trondheim

� Fully operative from September 1st 2017

Permanent Operation

Conversion into ECCSEL ERIC (European Research Infrastructure Consortium) legal entity

www.eccsel.org

Page 8: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

20208

General assembly

Researchfacilities

1 2 …5

Operations Centre (OC)Director / Management

User Entry point

FACILITY

OPERATORS/

OWNERS

Peer review

ADVISORY COMMITEES/

BOARDS

Scientific

Industry

Infrastructure Coordination Committee

National node B

Binding access rules, HSE, IPR

Binding accessAgreements and

operational follow up

3Ethics &

Environment

National node C

National node….

National node A

4 6 n

ECCSEL ERIC Functional Organisation

Permanent Operation

Page 9: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

Lean organization:

� 4-6 employees

� Annual budget ≈ 850.000 EUR

Including in-kind contributions

9

Location: NTNU/SINTEF Campus

Trondheim, Norway

www.eccsel.org

ECCSEL ERIC

Permanent Operation

Page 10: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

202010

Gap analysis – main conclusions

� Capture and transport: Need for up-scaling promising

solutions and testing at more

severe experimental

conditions (pressure,

temperature, gas

compositions, ..)

� Storage: Need for a variety of test/pilot sites throughout Europe

Investments

www.eccsel.org

Page 11: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

New Capture Facilities (Extract)

Item Description Priority CategoryBudgeted investment

cost in million €

13 Mobile unit (container size) for testing of CO2 capture from flue gases by absorption/desorption (≈1000 m3/h) High New 3-5

14Facility for testing (pilot scale, 1-10 m2) of inorganic membranes and modules for oxy- and Pre-combustion

applicationsHigh New 3-4

15

Experimental facility (small pilot) suitable for CO2 purification of gas mixtures originating from oxy-

combustion processes as well as CO2 / H2 separation, for pressures up to 110 bar and temperatures -70 ℃ -

+50℃. The test rig should be highly instrumented to monitor the operation of heat exchangers and non-equilibria

operations, and be built to handle the HSE requirements of H2.

High New 3-4

16

Aerosol counter measure development facility: demonstration of suitable countermeasures for aerosol formation

during post-combustion capture at different scales. Lab pilot: special demisters, wet electrostatic precipitator

(WESP), impactor. Pilot scale (real flue gas): wet electrostatic precipitator.

High New 2-3

17

Experimental facility for adsorption techniques capturing CO2 from flue gases at atmospheric pressure. The

facility should preferably be located to an industrial site where a realistic gas mixture can be provided. A mobile

unit serving various purposes is preferred.

High

MediumNew 2-3

18

Facility for testing (pilot scale, 1-10 m2) of inorganic high-temperature CO2/H2-separating membranes and

modules (pre-combustion power plant and industrial type applications). This facility should allow testing of

high-temperature H2S removal.

Medium

To HighNew 5-7

19

Experimental facility for testing of CO2/H2-separation at pressures up to 110 bar with auxiliary refrigeration at

temperatures down to at least -60ºC. Test rigs are further needed to be built to handle the HSE requirements of

H2.

Medium New 2-3

20 Experimental facility to investigate heat transfer and pressure loss in heat exchanger channels for CO2 mixtures. Medium New 1-2

21

Experimental facility for efficient laboratory screening and characterisation of absorption solvents at higher

pressures. (Low CO2 partial pressure and higher total pressure equilibrium measurements and high-pressure

kinetics.)

Medium

New or

upgrade

existing

2-3

22Experimental facility for membrane technology capturing CO2 from flue gases at atmospheric pressure. The

facility should preferably be located to an industrial site where a realistic gas mixture can be provided.Medium New 4-6

23 Experimental facility (pilot >3 MW thermal) for Chemical Looping Combustion (CLC) for solid fuels. Medium New 10-15

Investments

11www.eccsel.org

Page 12: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

New Storage Facilities (Extract)

Item Description Priority Category

Budgeted

investment cost

in million €

25

A pilot scale research facility for injection into a fracture to study

migration and attenuation processes during migration through the

overburden. Challenges could be site identification and permitting.

�Hontomin and Svalbard may be possible candidates.

High

New or

upgrade

existing

3-8

26

A large (i.e. metres-scale) true tri-axial cell to enable cap

rocks. Such a cell will give us the realistic stress testing for

reservoir and opportunity to investigate more realistic stress

distributions. For example, we could run fracture

propagation tests which are not possible in existing

equipment due to boundary effects.

Medium New 2-3

27

Well scale testing facility at well (with realistic diameter) for evaluating

in-situ a range of in-situ potentially damaging processes specific to

CCS wells (temperature changes, pressure changes, low pH

conditions...). This implies: cement-rock bonding, casing-cement

bonding, casing boundaries, remediation technologies, borehole

monitoring.

Medium New 3-5

28

Engineering facility to develop new low-cost, advanced, drilling

techniques for site characterisation and monitoring.

�Svelvik may be a potential candidate

Medium New 2-4

29

Facility to simulate leakage for developing models and integrated

monitoring technologies for offshore storage.

�No storage site needed.

High New 3-8

www.eccsel.org

Investments

12

Page 13: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

Research Facilities

CaptureM€

TransportM€

StorageM€

SUMM€

Upgrade 29-35 0,25 5-8 34-43

New 11-16 5-8 6-16 22-40

SUM 40-51 5-8 11-24 56-83

Cost of identified high priority facilities only

Over the first 5 -10 years a total investment in the range €80-120

million is expected

Investments

Page 14: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

202014

Preparatory Phase(2011 – 2014)

Norway (host)• NTNU, SINTEF,

RCNFrance • IFPEN, BRGMThe Netherlands • TNOGermany • Universität StuttgartUnited Kingdom • BGSSwitzerland • ETH ZürichSpain • CIUDENItaly • OGS, ENEAGreece • CERTH, ISFTAPoland• PGI-NRI

ECCSEL ERIC(2017 – )

• Norway (Operations Centre)

• The Netherlands• Italy• France• United Kingdom• Poland• Greece• Spain• Switzerland (ERIC

observer)

Signed up final commitment to become founding members of ECCSEL ERIC

Signed Letter of Intent (LoI) to join ECCSEL ERIC

Expansion (2017 – )

• Germany• Czech Republic • Other member states• Bilateral agreements

with oversea states,institutions, industry

www.eccsel.org

Membership Development and Expansion

Implementation Phase (2015 – 2017)

Norway (host)• NTNU, SINTEFFrance • BRGMThe Netherlands • TNOUnited Kingdom • BGSSwitzerland • ETH ZürichSpain • CIUDENItaly • OGS, SotacarboGreece • CERTHPoland• PGI-NRI, GIG

Page 15: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

Capture Labs Transport Labs Storage Labs

Absorption Labs

Membrane Labs

Cryogenics Labs

Combustion Labs

CO2 characterization Labs

Material integrity Labs

Rock characterization Labs

Field Labs

Solid Sorbent Labs

Sorted by category/science area

Transnational Access (TA) Programme

www.eccsel.org

Page 16: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

ECCSEL INFRADEV-3 Implementation Partners

16

14 partners are part of this project:

• NTNU (Norway) – Project Leader

• BGS (United Kingdom)

• BRGM (France)

• CERTH (Greece)

• CIUDEN (Spain)

• ETH Zurich (Switzerland)

• GIG (Poland)

• OGS (Italy)

• PGI-NRI (Poland)

• SINTEF Energy (Norway)

• SINTEF Materials and Chemistry

(Norway)

• SINTEF Petroleum (Norway)

• SOTACARBO (Italy)

• TNO (The Netherlands)

Transnational Access (TA) Programme

www.eccsel.org

Page 17: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

TA to 44 ECCSEL facilities -funded by H2020

17

3 TA open calls

• March 2016 – closed

(11 successful applications)

• June 2016 – closed

(5 successful applications)

• December 2016 (Open until June 2017)

Published

• ECCSEL - www.eccsel.org

• EU - http://www.rich2020.eu/tas_calls

• Direct e-mail

• Quarterly Greenhouse News newsletter

• IEAGHG Weekly News email (worldwide)

• CLIMIT newsletter (next call)

• EERA

• BigCCS website

• UKCCS Research Centre website

• ESFRI_EU Twitter

• NTNU intranet

• Info-days & training courses …

Page 18: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

Fact sheets (web) for all 44 TA facilities

� Organisation name

� Installation name

� Location

� Category, Science area

� Short description

� Pictures

� Calendar

Transnational Access

www.eccsel.org

Page 19: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

Third TA call overview

19

� 28 ECCSEL Infradev-3 facilities included

� Call opened December 2016

� Continuous open call until we have used up TA funds for this project (monthly reviews).

� First for facilities which have not had TA access

� Early this year will we try to reallocate some funds (subject to ECCSEL consortium and EU approval).

Page 20: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

Third TA call overview

20

� 28 ECCSEL Infradev-3 facilities included initially

� Call still open

Successful Applications so far for:� GIG HPTGA (TA12.1) – from Serbia

� TNO Mini Plant (TA2.1) – from Kazakhstan

� OGS Panarea Natural Laboratory (TA7.4) – from Slovenia

� BGS RMPL (TA3.2) – from Norway

� CIUDEN Transport Rig (TA5.2) – from Belgium

Page 21: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

Third TA call overview

21

15 ECCSEL Infradev-3 facilities still available

Capture:Insti

tution

Coun

try

Num

ber

Short NameLong Name

Access

unit

Unit

quan

tity

Pro

jects

CERTH GR TA 9.1 CERTH CLC Chemical Looping Combustion facility week 3 1

ETH Zürich CH TA11.1 ETH-BAL Adsorption Equilibrium Measurement Balance month 1 1

ETH Zürich CH TA11.2 ETH-PSA Two column lab PSA setup month 1 1

GIG PL TA12.2 GIG-FBR Fixed bed reactor week 3 1

GIG PL TA12.3 GIG-MBR Pilot-scale moving bed reactor week 1 1

NTNU NO TA1.5 ABSEQ Thermodynamic studies package week 4 1

NTNU NO TA1.1 MEM-FAB

Facilities to fabricate polymer-based membranes. Those

can be testet on the MEM-PERM facilities to test

membrane gas permeation performance

week 4 1

SINTEF

(MC)NO TA4.3 SINTEF PPLab Powder processing laboratories for CCS day 5 1

SINTEF

(MC)NO TA4.5 SINTEF SDR Solvent Degradation Rig day 30 1

SINTEF

(MC)NO TA4.6

SINTEF Tiller

PilotTiller CO2 Capture Pilot Plant day 20 1

SINTEF ER NO TA 8.1 CLC Hot Rig Chemical Looping Combustion Rig week 2 1

SOTA-

CARBOIT TA 10.1 COHYGEN COHYGEN (Coal to Hydrogen Generation) pilot plant day 20 1

TNO NL TA2.3 CLC CLC fixed bed facility week 4 1

TNO NL TA2.4 High-P abs&des High pressure absorption and desorption pilot week 4 1

TNO NL TA2.2 Qscan QSCAN solvent test street week 4 1

Page 22: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

Third TA call overview

22

8 ECCSEL Infradev-3 facilities still available for

Storage:

InstitutionCoun

try

Num

berShort Name Long Name Access unit Unit quantity Projects

BGS / NERC UK TA3.3 HTL Hydrothermal Laboratory month 1 1

BGS / NERC UK TA3.1 TPRL Transport Properties Research Laboratory month 1 1

CERTH GR TA 9.2

CERTH

Storage

facilities

CO2 Storage facilities week 3 1

CIUDEN ES TA5.1 PISCO2 Pilot for Injection of CO2 in Soils week 3 1

ETH Zürich CH TA11.4ETH Conf-

PermHigh pressure hydrostatic flow cell month 1 1

OGS IT TA7.1 DeepLab

DeepLab Sea Floor Landers for

meteooceanographic physical and geochemical

data collection

day 5 1

PGI-NRI PL TA6.2 GEOPH-Lab GEOPH-Lab week 2 1

SINTEF

PETROLEUM

AS

NO TA13.1SINTEF PR –

SCALCore Flood (SCAL) laboratory day 30 1

Page 23: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

TA - Application

23

Online Application from EU&non-EU for

� ‘Free of charge' (equal opportunity) access to a facility of the ECCSEL RI,

� to selected researchers or research teams (including from industry),

� working in a country other than the country where the RI is located.

Information

� Personal (and group) information

� Project description and objectives

� Equipment required & preferred facilities

� Own chemicals brought

� Ethical & environmental impact

� Publication plans

Page 24: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

202024www.eccsel.org

Transnational Access Application Process

Start/End

“Open” CALL (3x) published in 2016

Application made by Potential Users

Pre-Screening of Applications

Peer Review Committee

Successful Projects/Users access the Infrastructure

HSE and Practical Local Training

Dissemination

Page 25: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

EU funding for Access Costs for transnational access

25

Access costs: Costs incurred by the access provider for the provision of access.

They cover: • The running costs of the installation

• Costs for logistical, technological and scientific support to users’

access, including ad-hoc training and preparatory and closing

activities necessary to carry out user’s work

Researcher expenditure:

Covers travel, subsistence

Page 26: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

2020

EU funding: How much access is available ?

26

At least one EU funded access to each of the included facilities

• Typical time needed for a research project is listed on fact sheet

• Reasonable Travel and Subsidence funding for one researcher

• Up to € 500 for travel

• Up to € 100 for each day at the facility

• Travel claim with receipts must be submitted

• Access is also available to all those facilities and some additional

which will be listed soon to researchers paying the access costs

Page 27: European Carbon Dioxide Capture and Storag E Laboratory ... · New Capture Facilities (Extract) Item Description Priority Category Budgeted investment cost in million € 13 Mobile

HORIZON

202027www.eccsel.org

Thank you for your attention!

www.eccsel.org