Page 1: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Establishing an Electric Distribution Establishing an Electric Distribution GIS Using ArcFMGIS Using ArcFM

Melissa A. Williams, P.E.

Senior Project Engineer

Stantec Consulting

September 29 - 30, 2011 | Hyatt Regency Hotel | Columbus, Ohio

Page 2: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Establishing an Electric Distribution GIS Using ArcFM

• City of Columbus Electric Distribution Digital Conversion Project

• Telvent Multispeak Data Model, ArcFM Software• Data Conversion Strategy• Data Analysis/QC

Page 3: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

City of Columbus Electric Distribution Digital Conversion Project

• Existing Datasets– AutoCAD drawings– Hand drawn manhole/vault sketches– Access database– GPS points

Page 4: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

City of Columbus Electric Distribution Digital Conversion Project

• Existing Datasets: AutoCAD Single Line Drawings (underground)

Page 5: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

City of Columbus Electric Distribution Digital Conversion Project

• Existing Datasets: AutoCAD Single Line Drawings (overhead)

Page 6: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

City of Columbus Electric Distribution Digital Conversion Project

• Existing Datasets: AutoCAD Detail Drawings (manholes/vaults)

Page 7: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

City of Columbus Electric Distribution Digital Conversion Project

• Existing Datasets: AutoCAD Detail Drawings (padmount transformers)

Page 8: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

City of Columbus Electric Distribution Digital Conversion Project

• Existing Datasets: Hand drawn manhole/vault sketches

Page 9: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

City of Columbus Electric Distribution Digital Conversion Project

• Goals– Seamless data showing primary distribution

lines– Locations/attributes – Connectivity– Allow for future development / analysis

Page 10: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Telvent Multispeak Data Model, ArcFM Software

• Data Model created/maintained by Telvent GIS (formerly Telvent Miner & Miner)– M&M provided electrical engineering services since

1946– Automated Mapping/Facilities Management/GIS since

1986– Business partner with ESRI

• Telvent ArcFM Enterprise GIS is an extension for ArcGIS

Page 11: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Telvent Multispeak Data Model, ArcFM Software

Page 12: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Telvent Multispeak Data Model, ArcFM Software

• Customization of data model:– Used Microsoft Visio to make changes to data model– Added / Changed / Deleted attributes to match

existing Access

database fields– Added / Edited

domains, subtypes

Page 13: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Telvent Multispeak Data Model, ArcFM Software

• Advantages of using ArcFM software (vs data model alone)– Ability to perform more complex analyses and better

QC (e.g. electric traces)– Additional functionality through other Telvent solutions

• Conduit Manager• Responder

Page 14: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Telvent Multispeak Data Model, ArcFM Software

• Conduit Manager

Page 15: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Telvent Multispeak Data Model, ArcFM Software

• Responder

Page 16: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Data Conversion Strategy

• No heads-up digitizing with georeferenced images

• Start with GPS’ed and ortho-verfied point features– GPS points for poles,

manholes/vaults– Ortho-verified padmount

transformers

Page 17: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Data Conversion Strategy

• Create manhole diagrams for Conduit Manager

Page 18: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Data Conversion Strategy

• Digitize conduits between manholes/vaults– One conduit per

duct bank– Split conduit if

different configuration on each end

– Snap to manhole/vault points

Page 19: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Data Conversion Strategy

• Digitize underground conductors from manhole to manhole – Break, but not

snap at manholes

Page 20: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Data Conversion Strategy

• Add switches and transformers within manholes/vaults– Connect to match

detail drawings– Use ArcFM

favorites for composite features

Page 21: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Data Conversion Strategy

• Associate conductors to ducts in manholes to complete Conduit Manager diagrams

Page 22: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Data Conversion Strategy

• Associate conductors to ducts in manholes– Can split by phase to different ducts

Page 23: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Data Conversion Strategy

• Digitize overhead conductors, transformers– Draw close to, but

don’t snap to poles– Don’t need to

break at poles

Page 24: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Data Conversion Strategy

• Add additional devices on poles– Capacitors

– Switches (section points, tie points, auto-transfer)

– Risers (potheads), circuit feeders

– Regulators

– Reclosers

– Fault Indicators

Page 25: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Data Analysis/QC

• ArcFM Electric Traces– FeederID attribute

populated for energized conductors/devices

– Can trace by phase– Can open/close

switches to see new circuit path

Page 26: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Data Analysis/QC

• ArcFM Electric Traces

Page 27: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Data Analysis/QC

• ArcFM Feeder Manager Locator Tool– Will detect loops, devices energized by more than one

circuit, de-energized devices

Page 28: Establishing an Electric Distribution GIS Using ArcFM Melissa A. Williams, P.E. Senior Project Engineer Stantec Consulting September 29 - 30, 2011 | Hyatt

Establishing an Electric Distribution GIS Using ArcFM

• Questions??

Melissa A. Williams, P.E.

Stantec Consulting

[email protected]

614-486-4383 Ext.3526