Code No: V3205/R07III B. Tech II Semester Regular Examinations, April/ May 2011
ESTIMATING AND COSTING(Civil Engineering)
Set No. 1
Time: 3 hoursAnswer the Part –A
Answer any three questions from the Part –B*****
Part –A (1x50=50)
Max Marks: 80
Estimate the required quantities for the following data from the given plan Fig.3.4 byusing centre line method.
1 of 2
www.jntuhub.com
Set No. 1Code No: V3205/R07
(i) Earth work excavation in foundation with 1:4 C.M(ii) C.C in foundation (1:3:6)(iii)First Class Brick work in sub structure (C.M of 1:4)(iv)R.C.C(v) White washing
2. Part-B(3x10=30)
(i) What is approximate method of Estimation and explain?(ii) Write brief note on the earth for roads and explain?(iii)What do you understand about the Valuation and explain in detail(iv)Write the standard specifications for different items of building constructions andexplain?
(v) What do you understand about the Contract Documents and explain?
2 of 2
www.jntuhub.com
Set No.2Code No: V3205/R07
III B. Tech II Semester Regular Examinations, April/ May 2011ESTIMATING AND COSTING
(Civil Engineering)Time: 3 hours
Answer the Part –AAnswer any three questions from the Part –B
*****Part –A (1x50=50)
Max Marks: 80
1. Estimate the required quantities for the following data from the given plan Fig 3.5&3.6 by using individual wall method.
1 of 2
www.jntuhub.com
Set No.2Code No: V3205/R07
(i) Earth work excavation in foundation with 1:4 C.M(ii) C.C in foundation (1:3:6)(iii)First class brick work in foundation (C.M of 1:4)(iv)First class brick work in super structure(v) Painting or white washing
2. Part-B(3x10=30)
(i) Define the contractor & the contract and what are the types of contracts andexplain?
(ii) Explain the types and conditions of contracts in detailed?(iii)What do you understand about the bar bending and what factors plays majorroll in case of bar bending?
(iv)Write the units for working out quantities for detailed and abstract estimates?(v) Explain the principle and procedure for the earth work of roads and canals?
2 of 2
www.jntuhub.com
Set No.3Code No: V3205/R07
III B. Tech II Semester Regular Examinations, April/ May 2011ESTIMATING AND COSTING
(Civil Engineering)Time: 3 hours
Answer the Part –AAnswer any three questions from the Part –B
*****Part –A (1x50=50)
Max Marks: 80
1. Estimate the required quantities for the following data from the given plan 3.4 by anyone method.
1 of 2
www.jntuhub.com
Set No.3Code No: V3205/R07
(i) Earth work excavation in foundation(ii) C.C in foundation(iii) Second class brick work in foundation (C.M of 1:4)(iv) First class brick work in super structure(v) Sand filling basement
2.
Part –B(3x10=30)
(i) What are the Principles of working out quantities and explain them in brief?(ii) Perform the rate analysis for the following
(a). 1:6 CM(b). 1:2:4 C C
(iii) What are the types of contract and explain?(iv) Explain the conditions of contracts in detailed?(v) What are the standard Specification for the construction of buildings and explainthem in brief?
2 of 2
www.jntuhub.com
Set No.4Code No: V3205/R07
III B. Tech II Semester Regular Examinations, April/ May 2011ESTIMATING AND COSTING
(Civil Engineering)Time: 3 hours
Answer the Part –AAnswer any three questions from the Part –B
*****Part –A (1x50=50)
Max Marks: 80
Estimate the required quantities for the following data from the given plan Fig.3.3 byany one method
1 of 2
www.jntuhub.com
Set No.4Code No: V3205/R07
(i) Earth work excavation in foundation(ii) D.P.C(iii) Second class brick work in foundation (C.M of 1:4)(iv) Flooring with 1: 4 C:M(v) Brick work for parapet wall
2. Part – B(3x10=30)
(i) What are the Principles of working out quantities and explain them in brief?(ii) What are the types of contract and explain?(iii)What do you understand about the Valuation and explain in detail(iv)Write the standard specifications for different items of building constructions andexplain?
(v) What do you understand about the Valuation and explain in detail?
2 of 2
www.jntuhub.com