Essential Reliability ServicesERSWG
NERC Planning and Operating Committee MeetingsMarch 7-8, 2017
RELIABILITY | ACCOUNTABILITY2
ERSWG 2016 Follow up
2016 Deliverables:• ERS Sufficiency White Paper completed &
posted.• DER Report approved at February Board meeting
& posted.• PC needs to formally disband the DERTF,
scheduled for March 2017
RELIABILITY | ACCOUNTABILITY3
ERSWG 2017 Focus
Revised ERSWG Scope Document• Continue the development and refinement of ERS Sufficiency
Assessments (no longer to be called Sufficiency Guidelines). This includes:
• Ongoing analysis of current trends. Observations and results to be included in the annual State of Reliability (SOR)
Report.
• Development of forward looking (predictive) analyses of selected ERS Measures. Observations and results to be included in the NERC Long Term Reliability
Assessment (LTRA).
• Development of historical analyses of select ERS Measures. These will be illustrated in the SOR reports going forward.
RELIABILITY | ACCOUNTABILITY4
ERSWG 2017 Focus
ERSWG Activities• Monitor activities of the subcommittees and working groups related to
ERS Measures.• Evaluate other tools and/or processes for assessing the sufficiency of ERS
Measures for both current and future states.• Develop recommendations for practices and requirements, including
reliability standards, as necessary, that cover the planning, operations planning, and real-time operating procedures associated with ERS.
• Identify and recommend subgroups (existing or new) of the Operating and Planning Committees to ensure ongoing both historical and forward looking trending/analysis of ERS Measures.
RELIABILITY | ACCOUNTABILITY5
ERSWG 2017 Focus
ERSWG Activities – DER Related• Lead the implementation of recommendations from the February 2017 DER
Report (accepted February 2017) as directed by the NERC Board of Trustees. • Assess incorporation of DER data into the ERS Sufficiency Assessments and
Measures.
RELIABILITY | ACCOUNTABILITY6
ERSWG 2017 Focus
ERSWG Deliverables• Develop technical reference documents or assessment briefs, as
necessary, on recommended ERS Sufficiency Assessments and Measures.• Develop briefings for use with policy makers, as necessary, on various
ERS issues.• Support historical and forward looking ERS assessments for the State of
Reliability and the Long Term Reliability Assessment Reports. Propose, develop and implement new data collection and analytical processes, as needed.
• Develop various DER related technical reference documents and/or data collection guidelines.
RELIABILITY | ACCOUNTABILITY7
ERSWG 2017 Schedule
Date ActionJanuary – December 2017 ERSWG Leadership Conference Calls – Starting and reoccurring every 2 weeksJanuary – July 31, 2017 • Monitoring RS, RAS, PAS, ERS committee/group meetings
• Phone calls to set work efforts, guidelines, goals, and reviewing results for EOY reportFebruary 8 - 9 NERC Board Meeting (DER Reported approved)February 22 – 23 (Atlanta) ½ day each day
ERSWG Leadership Face to Face Meeting • Establishing ERSWG work plan DER subgroup creation and possible DER guidelines/paper
March 7 – 8, 8 (Atlanta) Q1: OC and PC Meeting
March 8 (Atlanta) ½ day onlyERSWG Face to Face Meeting (1/2 day Wed only)• Review current state of ERS measures, technical presentations, DER update
May 17-18 (Atlanta) ½ day each day ERSWG Face to Face Meeting• Progress meeting to update on ERS work efforts and DER work
June 6-7 (TBD) Q2: OC and PC Meeting
June 7-8 (TBD) ½ day each dayERSWG Face to Face Meeting• Review current state of ERS measures, technical presentations, DER update
August 1-2 (TBD) – if needed Progress meeting or conference call if needed to update on ERS work efforts and DER workAugust 9 NERC BOT Meeting, status update (as necessary)September 12 – 13 Q3: OC and PC Meeting
September 13-14 (TBD)½ day each day
ERSWG Face to Face Meeting (End of Year Deliverables)• Review current state of ERS measures, technical presentations, DER update• Finalization of ERS assessment briefs and any DER guideline/paper for the 2017 year
Early Nov (TBD) – if needed Progress meeting or conference call if needed to update on ERS work efforts and DER workNovember NERC BOT Meeting, status update (as necessary)December 12-13 Q4: OC and PC Meeting
December 13-14 (TBD) ½ day each ERSWG Face to Face Meeting• Review work of 2017 ERS measures and DER subgroup, Set work plan for 2018
Late January (TBD) 2018 – if needed Progress meeting or conference call if needed to update on ERS work efforts and DER work
RELIABILITY | ACCOUNTABILITY8
ERSWG 2017 Summary & Request
Key items for 2017• Test/Validate current measures/assessment methods• Further develop forward looking methods of assessment• Determine policy maker needs and develop necessary briefing
documents • Prioritize and develop DER related reference documents/reliability
guidelines• Provide status updates and technical briefs, as appropriate.• Request OC/PC approval of revised ERSWG Work Scope.
RELIABILITY | ACCOUNTABILITY9
Ryan D. Quint, NERCNERC Planning Committee MeetingMarch 7-8, 2017
Reliability Guideline: Forced Oscillation Monitoring & MitigationInitial Approval – Industry Comment Period
RELIABILITY | ACCOUNTABILITY2
Overview
• Provides industry with understanding of fundamental behavior of forced oscillations and how they differ from system (natural) oscillations.
• Highlights use of PMU data for oscillation monitoring and analysis.
• Provides framework for identifying, characterizing, and determining the source of forced oscillations
• Recommends practices and mitigation strategies for system operators and operations engineers
• Appendices of operational tools and actual forced oscillation events
RELIABILITY | ACCOUNTABILITY3
Guideline Overview
RELIABILITY | ACCOUNTABILITY4
Characteristics of Oscillations
RELIABILITY | ACCOUNTABILITY5
Considerations
• Sources of forced oscillations Generation Load Controls
• Monitoring devices for forced oscillations Reporting rates Filtering Electrical quantities
• Interactions between system and forced oscillations Resonance effects Widespread impacts of localized forced oscillations
RELIABILITY | ACCOUNTABILITY6
Recommended Practices & Mitigation Measures
• Step 1: Identify occurrence of forced oscillation• Step 2: Determine oscillation frequency and magnitude• Step 3: Determine “containment” of oscillation• Step 4: Determine location or general proximity of oscillation• Step 5: Determine specific system component oscillating
RELIABILITY | ACCOUNTABILITY7
Operational Tool Examples
RELIABILITY | ACCOUNTABILITY8
Event Examples
RELIABILITY | ACCOUNTABILITY9
Event Examples
RELIABILITY | ACCOUNTABILITY10
Development Timeline
• April ‘16-Jan ‘17 Development of draft guideline• March PC PC initial approval for posting for comment• Mar 15-May 3 Industry comment period• May 3-21 Response to comments• June 6 PC Final Approval
RELIABILITY | ACCOUNTABILITY11
Approval
• SMS is seeking PC approval to post the Reliability Guideline on Forced Oscillation Monitoring & Mitigation for a 45-day industry comment period.
RELIABILITY | ACCOUNTABILITY12
Ryan D. Quint, NERC NERC Planning Committee Meeting March 7-8, 2017
Reliability Guideline: Developing Load Model Composition DataFinal Approval
RELIABILITY | ACCOUNTABILITY2
Final Approval
• Purpose: provide TPs and TOs with insights into end-use load behaviors and how to capture that in the composition of dynamic load models
• Comment Period: No comments received• Updates: Editorial changes from Publications review• Action: Seeking final approval of guideline
RELIABILITY | ACCOUNTABILITY3
Development Timeline
• Dec ‘15-Oct ‘16 Development of draft guideline• Oct 25 Detailed walkthrough of guideline to SAMS• Nov 3 LMTF approval of guideline• Nov 7 SAMS approval of guideline• Dec 13 PC initial approval for posting for comment• Jan 4-Feb 24 Industry comment period• Feb 24-28 Response to comments• March PC PC Final Approval
RELIABILITY | ACCOUNTABILITY4
Review of Data Change Management Processes for RTCA and Planning Models (Recommendation 16)
Amir Najafzadeh, Senior Engineer, System AnalysisPlanning Committee Meetings March 7-8, 2017
RELIABILITY | ACCOUNTABILITY2
Overview
The Charge• Standards Review• Regional Requirements Review• Gaps• Best Practices and Recommendations• Asking for Report Approval
RELIABILITY | ACCOUNTABILITY3
The Charge
SW Outage Recommendation 16 - Discrepancies between RTCA and Planning Models
“… WECC should ensure consistencies in model parameters between its planning model and its RTCA model and should review all model parameters on a consistent basis to make sure discrepancies do not occur.”
RELIABILITY | ACCOUNTABILITY4
Standards &Regional Requirements Review
Applicable Standards Review:• FAC-001-2 R1• IRO-010-1a R3• MOD-032-1
Existing Regional Requirements:• EI• WECC• Texas-RE
RELIABILITY | ACCOUNTABILITY5
Gaps & and Recommendations
• Case Benchmark• Periodic Databank Update• Single Point of Entry• Data Tracking
RELIABILITY | ACCOUNTABILITY6
PC Approval & Timeline
• MWG Drafted v1 August 2014• SAMS Approved v1 October 2014• Version 1 was not presented to the PC• MOD-032-1 became effective and required document rewrite • MWG Drafted v2 October 2016• SAMS Approved v2 November 2016• Presented to PC at December 2016 meeting• Posted for Industry Comment January 2017
RELIABILITY | ACCOUNTABILITY7
Phil Fedora, RAS ChairPlanning Committee MeetingMarch 7-8, 2017
Reliability Assessment SubcommitteeStatus Report
RELIABILITY | ACCOUNTABILITY2
Reliability Assessment SubcommitteeOutline
• 2017 Summer Reliability Assessment • 2017 Long Term Reliability Assessment• 2016 Probabilistic Assessment• Probabilistic Assessment Working Group• April Meeting Overview
RELIABILITY | ACCOUNTABILITY3
Reliability Assessment Subcommittee2017 Summer Reliability Assessment
RELIABILITY | ACCOUNTABILITY4
Reliability Assessment Subcommittee2017 Long-Term Reliability Assessment
Date DeliverableWednesday, January 25 2017 LTRA Materials Posted; Request Letter Sent to Regional Executives
Tuesday, April 11 –Wednesday, April 12
RAS Meeting: ERS, methods and assumptions presentations; resolve any issues with data collection and narrative responses; NERC to discuss process to transfer narrative responses to consistent assessment area section structures (template will be presented)
Friday, June 9 Data and Narratives Due to NERC
Friday, June 16 – Friday, June 30 RAS Peer Review
Friday, July 21 Data correction and final narrative responses due to NERC
Monday, August 14 – Friday, August 25
RAS Review of Draft Report
Friday, September 22 – Friday, October 6
PC/MRC/ERO Review of Draft Report
Tuesday, October 10 – Friday, October 13
NERC responds to PC/MRC/ERO Feedback
Monday, October 16 NERC sends updated report to the PC and hosts Webinar to present updates made
Monday, October 16 – Friday, October 20
PC Electronic Vote for report approval
Thursday, December 14 Target Release
RELIABILITY | ACCOUNTABILITY5
Reliability Assessment Subcommittee2016 Probabilistic Assessment
• Addendum to the 2016 LTRA• Third NERC Probabilistic Assessment• Key Findings and Recommendations• Link to Regions and Assessment Areas’
Assessment Reports
RELIABILITY | ACCOUNTABILITY6
Reliability Assessment SubcommitteeProbabilistic Assessment Working Group
• Continue the efforts of the PAITF Focus on Resource Adequacy Assessment
• Reports to the Reliability Assessment Subcommittee• Kickoff Meeting February 9th • Next Meeting - March 21st -22nd Finalize Workplan
RELIABILITY | ACCOUNTABILITY7
Reliability Assessment SubcommitteeApril Meeting Overview
Summary• 2017 Long-Term Reliability Assessment (LTRA) Data Definition
and Collection
LTRA Informational Webinars
• Review 2017 Summer Reliability Assessment• Review Single Point of Disruption Short-Term Special
Assessment
RELIABILITY | ACCOUNTABILITY8
Reliability Assessment SubcommitteeApril Meeting Overview
Summary (continued)• Reliability Assessment Guidebook Update• Approve Probabilistic Assessment Working Group Work Plan• Special Assessment Topics Identification of emerging reliability issues
RELIABILITY | ACCOUNTABILITY9
Probabilistic Assessment Working Group (PAWG) –Updates
Noha Abdel-Karim, PhD., Senior Engineer, Reliability AssessmentNERCPlanning Committee MeetingMarch 7-8, 2017
RELIABILITY | ACCOUNTABILITY2
Introduction & Background
• Purpose: Advance the work initiated by the GTRPMTF and
the PAITF. Evaluate more probabilistic approaches that will
provide further insights into resource adequacy assessment.
• Objectives: Conduct biennial NERC Core ProbA. Support NERC coordinated Special ProbA reports. Coordinate and promote alignment of
assessments. conducted by NERC, the Regions, and the industry at large.
• PAWG Scope of Work document approved by PC in December, 2016 meeting.
Visit link to access approved PAWG’s SOW document.
RELIABILITY | ACCOUNTABILITY3
• Membership and Leadership Positions Chair and Vice Chair nominated - awaiting PC
approval PAWG members (including alternates) cover
the entire North American footprint. More spots are open for subject matter
experts in the area of probabilistic analysis.
Updates –Members
RELIABILITY | ACCOUNTABILITY4
Updates –Draft Work Plan
• Five key work plan items: Technical Reference on reliability measures for resource adequacy assessment. Probabilistic sections of the LTRA. 2016 Core ProbA. Natural gas availability and pipeline outages special assessment. Data collection approaches and recommendation report.
• Additional items and assessment topics: Support ramping and frequency capability studies – Coordination with ERSWG as
needed. External coordination with related groups like IEEE-LOLEWG for information sharing
and exchanging knowledge.
Visit link to access PAWG’s draft work plan document.
RELIABILITY | ACCOUNTABILITY5
• Approve leadership nominations ( provided that names are available for the March meeting, else put action item on hold)
• Provide support to work plan draft –comments are encouraged but not mandatory at this time.
Request Actions by the PC
RELIABILITY | ACCOUNTABILITY6
Noha Abdel-Karim, PhD.Senior Engineer, Reliability Assessment202-644-8081 office | 202-480-6261 [email protected]
2016 Probabilistic Assessment
Noha Abdel-Karim, PhD., NERC Senior Engineer, Reliability Assessment NERC Planning Committee MeetingMarch 7-8, 2017
RELIABILITY | ACCOUNTABILITY2
Background
• Probabilistic Assessments 2011 Pilot Assessmento Complement 2010 LTRAo Study years: 2011 & 2014
2012 ProbA –First Reporto Complement 2011 LTRAo Study years: 2014 & 2016
2014 ProbAo Complement 2013 LTRAo Study years: 2016 & 2018
2016 ProbAo Complement 2015 LTRAo Study years: 2018 & 2020
RELIABILITY | ACCOUNTABILITY3
2016 ProbA –Introduction
• Purpose: Offers a different approach for examining the complexity of the changing
BPS.
• Main Objectives: Calculate a complete and non-overlapping set of monthly and annual
probabilistic reliability metrics. Perform a resource adequacy assessment covering all hours (compared to
only the peak demand hour of each season in the LTRA). Provide LOLH and EUE measures, and convey a clear understanding of the
reserve margin implications. Compare results over time and between studies. Calculate probabilistic reliability metrics under a sensitivity case with
increased in load growth.
RELIABILITY | ACCOUNTABILITY4
2016 ProbA –Implementation
• Monthly Reporting of Reliability Statistics Monthly LOLH and EUE reliability statistics were added to further
emphasize the objective of looking at reliability at all times of the year and not only seasonal peaks.
• Sensitivity Case A 2% increase of energy in both 2018 and 2020. Peak demand was increased by 2% in 2018 and by 4% in 2020. This sensitivity is generally interpreted as the effect of an increase in load
growth but could also provide insight related to additional resource retirements.
RELIABILITY | ACCOUNTABILITY5
Area Summary Graphic Example
MRO-Manitoba HydroBase Case Reserve Margins (Left) and Probabilistic Measures (Right)
LOLH Results (Left) and EUE Results (Right)
RELIABILITY | ACCOUNTABILITY6
Area Summary Graphic Example
MRO-Manitoba Hydro
Month
2018 Base 2020 Base 2018 Sensitivity 2020 Sensitivity
LOLH (hrs./month) EUE (MWh/month) LOLH (hrs./month)EUE
(MWh/month)LOLH (hrs./month) EUE (MWh/month) LOLH (hrs./month) EUE (MWh/month)
Jan0.008 19 0.000 0 0.017 44 0.000 0
Feb0.004 8 0.000 0 0.014 29 0.000 1
Mar0.024 20 0.000 0 0.041 42 0.028 42
Apr0.000 0 0.000 0 0.001 1 0.000 0
May0.000 0 0.000 0 0.000 0 0.000 0
Jun0.000 0 0.000 0 0.000 0 0.000 0
Jul0.000 0 0.000 0 0.000 0 0.000 0
Aug0.000 0 0.000 0 0.000 0 0.000 0
Sep0.000 0 0.000 0 0.000 0 0.000 0
Oct0.000 0 0.000 0 0.000 0 0.000 0
Nov0.027 44 0.000 0 0.157 218 0.002 4
Dec0.016 27 0.000 0 0.031 55 0.000 0
Annual0.078 117 0.000 0 0.261 390 0.030 47
RELIABILITY | ACCOUNTABILITY7
Main Key Findings
• High reserve margins in most areas resulted in no loss of load probability in either the base or sensitivity case.
• Assessment Areas’ boundary changes can cause challenges in measuring changes from year to year and study to study.
• Monthly LOLH and EUE statistics were reported for the first time this year. Recommendation –Determining the precise reasons for monthly patterns is useful
for resource planning and future probabilistic resource adequacy analysis. • Modeling variable energy resources continue to become enhanced as they
become a larger portion of the generating mix. Recommendation –Probabilistic approaches should be used to represent the
stochastic behavior of wind and solar as these resources increase penetration. • Peer review for the probabilistic assessment analysis is largely methodology-
based. Recommendation –Critical methodology review is needed as probabilistic
approaches introduce increased complexity and relatively new assumptions.
RELIABILITY | ACCOUNTABILITY8
Approve 2016 Probabilistic Assessment
Request Actions by the PC
RELIABILITY | ACCOUNTABILITY9
Noha Abdel-Karim, PhD.Senior Engineer, Reliability Assessment202-644-8081 office | 202-480-6261 [email protected]
PAS Update
Paul Kure, Chair, NERC Performance Analysis Subcommittee NERC Planning Committee MeetingMarch 7-8, 2017
RELIABILITY | ACCOUNTABILITY2
PAS update• PAS and working group scope documents – for approval• M-10 Transmission Constraints – approval for retirement
PAS Update
RELIABILITY | ACCOUNTABILITY3
• PAS, GADSWG, TADSWG, AND DADSWG scope documents approved in 2011, 2011, 2009, & 2013, respectively
• Changes were clean up or consistency changes Removed phased-in activities Some activities were combined Membership changes to eliminate duplicates; reflect current status TADSWG to operate by consensus
• Removed changes inconsistent with PC charter as noted at December PC meeting
Scope changes today are for approval by the PC
Updated Scope Documents
RELIABILITY | ACCOUNTABILITY4
Metrics Review
Reliability Metric M-10: Transmission Constraints
• Thought was that transmission constraints are a relative indicator of transmission robustness and a lack of transmission reinforcement would increase the number of mitigation plans for constraints
• Used the number of mitigation plans (SPS/RAS; operating procedures) as indicator of robustness (lack of constraints) on the transmission system
• PAS began a discussion during 2016 SoR on whether there was a correlation with the number of mitigation plans and transmission robustness
RELIABILITY | ACCOUNTABILITY5
Metrics Review
Reliability Metric M-10:Transmission Constraints
• Data correlating mitigation plans to transmission system has been inconclusive
• There will be no gaps in metrics measuring transmission reliability. Six of the remaining metrics address transmission system
PAS recommends retiring M-10 (Transmission Constraints): requests PC approval
RELIABILITY | ACCOUNTABILITY6
Open Distribution
NATF Update for NERC PC MeetingKen Keels
NATF Director, Practices and [email protected]; 704-945-1950
Open DistributionCopyright © 2017 North American Transmission Forum. Not for sale or commercial use. All rights reserved.
March 2017
Open Distribution
Topics
• Modeling and planning activities underway at NATF• NATF Publications Available for Open Distribution• Preview of June 2017 joint NATF-NERC Modeling Workshop• System protection activities underway at NATF
2
Open Distribution
Modeling and Planning Activities Underway at NATF
• EMS External Model Reference Document – Public: Spring 2017
• MOD-033 Reference Document– Public: Spring 2017 – File with NERC for Compliance Implementation Guidance approval
• CIP-014-2 Reference Document– Updating CIP-014-1 Reference document– Public: Spring 2017 – File with NERC for Compliance Implementation Guidance approval
• Actively following work of NERC Distributed Energy Resources Task Force
3
Open Distribution
NATF Publications Available for Open Distribution
Available on www.natf.net
NERC-endorsed Compliance Implementation Guidance
Submitted for endorsement as Compliance Implementation Guidance
4
Open Distribution
MOD-033 Reference Document
TABLE OF CONTENTSPurposeTopic 1: IntroductionTopic 2: Scope of MOD-033-1 Data ValidationsTopic 3: Approaches to R1.1 Steady State Model Validation Topic 4: Approach to the R1.2 Dynamic Model Validation Process Topic 5: R1.3: Guidelines to determine unacceptable differences Topic 6: R1.4: Guidelines to resolve unacceptable differences Appendix
Open Distribution 6
• When: June 20-21• Where: Exelon/ComEd in Oak Brook, Illinois (Chicago)• Planned topics
– Dynamic Load Modeling– Power Plant Modeling – Model validation and MOD-033 – Integrating Renewables at the Transmission Level – Modeling DER (renewables at the distribution level)– Catch all session: NERC/FERC update, NERC modeling updates,
Emerging modeling issues
Joint NATF-NERC Modeling Workshop
Open Distribution
System Protection Activities Underway at NATF
7
• Development of Forum Practices and Superior Practices– Short Circuit Modeling Practices– Protection System Maintenance Program (PSMP)
Template– System Protection Coordination Practices– Power Line Carrier Application and Maintenance
Practices– Protection Systems - Automated Testing Practices– DC Trip Circuit Design & Testing Practices
Open Distribution
System Protection Activities Underway at NATF
8
• System Protection Performance and Misoperations Analysis– Measure Definition File – Dependability vs Security– Identify practices and training for development to address key risk areas
• Training Webinars– Directional elements settings practices– Directional comparison blocking setting practices– Breaker failure design and settings (coming soon)– Source impedance ratio effects on protection (coming soon)
Open Distribution
Questions?
9
FERC Order No. 830 Progress UpdateGeomagnetic Disturbance Mitigation and Research Plan
Ken Donohoo, GMDTF ChairNERC Planning Committee Meeting March 7-8, 2017
RELIABILITY | ACCOUNTABILITY2
• Federal Energy Regulatory Commission (FERC) Order initiates further actions to address geomagnetic disturbances (GMD) Implementation of GMD Vulnerability Assessments (TPL-007-1) Revisions to TPL-007-1 Additional research Data collection
• GMD research work plan due to FERC by May 29, 2017
Order No. 830
RELIABILITY | ACCOUNTABILITY3
• Order No. 830 directs NERC to revise TPL-007 to address Commission concerns Modify the benchmark GMD event definition used for GMD assessments Require entities to collect GMD data Establish deadlines for Corrective Action Plans (CAPs) and mitigating
actions to address identified GMD impacts
• Revisions must be filed by May 2018
Revisions to TPL-007
RELIABILITY | ACCOUNTABILITY4
• NERC is seeking input on the research plan through: GMD Task Force Technical committees Research organizations
• GMDTF meeting held on February 21 – 22, 2017 Received input to research plan from task force
• EPRI and NERC will have the final plan ready mid of March 2017• Will need an off-cycle webinar to review the final plan with PC• Task 6 of research plan (Section 1600 data request goals) PC to approve data request for 45 day industry comment at June 2017 PC
meeting, approve at September 2017 PC meeting PC to submit data request to NERC Board of Trustees in Q4 2017 for final
approval (depending on comments received)
Next Steps
RELIABILITY | ACCOUNTABILITY5
Preliminary Research Plan Proposal
File research plan with FERC
May 29, 2017
Task 1:Spatial
Averaging
Task 2,3:Latitude Scaling /Improve Earth
Conductivity Models
Task 8:Improve
Harmonics Analysis
Research Plan Begins:
Planning and Project
Management
Task 7:Geoelectric Field Calculation Tool
Task 4,5:Transformer
Thermal Impact
December 2017
December 2019
December2020
December 2018
June2017
RELIABILITY | ACCOUNTABILITY6
System Analysis and Modeling Subcommittee (SAMS) UpdateMichael R. LombardiChair, System Analysis and Modeling SubcommitteeNERC Planning Committee MeetingMarch 7-8, 2017
RELIABILITY | ACCOUNTABILITY2
SAMS Update March 2017 PC Meeting
SAMS Informational Items:• NERC-NATF Modeling Workshop• Approved Model List
RELIABILITY | ACCOUNTABILITY3
NERC-NATF Modeling Workshop
NERC-NATF Technical Conference on Power System Modeling• Industry Experts• NERC Technical Committees• NATF Modeling Practices Group
Focus on Modeling and System Analysis Topics, including:• Dynamic load modeling• Power plant modeling• Power plant and system model verification• Integration of renewable energy resources at the transmission level• Modeling distributed energy resources at the distribution level• Efforts to improve interconnection-wide models
RELIABILITY | ACCOUNTABILITY4
NERC-NATF Modeling Workshop
Workshop Date and Times:• June 20, 2017 -- 8:00 a.m. – 5:00 p.m. Central Time• June 21, 2017 -- 8:00 a.m. – 12:00 p.m. Central Time
Location:Exelon/ComEd – Commercial Center1919 Swift RoadOak Brook, IL 60523
Conference Registration:• https://www.eventbrite.com/e/technical-conference-power-system-
modeling-registration-32330299797
RELIABILITY | ACCOUNTABILITY5
Development and Issuance of an Approved Model List
NERC Standardized Component Model Manual• Library of component models vetted by the industry for use in
Interconnection-wide models• Some Models Annotated:
deprecated model; use of this model is not recommended interim model; replacement recommended
• Modeling Working Group (MWG) posted 3/2/16
RELIABILITY | ACCOUNTABILITY6
Development and Issuance of an Approved Model List
Next Steps:• Update and refine NERC Standardized Component Model Manual• NERC Approved Power Flow and Dynamics Model List• Maintain and document for industry list of ‘approved models’ for power
flow and dynamics Align with Model Notifications Capture Industry Advancements
• Coordination with the MOD-032 Designees to enforce the approved model list in their case creation development, as applicable
RELIABILITY | ACCOUNTABILITY7
PCPMTF REPORT
Mohamed Osman, P.E., Senior Engineer of System AnalysisNERC – Planning Committee MeetingMarch 7-8, 2017
RELIABILITY | ACCOUNTABILITY2
PCPMTF Background
PCPMTF: Plant-Level Controls and Protection Modeling Task Force:• Studying effects of plant-level, turbine, and boiler control and protection
systems• Comprehensive look at the short- and mid-term post-disturbance behavior of
plant control and protection systems• Outlining impacts plant control and protection systems have on unit reliability
and system stability during grid disturbances
PCPMTF Stakeholders:• Turbine Manufacturers; Generators Owners/Operators; North American
Generator Forum (NAGF); experts in power system dynamics and control; stability simulation software vendors
RELIABILITY | ACCOUNTABILITY3
Events Investigated to Quantify Effects of Boiler and Turbine Controllers
RELIABILITY | ACCOUNTABILITY4
What is the issue?
If we look at the generator tripping events that the TF haslooked at and could not be duplicated by models, most occurredbecause of either:
• Equipment failure
• Expected protection action (correct action)
• Protection action that was not properly coordinated
• Complex dynamics of combustion/boiler systems
RELIABILITY | ACCOUNTABILITY5
Generator Protection
• Loss of field• Overexcitation protection• Overvoltage protection• Undervoltage protection• V/Hz protection• Over/Under-Frequency protection• Power/Load Unbalance (for STs)• Reverse Power relays• Many others (e.g. Neg. Sequence, Phase Differential Current, etc.) which
cannot be modeled in positive sequence simulation tools
RELIABILITY | ACCOUNTABILITY6
Considerations for Quantities
• It is not practical or necessary to model the entire set of turbine or boiler controls
• Task Force focused on defining the functions and behaviors that should be modeled for transient and mid-term dynamics
• Variables to be monitored in simulation tools:
• Protection systems and Limiters:
RELIABILITY | ACCOUNTABILITY7
Models with Representation of Plant-level DCS Controls
Turbine Load Controllers:• GGOV1• GGOV3• LCFB1
Turbine Control Modes: ability to represent boiler dynamics• ccbt1 & ccbt3 (PSLF)• TGOV4 & TGOV5 (PSS/E)
Power-Load Unbalance: ability to model fast valving scheme• TGOV3 and TGOV5 (PSS/E)
RELIABILITY | ACCOUNTABILITY8
Generator Protection
• WECC has for years used simple models in GE PSLFTM called gp1/gp2 thatmodel many of these functions generically – WECC uses these only tomonitor the behavior in simulations, not to trip units
• This can be a good starting point, with the next steps being to: Update those models Double check to ensure they are applying reasonable default
settings/assumptions Add missing features (e.g. V/Hz, Power/Load unbalance, etc.)
RELIABILITY | ACCOUNTABILITY9
Available Models
Existing turbine-governor models (see IEEE PES- TR1 report [1])allow for reasonable modeling of:
• Unit ramp rates in power
• Deadband
• Outer-loop MW controllers
• Baseload
• Temperature limit of GTs
The new IEEE Std 421.5 will have documented OEL, UEL andstator current limiter models
RELIABILITY | ACCOUNTABILITY10
Task Force Recommendations
• Adopt a model similar to gp1 (and gp2) in GE PSLFTM that can monitor and provide warnings of potential unit tripping due to the generator encroaching on possible trip-zones of protection systems.
• Inclusion of Volt/Hz, over excitation limiter, under excitation limiter and reverse power dynamic models in future year planning cases.
• NERC SPCS should look closely at the reliability impacts of plant-level controls and protection on applicable NERC Reliability Standards.
RELIABILITY | ACCOUNTABILITY11
References
[1] IEEE Task Force on Turbine-Governor Modeling, DynamicModels for Turbine-Governors in Power System Studies, IEEETechnical Report PES-TR1, January 2013.
RELIABILITY | ACCOUNTABILITY12