estates development department presentation by maria ferreira and diane jones december 2013
DESCRIPTION
ESTATES DEVELOPMENT DEPARTMENT Presentation by Maria Ferreira and Diane Jones December 2013. Background Following a review in October 2011 a decision was made to restructure the Estates Department. In June 2012 two new departments were created - PowerPoint PPT PresentationTRANSCRIPT
ESTATES DEVELOPMENT DEPARTMENT
Presentation by
Maria Ferreira and Diane Jones
December 2013
Background
Following a review in October 2011 a decision was made to restructure the Estates Department. In June 2012 two new departments were created • Property Services Team (PST) – dealing with reactive
maintenance, (most) planned preventative maintenance, grounds maintenance and minor projects (<£25k). PST are in Campus Services and managed by Sean Kenny.
• Estates Development Department
Role of the Estates Development Department • Developing and managing major projects (>£25k)• Energy management (eg sourcing and introducing energy saving measures,
monitoring energy usage)• Utility contract management (eg procuring contracts, reconciling payments for
electricity, gas and water, CRC)• Managing Planet Enterprise• Legislative compliance (eg lift maintenance, legionella control, emergency light
testing, asbestos management)• Space management (eg space planning, room moves, space utilisation surveys,
EMS data)• Estate management (eg leases, rental agreements, acquisitions and disposals of
land and property, Business Rates, Council Tax)
The Estate
• AU owned property - Penglais, Llanbadarn (except Coleg Ceredigion), Gogerddan, Old College, 1/2 Marine Terrace, Y Bwthyn, 2 King St, 1/9/10 Laura Place, Edward Davies building, Sci Park Unit 12
• AU owned facilities - Blaendolau, Vicarage fields (including Mosque), Boathouse• AU owned farms – Penglais, Frongoch, Frondeg, Wern Phillip, Morfa Mawr• Leased in properties – PJM, Wellness Centre, Penglais Nursery, Castle Theatre,
Brynderw, Seafront Halls, Glanyrafon Bookstore, Clarach stores• Leased in farms – Trawsgoed, Pwllpeiran• Leased out – Gogerddan Nursery, Plascrug Bowling Green, various farms and
pieces of land• 35 Domestic properties across various locations• Land – and lots of it – from Talybont (Rhydyronnen Farm) to Llanon (Morfa Mawr)
Current structure
Tel: 2076E-mail: eddstaff
Head of Department(Consultant on interim basis
pending recruitment process)
(Len Cotton)
Improvements Manager (Building)
(Dave Lister)Extn: 3033
Quality Officer(Mark Mountford)
Extn: [email protected]
Quality Officer(Glyn Williams)
Extn: [email protected]
Improvements Manager (M&E)(Mike Tipping)
Extn: [email protected]
Quality Officer(Jimmy Edwards)
Extn: [email protected]
Quality Officer(Gareth Jenkins)
Extn: [email protected]
Space Manager(Tim Macy)Extn: 8714
Energy Advisor(Janet Sanders)
Extn: [email protected]
Compliance and Improvement
Manager(Simon Edwards)
Extn: [email protected]
Emergency Lighting Officer
(Jonathan Ashworth)
Fire Protection Officer
(Peter Heading)
Admin Assistant(Dave Robinson)
Extn: [email protected]
Senior Administrator(Maria Ferreira)
Extn: [email protected]
Senior Administrator(Diane Jones)Extn: 2079
AUStrategic
Plan
Strategic Drivers1. Student and staff
experience2. Excellent infrastructure
and buildings3. Sustainable
development4. Space as an enabler
A beautiful, coherent
and sustainable
estate
• Capital Projects Advisory Group, reporting to Finance and Strategy Committee.• Cap 27 Pipeline – clearer methodology for working up and approving projects
over £25k.• Four stages: Spark, Shape, Firm, Start.• Improves our chances of having ‘shovel ready’ projects to maximise funding
opportunities
Capital Projects Strategy
Focus of Attention
• Penglais• Llanbadarn• Gogerddan• Old College
Achievements in 2012-2013
• Teaching rooms• Llanbadarn Centre• Postgraduate Centre• Swimming pool filtration• Fire alarms and lighting in Hugh Owen• Electrical testing & improvements• Sports Cage energy efficient lighting
Expenditure Budgets 2013-14 £'000k
Utilities 2,835
Salaries 639
Projects 600
Insurance 585
Rent/Rates 337
Planned Maintenance 232
Other Costs 104
(inc Vehicles, Prof fees & Office Costs)
5,332
53%
12%
11%
11%
6%4%
2%
UtilitiesSalariesProjectsInsuranceRent/RatesPlanned MaintenanceOther Costs(inc Vehicles, Prof fees & Office Costs)
EDD Expenditure Budget 2013-14
Projects for 2013-14
Number Building Outline of works IMEstimated funds
0073 Llandinam E21 install air system Mike Tipping £20,0000075 Llandinam Make safe windows Dave Lister £10,0000076 Hugh Owen Investigate & monitor beams Dave Lister £10,0000077 Old College Stone defects Dave Lister £50,0000078 Penglais Campus Infrastructure survey Mike Tipping £50,0000079 Cledwyn Demolish hut Dave Lister £10,0000080 Physical Sciences Rewire Mike Tipping £200,0000081 Penglais Campus Design & print HV switchgear replacement Mike Tipping £120,0000089 Llanbadarn Heating in teaching rooms Mike Tipping £15,0000083 Llanbadarn Drain repairs Mike Tipping £50,0000086 Hugh Owen D floor Dave Lister £12,000ESPAC Various Space moves Tim Macy £15,0000088 Llanbadarn Examinations work Mike Tipping £8,0000094 Llandinam Postgrad Centre 24-hour heating Mike Tipping 0092 Llandinam Upgrade fire alarm system Mike Tipping £10,0000091 Llandinam Heating issues Mike Tipping 0090 Pantycelyn Investigations Jan Sanders 0062 Llandinam Geology roof Dave Lister £5,0000020 Various Electrical testing & remedials Mike Tipping £50,0000068 Hugh Owen/Llanbadarn Banners Dave Lister £6,1000068 Hugh Owen Scaffold Dave Lister £31,0000067 Edward Llwyd Extend fire escape Dave Lister £20,000 £692,100
Institute identifies maintenance or refurbishment requirements
Log Call on the Helpdesk and get Call Number
Is work in a centrally
timetabled space?
Is work simple reactive?
Call allocated to PST Manager for action
Discussed at PST/EDD meeting and decision made on who
should carry forward(This stage may be by-passed and the work fast-tracked to the next
stage)
<£25k: Call allocated to PST Manager
to progress
>£25k:Call allocated to EDD.
Improvements Manager appointed to verify funding, Executive approval, progress
feasibility, etc
Check with Timetable Office before proceeding
What Institutes need to do
NB:
• Consider designating individual(s) in Institute structure for web call logging
• The current situation in relation to any logged call can be ascertained from the Helpdesk
(extn: 2999, e-mail: [email protected])
YES
YES
NO
NO
Departmentally Funded Project
• Written (e-mail accepted) approval of Institute Manager• Departmental Cost Centre and Project code • Creation of ABW Work Order (EXPR****)• All external commitments via ABW Purchase Order
Centrally Funded Project
• Backlog maintenance identified on Condition Survey or highlighted by other projects
• Strategic requirement identified by AU Exec (eg via Planning Round)
Future Ways of Working
• All enquiries to Estates Development start with Call on Planet Enterprise, for example Potential project Request for spaceThis creates an audit trail, prevents duplication and overcomes problems resulting from personnel changes.
• The Institute Managers are automatically included in any dialogue as soon as possible
• All requests to Campus Services start with a Call on Planet Enterprise, for example Reporting reactive maintenance issue Reporting grounds maintenance issue Request for portering/cleaning services
Diolch Thank you
Any questions?
NADOLIG LLAWENMerry Christmas