Euclid Creek Tunnel
Community Update
February 19, 2013
![Page 2: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/2.jpg)
euclidcreek.blogspot.com
Agenda
• Housekeeping
• Project Overview
• Construction Updates
• Shaft Updates
• Contact Info
![Page 3: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/3.jpg)
euclidcreek.blogspot.com
Because Dogs Can’t Flush
![Page 4: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/4.jpg)
euclidcreek.blogspot.com
neorsd.org/pup
![Page 5: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/5.jpg)
euclidcreek.blogspot.com
Project Overview
![Page 6: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/6.jpg)
euclidcreek.blogspot.com
Euclid Creek Tunnel: By the Numbers
• Tunnel
– 24’ diameter
– 17,750’ in length
– 60,100,000 gallons
• ~30 near surface structures
– 10 complete
– 9 under construction
• Shafts: 5 total
– 24’ to 60’ diameter
– 185-225’ deep
• 2,440 linear feet of open cut pipe placed
• 2,110 linear feet of microtunnel complete
– 240 more to go
![Page 7: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/7.jpg)
euclidcreek.blogspot.com
Construction Updates
• New sewer, Lakeshore BoulevardEast 150th Street to (east of) Collinwood Rec.
– Work completed: Sept 2013
• New sewer, St. Clair Ave. and Nottingham Rd.
– Work completed: Oct 2013
![Page 8: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/8.jpg)
euclidcreek.blogspot.com
Shaft #1Construction Staging Site
• “Mackenzie” tunneled and lined 5400’
• Operating 24/7 with regularly-scheduled maintenance periods
• Currently beneath Easterly WWTP
![Page 9: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/9.jpg)
euclidcreek.blogspot.com
Project Overview
![Page 10: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/10.jpg)
euclidcreek.blogspot.com
![Page 11: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/11.jpg)
euclidcreek.blogspot.com
Shaft #2Easterly Wastewater Treatment Plant
• 80 feet excavated
• Installing base slab for adjacent structure(Structure 2-1).
![Page 12: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/12.jpg)
euclidcreek.blogspot.com
![Page 13: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/13.jpg)
euclidcreek.blogspot.com
Shaft #2Easterly Wastewater Treatment Plant
• 80 feet excavated
• Installing base slab for adjacent structure(Structure 2-1).
• Blasting last 100 feet
– Will begin this year
– Field trips… any interest?
![Page 14: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/14.jpg)
euclidcreek.blogspot.com
• Construction staging area
– Secant pile wall installation
• Increased truck traffic (spoils removal and concrete delivery)
• 17 piles complete– 10 primary piles, 7 secondary
– East 156th Street
• West side sidewalk still closed
• Will be replaced when feasible
Shaft #3Beulah Park
![Page 15: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/15.jpg)
euclidcreek.blogspot.com
![Page 16: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/16.jpg)
euclidcreek.blogspot.com
Shaft #3: Schedule*2013 2014
January February March April May June July Aug Sept Oct Nov Dec Jan Feb Mar April May June July Aug
Shaft Support & Excvation
Shaft Structural Work
Strs 3-2 & 3-3 (Btw Wadsworth & Gordon)
Close E 156th Street
Diversion Sructure E 156th
Microtunneling
Str 3-5 (Lakeshore & E 156th)
Non-Working Holidays
Memorial Day
July 4th
Labor Day
Thanksgiving Day
Christmas Day
New Years Day
*Schedule subject to change
![Page 17: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/17.jpg)
euclidcreek.blogspot.com
Shaft #3: Schedule
1/13–6/1310/13–12/131/14—8/14
4/13–8/14
3/13–3/14
8/13–11/13
4/13–3/14
![Page 18: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/18.jpg)
euclidcreek.blogspot.com
Repaved Roads
![Page 19: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/19.jpg)
euclidcreek.blogspot.com
Shaft #4Triangle Park
• Excavation work is complete at this site
• Currently installing rebar to reinforce shaft
• Fencing will remain throughout 2014
![Page 20: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/20.jpg)
euclidcreek.blogspot.com
Shaft #4Triangle Park
![Page 21: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/21.jpg)
euclidcreek.blogspot.com
Shaft #5Nottingham & St. Clair
• Excavation nearing completion
– 210 feet excavated
– 10 more to go
![Page 22: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/22.jpg)
euclidcreek.blogspot.com
Stay Informed
• Blog
– EuclidCreek.blogspot.com
• Semi-Monthly Newsletter
– E-mail distribution
– [email protected] to be added to the list
![Page 23: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/23.jpg)
euclidcreek.blogspot.com
How to Reach Us
Social Mediafacebook.com/yoursewerdistrict@neorsd | @wallywaterdrop
Customer Service (216) 881-8247
Emergencies: NEORSD ECT Field Office(216) 268-5469
Ryan Sullivan, [email protected] Elting, [email protected]
![Page 24: Euclid creek tunnel ppt feb2013](https://reader033.vdocuments.us/reader033/viewer/2022042816/55975afd1a28ab480e8b4577/html5/thumbnails/24.jpg)
euclidcreek.blogspot.com
Next Meeting
Tuesday, March 19, 20136:00 p.m.Cleveland Public Library,Memorial-Nottingham Branch
Save the Date!
– April 16 (possible location/date change)
– May 21
– June 18
Dates
May
Change!